410_S__Webster.msg
MSG file 788 KB Posted
- Attached to
- 410 S. WEBSTER - DEMOLITION
- Solicitation number
- 2025-COMMUNITY DEVELOPMENT-085
- Issued by
- Kalamazoo County, Huntington Woods City, Michigan
About this file
This file is a demolition project document from the City of Jackson, Michigan, involving a property located at 410 S. Webster Street. The project involves the complete demolition of an approximately 869 square foot residential building constructed in 1920, with bids to be returned within one week. The demolition is to be completed no later than December 15, 2025, with full project completion by December 20, 2025. If winter weather conditions permit and authorization is received from the Community Development Department, a potential winter work payment of 70/30 may be issued, with final concrete and yard installations to be completed no later than April 15, 2026.
The project includes specific requirements for site preparation and restoration, such as hazardous materials abatement in compliance with MIOSHA and DEQ regulations, compacting backfill material, removing and replacing concrete approaches and sidewalks, managing vegetation by removing trees and brush while preserving select trees, and regrading the site with 3 inches of topsoil, seeding, and straw cover. A pre-demolition compliance survey was conducted by Red Cedar Consulting, which found no asbestos-containing materials requiring abatement. The project will require filing a Notification of intent to Renovate/Demolish with the Michigan Department of Environmental Quality-Air Quality Division at least 10 working days prior to demolition activities.
Text of this file
410 S. Webster
| From |
| Brian Taylor |
| To |
| Kari Kerstetter |
| Cc |
| Shane LaPorte; Shannon Williams |
| Recipients |
| KKerstetter@cityofjackson.org; slaporte@cityofjackson.org; swilliams@cityofjackson.org |
Kari, We need to seek bids for this general fund demolition project. Please have bids returned in a week as typical and list that the home is to be demolished with quality rough grade no later than 12-15-25 with full completion date of 12-20-25. If winter weather conditions and authorization is provided by Community Development Dept, winter work payment of 70/30 may be issued for final concrete and yard installations to be completed no later than April 15,2026.
If you have any questions, please let me know.
Thank you, Brian
0231621a-3146-46cf-bc0b-b38500889c6f.pdf
P.O. Box 13216
Lansing, MI 48901
Phone: 888.449.4566
Fax: 888.448.8739 www.redcedarconsulting.net
October 16, 2025
Mr. Brian Taylor
City of Jackson
Community Development Department
Jackson, MI 49202
RE: Asbestos Containing Material and Hazardous Materials Inspection
410 S Webster St. Jackson, MI 49203
Parcel ID: 3-077100000
Dear Mr. Taylor:
Red Cedar Consulting has completed an asbestos-containing material (ACM) and hazardous materials inspection at 410 S Webster St. Jackson, Michigan (Subject Property). This inspection was completed at the request of the City of Jackson to comply with the United States Environmental Protection Agency
(USEPA) requirements for demolition and renovation set forth under the National Emissions Standards for Hazardous Air Pollutants (NESHAP, 40 CFR Part 61). This inspection was also completed to comply with the Occupational Safety and Health Administration (OSHA) Asbestos Standards for Construction
(29 CFR 1926.1101) which limits employee exposure to asbestos.
SUBJECT PROPERTY
The Subject Property is comprised of a .10-acre residential parcel which contains an approximate 869 square foot residential building (the Building) constructed in 1920. The Building was constructed on a concrete basement with two aboveground floors. The exterior walls of the Building were finished with vinyl and wood lap while the roof was sealed with asphalt shingles. The Building can be further divided into a front porch, living room, dining room, kitchen, bath, and front porch on the first floor while the second floor contains two bedrooms.
VISUAL INSPECTION AND SAMPLING
Asbestos Containing Materials Inspection
Jeff Cain of Red Cedar Consulting (Red Cedar), accredited State Of Michigan/EPA Asbestos Building
Inspector (Accreditation Number A14057) who completed training per the Michigan Asbestos Workers
Accreditation Act 440, completed an inspection of the Subject Property on September 15, 2025, for suspected asbestos containing building materials.
Project No.: 12-1027
This inspection, and subsequent sample collection was completed in accordance with the USEPA
Asbestos Hazard Emergency Response Act (AHERA) (40 CFR Part 763) assessment and sampling protocol.
During the completion of the inspection, each area of the Subject Property was visually inspected for asbestos containing building materials (ACBM). Following the completion of the visual inspection, Red
Cedar staff identified each suspect area of friable and non-friable ACBM and sorted them into one of three homogenous categories for sampling purposes. AHERA defines friable as a material that when dry, may be crumbled, pulverized, or reduced to powder by hand pressure. A homogenous area is defined by
OSHA as an area of surfacing, thermal system insulation (TSI) or miscellaneous material that is uniform in color and texture. Surfacing materials are most commonly found in sprayed-on, troweled-on or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members. TSI refers to materials applied to pipes, fittings, boilers, ductwork, or other components to prevent heat loss or gain, or condensation. Any material that does not fall under the surfacing or TSI category, such as floor tile, drywall, and acoustical ceiling tile are placed into the miscellaneous materials category.
Following the completion of the visual inspection, Red Cedar staff identified the following materials as suspect ACBM:
• Roofing Materials
• Fiberboard
• Tar Paper
• Window Caulk
• 12”x12” Ceiling Tile with Glue Pods
• Linoleum
• Drywall with Compound
• Plaster
Red Cedar staff collected thirty-three samples of suspect ACBM separated into fourteen distinct homogenous groups for laboratory analysis. Samples were collected and submitted to APEX Research
Inc. Laboratories (APEX) (Accreditation Number 102118-0) for laboratory analysis. Analysis was completed utilizing polarized light microscopy (PLM) which is the Environmental Protection Agency
(EPA) approved method for analysis of bulk materials for asbestos. PLM analysis completed pursuant to method (EPA 600/M4-82-020) identifies asbestos fiber bundles by the visual properties displayed when the sample is treated with various dispersion staining liquids. The laboratory report completed following the sample analysis indicates if asbestos is present, and at what percentage along with a description and percentage of other fibrous and non-fibrous materials and sample color. Chain-of-custody documentation was followed from sample collection through shipping and receiving of the samples at the designated laboratory. The documentation assures that samples will meet the quality assurance/quality control measures defined by AHERA. The laboratory analytical report prepared by APEX for the thirty-three samples is included as Attachment A.
Hazardous Materials Inspection
On September 15, 2025, the Subject Property was also inspected for the presence of hazardous materials which include but are not limited to polychlorinated biphenyls (PCBs) and potential mercury containing equipment and any items or containers that may contain or be classified as a hazardous or regulated material. Each material, if identified, was documented along with the approximate location. Any materials identified as hazardous are included in Table 1.
INSPECTION RESULTS AND RECOMMENDATIONS
During the completion of the asbestos inspection, thirty-three samples of suspect ACM were collected and are documented in Table 2 along with the Red Cedar sample number, description, friability, material type, ACM classification, sample location, material quantity and laboratory analytical results. A Site
Diagram was prepared which provides the general building layout and sample locations and is included as
Attachment B.
ACM, as defined by the USEPA NESHAP is “any material containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763 Section 1, Polarized
Light Microscopy”.
Friable ACM is defined by NESHAP as any material containing more than 1 percent asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. Friable ACM is a concern due to the ease of unintentionally disturbing the ACM which may result in “visible emissions” which is known as a Fiber Release Episode.
Non-friable asbestos-containing material is defined as “material containing more than 1 percent asbestos that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Non-friable
ACMs are separated into Category I and Category II ACM. Category I ACM is any asbestos containing packing’s, gaskets, resilient floor coverings (vinyl floor tile and linoleum are examples of these) and asphalt roofing products. Category II ACM is stated by NESHAP as any material excluding Category I non-friable ACM such as drywall, plaster or fiberboard insulation.
Presumed Asbestos Containing Material
Presumed Asbestos Containing Materials (PACM) are suspect surfacing, TSI and miscellaneous materials found in buildings constructed prior to 1980 which are classified as and due to the age of the structure, are assumed to be ACM and do not require sample collection and analysis. OSHA dictates that PACM may be “rebutted” following a complete inspection pursuant to AHERA protocol.
No PACM was identified during the completion of this inspection. All suspect materials identified were sampled and analyzed for ACM.
Table 3 lists the location, material description, friability, condition, material type (surfacing, thermal or miscellaneous) and approximate quantity of all PACM documented at the Subject Property.
Table 4 provides a summary of all ACM documented at the Subject Property which includes the material location, description, and approximate quantity.
Friable ACM’s
No friable ACM’s were identified during the completion of this inspection.
Category I ACM
No Category I ACM was identified during the completion of this inspection.
Category II ACM
No Category II non-friable ACM was identified during the completion of this inspection.
RECOMMENDATIONS
Asbestos Containing Materials
No ACM was identified within the Building that would require abatement prior to demolition/renovation of the structure.
Please note: The location of samples obtained during this inspection were in a random fashion and areas that were not identified during this inspection may be damaged or have become damaged since the inspection was completed. If Category I or Category II friable materials are discovered prior to or during the demolition/renovation process, these materials must be abated prior to commencement of any demolition/renovation activities at the Subject Property.
Hazardous Materials
Hazardous Materials identified at the Subject Property and documented in Table 1 which require proper removal and disposal consist of the following items:
• No Hazardous Materials Identified
REGULATORY REQUIREMENTS
A Notification of intent to Renovate/Demolish form must be filed with the Michigan Department of
Environmental Quality- Air Quality Division at least 10 working days prior to any renovation or demolition activities at a site.
The Notification of Intent to Renovate/Demolish form must also be completed and submitted to the
MIOSHA-Asbestos Program whenever demolition, encapsulation and/or renovation activities at a site involving greater than ten lineal feet and/or fifteen square feet of ACM will be completed.
Regulated asbestos containing materials per NESHAP (40 CFR Part 61) which falls into any of the following categories are ACM’s that must be removed prior to any renovation/demolition activities at the
Subject Property.
• Friable asbestos material.
• Category I non-friable ACM that has become friable.
• Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading.
• Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of renovation or demolition operations.
Asbestos abatement should only be performed by a certified asbestos abatement contractor licensed to complete abatement work. The contractor must also follow the standards and requirements set forth per the OSHA Asbestos Standards for Construction (29 CFR 1926.1101) and the USEPA NESHAP (40 CFR
Part 61).
Additional information regarding the OSHA Asbestos Standards for Construction (29 CFR 1926.1101) and the USEPA NESHAP (40 CFR Part 61) can be obtained by contacting the associated agency below.
NESHAP Asbestos Program MIOSHA-CSHD-Asbestos Program
Department of Environmental Quality State of Michigan
Phone: 517-284-6777 Phone: 517-284-7680
Email: asbestos@michigan.gov
DISCLAIMER
Red Cedar Consulting performed destructive testing methods in an attempt to access and inspect all areas of the Building. Unfortunately, due to the age of construction along with multiple additions/renovations that may have been completed on the Building, additional inspections may be required if suspect ACM material not documented within this report is encountered during renovation/demolition activities.
This report was prepared at the request and for exclusive use by the City of Jackson and may not be reproduced or sold without written permission from Red Cedar Consulting.
We appreciate the opportunity to provide the requested services. Please contact us at (888) 449-4566 with any questions or concerns.
Sincerely, Red Cedar Consulting
Aaron Paquet
Michigan/EPA Certified Asbestos Building Inspector
(A30955)
©2025 Red Cedar Consulting, LLC.
410 S. Webster - Demolition Special Conditions.docx
To: Kari Kerstetter, Purchasing Department
From: Neighborhood & Economic Operations Dept.
Date: 11-030-13-25
Re: Please solicit bids for demolition of the following property as soon as possible.
Property Address: 521 Wildwood Ave410 S. Webster
Parcel Number: 3-07712-006600000
S.
Sq Ft: 8694947 sq. ft. (househouse)
Special Conditions to include:
1) Hazardous materials must be abated in accordance with MIOSHA and DEQ regulations and the attached Pre-Demolition Compliance Survey assessment.
2) Compact all clean backfill material with a hoe-pack or vibrating roller compactor.
3) Remove: _ _1/2 of double wide approac1 h_ curb(s) cut(s) and entry approach(s). (1512 lineal feet- S half of double wide approach)
Install 25 lineal feet of concrete curb and gutter. F-4 along street and angled entry approach to restore single lane drive to N parcel.
4) Install _ __40_ lineal feet of curb and gutter.(to reduce W half of approach to single approach with 16’ throat as marked on site) If road is in disrepair will need to be cut street and have forms installed to form front gutter pan and then have road repaired with hot patch asphalt upon completion of concrete work.
5) Remove and replace _ 078 lineal feet (6’ wide to match walks to E and W) _of cracked, heaved and broken public sidewalks. Provide maximum cross slope of 2%
6) See enclosed water and sewer service records for approximate location and any special instructions for shared services. If no service card is provided it is the contractor’s responsibility to insure that neighboring water and sewer services are operational at the conclusion of the demolition.
1) Trees/shrubs: Remove all trees, brush overgrowth from south and trim along S chain link fence. Remove all brush/trees and overgrowth along E and W property line with exception of 1 large tree S of the home along the E line. Note remove brush from each side of fence to the SW. Leave 1 large tree to the NE corner. All other trees, stumps, brush and overgrowth to be removed to fully clean property along east and south property lines. . Trim remaining trees minimum 10’-12’ above grade. Plant 2 – 2 ½” caliper Japanese Lilac all brush from the propertytrees evenly spaced to the south side of the new sidewalk along Wildwood Ave. Center trees 3’ from back of sidewalk
2) Miscellaneous: Remove all concrete drive from site, shed and regrade full site to blend with adjacent grades and install 3” top soil/seed/strawchain link fencing to the east and south ex Saw cut driveway from north to south to allow for removal of all hard surfaces from 521 Wildwood. See paint markings on site. Note, any damage to adjacent W property will be the responsibility of the demolition contractor to replace. Use caution with trucks and equipment so as not to damage adjacent driveway areas. Remove rocks to NE corner. Level all grades to blend with adjacent grades. Provide 3” top soil, seed, straw and have final grade and soils verified by inspection prior to straw cover. Regrade full site to smooth all grades and to blend with all surrounding elevations.
image1.jpeg image2.jpeg
410 S WEBSTER- water sewer card.pdf
(t e/ o t ts N o\h
CIAUSS U:IM:IS 3ZIS I
o)J14.Dv ^VJN\ntfrf Nvutsuo!asrNll{ssSssv r4t,t ??t^nl '41)
(r1
///,o) . 7to97 ol?/s 1707w/>9/Jv)/oQl :sYuvntu
Il lno Nvl'lc
Jo lNt't Aluldoud-lo_-.ll .-oNv lo lNt't lluldoud-lo- rJ-XOg dors
JO 3Nt'r lJ.uldoud-lo--'11-Nlvll .Nt-
-Vzl,fl7-ro 3Nr1 ^lu3doud-il
!o- O-.u-ZS-oNY nln lfttz-lo JNn Aruidoud--g-lo,J.J-Z-xos dors aa/"JOIN|rAluldoUd 9 JoJ: 'rt eeNty$'NtZf
0r't'tvrsNt 3lv0oN 'o ilt m
=m a a m
- >,"p-Jlohu3s ut.wr lzts
4-ce:Z -AJtg?(7's e/ h
SS]UOOV
s a1tt7 TltYW
1+N
I
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .