421_Laundry_QASP_Dated.pdf
PDF 239 KB Posted
- Attached to
- JBMDL 421 Laundry Services
- Solicitation number
- FA448424Q0007
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract to provide laundry services at the U.S. Air Force Expeditionary Operations School (USAF EOS) at Joint Base McGuire-Dix-Lakehurst.
The QASP outlines the performance requirements, inspection methods, roles and responsibilities, and reporting procedures the government will use to monitor the contractor's performance. Key performance objectives include meeting pickup/delivery schedules, delivering laundry of the correct weight and free of defects, and cleaning laundry to standards. The government will use Performance Assessment Reports (PARs) and Corrective Action Reports (CARs) to document and address any performance issues. The contract is managed by the 87th Contracting Squadron, with the primary Contracting Officer's Representative (COR) being Richard Oliver.
The related federal contract opportunity, Solicitation Number FA448424Q0007, is for the 421st EC to procure these laundry services. The awarded contractor must be located within 100 miles of the joint base. The solicitation and its attachments, including this QASP, provide the full details on the contract requirements.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
FOR
LAUNDRY SERVICES
AT
USAF EXPEDITIONARY OPERATIONS SCHOOL (EOS)
Joint Base McGuire-Dix-Lakehurst Version 1.0
5 February 2024
TABLE OF CONTENTS
SECTION 1: PURPOSE/OBJECTIVES/RESULTS
SECTION 2: AUTHORITY
SECTION 3: ROLES AND RESPONSIBILITIES
SECTION 4: PERFORMANCE REQUIREMENTS & METHOD OF SURVEILLANCE
SECTION 5: PERFORMANCE REPORTING
ATTACHMENTS:
*3
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract.
The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for continuous oversight process:
• What will be monitored
• How monitoring will take place
• Who will conduct the monitoring
• How monitoring efforts and results will be documented
The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance to assure that it meets contract standards. It is the government’s responsibility to be objective, fair, and consistent in evaluating contractor performance.
The QASP is not part of the contract, nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
This QASP is based on the premise that the government requires a quality standard for the Laundry Services contract for the U.S. Air Force Expeditionary Operations School (USAF EOS).
This QASP is the best means of achieving that objective.
The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor. (Information only)
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance. (Information only)
2. Authority
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition regulation, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
3. Roles and Responsibilities
*4
The following personnel shall oversee and coordinate surveillance activities.
Government Personnel
Contracting Officer (CO) The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Assigned CO:
Organization or Agency: 87th Contracting Squadron, Joint Base McGuire-Dix-Lakehurst, NJ 08641 Telephone:
Email:
Contracting Officer’s Representative (COR) The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR will use the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the CO. The COR is required to provide an annual performance assessment to the CO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Primary COR: Richard Oliver Organization or Agency: 421 Combat Training Squadron, Joint Base McGuire-Dix-Lakehurst, NJ 08640
Telephone: (609) 754-7367 Email: richard.oliver.13@us.af.mil
Alternate Assigned COR: SSgt Patric Roemer Organization or Agency: 421 Combat Training Squadron, Joint Base McGuire-Dix-Lakehurst, NJ 08640
Telephone: (609) 754-7544 Email: patric.roemer@us.af.mil
Alternate Assigned COR: John F. Smith Organization or Agency: 421 Combat Training Squadron, Joint Base McGuire-Dix-Lakehurst, NJ 08640
Telephone: (609) 754-7657 Email: john.smil.297@us.af.mil
COR Supervisor: Philip Mohacsi Organization or Agency: USAF EC/DA7 Telephone: (609) 754-7720 mailto:richard.oliver.13@us.af.mil mailto:richard.hollingworth.1@us.af.mil mailto:john.smil.297@us.af.mil
*5
Email: philip.mohacsi@us.af.mil
Other Key Government Personnel *USAF EC/DS Staff *USAF EOS Contract Manager *421 CTS Mission Assurance
Contractor Representatives
The following employees of the contract serve as the contractor’s Program Manager and Task Manager for this contract.
Program Manager:
Telephone:
Email:
Task (Operations) Manager:
Telephone:
Email:
Other Key Contract Personnel:
Telephone:
Email:
4. Performance Requirements and Method of Surveillance
4.1 Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the contracting officer, contracting specialist and the contractor, which enables positive, open, and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
4.2 Surveillance Matrix (Service Summary)
The Surveillance Matrix (Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality mailto:philip.mohacsi@us.af.mil
*6 of the contractor’s performance as it relates to the performance element standards. The Performance Requirement Summary (PRS) should be used to form the foundation of the COR’s inspection checklist.
4.3 Combating Trafficking in Persons
The contractor shall comply with FAR 52.222-50, Combating Trafficking in Persons.
The COR will monitor contractor’s performance regarding trafficking in persons. Surveillance may involve an examination of the Contractor(s) and Sub-Contractor(s) business practices to include the following: All paperwork pertaining to the Contractor(s) and Sub-Contractor(s) activities; All electronic (e.g. e-mail, facsimile, text messaging, and telephonic) traffic pertaining to the Contractor(s) and Sub-Contractor(s) activities; Facilities pertaining to the Contractor(s) and Sub-Contractor(s) activities; and Interviews with Contractor(s) and Sub-Contractor(s) personnel.
In accordance with DFARS PGI 222.17, Combating Trafficking in Persons, the COR shall immediately notify the Contracting Officer of non-compliance with FAR 52.222-50.
4.4 Performance Rating Definitions
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance Rating Criteria
Excellent / Outstanding
Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Good Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
5. Performance Reporting
5.1 Remedies for on-Conformance
If inspections indicate unacceptable performance, the COR will notify the contractor’s POC of the deficiencies for correction. Use the remedy the government is going to use per what is stated in the Services Summary (SS). If deficiencies are not corrected within the required time frame, the COR
*7 should notify the CO for action. If the contractor disagrees with the noted discrepancy and an agreement cannot be reached, the CO shall be notified for a final decision
5.2 Performance Assessment Report (PAR)
PARs will be used to report ALL minor discrepancies and will be generated by the COR and sent to the contractor for corrective action. Contractors will be given 10 days to correct PARs unless they have requested an extension. If 3 minor discrepancies are found, combine them, and process a CAR.
5.3 Customer Complaint Form
The COR must furnish instructions to the customer receiving the contractor’s service. The customer must retain supporting evidence of complaint or feedback. After the COR validates feedback or complaint demonstrating contractor noncompliance, the COR processes a Performance Assessment Report (PAR) or Corrective Action Report (CAR) to the CO. ALL Customer Complaint forms WILL be validated by the COR prior to notifying the contractor.
5.4 Corrective Action Report (CAR)
The CAR will be forwarded to the Chief COR for review. The COR will forward the CAR to the CO for action. A copy will be provided to the contractor’s representative by the CO. Most CARs will be corrected within 30 calendar days depending on the complexity of the finding, the contractor may be allowed up to six months (maximum) correcting a CAR. The contractor will be asked the status of the CAR on a monthly basis. The COR will keep an electronic log of all CARs and will keep a hard copy of CARs in the contract oversight file.
5.5 Disputes
Every attempt will be made to resolve all disputes arising under this contact/plan using the Alternate Dispute Resolution (ADR) as outlined in FAR 33.214. If no resolution can be made under ADR, the CO will render a Contracting Officer’s final decision.
Attachments:
1. SURVEILLANCE MATRIX (SERVICE SUMMARY)
2. CORRECTIVE ACTION REPORT (CAR)
3. PERFORMANCE ASSESSMENT REPORT (PAR)
Attachment 1: Surveillance Matrix (Service Summary)
SS# Performance Objective PWS Paragraph Performance Threshold
1. Pickup & delivery schedules are met.
1.1.9, 1.1.10, 1.1.10.1, 1.1.11 95% of the time per year
2. Correct weight of laundry (within allowable 2% variance) is delivered & properly packaged.
1.1.2, 1.1.9, 1.1.10 No more than 2 valid discrepancies per agency within 30 days
*8
3. Laundry is delivered free of all visible dirt, debris, dampness, odor, mildew, cleaning chemical residue, has a uniform appearance & is properly finished, 1.1.1, 1.1.5, 1.1.6, 1.1.7, 1.1.8, 1.1.9, 1.1.10, 1.1.13
No more than 2 valid discrepancies per organization within 30 days
4.
Laundry is cleaned in accordance with standards, 1.1.4, 1.1.5, 1.1.7, 1.1.13 95% of deliveries (drop-offs) are free of discrepancies per year