40-52100-24-06142_40-52100-24-06142 - Central Reservation System Services.docx.DOCX
DOCX document 217 KB Posted
- Attached to
- NMBHI FORENSIC FACILITY
- Solicitation number
- 40-35000-24-08760
- Issued by
- San Miguel County, Las Cruces City, New Mexico
About this file
This document is a Request for Proposals (RFP) issued on behalf of the New Mexico Energy, Minerals and Natural Resources Department (EMNRD), State Parks Division, through the General Services Department (GSD), State Purchasing Division. The RFP requests proposals for Central Reservation System (CRS) services for New Mexico State Parks for a minimum of eight years, with two additional one-year renewals possible. The successful Contractor shall host and operate a CRS that allows visitors to reserve camping sites, yurts, cabins, and other park facilities, as well as sell passes and permits, and provide access for State Parks Division staff to make reservations. The RFP provides detailed requirements for the CRS, including availability, reservation features, reporting, data migration, security, implementation, and transition. Proposals are due by July 30, 2024, and the contract award is anticipated on September 27, 2024.
The RFP outlines pricing terms, including Level 1 and Level 2 pricing, which will assess the Offeror's fees associated with processing online reservations, cancellations, and transactions using a Point-Of-Sale system. The State will provide preferences for New Mexico/Native American Resident businesses. The RFP does not mention any incumbent contractor or current environment details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE PURCHASING
OF THE
GENERAL SERVICES DEPARTMENT
AND
THE STATE OF NEW MEXICO, ENERGY, MINERALS AND
NATURAL RESOURCES DEPARTMENT,
REQUEST FOR PROPOSALS (RFP)
Central Reservation System Services for the State Parks Division
RFP#
40-52100-24-06142
RFP Release Date: July 4, 2024
Proposal Due Date: July 30, 2024
ELECTRONIC-ONLY PROPOSAL SUBMISSION
Table of Contents
| I. | INTRODUCTION | 1 |
| A. | PURPOSE OF THIS REQUEST FOR PROPOSALS | 1 |
| B. | BACKGROUND INFORMATION | 1 |
| C. | SCOPE OF PROCUREMENT | 1 |
| D. | PROCUREMENT MANAGER | 2 |
| E. | PROPOSAL SUBMISSION | 2 |
| F. | DEFINITION OF TERMINOLOGY | 2 |
| G. | PROCUREMENT LIBRARY | 6 |
| II. | CONDITIONS GOVERNING THE PROCUREMENT | 6 |
| A. | SEQUENCE OF EVENTS | 6 |
| B. | EXPLANATION OF EVENTS | 7 |
| 1. | Issue RFP | 7 |
| 2. | Acknowledgement of Receipt Form | 7 |
| 3. | Pre-Proposal Conference | 7 |
| 3. | Deadline to Submit Written Questions | 8 |
| 4. | Response to Written Questions | 8 |
| 5. | Submission of Proposal | 8 |
| 6. | Proposal Evaluation | 9 |
| 7. | Selection of Finalists | 9 |
| 8. | Oral Presentations | 9 |
| 9. | Finalize Contractual Agreements | 9 |
| 10. | Contract Awards | 10 |
| 11. | Protest Deadline | 10 |
| B. | GENERAL REQUIREMENTS | 10 |
| 1. | Acceptance of Conditions Governing the Procurement | 10 |
| 2. | Incurring Cost | 10 |
| 3. | Prime Contractor Responsibility | 10 |
| 4. | Subcontractors/Consent | 11 |
| 5. | Amended Proposals | 11 |
| 6. | Offeror’s Rights to Withdraw Proposal | 11 |
| 7. | Proposal Offer Firm | 11 |
| 8. | Disclosure of Proposal Contents | 11 |
| 9. | No Obligation | 12 |
| 10. | Termination | 12 |
| 11. | Sufficient Appropriation | 12 |
| 12. | Legal Review | 12 |
| 13. | Governing Law | 12 |
| 14. | Basis for Proposal | 12 |
| 15. | Contract Terms and Conditions | 13 |
| 16. | Offeror’s Terms and Conditions | 13 |
| 17. | Contract Deviations | 13 |
| 18. | Offeror Qualifications | 14 |
| 19. | Right to Waive Minor Irregularities | 14 |
| 20. | Change in Contractor Representatives | 14 |
| 21. | Notice of Penalties | 14 |
| 22. | Agency Rights | 14 |
| 23. | Right to Publish | 14 |
| 24. | Ownership of Proposals | 14 |
| 25. | Confidentiality | 15 |
| 26. | Electronic mail address required | 15 |
| 27. | Use of Electronic Versions of this RFP | 15 |
| 28. | New Mexico Employees Health Coverage | 15 |
| 29. | Campaign Contribution Disclosure Form | 16 |
| 30. | Letter of Transmittal | 16 |
| 31. | Disclosure Regarding Responsibility | 17 |
| 32. | New Mexico/Native American Resident Preferences | 18 |
| III. | RESPONSE FORMAT AND ORGANIZATION | 18 |
| A. | NUMBER OF RESPONSES | 18 |
| B. | ELECTRONIC SUBMISSION | 19 |
| C. | PROPOSAL CONTENT AND ORGANIZATION | 20 |
| IV. | SPECIFICATIONS | 21 |
| A. | DETAILED SCOPE OF WORK | 21 |
| B. | TECHNICAL SPECIFICATIONS | 26 |
| 1. | Organizational Experience | 26 |
| 2. | Organizational References | 30 |
| 3. | Mandatory Specification | 31 |
| 4. | Desirable Specification | 33 |
| C. | BUSINESS SPECIFICATIONS | 34 |
| 1. | Performance Surety Bond | 34 |
| 2. | Letter of Transmittal Form | 34 |
| 3. | Campaign Contribution Disclosure Form | 34 |
| 4. | Oral Presentation | 34 |
| 5. | Cost | 34 |
| 6. | New Mexico/Native American Resident Preferences | 34 |
| V. | EVALUATION | 35 |
| A. | EVALUATION POINT SUMMARY | 35 |
| Table 1. Evaluation Factors | 35 | |
| B. | EVALUATION FACTORS | 36 |
| 1. | B.1 Organizational Experience 110 Points Available (See Table 1) | 36 |
| 2. | B.2 Organizational References 90 Points Available (See Table 1) | 36 |
| 3. | B.3 Mandatory Specifications | 36 |
| 4. | B.4 Desirable Specifications | 39 |
| 5. | C.1 Performance Bond Concurrence Letter (See Table 1) | 39 |
| 6. | C.2 Letter of Transmittal (See Table 1) | 39 |
| 7. | C.3 Campaign Contribution Disclosure Form (See Table 1) | 39 |
| 8. | C.4 Oral Presentation (See Table 1) | 40 |
| 9. | C.5 Cost (See Table 1) | 40 |
| 10. | C.6. New Mexico/Native American Resident Preferences | 40 |
| C. | EVALUATION PROCESS | 41 |
| APPENDIX A | 42 | |
| APPENDIX B | 43 | |
| APPENDIX C | 46 | |
| DRAFT CONTRACT | 46 | |
| APPENDIX D | 67 | |
| COST RESPONSE FORM | 67 | |
| COST RESPONSE FORM | 67 | |
| APPENDIX F | 69 | |
| ORGANIZATIONAL REFERENCE QUESTIONNAIRE | 69 |
GSD/SPD Version 1.7 2022-08 iv
I. INTRODUCTION
A. PURPOSE OF THIS REQUEST FOR PROPOSALS
The New Mexico Energy, Minerals and Natural Resources Department (EMNRD), State Parks Division, through the General Services Department (GSD), State Purchasing Division, is requesting proposals for Central Reservation System (CRS) services for New Mexico State Parks.
Pursuant to NMSA 1978, Section 13-1-150, the services contract which may result from this Request for Proposals (RFP) may extend for a minimum of eight years, with two additional one-year renewals possible, as long as the State Parks Division is satisfied with the successful Offeror’s performance and with the concurrence of the GSD State Purchasing Division.
B. BACKGROUND INFORMATION
The State Parks Division currently has more than 1,700 camping sites (approximately 80% of the State Parks Division’s total sites) in the State Parks Division’s reservation inventory and may increase that number over the course of the Contract awarded as a result of this request for proposals (RFP). The successful Contractor shall host and be able to design, develop, manage, and operate a CRS that allows visitors to reserve camping sites, yurts, cabins, and other park facilities such as meeting rooms, lodge, and group shelters, and actively promote state parks, as well as sell the State Parks Division’s Annual Day-Use Passes and Annual Camping Permits and honor promotional coupons, Lifetime Passes, and Disabled Veterans Camping Passes, and that also allows State Parks Division staff to access the Contractor’s CRS system directly to make and adjust reservations on behalf of visitors and other related tasks such as pulling camping reports, validate passes, create park alerts and complaint resolution, and access training modules, among other potential State Parks Division needs.
C. SCOPE OF PROCUREMENT
The State Parks Division is requesting proposals for CRS services for New Mexico State Parks for a minimum of eight years, with two additional one-year renewals possible. CRS services constitute an operational framework by which customers can make reservations via a Call Center or online through an Internet browser, mobile application, or an onsite kiosk. The successful Contractor shall have the capability to staff, operate, and maintain a 24-hour Call Center and an Internet-based CRS, and payment kiosks, as well as generate a wide range of required reports, process financial transactions, and accommodate various State Parks Division promotional/marketing strategies.
This RFP will result in a single award.
This procurement will result in a contractual agreement between two parties; the procurement may ONLY be used by those two parties exclusively.
D. PROCUREMENT MANAGER
The State Parks Division has assigned a Procurement Manager who is responsible for the conduct of this procurement whose name, address, telephone number, and e-mail address are listed below:
| Name: | Robert Stokes, Procurement Manager | |
| Address: | Energy, Minerals and Natural Resources Department |
State Parks Division 1220 S. St. Francis Dr.
Santa Fe, NM 87505 Telephone: (505) 479-0911 Email: Robert.stokes@emnrd.nm.gov
1. Any inquiries or requests regarding this procurement shall be submitted, in writing, to the Procurement Manager. Offerors may contact ONLY the Procurement Manager regarding this procurement. Other state employees or Evaluation Committee members do not have the authority to respond on behalf of the State Parks Division.
2. Protests of the solicitation or award must be submitted in writing to the Protest Manager identified in Section II.B.13. As a Protest Manager has been named in this Request for Proposals, pursuant to §13-1-172 NMSA 1978 and 1.4.1.82 NMAC, ONLY protests delivered directly to the Protest Manager in writing and in a timely fashion will be considered to have been submitted properly and in accordance with statute, rule and this Request for Proposals. Protests submitted or delivered to the Procurement Manager will NOT be considered properly submitted.
E. PROPOSAL SUBMISSION
Submissions of all proposals must be accomplished via SPD’s eProNM electronic procurement system. Refer to Section III.B.1 for instructions.
F. DEFINITION OF TERMINOLOGY
This section contains definitions of terms used throughout this procurement document, including appropriate abbreviations:
“ADA-accessible” means a campsite that meets the requirements of the Americans With Disabilities Act.
“Annual Camping Permit” or “ACP” means an annual permit that permits unlimited camping. The ACP is valid for 12 months from the month of issue.
“Annual Day-Use Pass” or “ADU” means an annual pass that permits unlimited daytime access to a park but does not cover camping fees.
“Agency” means the State Purchasing of the General Services Department or that State Agency sponsoring the Procurement action.
“Attestation of Compliance” or (AoC) means Attestation of Compliance is a declaration of an organization's compliance with Payment Card Industry Data Security Standard (PCI DSS). It is testimony that an organization successfully demonstrated exceptional security best practices to secure cardholder data.
“Award” means the final execution of the Agreement document.
“Confidential” means confidential financial information concerning Offeror’s organization and data that qualifies as a trade secret in accordance with the Uniform Trade Secrets Act NMSA 1978 57-3-A-1 to 57-3A-7. See NMAC 1.4.1.45. As one example, no information that could be obtained from a source outside this request for proposals can be considered confidential information.
“Contract" means any agreement for the procurement of items of tangible personal property, services or construction.
“Contractor" means any business having an Agreement with a state Agency or local public body.
“Coupon” means a promotional item issued by the State Parks Division that can be used as a marketing/advertising tool for reduced fees or no-cost use.
“CRS” means Central Reservation System and includes both the Internet-based operations and the Call Center operations.
“Determination" means the written documentation of a decision of a procurement officer including findings of fact required to support a decision. A determination becomes part of the procurement file to which it pertains.
“Desirable" the terms "may," "can," "should," "preferably," or "prefers" identify a desirable or discretionary item or factor.
Disabled Veterans Camping Pass” means a coupon that can be used for free camping. Currently, a New Mexico Veteran with a fifty percent or greater disability is authorized to obtain three coupons each calendar year valid for one free night’s camping each.
“Electronic Version/Copy” means a digital PDF consisting of text, images or both readable on computers or other electronic devices. The digital form may be submitted via email.
“EMNRD” means Energy, Minerals and Natural Resources Department
“Evaluation Committee" means a body appointed to perform the evaluation of Offerors’ proposals.
“Evaluation Committee Report" means a report prepared by the Procurement Manager and the Evaluation Committee for Agreement award. It will contain written determinations resulting from the procurement.
“Field System” means a component of the CRS that is used for field input/display of data and can support a POS feature.
“Finalist” means an Offeror who meets all the mandatory specifications of this Request for Proposals and whose score on evaluation factors is sufficiently high to merit further consideration by the Evaluation Committee.
“Level 1” means that the Agreement includes all facets of the CRS except the Field System component.
“Level 2” means that the Agreement shall incorporate a Field System component that includes a POS feature. Level 2 shall be used for “cost of lease or purchase for kiosk deployment, and merchandising capability.”
“Mandatory" the terms "must," "shall," "will," "is required," or "are required," identify a mandatory item or factor. Failure to meet a mandatory item or factor will result in the rejection of the Offeror’s proposal.
“Minor Technical Irregularities” means anything in the proposal that does not affect the price quality and quantity or any other mandatory requirement.
“Offeror" is any person, corporation, or partnership who chooses to submit a proposal.
“PCI” or “Payment Card Industry” is the financial industry segment that includes all the various organizations responsible for storing, processing, and transmitting cardholder data. This includes both debit cards and credit cards.
“Point-Of-Contact” or “POC” means the person for the State Parks Division that is to be contacted in the event of a system disruption or for routine notifications or questions. The State Parks Division’s POC for this Agreement may be changed from time to time depending on State Parks Division staff responsibility changes. The State Parks Division shall notify Contractor’s Project Manager within 24 hours of a POC change. The State Parks Division shall identify the initial POC upon the Agreement becoming effective.
“Point-Of-Sale” or “POS” means a component of the CRS that allows field transactions.
“Procurement Manager” means any person or designee authorized by a state Agency or local public body to enter into or administer contracts and make written determinations with respect thereto.
“Project Manager” means the person designated by the Contractor to manage Contractor’s work effort and function as the primary Point-Of-Contact between the State Parks Division and Contractor.
“Project” means a temporary process undertaken to solve a well-defined goal or objective with clearly defined start and end times, a set of clearly defined tasks, and a budget. The project terminates once the project scope is achieved, and project acceptance is given by the project executive sponsor.
“Redacted” means a version/copy of the proposal with the information considered confidential as defined by NMAC 1.4.1.45 and defined herein and outlined in Section II.C.8 of this RFP blacked out BUT NOT omitted or removed.
“Real Time” means having a computer system that updates and displays information at the same rate as data is entered into or received by Contractor’s system. No “batch” transmissions to a central data repository are allowed, and real time processing shall occur through the Call Center, via the Internet, and at the park level.
“Request for Proposals (RFP)" means all documents, including those attached or incorporated by reference, used for soliciting proposals.
“Responsible Offeror" means an Offeror who submits a responsive proposal and who has furnished, when required, information and data to prove that his financial resources, production or service facilities, personnel, service reputation, and experience are adequate to make satisfactory delivery of the services, or items of tangible personal property described in the proposal.
“Responsive Offer" or means an offer which conforms in all material respects to the requirements set forth in the request for proposals. Material respects of a request for proposals include, but are not limited to price, quality, quantity, or delivery requirements.
“SPD” means State Purchasing Division of the New Mexico State General Services Department.
“Staff" means any individual who is a full-time, part-time, or an independently contracted employee with the Offeror’s company.
“State (the State)” means the State of New Mexico.
“State Agency” means any department, commission, council, board, committee, institution, legislative body, Agency, government corporation, educational institution, or official of the executive, legislative, or judicial branch of the government of this state. “State Agency” includes the Purchasing Division of the General Services Department and the State Purchasing Agent but does not include local public bodies.
“State Purchasing Agent” means the director of the Purchasing Division of the General Services Department.
“State Parks Division” means State Parks Division of Energy, Minerals and Natural Resources Department
“Statement of Concurrence” means an affirmative statement from the Offeror to the required specification agreeing to comply and concur with the stated requirement(s). This statement shall be included in Offeror’s proposal (e.g., “We concur,” “Understands and Complies,” “Comply,” “Will Comply if Applicable,” etc.).
“Unredacted” means a version/copy of the proposal containing all complete information including any that the Offeror would otherwise consider confidential, such copy for use only for the purposes of evaluation.
“508 compliance” means to make the Contractor’s electronic and information technology accessible to people with disabilities.
G. PROCUREMENT LIBRARY
A procurement library has been established. Offerors are encouraged to review the material contained in the Procurement Library by selecting the link provided in this document through your own internet connection. The library contains information listed below:
RFP, Questions & Answers, RFP Amendments, etc. https://www.generalservices.state.nm.us/statepurchasing/active-procurements.aspx
State Parks Division website, follow link: https://www.emnrd.nm.gov/spd/request-for-proposals/
II. CONDITIONS GOVERNING THE PROCUREMENT
This section of the RFP contains the schedule of events, the descriptions of each event, and the conditions governing this procurement.
A. SEQUENCE OF EVENTS
The Procurement Manager will make every effort to adhere to the following schedule:
| Action |
| Responsible Party |
| Due Dates |
| 1. Issue RFP |
| SPD |
| 7-4-2024 |
| 2. Acknowledgement of Receipt Distribution List |
| Agency |
| 7-12-2024 |
| 3. Pre-Proposal Conference |
| Agency |
| 7-12-2024 |
| 4. Deadline to Submit Questions |
| Potential Offerors |
| 7-17-2024 |
| 5. Response to Written Questions |
| Procurement Manager |
| 7-19-2024 |
| 6. Submission of Proposal |
| Potential Offerors |
| 7-30-2024 |
| 7 *Proposal Evaluation |
| Evaluation Committee |
| 7-30-2024 thru 8-13-2024 |
| 8. *Selection of Finalists |
| Evaluation Committee |
| 8-26-2024 |
| 9. *Oral Presentation |
| Evaluation Committee |
| 8-28-2024 |
| 10. *Finalize Contractual Agreement |
| Agency/Finalist Offeror |
| 9-11-2024 |
| 11. *Contract Award |
| Agency/Finalist Offeror |
| 9-27-2024 |
| 12. *Protest Deadline |
| SPD |
| 15 Days from Date of Award Notification |
*Dates indicated in Events 7 through 13 are estimates only and may be subject to change without necessitating an amendment to the RFP.
B. EXPLANATION OF EVENTS
The following paragraphs describe the activities listed in the Sequence of Events shown in Section II.A., above.
1. Issue RFP This RFP is being issued on behalf of the EMNRD, State Parks Division on the date specified in Section II.A above.
2. Acknowledgement of Receipt Form Potential Offerors may e-mail the Acknowledgement of Receipt Form (APPENDIX A), to Robert Stokes (Procurement Manager) at Robert.Stokes@emnrd.nm.gov, to have their organization placed on the Procurement Distribution List. The form must be returned to the Procurement Manager by 5 p.m. MDT on the date indicated in Section II.A, Sequence of Events
The Procurement Distribution list will be used for the distribution of written responses to questions, and/or any amendments to the RFP. Failure to return the Acknowledgement of Receipt Form does not prohibit potential Offerors from submitting a response to this RFP. However, by not returning the Acknowledgement of Receipt Form, the potential Offeror’s representative shall not be included on the distribution list and will be solely responsible for obtaining from the Procurement Library (Section I.G.) responses to written questions and any amendments to the RFP.
3. Pre-Proposal Conference A Pre-Proposal Conference will be held as indicated in Section II.A, Sequence of Events, beginning at 10 a.m. MDT via Teams Pre-Proposal Conference. Please visit link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDlkMTk1MmEtMTFlOS00NTFmLTgzNTEtOTRhNDNhMjFmZDM3%40thread.v2/0?context=%7b%22Tid%22%3a%2204aa6bf4-d436-426f-bfa4-04b7a70e60ff%22%2c%22Oid%22%3a%228107e6dc-2775-4a34-88d8-730670961cac%22%7d
Potential Offeror(s) are encouraged to submit written questions in advance of the conference to the Procurement Manager (see Section I.D). The identity of the organization submitting the question(s) will not be revealed. Additional written questions may be submitted at the conference. All questions answered during the Pre-Proposal Conference will be considered unofficial until they are posted in writing. All written questions will be addressed in writing on the date listed in Section II.A, Sequence of Events. A public log will be kept of the names of potential Offeror(s) that attended the pre-proposal conference.
Attendance at the pre-proposal conference is highly recommended, but not a prerequisite for submission of a proposal.
3. Deadline to Submit Written Questions Potential Offerors may submit written questions to the Procurement Manager as to the intent or clarity of this RFP until July 17, 2024 at 5:00 pm MDT specified in Section II.A, Sequence of Events above. All written questions must be addressed to the Procurement Manager as declared in Section I.D. Questions shall be clearly labeled and shall cite the Section(s) in the RFP or other document which form the basis of the question.
4. Response to Written Questions Written responses to the written questions will be provided via e-mail, on or before the date indicated in Section II.A, Sequence of Events, to all potential Offerors who timely submitted an Acknowledgement of Receipt Form (Section II.B.2 and APPENDIX A).
The Questions and Answers will be posted to: https://www.generalservices.state.nm.us/statepurchasing/active-procurements.aspx https://www.emnrd.nm.gov/spd/request-for-proposals/
5. Submission of Proposal At this time, only electronic proposal submission is allowed. Do not submit hard copies until further notice.
ALL PROPOSALS MUST BE RECEIVED BY THE PROCUREMENT MANAGER OR DESIGNEE NO LATER THAN 5:00 PM MDT ON THE DATE INDICATED ABOVE IN SECTION II.A, SEQUENCE OF EVENTS. NO LATE PROPOSALS CAN BE ACCEPTED. The date and time of receipt will be recorded on each proposal. Proposals will be time-stamped in the system when the Offeror clicks “OK” after “Review and Submit.” Such electronic submissions will be considered sealed in accordance with statute.
It is the Offeror’s responsibility to ensure all documents are completely uploaded and submitted electronically via the eProNM system by the deadline set forth in this RFP. The eProNM system will automatically cease uploading data at the date and time of the deadline. Please ensure that you, as the Offeror, allow adequate time for large uploads and to fully complete your submittal by the deadline. A submission that is not both: (1) fully complete; and (2) received, via the eProNM system by the deadline, will be deemed late. Further, a submission that is not fully complete and received via the eProNM system by the deadline because the response was captured, blocked, filtered, quarantined, or otherwise prevented from reaching the proper destination server by any anti-virus or other security software will be deemed late. In accordance with statute and rule, NO LATE PROPOSAL CAN BE ACCEPTED.
Proposals must be submitted electronically through SPD’s eProNM electronic procurement system. Refer to Section III.B.1 for instructions. Proposals submitted by facsimile, or other electronic means other than through the SPD electronic e-procurement system, will not be accepted.
A log will be kept of the names of all Offeror organizations that submitted proposals. Pursuant to §13-1-116 NMSA 1978, the contents of proposals shall not be disclosed to competing potential Offerors during the negotiation process. The negotiation process is deemed to be in effect until the contract is awarded pursuant to this Request for Proposals. Awarded in this context means the final required state agency signature on the contract(s) resulting from the procurement has been obtained.
6. Proposal Evaluation An Evaluation Committee will perform the evaluation of proposals. This process will take place as indicated in Section II.A, Sequence of Events, depending upon the number of proposals received. During this time, the Procurement Manager may initiate discussions with Offerors who submit responsive or potentially responsive proposals for the purpose of clarifying aspects of the proposals. However, proposals may be accepted and evaluated without such discussion. Discussions SHALL NOT be initiated by the Offerors.
7. Selection of Finalists The Evaluation Committee will select and the Procurement Manager will notify the finalist Offerors as per schedule Section II.A, Sequence of Events or as soon as possible thereafter. A schedule for Oral Presentation, if any, will be determined at this time.
Finalists will be selected and scored based on their ability to fulfill the mandatory specifications outlined in Section IV B.3, as well as their commitment to ensuring a smooth transition of CRS within a timeframe of less than 60 days, with no disruption in service to customers.
8. Oral Presentations Finalist Offerors, as selected per Section II.B.8 above, may be required to conduct an oral presentation at a venue to be determined as per schedule Section II.A., Sequence of Events, or as soon as possible thereafter. If Oral Presentations are held, Finalist Offerors may be required to make their presentations through electronic means (Microsoft Teams, Zoom, etc.). The Agency will provide Finalist Offerors with an agenda and applicable details; including an invitation to the event. Whether or not Oral Presentations will be held is at the sole discretion of the Evaluation Committee.
9. Finalize Contractual Agreements After approval of the Evaluation Committee Report, any contractual agreement(s) resulting from this RFP will be finalized with the most advantageous Offeror(s), taking into consideration the evaluation factors set forth in this RFP, as per Section II.A., Sequence of Events, or as soon as possible thereafter. The most advantageous proposal may or may not have received the most points. In the event mutually agreeable terms cannot be reached with the apparent most advantageous Offeror in the timeframe specified, the State reserves the right to finalize a contractual agreement with the next most advantageous Offeror(s) without undertaking a new procurement process.
10. Contract Awards Upon receipt of the signed contractual agreement, the Agency Procurement office will award as per Section II.A., Sequence of Events, or as soon as possible thereafter. The award is subject to appropriate Department and State approval.
11. Protest Deadline Any protest by an Offeror must be timely submitted and in conformance with §13-1-172 NMSA 1978 and applicable procurement regulations. As a Protest Manager has been named in this Request for Proposals, pursuant to §13-1-172 NMSA 1978 and 1.4.1.82 NMAC, ONLY protests delivered directly to the Protest Manager in writing and in a timely fashion will be considered to have been submitted properly and in accordance with statute, rule and this Request for Proposals. The 15-calendar day protest period shall begin on the day following the notice of award of contract(s) and will end at 5:00 pm MDT on the 15th day. Protests must be written and must include the name and address of the protestor and the request for proposal number. It must also contain a statement of the grounds for protest including appropriate supporting exhibits and it must specify the ruling requested from the party listed below. The protest must be directed to:
Name: State Purchasing Agent Dorothy.mendonca@gsd.nm.gov
PROTESTS RECEIVED AFTER THE DEADLINE WILL NOT BE ACCEPTED.
B. GENERAL REQUIREMENTS
1. Acceptance of Conditions Governing the Procurement Offerors must indicate their acceptance to be bound by the Conditions Governing the Procurement, Section II.C, and Evaluation, Section V, by completing and signing the Letter of Transmittal form, pursuant to the requirements in Section II.C.30, located in APPENDIX E.
2. Incurring Cost Any cost incurred by the potential Offeror in preparation, transmittal, and/or presentation of any proposal or material submitted in response to this RFP shall be borne solely by the Offeror. Any cost incurred by the Offeror for set up and demonstration of the proposed equipment and/or system shall be borne solely by the Offeror.
3. Prime Contractor Responsibility Any contractual agreement that may result from this RFP shall specify that the prime contractor is solely responsible for fulfillment of all requirements of the contractual agreement with a State Agency which may derive from this RFP. The State Agency entering into a contractual agreement with a vendor will make payments to only the prime contractor.
4. Subcontractors/Consent The use of subcontractors is allowed with State Parks Division approval. The prime contractor shall be wholly responsible for the entire performance of the contractual agreement whether or not subcontractors are used. Additionally, the prime contractor must receive approval, in writing, from the agency awarding any resultant contract, before any subcontractor is used during the term of this agreement.
5. Amended Proposals An Offeror may submit an amended proposal before the deadline for receipt of proposals. Such amended proposals must be complete replacements for a previously submitted proposal and must be clearly identified as such in the transmittal letter. Agency personnel will not merge, collate, or assemble proposal materials.
6. Offeror’s Rights to Withdraw Proposal Offerors will be allowed to withdraw their proposals at any time prior to the deadline for receipt of proposals. The Offeror must submit a written withdrawal request addressed to the Procurement Manager and signed by the Offeror’s duly authorized representative.
The approval or denial of withdrawal requests received after the deadline for receipt of the proposals is governed by the applicable procurement regulations, 1.4.1.5 & 1.4.1.36 NMAC.
7. Proposal Offer Firm Responses to this RFP, including proposal prices for services, will be considered firm for one year after the due date for receipt of proposals.
8. Disclosure of Proposal Contents The contents of all submitted proposals will be kept confidential until the final award has been completed by the Agency. At that time, all proposals and documents pertaining to the proposals will be available for public inspection, except for proprietary or confidential material as follows:
a. Proprietary and Confidential information is restricted to:
1. confidential financial information concerning the Offeror’s organization; and
2. information that qualifies as a trade secret in accordance with the Uniform Trade Secrets Act, §§57-3A-1 through 57-3A-7 NMSA 1978.
b. An additional but separate redacted version of Offeror’s proposal, as outlined and identified in Section III.B.2.a, shall be submitted containing the blacked-out proprietary or confidential information, in order to facilitate eventual public inspection of the non-confidential version of Offeror’s proposal.
IMPORTANT: The price of products offered or the cost of services proposed SHALL NOT be designated as proprietary or confidential information.
If a request is received for disclosure of proprietary or confidential materials, the Agency shall examine the request and make a written determination that specifies which portions of the proposal should be disclosed. Unless the Offeror takes legal action to prevent the disclosure, the proposal will be so disclosed. The proposal shall be open to public inspection subject to any continuing prohibition on the disclosure of proprietary or confidential information.
9. No Obligation This RFP in no manner obligates the State of New Mexico or any of its Agencies to the use of any Offeror’s services until a valid written contract is awarded and approved by appropriate authorities.
10. Termination This RFP may be canceled at any time and any and all proposals may be rejected in whole or in part when the Agency determines such action to be in the best interest of the State of New Mexico.
11. Sufficient Appropriation Any contract awarded as a result of this RFP process may be terminated if sufficient appropriations or authorizations do not exist. Such terminations will be affected by sending written notice to the contractor. The Agency’s decision as to whether sufficient appropriations and authorizations are available will be accepted by the contractor as final.
12. Legal Review The Agency requires that all Offerors agree to be bound by the General Requirements contained in this RFP. Any Offeror’s concerns must be promptly submitted in writing to the attention of the Procurement Manager.
13. Governing Law This RFP and any agreement with an Offeror which may result from this procurement shall be governed by the laws of the State of New Mexico.
14. Basis for Proposal Only information supplied in writing by the Procurement Manager or contained in this RFP shall be used as the basis for the preparation of Offeror proposals.
15. Contract Terms and Conditions The contract between an agency and a contractor will follow the format specified by the Agency and contain the terms and conditions set forth in the Draft Contract APPENDIX C. However, the contracting agency reserves the right to negotiate provisions in addition to those contained in this RFP (Draft Contract) with any Offeror. The contents of this RFP, as revised and/or supplemented, and the successful Offeror’s proposal will be incorporated into and become part of any resultant contract.
The Agency discourages exceptions from the contract terms and conditions as set forth in the RFP Draft Contract. Such exceptions may cause a proposal to be rejected as nonresponsive when, in the sole judgment of the Agency (and the Evaluation Committee), the proposal appears to be conditioned on the exception, or correction of what is deemed to be a deficiency or an unacceptable exception is proposed which would require a substantial proposal rewrite to correct.
Should an Offeror object to any of the terms and conditions as set forth in the RFP Draft Contract (APPENDIX C) strongly enough to propose alternate terms and conditions in spite of the above, the Offeror must propose specific alternative language. The Agency may or may not accept the alternative language. General references to the Offeror’s terms and conditions or attempts at complete substitutions of the Draft Contract are not acceptable to the Agency and will result in disqualification of the Offeror’s proposal.
Offerors must provide a brief discussion of the purpose and impact, if any, of each proposed change followed by the specific proposed alternate wording.
If an Offeror fails to propose any alternate terms and conditions during the procurement process (the RFP process prior to selection as successful Offeror), no proposed alternate terms and conditions will be considered later during the negotiation process. Failure to propose alternate terms and conditions during the procurement process (the RFP process prior to selection as successful Offeror) is an explicit agreement by the Offeror that the contractual terms and conditions contained herein are accepted by the Offeror.
16. Offeror’s Terms and Conditions Offerors must submit with the proposal a complete set of any additional terms and conditions they expect to have included in a contract negotiated with the Agency. See Section II.C.15 for requirements.
17. Contract Deviations Any additional terms and conditions, which may be the subject of negotiation (such terms and conditions having been proposed during the procurement process, that is, the RFP process prior to selection as successful Offeror), will be discussed only between the Agency and the Offeror selected and shall not be deemed an opportunity to amend the Offeror’s proposal.
18. Offeror Qualifications The Evaluation Committee may make such investigations as necessary to determine the ability of the potential Offeror to adhere to the requirements specified within this RFP. The Evaluation Committee will reject the proposal of any potential Offeror who is not a Responsible Offeror or fails to submit a Responsive Offer as defined in §13-1-83 and §13-1-85 NMSA 1978.
19. Right to Waive Minor Irregularities The Evaluation Committee reserves the right to waive minor irregularities, as defined in Section I.F.19. The Evaluation Committee also reserves the right to waive mandatory requirements, provided that all of the otherwise responsive proposals failed to meet the same mandatory requirements and the failure to do so does not otherwise materially affect the procurement. This right is at the sole discretion of the Evaluation Committee.
20. Change in Contractor Representatives The Agency reserves the right to require a change in contractor representatives if the assigned representative(s) is (are) not, in the opinion of the Agency, adequately meeting the needs of the Agency.
21. Notice of Penalties The Procurement Code, §§13-1-28 through 13-1-199 NMSA 1978, imposes civil, and misdemeanor and felony criminal penalties for its violation. In addition, the New Mexico criminal statutes impose felony penalties for bribes, gratuities and kickbacks.
22. Agency Rights The Agency in agreement with the Evaluation Committee reserves the right to accept all or a portion of a potential Offeror’s proposal.
23. Right to Publish Throughout the duration of this procurement process and contract term, Offerors and contractors must secure from the agency written approval prior to the release of any information that pertains to the potential work or activities covered by this procurement and/or agency contracts deriving from this procurement. Failure to adhere to this requirement may result in disqualification of the Offeror’s proposal or removal from the contract.
24. Ownership of Proposals All documents submitted in response to the RFP shall become property of the State of New Mexico. If the RFP is cancelled, all responses received shall be destroyed by the Agency or SPD.
25. Confidentiality Any confidential information provided to, or developed by, the contractor in the performance of the contract resulting from this RFP shall be kept confidential and shall not be made available to any individual or organization by the contractor without the prior written approval of the Agency.
The Contractor(s) agrees to protect the confidentiality of all confidential information and not to publish or disclose such information to any third party without the procuring Agency's written permission.
26. Electronic mail address required A large part of the communication regarding this procurement will be conducted by electronic mail (e-mail). Offeror must have a valid e-mail address to receive this correspondence. (See also Section II.B.5, Response to Written Questions).
27. Use of Electronic Versions of this RFP This RFP is being made available by electronic means. In the event of conflict between a version of the RFP in the Offeror’s possession and the version maintained by the agency, the Offeror acknowledges that the version maintained by the agency shall govern. Please refer to:
https://www.generalservices.state.nm.us/statepurchasing/active-procurements.aspx or https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=StateOfNewMexico&tap=PHX
28. New Mexico Employees Health Coverage A. If the Offeror has, or grows to, six (6) or more employees who work, or who are expected to work, an average of at least 20 hours per week over a six (6) month period during the term of the contract, Offeror must agree to have in place, and agree to maintain for the term of the contract, health insurance for those employees if the expected annual value in the aggregate of any and all contracts between Contractor and the State exceed $250,000 dollars.
B. Offeror must agree to maintain a record of the number of employees who have (a) accepted health insurance; (b) decline health insurance due to other health insurance coverage already in place; or (c) decline health insurance for other reasons. These records are subject to review and audit by a representative of the state.
C. Offeror must agree to advise all employees of the availability of State publicly financed health care coverage programs by providing each employee with, as a minimum, the following web site link to additional information: https://bewellnm.com.
D. For Indefinite Quantity, Indefinite Delivery contracts (price agreements without specific limitations on quantity and providing for an indeterminate number of orders to be placed against it); these requirements shall apply the first day of the second month after the Offeror reports combined sales (from state and, if applicable, from local public bodies if from a state price agreement) of $250,000.
29. Campaign Contribution Disclosure Form Offeror must complete, sign, and return the Campaign Contribution Disclosure Form (APPENDIX B) as a part of their proposal. This requirement applies regardless of whether a covered contribution was made or not made for the positions of Governor and Lieutenant Governor or other identified official. Failure to complete and return the signed, unaltered form will result in Offeror’s disqualification.
30. Letter of Transmittal Offeror’s proposal must be accompanied by a Letter of Transmittal Form (APPENDIX E), which must be signed by the individual authorized to contractually obligate the company, identified in #2 below.
Provide the following information:
1. Identify the submitting business entity; Name, Mailing Address, Phone Number, Federal Tax ID Number (TIN), and New Mexico Business Tax ID Number (BTIN, formerly CRS);
2. Identify the Name, Title, Telephone, and E-mail address of the person authorized by the Offeror’s organization to (A) contractually obligate the business entity providing the Offer, (B) negotiate a contract on behalf of the organization; and/or (C) provide clarifications or answer questions regarding the Offeror’s proposal content (A response to B and/or C is only necessary if the responses differs from the individual identified in A);
3. Identify any subcontractor/s that may be utilized in the performance of any resultant contract award;
4. Identify any other entity/-ies (such as State Agency, reseller, etc., that is not a sub-contractor identified in #3) that may be used in the performance of this awarded contract; and
5. The individual identified in #2 above, must sign and date the form, attesting to the veracity of the information provided, and acknowledging (a) the organization’s acceptance of the Conditions Governing the Procurement stated in Section II.C.1, (b) the organizations acceptance of the Section V Evaluation Factors, and (c) receipt of any and all amendments to the RFP.
Failure to submit a signed Letter of Transmittal Form (APPENDIX E) will result in Offeror’s disqualification.
31. Disclosure Regarding Responsibility A. Any prospective Contractor and any of its Principals who enter into a contract greater than sixty thousand dollars ($60,000.00) with any state agency or local public body for professional services, tangible personal property, services or construction agrees to disclose whether the Contractor, or any principal of the Contractor’s company:
1. is presently debarred, suspended, proposed for debarment, or declared ineligible for award of contract by any federal entity, state agency or local public body;
2. has within a three-year period preceding this offer, been convicted in a criminal matter or had a civil judgment rendered against them for:
a. the commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal, state or local) contract or subcontract;
b. violation of Federal or state antitrust statutes related to the submission of offers; or
c. the commission in any federal or state jurisdiction of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violation of Federal criminal tax law, or receiving stolen property;
3. is presently indicted for, or otherwise criminally or civilly charged by any (federal state or local) government entity with the commission of any of the offenses enumerated in paragraph A of this disclosure;
4. has, preceding this offer, been notified of any delinquent Federal or state taxes in an amount that exceeds $3,000.00 of which the liability remains unsatisfied. Taxes are considered delinquent if the following criteria apply.
a. The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge of the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.
b. The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.
c. Have within a three-year period preceding this offer, had one or more contracts terminated for default by any federal or state agency or local public body.)
B. Principal, for the purpose of this disclosure, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity or related entities.
C. The Contractor shall provide immediate written notice to the State Purchasing Agent or other party to this Agreement if, at any time during the term of this Agreement, the Contractor learns that the Contractor’s disclosure was at any time erroneous or became erroneous by reason of changed circumstances.
D. A disclosure that any of the items in this requirement exist will not necessarily result in termination of this Agreement. However, the disclosure will be considered in the determination of the Contractor’s responsibility and ability to perform under this Agreement. Failure of the Contractor to furnish a disclosure or provide additional information as requested will render the Offeror nonresponsive.
E. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the disclosure required by this document. The knowledge and information of a Contractor is not required to exceed that which is the normally possessed by a prudent person in the ordinary course of business dealings.
F. The disclosure requirement provided is a material representation of fact upon which reliance was placed when making an award and is a continuing material representation of the facts during the term of this Agreement. If during the performance of the contract, the Contractor is indicted for or otherwise criminally or civilly charged by any government entity (federal, state or local) with commission of any offenses named in this document the Contractor must provide immediate written notice to the State Purchasing Agent or other party to this Agreement. If it is later determined that the Contractor knowingly rendered an erroneous disclosure, in addition to other remedies available to the Government, the State Purchasing Agent or Central Purchasing Officer may terminate the involved contract for cause. Still further the State Purchasing Agent or Central Purchasing Officer may suspend or debar the Contractor from eligibility for future solicitations until such time as the matter is resolved to the satisfaction of the State Purchasing Agent or Central Purchasing Officer.
32. New Mexico/Native American Resident Preferences To ensure adequate consideration and application of §13-1-21 NMSA 1978 (as amended), Offeror must submit a copy of its valid New Mexico/Native American Resident Preference Certificate or its valid New Mexico/Native American Resident Veteran Preference with its proposal. Certificates for preferences must be obtained through the New Mexico Department of Taxation & Revenue http://www.tax.newmexico.gov/Businesses/in-state-veteran-preference-certification.aspx.
In accordance with §13-1-21(H) NMSA 1978, an agency shall not award any combination of New Mexico/Native American Resident Preferences.
III. RESPONSE FORMAT AND ORGANIZATION
A. NUMBER OF RESPONSES
Offerors shall submit only one proposal in response to this RFP.
B. ELECTRONIC SUBMISSION
ONLY ELECTRONIC SUBMISSION VIA SPD’S eProNM SYSTEM IS PERMITTED (https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=StateOfNewMexico)
Any proposal that does not adhere to the requirements of this Section II.B and Section III.C Proposal Content and Organization may be deemed non-responsive and rejected on that basis.
1. Electronic Submission Requirements
a. Register in eProNM well in advance of the submission deadline - In order to submit a response to this RFP, Offeror must be fully registered in the eProNM System. It is the Offeror’s responsibility to ensure the registration process is completed in enough time to upload its proposal documents by the deadline set forth in this RFP. The registration page may be accessed via the following link: https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=StateOfNewMexico
b. Follow all submission instructions - Proposals must be submitted in the manner outlined in Sections III.B.2 and III.B.3, and organized in accordance with Section III.C. Technical and Cost portions of Offerors proposal must be submitted as separate uploads, and must be prominently identified as “Technical Proposal,” or “Cost Proposal,” on the front page of each upload.
c. Complete proposal upload prior to submission deadline - It is the Offeror’s responsibility to ensure all documents are completely uploaded and submitted electronically via the eProNM system by the deadline set forth in this RFP. The eProNM system will automatically cease uploading data at the date and time of the deadline. Please ensure that you, as the Offeror, allow adequate time for large uploads and to fully complete your submittal by the deadline. A submission that is not both: (1) fully complete; and (2) received, via the eProNM system by the deadline, will be deemed late. Further, a submission that is not fully complete and received via the eProNM system by the deadline because the response was captured, blocked, filtered, quarantined or otherwise prevented from reaching the proper destination server by any anti-virus or other security software will be deemed late. In accordance with statute and rule, NO LATE OFFER CAN BE ACCEPTED.
d. Upload a single Technical file and a single Cost file, unless a document…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .