Bid Tabulation Summary
This bid tabulation document pertains to a roadway construction project administered by the Broward County Highway Construction and Engineering Division (HCED) in the City of Coral Springs, Florida. The project encompasses the widening, milling, and resurfacing of Royal Palm Boulevard extending from East of University Drive to Riverside Drive, along with construction of raised curb medians, removal and replacement of damaged sidewalk, ADA curb ramp upgrades, driveway improvements to current standards, signing and pavement marking upgrades, pedestrian crossing signal upgrades, and mast arm installation. Vendors were required to submit complete solicitation responses electronically through BPRO by the specified closing date and time, with receipt confirmation mandatory. The County emphasized that while certain documents were designated as optional in BPRO, all submitted materials would be considered relevant to the evaluation process.
The project is funded through a combination of Federal Highway Administration (FHWA) allocations channeled through the State of Florida Department of Transportation (FDOT) and Broward County Transportation Surtax Funds. Vendor eligibility requires compliance with County and State licensing requirements and bonding requirements as specified in the full solicitation documents. The County provided a designated period for vendors to submit questions and seek clarification regarding solicitation requirements through BPRO's messaging system, with all inquiries and corresponding responses documented for vendor reference during the submittal process.
View the file
Other files
Show 40 more
Latest 50 of 198 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Open Date: August 12, 2026 Bid Amount
Bid Close Date: Septmeber 14, 2026 Bid Allowance Total Cost
# Items Item
Description Quantity Required
Unit of
Measure Unit Price
Total Extended Amount
Unit Price
Total Extended Amount
Unit Price
Total Extended Amount
Unit Price
Total Extended Amount
Unit Price
Total Extended Amount
Unit Price
Total Extended Amount
ROADWAY PAY ITEMS:
Totals $1,538,460.49 $2,108,521.49 $2,127,376.36 $2,248,665.37 $2,414,977.55 $2,677,509.93 #1-1 0101-1 MOBILIZATION 1 Lump Sum $155,000.00 $155,000.00 $250,000.00 $250,000.00 $310,100.00 $310,100.00 $156,987.00 $156,987.00 $300,000.00 $300,000.00 $314,900.00 $314,900.00 #1-2 0101-2 AUDIO/VISUAL PRE/POST CONSTRUCTION RECORDS 2 Lump Sum $7,500.00 $15,000.00 $10,000.00 $20,000.00 $1,405.00 $2,810.00 $1,800.00 $3,600.00 $2,500.00 $5,000.00 $1,470.00 $2,940.00 #1-3 0102-1 MAINTENANCE OF TRAFFIC, COMPLETE 1 Lump Sum $88,843.49 $88,843.49 $235,000.00 $235,000.00 $185,000.00 $185,000.00 $295,610.00 $295,610.00 $250,000.00 $250,000.00 $631,721.00 $631,721.00 #1-4 0101-3 SPECIAL CONSTRUCTION SIGN 2 Assembly $1,500.00 $3,000.00 $1,850.00 $3,700.00 $1,100.00 $2,200.00 $700.00 $1,400.00 $2,500.00 $5,000.00 $1,720.00 $3,440.00 #1-5 0102-14 TRAFFIC CONTROL OFFICER 248 Hour $100.00 $24,800.00 $90.00 $22,320.00 $110.00 $27,280.00 $89.00 $22,072.00 $80.00 $19,840.00 $86.20 $21,377.60 #1-6 0104-10-3 SEDIMENT BARRIER 6328 Linear Foot $3.30 $20,882.40 $5.00 $31,640.00 $2.15 $13,605.20 $3.00 $18,984.00 $2.50 $15,820.00 $3.45 $21,831.60 #1-7 0104-18 INLET PROTECTION SYSTEM 18 Each $190.00 $3,420.00 $150.00 $2,700.00 $210.00 $3,780.00 $250.00 $4,500.00 $250.00 $4,500.00 $345.70 $6,222.60 #1-8 0107-1 LITTER REMOVAL AND DISPOSAL 83.04 Acre $30.00 $2,491.20 $15.00 $1,245.60 $289.05 $24,002.71 $20.00 $1,660.80 $50.00 $4,152.00 $172.90 $14,357.62 #1-9 0107-2 MOWING 83.04 Acre $50.00 $4,152.00 $15.00 $1,245.60 $520.25 $43,201.56 $20.00 $1,660.80 $50.00 $4,152.00 $308.05 $25,580.47 #1-10 0108-1 MONITOR EXISTING STRUCTURES - INSPECTION AND SETTLEMENT MONITORING 1 Lump Sum $9,405.00 $9,405.00 $5,000.00 $5,000.00 $3,190.00 $3,190.00 $3,323.00 $3,323.00 $12,000.00 $12,000.00 $3,330.00 $3,330.00 #1-11 0108-2 MONITOR EXISTING STRUCTURES - VIBRATION MONITORING 1 Lump Sum $7,700.00 $7,700.00 $5,000.00 $5,000.00 $2,640.00 $2,640.00 $2,670.00 $2,670.00 $10,000.00 $10,000.00 $2,760.00 $2,760.00 #1-12 0110-1-1 CLEARING & GRUBBING 0.78 Acre $43,700.00 $34,086.00 $150,000.00 $117,000.00 $25,000.00 $19,500.00 $236,500.00 $184,470.00 $60,000.00 $46,800.00 $82,500.00 $64,350.00 #1-13 0110-4-10 REMOVAL OF EXISTING CONCRETE 1101 Square Yard $40.00 $44,040.00 $25.00 $27,525.00 $61.25 $67,436.25 $42.00 $46,242.00 $35.00 $38,535.00 $46.20 $50,866.20 #1-14 0110-23 TREE REMOVAL 6 Each $2,160.00 $12,960.00 $2,500.00 $15,000.00 $3,000.00 $18,000.00 $2,093.00 $12,558.00 $5,000.00 $30,000.00 $2,550.00 $15,300.00 #1-15 0120-1 REGULAR EXCAVATION 154.1 Cubic Yard $40.00 $6,164.00 $60.00 $9,246.00 $46.75 $7,204.18 $92.87 $14,311.27 $15.50 $2,388.55 $53.55 $8,252.06 #1-16 0120-4 SUBSOIL EXCAVATION 354 Cubic Yard $55.00 $19,470.00 $90.00 $31,860.00 $77.25 $27,346.50 $68.83 $24,365.82 $18.00 $6,372.00 $37.55 $13,292.70 #1-17 0120-6 EMBANKMENT 490.5 Cubic Yard $45.00 $22,072.50 $35.00 $17,167.50 $31.30 $15,352.65 $69.05 $33,869.03 $16.00 $7,848.00 $40.25 $19,742.63 #1-18 0121-70 FLOWABLE FILL 47.5 Cubic Yard $240.00 $11,400.00 $250.00 $11,875.00 $379.00 $18,002.50 $260.00 $12,350.00 $350.00 $16,625.00 $269.60 $12,806.00 #1-19 0160-4 TYPE B STABILIZATION, LBR-40, 12" 1901 Square Yard $10.00 $19,010.00 $20.00 $38,020.00 $22.70 $43,152.70 $29.96 $56,953.96 $11.00 $20,911.00 $19.90 $37,829.90 #1-20 285-706 OPTIONAL BASE, BASE GROUP 06 165 Square Yard $37.50 $6,187.50 $69.00 $11,385.00 $78.70 $12,985.50 $48.13 $7,941.45 $58.00 $9,570.00 $107.10 $17,671.50 #1-21 285-709 OPTIONAL BASE, BASE GROUP 09 1879 Square Yard $42.00 $78,918.00 $35.00 $65,765.00 $55.35 $104,002.65 $38.31 $71,984.49 $60.00 $112,740.00 $38.60 $72,529.40 #1-22 0327-70-6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH 16009 Square Yard $2.50 $40,022.50 $3.75 $60,097.79 $4.10 $65,636.90 $4.50 $72,040.50 $7.00 $112,063.00 $5.15 $82,446.35 #1-23 0334-1-13 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C (OVERBUILD) 106.6 Ton $270.00 $28,782.00 $235.00 $25,051.00 $236.75 $25,237.55 $250.00 $26,650.00 $300.00 $31,980.00 $211.20 $22,513.92 #1-24 0334-1-53 SUPERPAVE ASPHALTIC CONCRETE,TRAFFIC C, PG 76-22 137.8 Ton $222.00 $30,591.60 $250.00 $34,450.00 $266.00 $36,654.80 $250.00 $34,450.00 $300.00 $41,340.00 $308.40 $42,497.52 #1-25 0337-7-82 ASPHALT CONCRETE FRICTION COURSE, TRAFFIC C, FC-9.5 PG 76-22 1434.7 Ton $184.00 $263,984.80 $250.00 $358,675.00 $205.95 $295,476.47 $215.00 $308,460.50 $320.00 $459,104.00 $219.65 $315,131.86 #1-26 0425-1201 INLETS, CURB, TYPE 9, <10' 1 Each $8,424.00 $8,424.00 $15,000.00 $15,000.00 $7,480.00 $7,480.00 $13,340.00 $13,340.00 $13,000.00 $13,000.00 $7,820.00 $7,820.00 #1-27 0425-1204 INLETS, CURB, TYPE 9, J BOT, >10' 1 Each $14,200.00 $14,200.00 $17,000.00 $17,000.00 $16,940.00 $16,940.00 $20,250.00 $20,250.00 $23,500.00 $23,500.00 $17,700.00 $17,700.00 #1-28 0425-1351 INLETS, CURB, TYPE P-5, <10' 2 Each $7,500.00 $15,000.00 $15,000.00 $30,000.00 $11,330.00 $22,660.00 $16,000.00 $32,000.00 $12,000.00 $24,000.00 $11,800.00 $23,600.00 #1-29 0425-1361 INLETS, CURB, TYPE P-6, <10' 1 Each $7,500.00 $7,500.00 $15,000.00 $15,000.00 $10,450.00 $10,450.00 $17,100.00 $17,100.00 $12,500.00 $12,500.00 $10,900.00 $10,900.00 #1-30 0425-2-61 MANHOLES, P-8, <10' 1 Each $7,500.00 $7,500.00 $15,000.00 $15,000.00 $10,780.00 $10,780.00 $14,300.00 $14,300.00 $9,500.00 $9,500.00 $11,300.00 $11,300.00 #1-31 0425-2-62 MANHOLES, P-8, >10' 1 Each $10,000.00 $10,000.00 $17,000.00 $17,000.00 $14,630.00 $14,630.00 $16,000.00 $16,000.00 $11,000.00 $11,000.00 $15,300.00 $15,300.00 #1-32 0425-2-92 MANHOLES, J-8, >10' 1 Each $12,000.00 $12,000.00 $17,000.00 $17,000.00 $15,950.00 $15,950.00 $16,000.00 $16,000.00 $26,000.00 $26,000.00 $16,700.00 $16,700.00 #1-33 430175118 PIPECULVERT, OPTIONAL MATERIAL, ROUND, 18"S/CD 264 Linear Foot $140.00 $36,960.00 $200.00 $52,800.00 $181.50 $47,916.00 $208.50 $55,044.00 $265.00 $69,960.00 $189.65 $50,067.60 #1-34 0443-70-3 FRENCH DRAIN, 18" 576 Linear Foot $240.00 $138,240.00 $350.00 $201,600.00 $462.00 $266,112.00 $517.00 $297,792.00 $380.00 $218,880.00 $505.75 $291,312.00 #1-35 0425-5 MANHOLE, ADJUST 3 Each $1,260.00 $3,780.00 $850.00 $2,550.00 $750.00 $2,250.00 $750.00 $2,250.00 $1,500.00 $4,500.00 $977.00 $2,931.00 #1-36 0425-5-1 MANHOLE, ADJUST, UTILITIES 7 Each $1,500.00 $10,500.00 $850.00 $5,950.00 $750.00 $5,250.00 $725.00 $5,075.00 $1,500.00 $10,500.00 $1,030.00 $7,210.00 #1-37 0425-6 VALVE BOXES, ADJUST 11 Each $600.00 $6,600.00 $750.00 $8,250.00 $500.00 $5,500.00 $670.00 $7,370.00 $1,000.00 $11,000.00 $862.05 $9,482.55 #1-38 0515-1-2 PIPE HANDRAIL - GUIDERAIL, ALUMINUM 330 Linear Foot $114.00 $37,620.00 $95.00 $31,350.00 $98.00 $32,340.00 $71.00 $23,430.00 $95.00 $31,350.00 $73.40 $24,222.00 #1-39 0520-1-10 CONCRETE CURB & GUTTER, TYPE F 2468 Linear Foot $35.00 $86,380.00 $35.00 $86,380.00 $48.00 $118,464.00 $37.62 $92,846.16 $48.00 $118,464.00 $56.25 $138,825.00 #1-40 0520-2-2 CONCRETE CURB, TYPE B 88 Linear Foot $38.40 $3,379.20 $35.00 $3,080.00 $44.00 $3,872.00 $40.00 $3,520.00 $45.00 $3,960.00 $43.35 $3,814.80 #1-41 0520-2-4 CONCRETE CURB, TYPE D 270 Linear Foot $34.80 $9,396.00 $30.00 $8,100.00 $44.00 $11,880.00 $44.00 $11,880.00 $45.00 $12,150.00 $38.35 $10,354.50 #1-42 0520-5-41 TRAFFIC SEPARATOR, CONCRETE, TYPE IV, 4' WIDE 456 Linear Foot $74.40 $33,926.40 $80.00 $36,480.00 $54.55 $24,874.80 $60.50 $27,588.00 $120.00 $54,720.00 $102.65 $46,808.40 #1-43 0520-70 CONCRETE TRAFFIC SEPARATOR, SPECIAL - VARIABLE WIDTH 86 Square Yard $150.00 $12,900.00 $180.00 $15,480.00 $136.05 $11,700.30 $135.00 $11,610.00 $150.00 $12,900.00 $255.05 $21,934.30 #1-44 0522-2 CONCRETE SIDEWALK, 6" THICK 738 Square Yard $88.00 $64,944.00 $75.00 $55,350.00 $85.85 $63,357.30 $68.00 $50,184.00 $110.00 $81,180.00 $115.90 $85,534.20 #1-45 0527-2 DETECTABLE WARNING SURFACE 191 Square Foot $45.60 $8,709.60 $35.00 $6,685.00 $55.00 $10,505.00 $41.00 $7,831.00 $45.00 $8,595.00 $52.85 $10,094.35 #1-46 0570-1-2 PERFORMANCE TURF, SOD 1971 Square Yard $9.30 $18,330.30 $10.00 $19,710.00 $10.35 $20,399.85 $6.60 $13,008.60 $18.00 $35,478.00 $12.55 $24,736.05 #1-47 0635-2-11; (LIGHTING) PULL & SPLICE BOX, F&I, (13" X 24") COVER SIZE 1 Each $1,800.00 $1,800.00 $1,348.00 $1,348.00 $1,947.00 $1,947.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,570.00 $1,570.00 #1-48 919528100 DIRECTIONAL INDICATORS 24 Square Foot $62.00 $1,488.00 $60.00 $1,440.00 $55.00 $1,320.00 $60.00 $1,440.00 $150.00 $3,600.00 $97.70 $2,344.80
#1-49
GENERAL CONDITIONS: PERFORMANCE
AND PAYMENT GUARANTY AND
INSURANCE
Premiums for Bonds and Insurance required for this Project. The costs are not to exceed 3% of the Total Bid Price. Any amount in excess of 3% will be moved to Line Item #1-3, Maintenance of Traffic; and will not change the Total Price. 1 Lump Sum $36,500.00 $36,500.00 $45,000.00 $45,000.00 $27,000.00 $27,000.00 $88,692.00 $88,692.00 $50,000.00 $50,000.00 $19,257.47 $19,257.47
SIGNALIZATION PAY
ITEMS: Totals $410,306.00 $340,433.00 $427,005.30 $291,045.00 $345,115.00 $350,899.45 #2-1 0630-2-11 CONDUIT, F & I, OPEN TRENCH 341 Linear Foot $26.00 $8,866.00 $18.00 $6,138.00 $22.00 $7,502.00 $15.00 $5,115.00 $30.00 $10,230.00 $17.90 $6,103.90 #2-2 0630-2-12 CONDUIT, F & I, DIRECTIONAL BORE 346 Linear Foot $50.00 $17,300.00 $50.00 $17,300.00 $55.00 $19,030.00 $35.00 $12,110.00 $40.00 $13,840.00 $47.40 $16,400.40 #2-3 0632-7-1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, F & I 1 Per Intersection $11,500.00 $11,500.00 $8,000.00 $8,000.00 $16,071.00 $16,071.00 $10,000.00 $10,000.00 $12,500.00 $12,500.00 $8,970.00 $8,970.00 #2-4 0632-7-6 SIGNAL CABLE, REMOVE- INTERSECTION 1 Per Intersection $3,000.00 $3,000.00 $1,200.00 $1,200.00 $4,374.00 $4,374.00 $500.00 $500.00 $500.00 $500.00 $1,250.00 $1,250.00 #2-5 0635-2-11; (SIGNALIZATION) PULL SPLICE BOX, F & I, (13" X 24") COVER SIZE 26 Each $1,750.00 $45,500.00 $1,500.00 $39,000.00 $1,860.00 $48,360.00 $1,000.00 $26,000.00 $1,500.00 $39,000.00 $1,520.00 $39,520.00 #2-6 0635-2-12; (SIGNALIZATION) PULL & SPLICE BOX, F & I, (24" X 36") COVER SIZE 1 Each $3,000.00 $3,000.00 $2,800.00 $2,800.00 $3,992.00 $3,992.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 $2,680.00 $2,680.00 #2-7 0635-2-30 PULL & SPLICE BOX, INSTALL 1 Each $1,000.00 $1,000.00 $1,100.00 $1,100.00 $1,357.00 $1,357.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00 $1,150.00 $1,150.00 #2-8 0639-1122 ELECTRICAL POWER SERVICE, F&I, UNDERGROUND, METER FURNISHED BY CONTRACTOR 1 Assembly $5,400.00 $5,400.00 $2,500.00 $2,500.00 $6,210.00 $6,210.00 $5,000.00 $5,000.00 $7,500.00 $7,500.00 $2,780.00 $2,780.00 #2-9 0639-1620 ELECTRICAL POWER SERVICE, REMOVE, UNDERGROUND 1 Assembly $2,500.00 $2,500.00 $700.00 $700.00 $1,386.00 $1,386.00 $700.00 $700.00 $750.00 $750.00 $623.85 $623.85 #2-10 0639-2-1 ELECTRICAL SERVICE WIRE, F & I 45 Linear Foot $20.00 $900.00 $15.00 $675.00 $7.70 $346.50 $20.00 $900.00 $25.00 $1,125.00 $11.10 $499.50 #2-11 0639-2-6 ELECTRICAL SERVICE WIRE, REMOVE 20 Linear Foot $2.00 $40.00 $1.00 $20.00 $0.44 $8.80 $1.00 $20.00 $1.00 $20.00 $0.55 $11.00 #2-12 0639-3-11 ELECTRICAL SERVICE DISCONNECT, F&I, POLE MOUNT 1 Each $2,800.00 $2,800.00 $2,500.00 $2,500.00 $3,012.00 $3,012.00 $2,800.00 $2,800.00 $2,000.00 $2,000.00 $2,440.00 $2,440.00 #2-13 0641-2-12 PRESTRESSED CONCRETE POLE, F&I, TYPE P-II SERVICE POLE 1 Each $3,500.00 $3,500.00 $2,800.00 $2,800.00 $4,361.00 $4,361.00 $2,500.00 $2,500.00 $2,500.00 $2,500.00 $2,890.00 $2,890.00 #2-14 0641-2-60 PRESTRESSED CONCRETE POLE, COMPLETE POLE REMOVAL - PEDESTAL/SERVICE POLE 1 Each $2,500.00 $2,500.00 $900.00 $900.00 $1,093.00 $1,093.00 $500.00 $500.00 $750.00 $750.00 $831.80 $831.80 #2-15 0646-1-11 ALUMINUM SIGNALS POLE, PEDESTAL, F & I 8 Each $3,000.00 $24,000.00 $2,500.00 $20,000.00 $4,080.00 $32,640.00 $1,300.00 $10,400.00 $2,000.00 $16,000.00 $2,420.00 $19,360.00 #2-16 0646-1-60 ALUMINUM SIGNALS POLE, REMOVE 8 Each $500.00 $4,000.00 $600.00 $4,800.00 $721.00 $5,768.00 $200.00 $1,600.00 $500.00 $4,000.00 $519.90 $4,159.20 #2-17 0649-21-15 MAST ARM ASSEMBLY, FURNISH & INSTALL, SINGLE ARM 70' 1 Each $98,000.00 $98,000.00 $105,000.00 $105,000.00 $120,000.00 $120,000.00 $95,000.00 $95,000.00 $110,000.00 $110,000.00 $115,794.15 $115,794.15 #2-18 0649-26-5 MAST ARM ASSEMBLY, REMOVE, DEEP FOUNDATION, BOLT ON ATTACHMENT 1 Each $6,500.00 $6,500.00 $14,000.00 $14,000.00 $13,172.00 $13,172.00 $8,000.00 $8,000.00 $5,000.00 $5,000.00 $14,500.00 $14,500.00 #2-19 0650-1-14 VEHICULAR TRAFFIC SIGNAL, F & I, ALUMINUM, 3 SECTION, 1 WAY 14 Assembly $2,000.00 $28,000.00 $2,000.00 $28,000.00 $2,458.00 $34,412.00 $1,800.00 $25,200.00 $1,800.00 $25,200.00 $1,860.00 $26,040.00 #2-20 0650-1-70 VEHICULAR TRAFFIC SIGNAL, RELOCATE - INCLUDES REMOVAL AND REINSTALLATION 3 Assembly $1,200.00 $3,600.00 $1,200.00 $3,600.00 $1,595.00 $4,785.00 $800.00 $2,400.00 $650.00 $1,950.00 $1,190.00 $3,570.00
#2-21 0650-2109 VEHICULAR SIGNAL AUXILIARIES, REPAIR/REPLACE/RETROFIT, FURNISH & INSTALL, BACKPLATE, FLEXIBLE REQUIRED 3 Each $950.00 $2,850.00 $900.00 $2,700.00 $635.00 $1,905.00 $750.00 $2,250.00 $600.00 $1,800.00 $770.60 $2,311.80 #2-22 0653-1-11 PEDESTRIAN SIGNAL, F & I LED COUNTDOWN, 1 WAY 8 Assembly $2,400.00 $19,200.00 $1,200.00 $9,600.00 $1,179.00 $9,432.00 $1,200.00 $9,600.00 $1,500.00 $12,000.00 $1,090.00 $8,720.00 #2-23 0660-4-11 VECHICLE DETECTION SYSTEM - VIDEO, F & I CABINET EQUIPMENT 2 Each $20,000.00 $40,000.00 $4,500.00 $9,000.00 $19,588.00 $39,176.00 $12,000.00 $24,000.00 $5,000.00 $10,000.00 $4,700.00 $9,400.00 #2-24 0660-4-12 VECHICLE DETECTION SYSTEM - VIDEO, F & I ABOVE GROUND EQUIPMENT 2 Each $17,000.00 $34,000.00 $12,500.00 $25,000.00 $5,571.00 $11,142.00 $4,500.00 $9,000.00 $12,500.00 $25,000.00 $13,000.00 $26,000.00 #2-25 0660-4-42 VEHICLE DETECTION SYSTEM - VIDEO, RELOCATE, ABOVE GROUND EQUIPMENT 3 Each $4,000.00 $12,000.00 $1,500.00 $4,500.00 $1,587.00 $4,761.00 $1,000.00 $3,000.00 $1,500.00 $4,500.00 $1,500.00 $4,500.00 #2-26 0665-1-12 PEDESTRIAN DETECTOR, FURNISH & INSTALL, ACCESSIBLE 8 Each $1,600.00 $12,800.00 $2,000.00 $16,000.00 $1,929.00 $15,432.00 $2,500.00 $20,000.00 $2,000.00 $16,000.00 $2,180.00 $17,440.00 #2-27 0676-1500 TRAFFIC SIGNAL CONTROLLER CABINET, ADJUST/MODIFY 1 Each $6,800.00 $6,800.00 $2,000.00 $2,000.00 $5,703.00 $5,703.00 $3,500.00 $3,500.00 $7,500.00 $7,500.00 $2,070.00 $2,070.00 #2-28 0700-3201 SIGN PANEL, FURNISH & INSTALL OVERHEAD MOUNT, UP TO 12 SF 4 Each $750.00 $3,000.00 $1,000.00 $4,000.00 $1,100.00 $4,400.00 $600.00 $2,400.00 $1,500.00 $6,000.00 $1,000.00 $4,000.00 #2-29 0700-3601 SIGN PANEL, REMOVE, UP TO 12 SF 3 Each $250.00 $750.00 $200.00 $600.00 $484.00 $1,452.00 $250.00 $750.00 $250.00 $750.00 $207.95 $623.85 #2-30 0700-5-22 INTERNALLY ILLUMINATED SIGN, F & I, OVERHEAD MOUNT, 12-18 SF 1 Each $4,500.00 $4,500.00 $4,000.00 $4,000.00 $4,436.00 $4,436.00 $3,800.00 $3,800.00 $3,500.00 $3,500.00 $4,210.00 $4,210.00 #2-31 0700-5-50 INTERNALLY ILLUMINATED SIGN, RELOCATE 1 Each $2,500.00 $2,500.00 $2,000.00 $2,000.00 $1,286.00 $1,286.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $2,050.00 $2,050.00
SIGNING & PAVEMENT
MARKING PAY ITEMS:
Totals $99,788.51 $116,569.00 $78,622.06 $87,525.47 $107,907.45 $84,887.46 #3-1 0700-1111 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, LESS THAN 12 SF 7 Each $650.00 $4,550.00 $950.00 $6,650.00 $605.00 $4,235.00 $695.00 $4,865.00 $1,650.00 $11,550.00 $714.80 $5,003.60 #3-2 0700-1112 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, 12.0-20.0 SF 5 Each $1,800.00 $9,000.00 $1,850.00 $9,250.00 $2,200.00 $11,000.00 $2,350.00 $11,750.00 $2,250.00 $11,250.00 $1,920.00 $9,600.00 #3-3 0700-1600 SINGLE COLUMN GROUND SIGN ASSEMBLY, REMOVE 18 Each $225.00 $4,050.00 $150.00 $2,700.00 $220.00 $3,960.00 $10.00 $180.00 $25.00 $450.00 $111.90 $2,014.20 #3-4 0700-3501 SIGN PANEL, RELOCATE, UP TO 12 SF 3 Each $250.00 $750.00 $350.00 $1,050.00 $110.00 $330.00 $375.00 $1,125.00 $500.00 $1,500.00 $481.10 $1,443.30 #3-5 0700-13-15 RETROREFLECTIVE SIGN STRIP, FURNISH & INSTALL 5' 3 Each $120.00 $360.00 $650.00 $1,950.00 $110.00 $330.00 $200.00 $600.00 $300.00 $900.00 $115.20 $345.60
$50,000.00 $50,000.00 $2,125,555.00 $2,685,523.49 $2,705,003.72 $2,726,125.84 $2,948,000.00 $3,199,296.84
Bid Tabulation TRN2132636C1, Royal Palm Boulevard from East of University Drive to Riverside Drive $50,000.00 $50,000.00 $50,000.00 $50,000.00
Weekley Asphalt Paving Inc.
$2,898,000.00$2,655,003.72 $3,149,296.84$2,075,555.00 $2,635,523.49 $2,676,125.84
AUM Construction, IncR&D Paving Ranger Construction Industries, Inc.TRAFFICO LLC The Stout Group, LLC
Bid Open Date: August 12, 2026 Bid Amount
Bid Close Date: Septmeber 14, 2026 Bid Allowance Total Cost
# Items Item
Description Quantity Required
Unit of
Measure Unit Price
Total Extended Amount
Unit Price
Total Extended Amount
Unit Price
Total Extended Amount
Unit Price
Total Extended Amount
Unit Price
Total Extended Amount
Unit Price
Total Extended Amount
$50,000.00 $50,000.00 $2,125,555.00 $2,685,523.49 $2,705,003.72 $2,726,125.84 $2,948,000.00 $3,199,296.84
Bid Tabulation TRN2132636C1, Royal Palm Boulevard from East of University Drive to Riverside Drive $50,000.00 $50,000.00 $50,000.00 $50,000.00
Weekley Asphalt Paving Inc.
$2,898,000.00$2,655,003.72 $3,149,296.84$2,075,555.00 $2,635,523.49 $2,676,125.84
AUM Construction, IncR&D Paving Ranger Construction Industries, Inc.TRAFFICO LLC The Stout Group, LLC
#3-6 0706-1-3 RAISED PAVEMENT MARKER, TYPE B 726 Each $6.00 $4,356.00 $5.00 $3,630.00 $6.35 $4,610.10 $5.00 $3,630.00 $6.00 $4,356.00 $4.60 $3,339.60 #3-7 0710-12290 PAINTED PAVEMENT MARKINGS DURABLE PAINT, YELLOW, ISLAND NOSE 34 Square Foot $4.80 $163.20 $10.00 $340.00 $4.40 $149.60 $4.00 $136.00 $10.00 $340.00 $4.60 $156.40 #3-8 0710-90 PAINTED PAVEMENT MARKINGS, FINAL SURFACE 1 Lump Sum $16,425.00 $16,425.00 $25,000.00 $25,000.00 $2,200.00 $2,200.00 $13,216.80 $13,216.80 $11,725.90 $11,725.90 $10,400.00 $10,400.00 #3-9 0711-11102 THERMOPLASTIC, STANDARD, WHITE, SOLID, 8" FOR INTERCHANGE AND URBAN ISLAND 0.092 Gross Mile $7,920.00 $728.64 $8,000.00 $736.00 $10,164.00 $935.09 $6,600.00 $607.20 $10,000.00 $920.00 $8,420.00 $774.64 #3-10 0711-11123 THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT 1618 Linear Foot $2.88 $4,659.84 $5.00 $8,090.00 $3.60 $5,824.80 $2.40 $3,883.20 $3.75 $6,067.50 $3.15 $5,096.70 #3-11 0711-11124 THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" FOR DIAGONALS AND CHEVRONS 425 Linear Foot $4.32 $1,836.00 $8.00 $3,400.00 $4.95 $2,103.75 $3.60 $1,530.00 $5.50 $2,337.50 $4.70 $1,997.50 #3-12 0711-11125 THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE AND CROSSWALK 283 Linear Foot $5.76 $1,630.08 $10.00 $2,830.00 $6.60 $1,867.80 $4.80 $1,358.40 $7.25 $2,051.75 $6.30 $1,782.90 #3-13 0711-11141 THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 GAP EXTENSION, 6" 0.248 Gross Mile $2,760.00 $684.48 $5,000.00 $1,240.00 $2,200.00 $545.60 $2,300.00 $570.40 $3,000.00 $744.00 $2,340.00 $580.32 #3-14 0711-11160 THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR SYMBOL 5 Each $144.00 $720.00 $250.00 $1,250.00 $275.00 $1,375.00 $120.00 $600.00 $300.00 $1,500.00 $80.45 $402.25 #3-15 0711-11170 THERMOPLASTIC, STANDARD, WHITE, ARROW 32 Each $96.00 $3,072.00 $150.00 $4,800.00 $138.00 $4,416.00 $80.00 $2,560.00 $150.00 $4,800.00 $57.45 $1,838.40 #3-16 0711-11224 THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL OR CHEVRONS 478 Linear Foot $4.32 $2,064.96 $6.00 $2,868.00 $4.95 $2,366.10 $3.60 $1,720.80 $5.30 $2,533.40 $4.70 $2,246.60 #3-17 0711-11241 THERMOPLASTIC, STANDARD, YELLOW, 2-4 DOTTED GUIDE LINE / 6-10 DOTTED EXTENSION LINE, 6" 0.205 Gross Mile $2,760.00 $565.80 $3,500.00 $717.50 $2,200.00 $451.00 $2,300.00 $471.50 $3,000.00 $615.00 $2,360.00 $483.80 #3-18 0711-14125 THERMOPLASTIC, PREFORMED, WHITE, SOLID, 24" FOR CROSSWALK 618 Linear Foot $20.52 $12,681.36 $20.00 $12,360.00 $6.60 $4,078.80 $19.00 $11,742.00 $22.00 $13,596.00 $18.95 $11,711.10 #3-19 0711-14160 THERMOPLASTIC, PREFORMED, WHITE, MESSAGE 5 Each $312.00 $1,560.00 $350.00 $1,750.00 $192.50 $962.50 $260.00 $1,300.00 $500.00 $2,500.00 $244.85 $1,224.25 #3-20 0711-14170 THERMOPLASTIC, PREFORMED, WHITE, ARROW 5 Each $180.00 $900.00 $250.00 $1,250.00 $137.50 $687.50 $150.00 $750.00 $250.00 $1,250.00 $102.30 $511.50 #3-21 0711-16101 THERMOPLASTIC, STANDARD, OTHER SURFACES, WHITE, SOLID, 6" 1.168 Gross Mile $6,849.00 $7,999.63 $6,500.00 $7,592.00 $7,260.00 $8,479.68 $6,336.00 $7,400.45 $7,300.00 $8,526.40 $6,410.00 $7,486.88 #3-22 0711-16102 THERMOPLASTIC, STANDARD, OTHER SURFACES, WHITE, SOLID, 8" 0.085 Gross Mile $7,920.00 $673.20 $6,500.00 $552.50 $10,164.00 $863.94 $6,600.00 $561.00 $10,000.00 $850.00 $8,100.00 $688.50 #3-23 0711-16131 THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SKIP, 6", 10-30 SKIP OR 3-9 LANE DROP 0.382 Gross Mile $2,760.00 $1,054.32 $6,500.00 $2,483.00 $3,300.00 $1,260.60 $2,300.00 $878.60 $2,000.00 $764.00 $1,610.00 $615.02 #3-24 0711-16201 THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6" 0.92 Gross Mile $7,600.00 $6,992.00 $6,500.00 $5,980.00 $7,260.00 $6,679.20 $6,336.00 $5,829.12 $6,500.00 $5,980.00 $5,720.00 $5,262.40 #3-25 0714-10 GREEN - COLORED PAVEMENT MARKINGS, BIKE LANE 540 Square Foot $22.80 $12,312.00 $15.00 $8,100.00 $16.50 $8,910.00 $19.00 $10,260.00 $20.00 $10,800.00 $18.30 $9,882.00
IRRIGATION PAY ITEMS:
Totals $27,000.00 $70,000.00 $22,000.00 $48,890.00 $30,000.00 $36,000.00
#4-1 0590-70
IRRIGATION SYSTEM REMARKS: COMPLETE IRRIGATION; INCLUDE ALL ITEMS AND ACTIVTIES ASSOCIATED WITH THE IRRIGATION AS PER THE PLANS, DETAILS, AND NOTES IRRIGATION SCHEDULE: i.)IRRIGATION HEADS (57 EACH) ii.)SWING ASSEMBLY (57 EACH) iii.)LATERAL - SCHEDULE 40 PVC PIPE (800 LINEAR FOOT - *SIZES RANGING FROM 1/2-INCH to 3/4- INCH) iv.)MAIN LINE - SCHEDULE 40 PVC PIPE (150 LINEAR FOOT - *SIZES RANGING FROM 1.5-INCH to 2-INCH) v.)WIREING (150 LINEAR FOOT) vi.)SLEEVES - SCHEDULE 40 PVC PIPE (20 LINEAR FOOT - *SIZES RANGING FROM 4-INCH to 6-INCH) vii.)JUNCTION BOX (2 EACH) viii.)VALVES (2 EACH - *SIZES RANGING FROM 1/2-INCH to 3/4-INCH) *Sizes shown are approximate ranges for bidding purposes. As this is a modification to an existing system, the Contractor shall field-verify all irrigation component sizes and provide materials matching the existing system. No additional compensation will be made for size variations within the existing system. 1 Lump Sum $27,000.00 $27,000.00 $70,000.00 $70,000.00 $22,000.00 $22,000.00 $48,890.00 $48,890.00 $30,000.00 $30,000.00 $36,000.00 $36,000.00
Sheet 1