4237408_ATTACH.pdf
PDF 157 KB Posted
- Attached to
- AIRCRAFT DOOR
- Solicitation number
- SPRTA1-25-R-0497
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Data Item Description (DID) for a Production Surge Plan, with the identification number DI-MGMT-80969. The document outlines a contractor's requirements for developing a plan that demonstrates the ability to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment or subsequent emergency war powers scenario.
Key details include specific requirements for the Production Surge Plan, which must include: a maximum sustainable production rate building schedule, two comprehensive lists of subcontracted and non-subcontracted items/components (detailing nomenclature, part numbers, leadtime, and critical/pacing items), a list of government contracts being performed at the contractor's facility, impact analysis on other contracts' performance, identification of additional skilled labor requirements, strategic material/equipment lists, and production equipment details. The plan must demonstrate the ability to increase production rate, reduce leadtime by at least 10 percent, and provide flexibility for surge production capabilities. The document is marked for public release with unlimited distribution and supersedes a previous version (DI-P-1634A).
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .