4289508_CDRL1_REPORT.pdf

PDF 98 KB Posted

Attached to
SEAL, AlR, AIRCRAFT G
Solicitation number
FA8121-26-R-0014
Issued by

About this file

This is a Contract Data Requirements List (DD Form 1423-1) specifying two data items required under Contract No. FD20302600280 for the F100 aircraft component (P/N 4081980), an air seal (NSN: 2840-01-602-8421NZ), issued by AFLCMC/LPSAA.

Data Item A001 - First Article Qualification Test Plan and Procedures must be submitted 30 calendar days from contract date. The contractor must provide a comprehensive plan ensuring all drawing requirements are met on each first article, including: (a) a detailed list of all drawing dimensions, tolerances, and equipment used to verify each dimension with correlated actual drawings; (b) a plan to verify all non-destructive inspections are met; (c) a plan to verify all visual inspection requirements; (d) a plan to verify material properties including mechanical, metallurgical, and chemical composition; (e) a plan to verify all significant manufacturing processes are performed by OEM (P&W) or CEA (AFLCMC/LPSAA) approved/certified sources; and (f) a plan to verify forging or casting sources are approved/certified by OEM or CEA if applicable. Guidelines are contained in LPF-QAR-003. Government coordination is required before submission.

Data Item A002 - Test/Inspection Report must be received 120 calendar days from government approval of the test plan at OC-ALC/ENRS. The report must satisfy all requirements in the approved test plan and demonstrate compliance with all drawing requirements, dimensions, visual inspections, non-destructive inspections, manufacturing processes, and material requirements. The contractor must provide a copy of part process sheets and indicate that sources used for significant manufacturing processes are approved/certified by P&W or AFLCMC/LPSAA. Any QAR findings must be included with the final report submitted to AFLCMC/LZPED. Both deliverables must be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format and are approved for public release with unlimited distribution.

View the file

Other files

File Type Posted
FA8121-26-R-0014 0001.pdf PDF
FA8121-26-R-0014.pdf PDF
First_Article_Test_Plans.pdf PDF
First_Article_Qualification.pdf PDF
4340110_TRNSPDATA_REPORT.pdf PDF
4337978_PKGRQMT_REPORT.pdf PDF
Test_Inspection_Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100 P/N 4081980

E. CONTRACT / PR NO.

FD20302600280

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

First Article Qualification Test Plan and Procedures

3. SUBTITLE

NSN: 2840-01-602-8421NZ Noun: Seal, Air, Aircraft G

4. AUTHORITY

DI-NDTI-81307A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPSAA

7. DD 250 REQ

SD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Litchfield, Kenzi JNAME: 20 NOV 2025DATE:

Block 9: DIST STATEMENT REQUIRED: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 848 SCMG/421 GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Block 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor must provide a plan to ensure that all drawing requirements are met on each first article. The plan should include the equipment and facilities utilized to verify all drawing requirements. As a minimum, the following information is required.

a. A list of all drawing dimension, tolerances and the equipment utilized to verify each dimension. An actual drawing should be submitted to correlate with the dimension list.

b. A plan to verify that all non-destructive inspections are met.

c. A plan to verify that all visual inspection requirements are met.

d. A plan to verify material properties to include mechanical properties, metallurgical properties and chemical compositions.

e. A plan to verify that all significant manufacturing processes are performed by sources that are currently approved/ certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

f. A plan to verify that all forging or casting sources are currently approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA) if applicable. Guidelines for first article test plans are contained within LPF-QAR-003, attached.

A government representative must coordinate on the first article test plan. The first article test plan shall be received 30 calendar days from the date of contract.

Contractor will include any QAR findings relative to the test report with the final test report submitted to

AFLCMC/LZPED.

COORDINATORS:

AFLCMC/LZPED

3001 Staff Dr, Ste 1AF1 105A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

0 2 015. TOTAL

G. PREPARED BY

Litchfield, Kenzi J

421 SCMS / GUMAC

405-582-1884

H. DATE

20 NOV 2025

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Shelley, Eric C

AFLCMC / LPSBE 405-734-0001 / 884-0001

J. DATE

20-NOV-25

Page 1 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 13 Mar 2026

PREVIOUS EDITION MAY BE USED.

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100 P/N 4081980

E. CONTRACT / PR NO.

FD20302600280

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

NSN: 2840-01-602-8421NZ Noun: Seal, Air, Aircraft G

4. AUTHORITY

DI-NDTI-80809B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPSAA

7. DD 250 REQ

SD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Litchfield, Kenzi JNAME: 20 NOV 2025DATE:

Block 9: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 848

SCMG/421 GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Block 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

The first article test report shall satisfy all requirements in the first article test plan. All drawing requirements must be satisfied including dimensions, visual inspections, non-destructive inspections (NDIs), manufacturing processes and material requirements. The test report shall indicate that any sources used to perform significant manufacturing processes are approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

A copy of the part process sheets shall be provided also. A government representative must coordinate on the test report.

Guidelines for the test reports are contained within LPF-QAR-003 Rev E, attached.

The first article test reports shall be received at OC-ALC/ENRS 120 calendar days from the date of government approval of test plan.

Contractor will include any QAR findings relative to the test report with the final test report submitted to

AFLCMC/LZPED.

COORDINATORS:

AFLCMC/LZPED

3001 Staff Dr, Ste 1AF1 105A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

0 2 015. TOTAL

G. PREPARED BY

Litchfield, Kenzi J

421 SCMS / GUMAC

405-582-1884

H. DATE

20 NOV 2025

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Shelley, Eric C

AFLCMC / LPSBE 405-734-0001 / 884-0001

J. DATE

20-NOV-25

Page 2 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 13 Mar 2026

PREVIOUS EDITION MAY BE USED.

File details come from the government source that posted it. Updated .