4237408_ATTACH.pdf

PDF 157 KB Posted

Attached to
AIRCRAFT DOOR
Solicitation number
SPRTA1-25-R-0497
Issued by

About this file

This is a Data Item Description (DID) for a Production Surge Plan, with the identification number DI-MGMT-80969. The document outlines a contractor's requirements for developing a plan that demonstrates the ability to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment or subsequent emergency war powers scenario.

Key details include specific requirements for the Production Surge Plan, which must include: a maximum sustainable production rate building schedule, two comprehensive lists of subcontracted and non-subcontracted items/components (detailing nomenclature, part numbers, leadtime, and critical/pacing items), a list of government contracts being performed at the contractor's facility, impact analysis on other contracts' performance, identification of additional skilled labor requirements, strategic material/equipment lists, and production equipment details. The plan must demonstrate the ability to increase production rate, reduce leadtime by at least 10 percent, and provide flexibility for surge production capabilities. The document is marked for public release with unlimited distribution and supersedes a previous version (DI-P-1634A).

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .