4208 Bush SOW REV 2 jge.pdf
PDF 130 KB Posted
- Attached to
- Water Main Extension and Water Service Line Federal contract opportunity
- Solicitation number
- 246-23-Q-0051
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Sheet REV 3-6-23.pdf | ||
| SOW 3-6-23.pdf | ||
| Bid Sheet REV 3-6-23.pdf | ||
| Questions and Answers.docx | DOCX document | |
| SF18 RFQ.pdf | ||
| ok31.txt | TXT text file | |
| SF18 RFQ.pdf | ||
| Bid Sheet.xlsx | XLSX spreadsheet | |
| Drawing.pdf | ||
| Spec. Reference ODEQ Chapter 626.19.pdf | ||
| Specs 091222.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PAWNEE OFFICE OF ENVIRONMENTAL HEALTH & ENGINEERING
PAYNE COUNTY RURAL WATER DISTRICT #4
WATER MAIN EXTENSION
TO SERVE JUSTIN BUSH
SERVICE REQUEST #4208
IHS PROJECT OK 18-V09
SCOPE OF WORK
Location: 2515 S Greenwood Rd, Yale, OK 74085. Contractor shall furnish and install approximately 938 linear feet of 2” water main extension of the Payne County Rural water
District #4 water system, and 515 linear feet of 1" water service line, new meter vault and meter, and all appurtenances.
The contractor shall perform all work described in the contract documents for the unit prices or lump sums stated in the completed bid schedule to be submitted for this project. Any item required for completion of the project that is not listed in the bid schedule shall be included by the contractor in any of the bid items currently listed on the bid schedule. The contractor shall complete the following tasks:
Install 938 LF of 2” SDR 11 HDPE along S Greenwood Rd
Install 515 LF of 1” SDR 11 HDPE from S Greenwood Rd to Justin Bush’s Home
Install 1453 LF of tracer wire
Connect the new water main to the existing system in one (1) location
Install two (2) 2-inch gate valves and boxes
Open Cut 182 LF of gravel driveway
Install 6” steel casing at open cut locations where 2” HDPE is installed
Install 2” steel casing at open cut locations where 1” HDPE is installed
Install end of line tee and flush hydrant
Install one (1) 2” water meter and vault
Connect new water service line to Justin Bush’s Home
All work shall be done in accordance with Oklahoma Department of Environmental Quality
(ODEQ) rules and regulations found in, but not limited to, OAC 252:626 - Public Water Supply
Construction Standards. All work must also conform to the contract plans & specifications.