42240025 RANGE ROAD REPAVING (2024)_DWGS.pdf
PDF 3 MB Posted
- Attached to
- Range Road Repaving
- Solicitation number
- 6100061096
- Issued by
- Lebanon County, Pennsylvania
About this file
This document is a set of design plans and related specifications for the Range Road Repaving Phase 2 project located in East Hanover and Union Townships, Lebanon County, Pennsylvania. The work generally consists of full-depth removal and repaving of approximately 140,000 square feet of Range Road, replacement of two 42-inch culvert pipes with HDPE, and other ancillary civil site work. A mandatory pre-bid conference is scheduled for May 14, 2024, and bids are due on June 6, 2024. The project will be awarded through a low-bid procurement process by the Pennsylvania Department of Military and Veterans Affairs.
The project includes Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 6% and 3% respectively. Bidders must either meet these goals or demonstrate good faith efforts. The project is funded through state sources, and the contract term is unknown but may include renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice to Bidders.docx | DOCX document | |
| Attachment_03_FTIG_Traffic_Route.pdf | ||
| BID DOCS TO BE RETURNED WITH BID SUBMISSION.pdf | ||
| Instructions to Bidders 2023 DMVA.doc | DOC document | |
| 42240025 RFI questions RESPONSES.pdf | ||
| Pre-bid sign-in.pdf | ||
| 42240025_RANGE ROAD REPAVING (2024)_SPECS.pdf | ||
| Administrative Procedures 2023 DMVA.docx | DOCX document | |
| FTIG Map 2017.pdf | ||
| General Conditions to the Construction Contract DMVA 2023 v4.docx | DOCX document | |
| Wage Rates.pdf | ||
| Addendum #1.docx | DOCX document | |
| Addendum #2.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STA 62+00 to 105+50
SHEET C.1.1
STA 0+00 TO 43+00
SHEET C.1.0
STA 10
5+ to
4+
SHEET C.1.
N.I.C.
N
JOSH SHAPIRO, GOVERNOR
MAJOR GENERAL MARK J. SHINDLER, THE ADJUTANT GENERAL
PROJECT
SITE
ArmstrongButler
Clarion
Venango Mercer
Lawrence
Crawford
Erie
Warren
Forest
McKean
Elk
Jefferson
Clearfield
Cameron
Potter
Centre
Clinton
Beaver
Allegheny
Washington
Greene Fayette
Westmoreland
Indiana
Somerset
Cambria
Bedford
Blair
Huntingdon
Fulton Franklin
Tioga Bradford Susquehanna Wayne
Pike
Lacka- Wyoming
Luzerne
Sullivan
Lycoming
Mifflin
Snyder
Union
Northum-tour Columbia
Schuylkill
Carbon
Monroe
North-
Lehigh
Bucks
Montgomery
Philadelphia
Delaware
Juniata
Perry
Cumberland
Adams York
Lancaster
Lebanon Dauphin Berks
Chester wanna
Mon-amptonberland
NO SCALE
PROJECT NO.: 42240025
RANGE ROAD REPAVING
PHASE 2
EAST HANOVER & UNION TWPS., LEBANON COUNTY, PENNSYLVANIA
COMMONWEALTH OF PENNSYLVANIA
DEPARTMENT OF MILITARY AND VETERANS' AFFAIRS
ANNVILLE, PENNSYLVANIA
PROJECT LOCATION MAP
VICINITY MAP
INDEX TO DRAWINGS
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILBING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
CAMPUS / KEY PLAN
REVISIONS
DESCRIPTION DATENO.
G.1.1 COVER SHEET
G.1.2 KEY PLAN & NOTES
GENERAL CONSTRUCTION
CIVIL DWGS.
C.1.0 STA 0+00 TO 43+00
C.1.1 STA 43+00 TO 105+50
C.1.2 STA 105+50 TO 124+00 AND DETAILS
Professional's Signature DateProfessional's Signature Date
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY & VETERANS' AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
PROJECT NO.:
G.1.1
05 APR, 24
AS NOTEDK.E.L
D.A.S
COVER SHEET
LEBANON COUNTY, PENNSYLVANIA
EAST HANOVER & UNION TWPS.
PHASE 2
RANGE ROAD REPAVING
42240025
PROJECT
SITE
PROJECT
SITE
PROJECT
SITE
PROJECT
SITE
AutoCAD SHX Text
CENTRAL
AutoCAD SHX Text
WASH
AutoCAD SHX Text
LOGAN ROAD
AutoCAD SHX Text
AutoCAD SHX Text
HEMLOCK STREET
AutoCAD SHX Text
DOGWOOD STREET
AutoCAD SHX Text
LOOP ST
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
HOWITZER
AutoCAD SHX Text
ARTILLERY
AutoCAD SHX Text
FRANKFORD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
RANGE
AutoCAD SHX Text
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PA ARMY NATIONAL GUARD
AutoCAD SHX Text
HELIPORT
AutoCAD SHX Text
RANGE
AutoCAD SHX Text
EASTERN ARNG AVIATION
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
AutoCAD SHX Text
TRAINING SITE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AIRCREW DORMITORY
AutoCAD SHX Text
UH-1 SIMULATOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DINING FAC
AutoCAD SHX Text
AH-1 SIMULATOR
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
REACTION
AutoCAD SHX Text
LEADERS
AutoCAD SHX Text
COURSE
AutoCAD SHX Text
AVIATION BDE
AutoCAD SHX Text
ARMORY
AutoCAD SHX Text
TANK TRAIL
AutoCAD SHX Text
AutoCAD SHX Text
RANGE
AutoCAD SHX Text
JOHNSON TRAIL
AutoCAD SHX Text
AutoCAD SHX Text
FACILITY
AutoCAD SHX Text
TRAINING
AutoCAD SHX Text
POL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RANGE 8-Q
AutoCAD SHX Text 8-Q
AutoCAD SHX Text
UTILITY ROAD
PENNDOT STANDARD GUIDE RAIL
TREE
BENCHMARK
447.75
[450]
CONCRETE HATCH
FIRE HAYDRANT
UTILITY POLE
FLOW ARROW
BENCHMARK ELEVATION
SPOT ELEVATION
MANHOLE
WATER VALVE
ELECTRIC - UNDERGROUND
WATER LINE
SANITARY SEWER
SITE / CIVIL LEGEND
POLE MOUNTED AREA LIGHTING
FENCELINE
COMMUNICATION - UNDERGROUND
NATURAL GAS
WATERLINE CURB STOP
STORM SEWER
STORM INLET
ELECTRIC - OVERHEAD
YCO SANITARY YARD CLEAN OUT
T ELECTRICAL TRANSFORMER W/ VAULT
G GENERATOR
BENCHMARK
447.75
YCO
T
G
EXISTING PROPOSED
CONTOUR LINE
CC COMMUNICATIONS MANHOLE
E ELECTRIC PULL-BOX
BOLLARD
MH-SAN (EXG)
RIM = XXX.XX'
INV = XXX.XX'
MH-SAN (NEW)
RIM = XXX.XX'
INV = XXX.XX'
GAS VALVEG G
IRON PIN FOUND
IRON PIN SET (TO BE SET)
CONCRETE MONUMENT FOUND
CONCRETE MONUMENT SET
STONE PILE
BERNSTEIN MONUMENT
STA 62+00 to 105+50
SHEET C.1.1
STA 0+00 TO 43+00
SHEET C.1.0
STA 10
5+ to
4+
SHEET C.1.
N.I.C.
N
1-800-242-1776
1. THE CONTRACTOR IS REQUIRED TO SUBMIT A REQUEST FOR A
DIGGING PERMIT, THROUGH THE DIVISION OF INSTALLATION MANAGEMENT (DIM) 717-861-6224 10 DAYS PRIOR TO
STARTING EXCAVATION.
2. THE CONTRACTOR WILL PROVIDE 3 DAY NOTICE PRIOR TO ALL
UTILITY CONNECTIONS. THE CONTRACTOR WILL NOTIFY DIM
UPON COMPLETION OF THE CONNECTIONS, BUT PRIOR TO BACKFILLING.
THE CONTRACTOR/UNIT WILL NOT BACKFILL ANY UTILITY CONNECTIONS UNTIL A REPRESENTATIVE FROM DIM
INSPECTS AND APPROVES THE WORK.
3. THE DUMP SITE FOR MILLINGS AND REMOVED MATERIALS IS LOCATED AT JOHNSON TRAIL, 0.25 MILE SOUTH OF RANGE ROAD. THE DUMP SITE FOR CONCRETE MATERIALS IS MOLE MOUNTAIN LOCATED OUTSIDE OF THE
CANTONMENT (FENCED) AREA (LESS THAN 10 MILES).
4. DRAWING PREPARED FROM PLAN BY GANFLEC ARCHITECTS AND ENGINEERS AND BRINJAC ENGINEERING INC DATED 20 AUGUST 2002. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY EXISTING UTILITIES, GRADES AND
SURVEY/LAYOUT OF NEW ROAD CONSTRUCTION.
CONTRACTOR'S RESPONSIBILITIES
1.
2.
3.
4.
5.
6.
7.
CONTRACTOR SHALL IMPLEMENT THE EROSION AND SEDIMENT POLLUTION CONTROL FEATURES IN ACCORDANCE WITH
PA CHAPTER 102 REGULATIONS
ALL FACILITIES WILL BE INSPECTED AND REPAIRED, IF NECESSARY, AFTER EACH STORM EVENT OR AT A PERIOD NOT TO EXCEED ONE WEEK. SEDIMENT COLLECTED FROM THE EROSION CONTROL STRUCTURES WILL BE PLACED UPSTREAM OF THOSE
CONTROLS AND STABILIZED WITH GRAVEL OR RESEEDING.
AT NO TIME WILL SEDIMENT BE ALLOWED TO LEAVE THE SITE AND ENTER COMMONWEALTH WATERS.
ANY PERMANENTLY SEEDED AREAS THAT BECOME ERODED WILL HAVE THE TOPSOIL REPLACED, THE EROSION CONTROL MATTING
REPLACED (IF APPLICABLE), THE GRASS RESOWN AND MULCH REAPPLIED.
A COPY OF THIS PLAN MUST BE KEPT AVAILABLE FOR INSPECTION ON THE CONSTRUCTION SITE AT ALL TIMES THROUGHOUT
THE TERM OF THE PROJECT.
THE INTENT OF THIS PLAN/NARRATIVE IS TO INDICATE GENERAL MEANS OF COMPLIANCE WITH THE REQUIREMENTS OF THE RULES AND REGULATIONS OF CHAPTER 102, THE DEPARTMENT OF ENVIRONMENTAL PROTECTION (AS AUTHORIZED UNDER THE CLEAN STREAMS LAW). IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IMPLEMENT THESE METHODS, PLUS ADDITIONAL METHODS, AS MAY BE NECESSARY BECAUSE OF CONDITIONS CREATED BY LOCALIZED SITE CONDITIONS AND/OR CONSTRUCTION PROCEDURES IN ORDER TO ASSURE COMPLIANCE WITH APPLICABLE LAW. IT WILL FURTHER BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN ALL EROSION AND SEDIMENT CONTROL FACILITIES SO THAT THEY PERFORM AS REQUIRED BY
APPLICABLE LAW.
FINES AND RELATED COSTS RESULTING FROM THE CONTRACTOR'S FAILURE TO PROVIDE ADEQUATE PROTECTION AGAINST SOIL EROSION AND FOR ANY VIOLATIONS OF THE CLEAN STREAMS LAW AND THE RULES AND REGULATIONS PROMULGATED THEREUNDER
SHALL BE BORNE BY THE CONTRACTOR.
Permanent Seeding
Permanent seeding shall take place in all disturbed areas as follows:
Fertilization: The following shall be spread and worked into the topsoil to a depth of 3 to 4 inches.
Agricultural Lime - 275 pounds per 1,000 square feet Fertilizer - 25 pounds per 1,000 square feet
The fertilizer shall be a commercial type 10-20-20.
Note: If agricultural lime and fertilizer have been applied previously to the ground where the permanent seed is to be applied, the lime and fertilizer rates shall be reduced by the amount by what has been applied previously.
Permanent Seed Mixture: The following seed mixtures shall be applied as follows:
TEMPORARY SEEDING
PADOT Formula E - Annual Ryegrass (Lolium multiflorum) 88.2% PLS, 48 lbs/ac
Seeding dates Mar 15 to Oct 15
PERMANENT SEEDING
PADOT Formula B - Perennial ryegrass 88.2% PLS, 20 lbs/ac Creeping Red Fescue 83.3% PLS, 29 lbs/ac
Kentucky Bluegrass mix, 78.4% PLS, 53 lbs/ac
Seeding dates Mar 15 to Jun 1 and Aug 1 to Oct 15
PERMANENT SEEDING - STEEP SLOPES
PADOT Formula D - Tall fescue, 88.3% PLS, 73 lbs/ac Creeping red fescue, 88.3% PLS, 29 lbs/ac
(Ref. Penn State Agronomy Guide and PADOT Publication 408)
*All mixtures given above are for PLS - Pure Live Seed 100%.
STABILIZATION NOTES *All mixtures given above are for PLS - Pure Live Seed 100%.
To calculate PLS, the percentage of pure seed is multiplied by the percentage of germination, and the product is divided by
100. (85% pure seed x 72% germination) divided by 100 = 61% PLS. To determine how much seed to plant, divide the percentage into 100. Example: 100 divided by 61 = 1.63. Thus, every pound of seed mixture called for should then be 1.63 lbs.
Mulch: Apply mulch to all permanently seeded areas.
Materials: Straw, air-dried and free from undesirable seeds and course materials.
Application: 140 pounds per 1,000 square feet.
Final Stabilization and Maintenence
An area shall be considered to have achieved final stabilization when it has a minimum of 70% uniform perennial vegetative cover or other permanent non-vegetative cover with a density sufficient to resist accelerated surface erosion and subsurface characteristics sufficient to resist sliding or other movements.
Revegetation shall occur immediately after completion of the final grading. Should conditions prohibit permanent revegetation efforts, the area will be temporarily stabilized through the use of quick-growing grasses, nylon erosion control mats or similar measures. The Contractor shall be responsible for the permanent stabilization of all areas exposed or disturbed during the Project.
The contractor shall maintain all temporary erosion and sedimentation control facilities in good condition until establishment of ground cover over tributary areas. This will include cleaning and, if required, repair of any filter fabric fence which may become torn, and seeding of eroded areas, as necessary.
Permanent erosion control measures will not require maintenance other than lawn mowing.
Permanent erosion and sedimentation control measures will become the responsibility of the State Reservation Maintenance personnel upon completion of all aspects of the Project.
Plan Notes
1. Prior to starting construction, the contractor shall be responsible to make sure that all required permits and approvals have been obtained. No construction or fabrication shall begin until the contractor has received and thoroughly reviewed all plans and other documents approved by all of the permitting authorities.
2. All work shall be performed in accordance with these plans, specifications and the requirements and standards of the governing authority.
3. The contractor shall be responsible for removing and replacing all soft, yielding or unsuitable materials and replacing with suitable materials.
4. The locations of overhead and underground facilities shown on these plans are based on prior plans prepared by outside consultant. It shall be the contractors responsibility to contact DIM or the appropriate utility company. No compensation shall be paid to the contractor for damage and repair to these facilities caused by his work force. All utilities must be verified at the time of construction.
5. All dimensions and grades shown on these plans shall be field verified by the contractor prior to construction.
Contractor shall notify the construction manager if any discrepancies exist, prior to proceeding with construction for necessary plan or grade changes.
6. Contractor to verify all existing site conditions.
7. PADOT 408 Specifications and Publication 72M details apply.
MAINTENANCE & PROTECTION OF
TRAFFIC DURING CONSTRUCTION.
1.
2.
3.
ACCESS TO ADJOINING STREETS AND DRIVES MUST
BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
TEMPORARY LANE CLOSURES WILL BE ALLOWED DURING
WORKING HOURS ONLY AND SHALL BE LIMITED TO A SINGLE
LANE. AT NO TIME WILL TEMPORARY LANE CLOSURES BE
ALLOWED TO REMAIN OVERNIGHT WITHOUT THE EXPRESSED
WRITTEN CONSENT OF THE PENNSYLVANIA ARMY NATIONAL
GUARD. THE CONTRACTOR SHALL SUPPLY FLAGMEN TO
CONTROL TRAFFIC DURING ANY TEMPORARY SINGLE LANE
CLOSURE IN ACCORDANCE WITH PENNDOT PUBLICATION
203 FIGURE 10 C.
DROP-OFFS IN PAVEMENT SHALL NOT EXCEED 1 1/2" INCHES
FOR TRAVEL LANES AND ADJACENT TO TRAVEL LANES WITHOUT
TRAFFIC CONTROL BARRIER DEVICES.
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
REVISIONS
DESCRIPTION DATENO.
Professional's Signature Date
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY & VETERAN'S AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
PROJECT NO.:
CONTRACTOR SHALL FIELD VERIFY
ALL DIMENSIONS.
VARIANCE FROM CONTRACT
DOCUMENTS NOT PERMITTED
WITHOUT BUREAU OF ENGINEERING
AND ARCHITECTURE APPROVAL.
VERIFY SCALE
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING:
0 1
42240025
RANGE ROAD REPAVING
PHASE 2
EAST HANOVER & UNION TWPS.
LEBANON COUNTY, PENNSYLVANIA
KEY PLAN & NOTES
D.A.S 05 APR, 24
K.E.L AS NOTED
G.1.2
KEY MAP
SCALE: 1" = 500'
500' 250' 0' 500' 1000'SCALE IN FEET
LOCATION MAP
SCALE: 1" = 2,000'
PROJECT SITE
EROSION & SEDIMENT CONTROL NOTES GENERAL NOTES TRAFFIC CONTROL NOTES
AutoCAD SHX Text
CENTRAL
AutoCAD SHX Text
WASH
AutoCAD SHX Text
LOGAN ROAD
AutoCAD SHX Text
AutoCAD SHX Text
HEMLOCK STREET
AutoCAD SHX Text
DOGWOOD STREET
AutoCAD SHX Text
LOOP ST
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
HOWITZER
AutoCAD SHX Text
ROUTE 443
AutoCAD SHX Text
ARTILLERY
AutoCAD SHX Text
FRANKFORD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
RANGE
AutoCAD SHX Text
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PA ARMY NATIONAL GUARD
AutoCAD SHX Text
HELIPORT
AutoCAD SHX Text
RANGE
AutoCAD SHX Text
EASTERN ARNG AVIATION
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
AutoCAD SHX Text
TRAINING SITE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AIRCREW DORMITORY
AutoCAD SHX Text
UH-1 SIMULATOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DINING FAC
AutoCAD SHX Text
AH-1 SIMULATOR
AutoCAD SHX Text
STREET
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
REACTION
AutoCAD SHX Text
LEADERS
AutoCAD SHX Text
COURSE
AutoCAD SHX Text
AVIATION BDE
AutoCAD SHX Text
ARMORY
AutoCAD SHX Text
TANK TRAIL
AutoCAD SHX Text
AutoCAD SHX Text
RANGE
AutoCAD SHX Text
JOHNSON TRAIL
AutoCAD SHX Text
AutoCAD SHX Text
FACILITY
AutoCAD SHX Text
TRAINING
AutoCAD SHX Text
POL
AutoCAD SHX Text
FIRST
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RANGE ROAD
AutoCAD SHX Text
AutoCAD SHX Text
RANGE 7
AutoCAD SHX Text
RANGE 8-Q
AutoCAD SHX Text
AutoCAD SHX Text 8-Q
AutoCAD SHX Text
UTILITY ROAD
CALL BEFORE YOU DIG! PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN STAGE - STOP CALL Pennsylvania One Call System, Inc
BENCHMARK
447.75
[450]
CONCRETE HATCH
FIRE HAYDRANT
UTILITY POLE
FLOW ARROW
BENCHMARK ELEVATION
SPOT ELEVATION
MANHOLE
WATER VALVE
ELECTRIC - UNDERGROUND
WATER LINE
SANITARY SEWER
SITE / CIVIL LEGEND
POLE MOUNTED AREA LIGHTING
FENCELINE
COMMUNICATION - UNDERGROUND
NATURAL GAS
WATERLINE CURB STOP
STORM SEWER
STORM INLET
ELECTRIC - OVERHEAD
YCO SANITARY YARD CLEAN OUT
T ELECTRICAL TRANSFORMER W/ VAULT
G GENERATOR
BENCHMARK
447.75
YCO
T
G
EXISTING PROPOSED
CONTOUR LINE
CC COMMUNICATIONS MANHOLE
E ELECTRIC PULL-BOX
BOLLARD
MH-SAN (EXG)
RIM = XXX.XX'
INV = XXX.XX'
MH-SAN (NEW)
RIM = XXX.XX'
INV = XXX.XX'
GAS VALVEG G
IRON PIN FOUND
IRON PIN SET (TO BE SET)
CONCRETE MONUMENT FOUND
CONCRETE MONUMENT SET
STONE PILE
BERNSTEIN MONUMENT
22.98'
M
AT
C H
L
IN
E
- S
TA
. 1
7+
M
AT
C H
L
IN
E
- S
TA
. 1
7+
M
ATC
H
LIN
E - STA. 34+50
3' 3'
STR. TYPE OF INVERT ELEV.NO. STRUCTURE STATION OFFSET
STORM DRAIN STRUCTURE TABLE
R
AN
G E
R O
AD
REMARKS
15" D-E Endwall
30"x42" F.E.S.
15" D-E Endwall 15" F.E.S.
15" F.E.S.
18" F.E.S.
18" F.E.S.
30"x42" F.E.S.
18" F.E.S.
18" F.E.S.
4+91 5+03 9+67 9+82
24+78 25+39 26+42 26+33 31+61 31+90
23' LT.
23' RT.
23' LT.
24' RT.
24' LT.
25' RT.
23' LT.
23' LT.
CL SR 443 STA. 0+00
3A 4A 3B 4B 3C 4C 3D 4D
N 36,191.8
EXISTING
N 89 59'41" E
N 85 41'13" E
494.19 493.82 484.05 483.14 463.39 463.02 461.94 461.44 460.94 460.54 451.14 448.54 444.27 439.91 440.62 439.46 446.83 446.23
25' LT.
25' RT.
23' RT.
23' RT.
23' RT.
23' RT.
30' RT.
30' RT.
24' RT.
31' RT.
17+25 17+40 18+35 18+55 18+75 18+95 22+45 23+10
18" F.E.S.
18" F.E.S.
18" F.E.S.
18" F.E.S.
18" F.E.S.
18" F.E.S.
18" F.E.S.
18" D Endwall
ALL PROPOSED PIPES WILL BE SMOOTH LINED HIGH DENSITY POLYETHYLENE (SL HDPE)
AND PROPOSED PIPE SIZE WILL MATCH EXISTING PIPE SIZE -UNLESS OTHERWISE NOTED.
F.E.S. = FLARED END SECTION
ALL PROPOSED CONCRETE ENDWALLS ARE PENNDOT TYPE D-W.
REFER TO PENNDOT RC STANDARD 31M. FOR DETAIL.
Replace Existing Concrete Tank Trail
S.R. 443 33' R.O .W
R/W
R/W
Limit of Work
SR 443 ROW
RANGE ROAD
RANGE ROAD
475 470
P.O .B. Sta. 0+00.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
P.C . Sta. 24+16.21
P.T. Sta. 24+80.12
P.C . Sta. 26+50.56
P.C .C
. Sta. 33+15.20
27 28
P.R.C. Sta. 30+70.09
Existing Gravel Driveway to Remain
Replace CMP Replace CMP
Existing Gravel Driveway to Remain
Existing Gravel Driveway to Remain
Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing
Existing Existing
Replace Existing CMP With HDPE and FES
Sta. 0+18.5 - 16.5' from C
L SR
14 30" F.E.S.
22' LT.
22' RT.
30" F.E.S. 35+28 35+15
441.40 441.27
Existing Existing
R25.00'
R
.0 0'
22.98'
Saw Cut Existing Trail to maintain min 20 ft wide lane Remove and replace once new lane is ready for traffic
20.00'
A
A B
498.80 498.10
20' LT.
22' LT.
2+75 3+45
18" F.E.S.
18" F.E.S.
Replace RCP w/RCP Replace RCP w/RCP
N
N
Existing Gate to RemainWhite Edge Line
Tie to Existing (Typ.)
TANK
Pad (See Detail)
Replace Existing Pipe With Conc Pipe and FES Maintain Passage for Traffic
White Edge Line Double Yellow Line
E 25,850.8
(STA. 0+00)
'1
2'
Seal Cracks from Utility Crossings and Seal Coat
20.00' B
Saw Cut (Typ.)
Tank Trail not to be disturbedTRAIL
Gravel Proposed
Not to be disturbed Existing Guiderail
503 49
White Edge Line
UNOPENED
HOWITZER ROAD
'1
2' 3'
3'
White Edge Line Double Yellow Line
White Edge Line
3'
'1 2'
3'
White Edge Line Tie to Existing (Typ.)
Double Yellow Line Break Line at Intersection
AR
TI
LL
ER
Y R
D
Limit of Paving at Artillery Rd.
Match exist. new pave
Saw Cut (Typ.)
Existing Gravel Driveway to Remain
'1
2' 3'
3'
Existing Concrete
M
AT
C H
L
IN
E
- S
TA
. 3
4+
RANGE ROAD
Tank Trail
N 56 06'38" E
Sta. 43+00
P.T. Sta. 37+77.59
P.C . Sta. 41+98.8035 36
Existing Gravel Driveway to Remain
Sta. 41+31R
.0 0'
R18'
N
P.R .C
. Sta. 35+26.11
Saw Cut (Typ.)
White Edge Line Double Yellow Line
White Edge Line3' 12'12'
3'
Existing Concrete Tank Trail not to be disturbed
White Edge Line Tie to Existing (Typ.)
LO
G
AN
R
D
Double Yellow Line Break Line at Intersection
R96'
Limit of Work Concrete Pad Tank Trail
Gravel Parking Lot
Limit of Work Concrete Pad
Existing Concrete Tank Trail not to be disturbed
MILL AND
OVERLAY
FULL DEPTH
ASPHALT
SEAL COAT
FULL DEPTH
CONCRETE
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
REVISIONS
DESCRIPTION DATENO.
Professional's Signature Date
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY & VETERAN'S AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
PROJECT NO.:
CONTRACTOR SHALL FIELD VERIFY
ALL DIMENSIONS.
VARIANCE FROM CONTRACT
DOCUMENTS NOT PERMITTED
WITHOUT BUREAU OF ENGINEERING
AND ARCHITECTURE APPROVAL.
VERIFY SCALE
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING:
0 1
42240025
RANGE ROAD REPAVING
PHASE 2
EAST HANOVER & UNION TWPS.
LEBANON COUNTY, PENNSYLVANIA
STA 0+00 TO 43+00
D.A.S 05 APR, 24
K.E.L AS NOTED
C.1.0
LOCATION MAP
SCALE: 1" = 2,000'
PROJECT SITE
RANGE ROAD - STA 34+50 TO 43+00
SCALE: 1" = 50'
50' 25' 0' 50' 100'SCALE IN FEET
RANGE ROAD - STA 1700 TO 34+50
SCALE: 1" = 50'
50' 25' 0' 50' 100'SCALE IN FEET
RANGE ROAD - STA 0+00 TO 17+00
SCALE: 1" = 50'
50' 25' 0' 50' 100'SCALE IN FEET
C.1.2
C.1.2
C.1.2
C.1.2
C.1.2
C.1.2
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 850.00'
AutoCAD SHX Text 4 18'28"
AutoCAD SHX Text 63.91'
AutoCAD SHX Text 31.97'
AutoCAD SHX Text N 87 50'27" E
AutoCAD SHX Text 63.89'
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 1000.00'
AutoCAD SHX Text 24 02'16"
AutoCAD SHX Text 419.54'
AutoCAD SHX Text N 73 40'05" E
AutoCAD SHX Text 416.47'
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 2500.00'
AutoCAD SHX Text 245.11'
AutoCAD SHX Text 122.65'
AutoCAD SHX Text N 64 27'29" E
AutoCAD SHX Text 245.01'
AutoCAD SHX Text Guy Pole
AutoCAD SHX Text F.H.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 212.90'
AutoCAD SHX Text 4A
AutoCAD SHX Text 5 37'03"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3A
AutoCAD SHX Text
AutoCAD SHX Text 19 12'43"
AutoCAD SHX Text 251.48'
AutoCAD SHX Text 126.93'
AutoCAD SHX Text N 65 43'00" E
AutoCAD SHX Text 250.31'
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 750.00'
AutoCAD SHX Text 210.90'
AutoCAD SHX Text 105.63'
AutoCAD SHX Text N 71 17'41" E
AutoCAD SHX Text 1500.00'
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 1500.00'
8 03'21"
BENCHMARK
447.75
[450]
CONCRETE HATCH
FIRE HAYDRANT
UTILITY POLE
FLOW ARROW
BENCHMARK ELEVATION
SPOT ELEVATION
MANHOLE
WATER VALVE
ELECTRIC - UNDERGROUND
WATER LINE
SANITARY SEWER
SITE / CIVIL LEGEND
POLE MOUNTED AREA LIGHTING
FENCELINE
COMMUNICATION - UNDERGROUND
NATURAL GAS
WATERLINE CURB STOP
STORM SEWER
STORM INLET
ELECTRIC - OVERHEAD
YCO SANITARY YARD CLEAN OUT
T ELECTRICAL TRANSFORMER W/ VAULT
G GENERATOR
BENCHMARK
447.75
YCO
T
G
EXISTING PROPOSED
CONTOUR LINE
CC COMMUNICATIONS MANHOLE
E ELECTRIC PULL-BOX
BOLLARD
MH-SAN (EXG)
RIM = XXX.XX'
INV = XXX.XX'
MH-SAN (NEW)
RIM = XXX.XX'
INV = XXX.XX'
GAS VALVEG G
IRON PIN FOUND
IRON PIN SET (TO BE SET)
CONCRETE MONUMENT FOUND
CONCRETE MONUMENT SET
STONE PILE
BERNSTEIN MONUMENT
M
ATC
H
LIN
E - STA. 71+00
RANGE ROAD
BO
AS RD
3' 3'
S 85 19'16" E
P.T. Sta. 63+65.16
St a.
2+
Existing Gravel Driveway to Remain
Existing Paved Driveway to Remain
Sta. 63+88
R30 .00
R20.00'
White Edge Line
N
Limit of Work Concrete Pad Tank Trail
EXISTING TANK
TRAIL
White Edge Line Break Line at Paved Driveway
Existing Concrete Tank Trail not to be disturbed
Asphalt Parking
Saw Cut (Typ.)
White Edge Line Tie to Existing (Typ.)
Double Yellow Line White Edge Line
Double Yellow Line Break Line at Intersection
White Edge Line Break Line at Paved Driveway
Limit of Work End of 20'R Perp. to Boas
'1
2'
M
ATCH LINE - STA. 71+00
M
ATC
H
LIN
E - STA. 88+00
M
ATC
H
LIN
E - STA. 88+00
MATCH LINE - STA. 105+50
RANGE ROAD
3'
3'
12'12'
STR. TYPE OF INVERT ELEV.NO. STRUCTURE STATION OFFSET
STORM DRAIN STRUCTURE TABLE
R
AN
G E
R O
AD
REMARKS
15" D-E Endwall
15" D-E Endwall 15" F.E.S.
15" F.E.S.
15" F.E.S.
15" F.E.S.
87+90 87+57 103+05 103+46
21' RT.
33' RT.
23' LT.
21' RT.
26' LT.
37' LT.
33' RT.
34' RT.
REPLACE CMP & EW72" D-W Endwall 72" D-W Endwall
75+28 75+51 78+72 79+01
SO
R
EN
SO
N R
D
N 76^02'32" E
N 62 32'15" E
N 80 14'31" E
S 79 09'25" E
21A
22A 23' RT.
23' RT. 441.14
440.14 436.22 435.88 429.32 428.95 393.09 394.09 412.00 410.30
73+91 73+56
15" F.E.S.
15" F.E.S.
ALL PROPOSED PIPES WILL BE SMOOTH LINED HIGH DENSITY POLYETHYLENE (SL HDPE).
PROPOSED PIPE SIZE WILL MATCH EXISTING PIPE SIZE UNLESS OTHERWISE NOTED.
F.E.S. = FLARED END SECTION
ALL CONCRETE ENDWALLS ARE PENNDOT TYPE D-E OR D-W.
REFER TO PENNDOT RC STANDARD 31M. FOR DETAIL.
RANGE ROAD
N 37,553.0 E 33,793.3
Sta. 101+87 Begin Superelevation Transition
Sta. 104+98 End Superelevation Transition
Sta. 104+35.98 End Full Superelevation, Begin Superelevation Transition
Sta. 102+49.20 End Superelevation Transition, Begin 2% Full Superelevation
445 440 435
P.C. Sta. 71+41.18
P.T. Sta. 73+36.34
P.C . Sta. 80+98.66
P.T. Sta. 82+16.51
73 74 75 76 77 78 79 80 81 82
410 415
P.C . Sta. 90+52.33
P.T. Sta. 92+60.90
P.C . Sta. 97+19.05
P.T. Sta. 98+89.84
P.C. Sta. 102+49.20
P.T. Sta. 104+35.98
92 93 94 95 96 97
RIP
R
AP S
W
ALE
RIP
R
AP S
W
ALE
REPLACE CMP & EW
Limit of Work 20' from Edge of Pave Perp. to Ruffner
Limit of Work 20' From Edge Pave Perp. to Access
Limit of Work 25' From Edge Pave Perp. to Latchford
R15 .00
R15.00'
R15 .00
3'
3' 3'
Existing Gravel Driveway to Remain
Existing Gravel Driveway to Remain
Limit of Work 10' from Edge of Pave Perp. to Driveway
Existing Gravel Driveway to Remain
Existing Gravel Parking to Remain
Existing Gravel Driveway to Remain
Existing Existing Existing Existing Existing Existing
Existing Existing
R12 0.0
0'
R5.00'
R18.00'
Limit of Work 86' from CL of Range Perp. to Johnson
TO DUMP SITE
Approx 1/4 mile
White Edge Line Break Line at Paved Driveway
White Edge Line Complete thru Radii (Typ.)
Double Yellow Line Break Line at Intersection
N
N
AV
IA
TI
O
N B
D E
PA
R
KI
N
G A
C C
ES
S
Existing Gravel Driveway to Remain
White Edge Line Break Line at Paved Driveway
R U
FF
N
ER
R
D
R2 0.
R15.00'
' 1
2' 3'
EXISTING TANK TRAIL
Existing Gravel Driveway to Remain
Repaint Crosswalk
Saw Cut (Typ.)
Existing Gravel Driveway to Remain
Gravel Parking Lot
White Edge Line Break Line at Paved Driveway
Existing Gravel Driveway to Remain White Edge Line Break Line at Paved Driveway
R15.00'
White Edge Line Double Yellow Line
White Edge Line
AV
IA
TI
O
N B
D E
PA
R
KI
N
G A
C C
ES
S Limit of Work
25' From Edge Pave Perp. to Access
3' 12' 12'
3'
Existing Gravel Driveway to Remain
EXISTING TANK
12' 12'
Existing Concrete Tank Trail not to be disturbed
TRAIL
Existing Gravel Driveway to Remain
415 420
Pa ve d D riv ew ay
White Edge Line Double Yellow Line
White Edge Line
Replace Existing CMP With HDPE and EW
White Edge Line Break Line at Paved Driveway
JO
H
N
SO
N T
R
AI
L
MILL AND
OVERLAY
FULL DEPTH
ASPHALT
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
REVISIONS
DESCRIPTION DATENO.
Professional's Signature Date
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY & VETERAN'S AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
PROJECT NO.:
CONTRACTOR SHALL FIELD VERIFY
ALL DIMENSIONS.
VARIANCE FROM CONTRACT
DOCUMENTS NOT PERMITTED
WITHOUT BUREAU OF ENGINEERING
AND ARCHITECTURE APPROVAL.
VERIFY SCALE
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING:
0 1
42240025
RANGE ROAD REPAVING
PHASE 2
EAST HANOVER & UNION TWPS.
LEBANON COUNTY, PENNSYLVANIA
STA 43+00 TO 105+50
D.A.S 05 APR, 24
K.E.L AS NOTED
C.1.1
LOCATION MAP
SCALE: 1" = 2,000'
PROJECT SITE
RANGE ROAD - STA 62+00 TO 71+00
SCALE: 1" = 50'
50' 25' 0' 50' 100'SCALE IN FEET
RANGE ROAD - STA 71+00 TO 88+00
SCALE: 1" = 50'
50' 25' 0' 50' 100'SCALE IN FEET
RANGE ROAD - STA 88+00 TO 105+50
SCALE: 1" = 50'
50' 25' 0' 50' 100'SCALE IN FEET
C.1.2
C.1.2
C.1.2
C.1.2
C.1.2
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 500.00'
AutoCAD SHX Text 23 00'46"
AutoCAD SHX Text 200.82'
AutoCAD SHX Text 101.78'
AutoCAD SHX Text N 83 10'21" E
AutoCAD SHX Text 199.48'
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 600.00'
AutoCAD SHX Text 98.45'
AutoCAD SHX Text 18 38'12"
AutoCAD SHX Text 195.16'
AutoCAD SHX Text N 85 21'38" E
AutoCAD SHX Text 194.30'
AutoCAD SHX Text N 69 17'24" E
AutoCAD SHX Text 117.58'
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 500.00'
AutoCAD SHX Text 59.20'
AutoCAD SHX Text 13 30'16"
AutoCAD SHX Text 117.85'
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 675.00'
AutoCAD SHX Text 17 42'15"
AutoCAD SHX Text 208.57'
AutoCAD SHX Text N 71 23'23" E
AutoCAD SHX Text 207.74'
AutoCAD SHX Text 105.12'
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 475.00'
AutoCAD SHX Text 20 36'04"
AutoCAD SHX Text 170.79'
AutoCAD SHX Text S 89 27'27" E
AutoCAD SHX Text 169.87'
AutoCAD SHX Text 86.33'
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 175.00'
AutoCAD SHX Text 61 09'05"
AutoCAD SHX Text 186.78'
AutoCAD SHX Text N 70 16'02" E
AutoCAD SHX Text 178.04'
AutoCAD SHX Text
36" CMP
AutoCAD SHX Text
36" CMP
AutoCAD SHX Text F.H.
AutoCAD SHX Text F.H.
AutoCAD SHX Text
18" CMP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 103.39'
AutoCAD SHX Text 19-119
AutoCAD SHX Text
FH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text 21A
AutoCAD SHX Text 22A
AutoCAD SHX Text
BENCHMARK
447.75
[450]
CONCRETE HATCH
FIRE HAYDRANT
UTILITY POLE
FLOW ARROW
BENCHMARK ELEVATION
SPOT ELEVATION
MANHOLE
WATER VALVE
ELECTRIC - UNDERGROUND
WATER LINE
SANITARY SEWER
SITE / CIVIL LEGEND
POLE MOUNTED AREA LIGHTING
FENCELINE
COMMUNICATION - UNDERGROUND
NATURAL GAS
WATERLINE CURB STOP
STORM SEWER
STORM INLET
ELECTRIC - OVERHEAD
YCO SANITARY YARD CLEAN OUT
T ELECTRICAL TRANSFORMER W/ VAULT
G GENERATOR
BENCHMARK
447.75
YCO
T
G
EXISTING PROPOSED
CONTOUR LINE
CC COMMUNICATIONS MANHOLE
E ELECTRIC PULL-BOX
BOLLARD
MH-SAN (EXG)
RIM = XXX.XX'
INV = XXX.XX'
MH-SAN (NEW)
RIM = XXX.XX'
INV = XXX.XX'
GAS VALVEG G
IRON PIN FOUND
IRON PIN SET (TO BE SET)
CONCRETE MONUMENT FOUND
CONCRETE MONUMENT SET
STONE PILE
BERNSTEIN MONUMENT
LI
M
IT
O
F W
O R
K
- S
TA
. 1
+0
RANGE ROAD
Gravel
STR. TYPE OF INVERT ELEV.NO. STRUCTURE STATION OFFSET
STORM DRAIN STRUCTURE TABLE
R
AN
G E
R O
AD
REMARKS
42" F.E.S.
18" F.E.S.
30" F.E.S.
30" F.E.S.
18" F.E.S.
112+88 112+06 118+63 117+95 118+61
27' LT.
26' RT.
24' RT.
21' LT.
21' LT.
26' RT.
23' RT.
Replace CMP and FES42" F.E.S.
18" F.E.S.
15" F.E.S.
15" F.E.S.
106+23 106+28 110+22 109+91
Post Boundary Control Marker #34 Not to be Disturbed
N 39 41'30" E N 40 55'39" E
392.83 391.96 404.96 404.68 409.20 407.13 424.97 422.78 424.97
23' RT.
23' RT.
Gravel Parking Lot
ALL PROPOSED PIPES WILL BE SMOOTH LINED HIGH DENSITY POLYETHYLENE (SL HDPE).
PROPOSED PIPE SIZE WILL MATCH EXISTING PIPE SIZE UNLESS OTHERWISE NOTED.
F.E.S. = FLARED END SECTION
ALL CONCRETE ENDWALLS ARE PENNDOT TYPE D-E OR D-W.
REFER TO PENNDOT RC STANDARD 31M. FOR DETAIL.
0 415
5 44
P.T. Sta. 118+97.62
P.C . Sta. 122+33.45
P.T. Sta. 123+66.82
106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123
Replace CMP and FES
Existing Gravel Driveway to Remain
Existing Gravel Driveway to Remain
Existing Existing Existing Existing Existing Existing Existing
Limit of Work 50' from Edge Perp. to First
R40.00'
Double Yellow Line Break Line at Intersection
N
Replace Existing CMP With HDPE and FES
0 400
Existing Gravel Driveway to Remain
Existing Gravel Driveway to Remain
White Edge Line Double Yellow Line
White Edge Line
425 430 435 440
R25.00'
White Edge Line Tie to Existing (Typ.)
FI
RS
T
ST
P.C . Sta. 117+89.76
'1
2' 3'
3'
Saw Cut (Typ.)
MILL AND
OVERLAY
FULL DEPTH
ASPHALT
24'-0" CARTWAY
PROPOSED CARTWAY
3'-0" MIN
2% +/- 2% +/-
LB
4%4%
4:1
MAX.
EXISTING
GROUND
BASE COURSE
SUBBASE
EXISTING
GROUND
NOT TO SCALE
TYPICAL SECTION
11" LANE 11" LANE
DOUBLE YELLOW
LINE
REMOVE EX. PAVEMENT
TO SUBGRADE
WEARING COURSE
TACK COAT
SUPERPAVE ASPHALT MIXTURE DESIGN
HMA WEARING COURSE, PG. 64S-22,
0.3 TO 3 MILLION ESALS, 12.5 mm
MIX,1-1/2" DEPTH
SUPERPAVE MIXTURE DESIGN, HMA
BASE COURSE, PG. 64S-22, 0.3 TO 3 MILLION
ESALS, 25 mm MIX, 4" DEPTH
APPLY TACK AS PER SPECIFICATIONS
ASPHALT PAVING SECTION DETAIL - FULL DEPTH
8" COMPACTED 2A SUBBASE
INSPECT EXISTING SUBGRADE, RECOMPACT EXISTING SUBGRADE AND/OR
SINGLE WHITE
LINE
SINGLE WHITE
LINE
NOT TO SCALE
ANY DISTURBANCE BEYOND
THE SHOULDER SHOULD BE
STABILIZED IN ACCORDANCE
WITH THE PLAN AND
SPECIFICATIONS (STONE, SEED, ETC.)
SHOULDER BACKUP, BOTH SIDES
ABUTTING NEW PAVE TO BE
4" MIN OF 2A MODIFIED, MIN 1' WIDE
FLUSH WITH PAVEMENT EDGE
FULL DEPTH
EXISTING ROAD CROSS SECTION
AND DISPOSE PER NOTES
3'-0" MIN
4:1
MAX.
REMOVE AND REPLACE UNSUITABLE MATERIALS OR UNSATISFACTORY SOILS WITH 2A
TO ENSURE DRAINAGE
24'-0" CARTWAY
PROPOSED CARTWAY
2% +/- 2% +/-
LB
4%
BASE COURSE
SUBBASE
EXISTING
GROUND
NOT TO SCALE
TYPICAL SECTION
11" LANE 11" LANE
DOUBLE YELLOW
LINE
REMOVE EX. PAVEMENT
AS SHOWN ON PLAN
WEARING COURSE
TACK COAT
ASPHALT PAVING SECTION DETAIL - MILL AND OVERLAY
SINGLE WHITE
LINE
SINGLE WHITE
LINE
NOT TO SCALE
ANY DISTURBANCE BEYOND
THE SHOULDER SHOULD BE
STABILIZED IN ACCORDANCE
WITH THE PLAN AND
SPECIFICATIONS (STONE, SEED, ETC.)
SUPERPAVE ASPHALT MIXTURE DESIGN
HMA WEARING COURSE, PG. 64S-22,
0.3 TO 3 MILLION ESALS, 12.5 mm
MIX,1-1/2" DEPTH
EXISTING BASE COURSE
APPLY TACK AS PER SPECIFICATIONS
EXISTING SUBBASE
EXISTING SUBGRADE
MILL AND OVERLAY
MILL 1-1/2" EXISTING SURFACE
AND DISPOSE PER NOTES
3'-0" MIN
4:1
MAX.
AS SHOWN ON PLAN
INSPECT AND NOTIFY IF
BASE COURSE IS DAMAGED
REMOVE MIN 13-1/2" OF
AS SHOWN ON PLAN
3'-0" MIN
4%
4:1
MAX.
EXISTING
GROUND
TO ENSURE DRAINAGE
SHOULDER BACKUP, BOTH SIDES
ABUTTING NEW PAVE TO BE
4" MIN OF 2A MODIFIED, MIN 1' WIDE
FLUSH WITH PAVEMENT EDGE
EXISTING
EXISTING
15'-0 15'-0
'-0
'-0
PLAN
JOINT
MAX. MAX.
M
AX
M
AX
TOP OF COMPACTED SUBGRADE
3/8"
3/ 4"
1/
4"
1/4"
4X4-W4XW4 WWF MID-SLAB
SECTION
3/8" JOINT DETAIL
PAD CROSS SLOPE TO
AND SHOULDER
6" PENNDOT 2A
STONE SUBBASE
NOT TO SCALE
CONCRETE TANK PAD
Concrete to Asphalt joint seal.
Rubberized joint sealing material ASTM D6690-Type III. Seams and work area to be completely dry and above 40 degrees F. Use compressed air to blow off dirt and other foreign materials. Sealing material to be max 400 degrees F and min 380 degrees F.
Install sealing 1/6” above surface and not greater than 2” width beyond seam edge.
SAWCUT 1/8" WIDTH
x 1/4 DEPTH OF
SLAB
SEALANT
RESERVOIR
- 5/8" WIDTH x 1"
DEPTH
- 5/8" BACKER ROD
- SEALANT- DOWSIL
890 SL
OR APPROVED
EQUAL
STEEL DOWELS -
1-1/4" x 24" @ 18" O.C., GREASED/SLEEVED
ONE SIDE
NOTE: 1/8" SAWCUT TO BE MADE WITHIN 8 HRS
OF CONCRETE PLACEMENT.
Contractor to submit specific pour plan and proposed joints. A 20 ft wide travel lane shall be maintained at all times for military vehicle traffic.
L(3) #4 BARS A
12"
2:1 SLOPE
N.T.S.
12"
6"3"
9" 3"
SD
30°12" 6"
6" 24"
L
A
6"
6"
W2
NOTE: SEE TABLE A ON PENNDOT RC-31M FOR SPECIFIC DIMENSIONS FOR CULVERT SIZE.
W2
TYPE D-W ENDWALL (REF. PADOT RC-31M)
OFF ROADWAY COMPACTED BACKFILL
(EMBANKMENT MATERIAL) 12" LIFTS
ROADWAY (2A STONE) 8" LIFTS
MIN. 97% STANDARD
PROCTOR DENSITY
COARSE AGGREGATE (2A)
COMPACTED TO MIN.
95% STANDARD PROCTOR
DENSITY
SUBGRADE/
FINISH GRADE
OR REFER TO PAVEMENT
RESTORATION DETAIL
O.D.
2A STONE
LIGHTLY COMPACTED TO
CENTERLINE OF PIPE
DEPTH VARIES
12"
O.D.
12" 12"
6"
N.T.S.
STORM TRENCH DETAIL
NOTES:
ALL APRONS SHALL BE CONSTRUCTED TO THE DIMENSIONS SHOWN. TERMINAL WIDTHS
SHALL BE ADJUSTED AS NECESSARY TO MATCH RECEIVING CHANNELS.
ALL APRONS SHALL BE INSPECTED AT LEAST WEEKLY AND AFTER EACH RUNOFF EVENT.
DISPLACED RIPRAP WITHIN THE APRON SHALL BE REPLACED IMMEDIATELY.
0% SLOPE
AI
AI
Atw
Pd
Rt
Aiw Pd
Y Y
Z
Z
OUTLET
NO.
PIPE
DIA
Pd
(IN)
RIPRAP APRON
SIZE
R-_
THICK.
Rt
(IN)
LENGTH
Al
(FT)
INITIAL
WIDTH
Aiw
(FT)
TERMINAL
WIDTH
Atw
(FT)
8 42 5 27 22 11 22
NOT TO SCALE
GEOTEXTILE
0% SLOPE
GEOTEXTILE
RIP RAP APRON AT PIPE OUTLET/ENDWALL
28 72 5 27 30 18 30
36 42 4 27 22 11 22
B 18 4 18 12 6 12
5'-0"
4" WHITE PAINT LINES
@ 45 DEG. ON 2'-0"
CENTERS (TYP.)
SE
E
SI
TE
P
LA
N
CROSS-WALK DETAIL
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
REVISIONS
DESCRIPTION DATENO.
Professional's Signature Date
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY & VETERAN'S AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
PROJECT NO.:
CONTRACTOR SHALL FIELD VERIFY
ALL DIMENSIONS.
VARIANCE FROM CONTRACT
DOCUMENTS NOT PERMITTED
WITHOUT BUREAU OF ENGINEERING
AND ARCHITECTURE APPROVAL.
VERIFY SCALE
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING:
0 1
42240025
RANGE ROAD REPAVING
PHASE 2
EAST HANOVER & UNION TWPS.
LEBANON COUNTY, PENNSYLVANIA
STA 105+50 TO 124+00 &
DETAILS
D.A.S 05 APR, 24
K.E.L AS NOTED
C.1.2
LOCATION MAP
SCALE: 1" = 2,000'
PROJECT SITE
RANGE ROAD - STA 105+50 TO 124+00
SCALE: 1" = 50'
50' 25' 0' 50' 100'SCALE IN FEET
C.1.2
C.1.2
C.1.2
C.1.2
C.1.2
C.1.2
C.1.2
C.1.2
C.1.2
C.1.2
C.1.2
AutoCAD SHX Text
MATCH LINE - STA. 105+50
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 5000.00'
AutoCAD SHX Text 107.86'
AutoCAD SHX Text N 40 18'35" E
AutoCAD SHX Text 107.86'
AutoCAD SHX Text 53.93'
AutoCAD SHX Text 1 14'10"
AutoCAD SHX Text
CURVE DATA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text 2500.00'
AutoCAD SHX Text 133.37'
AutoCAD SHX Text N 42 27'21" E
AutoCAD SHX Text 133.36'
AutoCAD SHX Text 66.70'
AutoCAD SHX Text 3 03'24"
AutoCAD SHX Text F.H.
AutoCAD SHX Text F.H.
AutoCAD SHX Text
12" PVC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| working plan-BMCE_Cover 30x42.pdf |
| Sheets and Views |
| BMCE_Cover 30x42 |
| working plan-key and notes.pdf |
| Sheets and Views |
| key and notes |
| working plan-0+00 to 43+00.pdf |
| Sheets and Views |
| 0+00 to 43+00 |
| working plan-43+00 to 105+50.pdf |
| Sheets and Views |
| 43+00 to 105+50 |
| working plan-105+50 to 124+00.pdf |
| Sheets and Views |
| 105+50 to 124+00 |
File details come from the government source that posted it. Updated .