4_EVER_HQ_Renovations_Previous_Q_A.pdf

PDF 204 KB Posted

Attached to
CONSTR, RENOVATE HQ CONF & BRK ROOM, EVER
Solicitation number
140P5424R0003
Issued by

About this file

This document contains questions and answers from potential bidders regarding a solicitation to renovate the headquarters conference room and breakroom at Everglades National Park. The scope of work includes replacing windows and doors, upgrading the porch screen enclosure, adding electrical circuits, treating the porch floor, and venting the range through the roof. Bidders requested clarification on material samples, use of restroom facilities during construction, availability of the pre-bid site visit sign-in sheet, and sizes of kitchen cabinets and appliances. The National Park Service confirmed window and door manufacturers, clarified material sample requirements, specified portable restrooms for contractor use, and determined kitchen layout and appliance sizes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovation / Remodeling of the Headquarters Breakroom

Amendment 1. Responses to Bidder Questions

PROJECT INFORMATION

Contract Number 140P5424R0003 Park Everglades National Park PARK / PMIS Number Project Title Renovation / Remodeling of the HQ Conference and Breakroom Period of Performance Approximately 120 Calendar Days

A1.01 What is the name of the window manufacturer?

Widows shall be PGT Casement Series CA-740 with Stainless Hardware Package. Door shall match. Contractor shall provide shop drawings and verify measurements in field. All windows and doors shall have Miami-Dade NOA and meet other codes. Door shall also meet ADA requirements.

A1.02 What is the specific scope of the porch screen enclosure replacement?

Existing enclosure walls and roof to be removed. New aluminum screen enclosure to include roof to be provided and installed to match existing and on same footprint and as per Drawings. New gutter and downspout to be included. 16” sheet metal kick plate shall be added to the bottom of the new screen enclosure. Framing color TBD.

A1.03 What is the specific scope of electrical evaluation and upgrade?

Existing service panel is adequate for increase in loading and work planned. Contractor to provide and install all circuits to new outlets and fixtures as shown in Drawings.

A1.04 What is the specific scope of porch floor treatment?

Porch floor shall be pressured washed and treated with an epoxy-based coating. Color

TBD.

A1.05 Where will the range vent exhaust?

Venting for range shall be through the standing seam pitched roof.

This requirement was previously solicited and did not result in an award. Below you'll find questions and answers asked by previous interested contractors.

A1.06 Page 1, Item 10 of the Solicitation, and M.3 Factor C require that the Offeror send Past Performance Questionnaires (PPQs) to at least three past performance references for similar projects completed within the past five years, and that the references are to send the PPQs directly to the Government.

It has been our experience that former Contract Specialists and Contracting Officers have frequently moved to new postings; those that are still reachable are often too busy or simply don’t follow through with filling them out and emailing them. Still others are openly aggravated at having to do yet another evaluation, years after the project was completed.

In order to give the evaluators sufficient information to assess Offeror performance risk, we respectfully request that, in lieu of Attachment 5 PPQs being submitted from our references directly to you:

a) Offerors be allowed to submit Contractor Performance Assessment Reports (CPARS) with their proposals, and

b) Offerors be allowed to submit PPQs which have been included with previous proposals to other agencies (so long as Performance, Timeliness, Quality, and Overall Rating are addressed).

In lieu of three new PPQ’s, Offerors may submit recent CPARS and at least three PPQ’s previously used within the past five years on projects similar in scope. Offerors shall also provide a point of contact for reference so that the Contracting Officer can verify all information provided in the PPQ.

A1.07 Will the HQ restroom facilities be available for contactor usage, or will the contract be required to provide a portable restroom?

Contractor will be required to provide a portable restroom. HQ restrooms are for NPS employees only.

A1.08 Will the Pre-Bid Site Visit Sign-In Sheet be provided, as it may become relevant in reference to SOW 2.5?

The pre-bid site visit sign in sheet will not be provided. However, when an award is made;

awardee and award information will be posted to SAM.gov linked to the solicitation.

A1.09 Among the drawings, Sub Sheet A-101, Sheet 4 of 11, Finish Notes Item #4 states “Submit four samples for approval per material specified, label each to match the finish legend designation. Include product data, seaming diagrams and shop drawings prior to procurement or fabrication.”

We respectfully request clarification of what specific material samples the Government is requesting.

Finish Materials are called out specifically on I-201. Contractor shall provide one sample to NPS as a final review prior to ordering and to ensure material is still available. If material is no longer available, Contractor shall provide similar for review and approval by NPS.

A1.10 Does the contractor have to furnish the space with the tables, chairs, and lamps?

Yes, the project involves providing and installing all furnishing and equipment as listed on the Drawings.

A1.11 Is the mobile island a firm decision?

Yes, the mobile island is part of the kitchen cabinet work and shall be provide. Contractor to submit shop drawings for approval and review by NPS.

A1.12 Would the park accept recommendations in regard to the Frigidaire size?

Refrigerator size has been determined based on field measurements of door clearances and cabinet sizes. Contractor is responsible to verify all measurements prior to ordering of cabinets and appliances. Contractor shall also submit shop drawings of cabinets and kitchen layout for final review and approval by NPS. Appliance sizes are subject to change based on final kitchen layout.