4 Refuse QASP Rev 2 April 8.doc
DOC document 119 KB Posted
- Attached to
- Integrated Solid Waste Management JB-MDL, NJ Federal contract opportunity
- Solicitation number
- FA448421R0003SolidWasteSolicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA448421R00020001 SF 30.pdf | ||
| Solid Waste Site Visit Questions and Answers.docx | DOCX document | |
| 1 REFUSE JOINT BASE PWS AF REV 3 Mar 2021.docx | DOCX document | |
| EAL Template.docx | DOCX document | |
| 6 and 7 Past Performance Cover Letter and PPQ_ 19 Jan 21.docx | DOCX document | |
| 3 WD 15-4191.txt | TXT text file | |
| 5 SFS ANNEX C - CONTRACTOR APPENDIX 2020.pdf | ||
| Solicitation - FA448421R0002.pdf | ||
| 1 REFUSE JOINT BASE PWS AF REV 2 JAN 5 2021.docx | DOCX document | |
| 2 WD 15-4195.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
FOR
INTEGRATED SOLID WASTE MANAGEMENT
AT
JOINT BASE MCGUIRE-DIX-LAKEHURST
Joint Base McGuire-Dix-Lakehurst
Rev 1 6 Feb 19 Quality Assurance Surveillance Plan (QASP)
1. Purpose
This Quality Assurance Surveillance Plan is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
· What will be monitored
· How monitoring will take place
· Who will conduct the monitoring
· How monitoring efforts and results will be documented
The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance to assure that it meets contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
This QASP is based on the premise that the government requires a quality standard for the Custodial Service. This QASP is the best means of achieving that objective.
2. Authority
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, an Inspection of Services clause, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
3. Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
Government Personnel
Contracting Officer (CO)
The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Assigned CO: Dennis Sughrue
Organization or Agency: 87 CONS/PKA Telephone: 609-754-4726 Email: dennis.sughrue@us.af.mil Contracting Officer’s Representative (COR)
The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR will use the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the CO. The COR is required to provide an annual performance assessment to the CO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Assigned COR: Lisa M. Ross Organization or Agency: 87 CES/CEOES Telephone: 754-5476 Email: lisa.ross@us.af.mil Contracting Officer’s Representatives Supervisor
Nominates Contracting Officer’s Representatives (CORs) in writing and sends nomination and COR nominee qualification documentation to the CO, ensures the COR is trained before performing any COR duties and supports the COR’s performance assessment activities, reviews COR documentation on a regular basis, evaluates performance of COR duties as part of performance assessment throughout the period of the contract.
COR Supervisor: Anthony Whiting
Organization or Agency: 87 CES/CEOES Telephone: 754-6780 Email: anthony.whiting.3@us.af.mil Contractor Representatives The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. (complete this section after the contract award) Program Manager: <upon award, enter name> Telephone: <enter number> Email: <enter address> Task Manager: <upon award, enter name>
Telephone: <enter number> Email: <enter address> Other Key Contract Personnel (enter name(s) or delete these lines if not applicable) Title: <enter title> Telephone: <enter number> Email: <enter address>
4. Performance Requirements and Method of Surveillance
4.1 Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the contracting officer, contracting specialist and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
4.2 Surveillance Matrix (Service Summary)
The Surveillance Matrix (Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The Performance Requirement Summary (PRS) should be used to form the foundation of the COR’s inspection checklist.
4.3 Combating Trafficking in Persons
The contractor shall comply with FAR 52.222-50, Combating Trafficking in Persons.
The COR will monitor contractor’s performance regarding trafficking in persons. Surveillance may involve an examination of the Contractor(s) and Sub-Contractor(s) business practices to include the following: All paperwork pertaining to the Contractor(s) and Sub-Contractor(s) activities; All electronic (e.g. e-mail, facsimile, text messaging, and telephonic) traffic pertaining to the Contractor(s) and Sub-Contractor(s) activities; Facilities pertaining to the Contractor(s) and Sub-Contractor(s) activities; and Interviews with Contractor(s) and Sub-Contractor(s) personnel
In accordance with DFARS PGI 222.17, Combating Trafficking in Persons, the COR shall immediately notify the Contracting Officer of non-compliance with FAR 52.222-50
4.4 Performance Rating Definitions
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance
Rating Criteria
| Excellent / Outstanding |
| Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective. |
| Good |
| Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
5. Performance Reporting
5.1 Remedies for Non-Conformance
If inspections indicate unacceptable performance, the COR will notify the contractor’s POC of the deficiencies for correction. Use the remedy the government is going to use per what is stated in the Services Summary (SS). If deficiencies are not corrected within the required time frame, the COR should notify the CO for action. If the contractor disagrees with the noted discrepancy and an agreement cannot be reached, the CO shall be notified for a final decision
5.2 Performance Assessment Report (PAR)
PARs will be used to report ALL minor discrepancies and will be generated by the COR and sent to the contractor for corrective action. Contractors will be given 10 days to correct PARs unless they have requested an extension. If 3 minor discrepancies are found, combine them and process a CAR.
5.3 Customer Complaint Form
The COR must furnish instructions to the customer receiving the contractor’s service. The customer must retain supporting evidence of complaint or feedback. After the COR validates feedback or complaint demonstrating contractor noncompliance, the COR processes a Performance Assessment Report (PAR) or Corrective Action Report (CAR) to the CO. ALL Customer Complaint forms WILL be validated by the COR prior to notifying the contractor.
5.4 Corrective Action Report (CAR)
The CAR will be forwarded to the Chief COR for review. The COR will forward the CAR to the CO for action. A copy will be provided to the contractor’s representative by the CO. Most CARs will be corrected within 30 calendar days depending on the complexity of the finding, the contractor may be allowed up to six months (maximum) correcting a CAR. The contractor will be asked the status of the CAR on a monthly basis. The COR will keep an electronic log of all CARs and will keep a hard copy of CARs in the contract oversight file.
5.5 Contract Performance Assessment Reporting System (CPARS)
CPARS will be initiated annually, documenting contractor performance for this specific contract. More frequent updates may be made as required to document a significant improvement or degradation of the level of contract performance.
5.6 Disputes
Every attempt will be made to resolve all disputes arising under this contact/plan using the Alternate Dispute Resolution (ADR) as outlined in FAR 33.214. If no resolution can be made under ADR, the CO will render a Contracting Officer’s final decision.
Attachments:
1. APPENDIX 1 – SURVEILLANCE MATRIX (SERVICE SUMMARY)
2. CORRECTIVE ACTION REPORT (CAR)
3. CUSTOMER COMPLAINT RECORD
4. PERFORMANCE ASSESSMENT REPORT (PAR)
Appendix 1 – Surveillance Matrix (Service Summary)
| Performance Objective |
| PWS Paragraph |
| Performance Threshold |
| Method of Assessment |
| 1 |
| Collect Municipal Solid Waste in accordance with the established schedule. |
| 1.1. |
| No more than 3 customer complaints monthly. |
| Periodic surveillance, customer complaint |
| 2 |
| Reports and Records in accordance with the PWS. |
| 1.1.6 |
| No more than 2 deficiencies annually. |
| Periodic surveillance |
| 3 |
| Maintain equipment in good workable condition. Trucks and containers are maintained in accordance with PWS. |
| 1.1.5 |
| No more than 3 customer complaints monthly. |
| Periodic Surveillance |
| 4 |
| Perform non-reoccurring services in accordance with PWS. |
| 1.1.2 |
| No more than 2 deficiencies monthly. |
| Periodic Surveillance |
| 5 |
| Perform the removal of foreign municipal waste in accordance with established schedule / requirements |
| 1.1.1.2 |
| No more than 1 deficiency annually |
| Periodic surveillance, customer complaint |
Inspection Metrologies:
M1: Periodic. Periodic surveillance/inspection is the type of surveillance that is based upon selecting samples for evaluation on other than 100% inspection or on a statistically random basis. Periodic surveillance can be accomplished, weekly, monthly or quarterly using a checklist method.
M2: Inspection of Reports. All reports shall be reviewed upon receipt. The reviewer will report any flaws in the document and categorize the flaws (Editorial, Format, and/or Substance).
M3: Technical Inspection: Surveillance/inspection is the type of surveillance that will be performed as specified on the project schedule by actually looking at the work being done.
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY FORMCHECKBOX
MAJOR FORMCHECKBOX
MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
FORMCHECKBOX
ACCEPTED FORMCHECKBOX
REJECTED
12. CLOSE DATE
| CUSTOMER COMPLAINT RECORD |
| DATE/TIME OF COMPLAINT |
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. FORMCHECKBOX
DEFICIENCY (CHECK ALL BOXES THAT APPLY)
FORMCHECKBOX
NEW
FORMCHECKBOX
REPEAT
FORMCHECKBOX
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE FORMCHECKBOX
CONCUR FORMCHECKBOX
NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. FORMCHECKBOX
CONCUR FORMCHECKBOX
NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS