4. Specifications.pdf
PDF 2 MB Posted
- Solicitation number
- 127EAW25R0029
- Issued by
-
Department of Agriculture Forest Service
About this file
These technical specifications detail the requirements for the Disaster Funds Recreation Site Facilities Project, focusing on campground and recreational site improvements in the Little Jackass and Placer Campgrounds within the Sierra National Forest. The project scope includes procuring and installing various constructed features such as bulletin boards, barriers, trash enclosures, picnic tables, signs, food lockers, fire rings, outdoor recreation access routes (ORARs), campsites, tent pads, roads, and parking spurs. Key technical requirements cover site preparation, earthwork, aggregate surfacing, concrete work, drainage structures, and accessibility standards, with specific provisions for rock barriers, culverts, and site-specific installations.
The specifications outline comprehensive technical requirements for contractors, including detailed guidelines for materials, construction methods, quality control, and site restoration. Contractors must adhere to multiple standards and codes, including ASTM, ACI, and Forest Service guidelines. The project emphasizes precise construction techniques, proper material selection, and environmental considerations, with requirements for surface preparation, compaction, drainage, and finishing. The work must be completed by December 13, 2024, with strict adherence to specified construction tolerances, accessibility standards, and Forest Service directives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment A00001 - 127EAW25R0029 - Disaster. Recreation Site Repairs.pdf | ||
| Solicitation 127EAW25R0029 - Disaster. Recreation Site Repairs.pdf | ||
| 3. Plan Drawings.pdf | ||
| 6. Fire Plan.pdf | ||
| 2. Schedule of Items.docx | DOCX document | |
| 5. Davis-Bacon Act WD CA20250018.pdf | ||
| 1. SOW.pdf | ||
| 7. RFI Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications D-i DisasterFunds_RecSiteFacilities_Project_Specifications_01232
5_FINAL
DISASTER FUNDS RECREATION SITE FACILITIES PROJECT
TECHNICAL SPECIFICATIONS
1010 SUMMARY OF WORK
FIELD ENGINEERING
REGULATORY REQUIREMENTS
SHOP DRAWINGS AND SUBMITTALS
SCHEDULES AND REPORTS
QUALITY CONTROL AND QUANTITY MEASUREMENT
MOBILIZATION
1507 TEMPORARY FACILITIES AND UTILITIES
MATERIAL SOURCES
PRODUCT HANDLING
CONTRACT CLOSEOUT AND CLEANUP
CLEARING AND DEMOLITION
EARTHWORK
HARDENED AGGREGATE SURFACE AND AGGREGATE BASE
ROCK RIPRAP
CORRUGATED METAL PIPE CULVERT
ROCK LINED DITCH, OUTLET, AND DISSIPATER
ROCK AND POST BARRIERS AND HORIZONTAL POST BARRIERS
CAMPSITES
OUTDOOR RECREATION ACCESS ROUTES (ORARS)
PICNIC TABLE
FIRE RINGS
FOOD LOCKER
TRASH ENCLOSURE
WHEEL STOPS
SIGNS
CONCRETE FORMWORK
CONCRETE REINFORCEMENT
PORTLAND CEMENT CONCRETE
PAINT
Specifications D-1 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
1010 SUMMARY OF WORK
SCOPE
The requirements of these Technical Specifications cover the Disaster Funds Recrea-tion Site Facilities Project. This project consists of having the contractor furnishing all labor, equipment, materials, and incidentals necessary to:
• procure and install constructed features including, but not limited to, bulletin boards, barriers, and trash enclosures;
• install picnic tables, signs, food lockers, and fire rings – the Forest Service shall furnish the picnic tables, entrance signs/credit lines/shields, food lockers, and fire rings;
• construct outdoor access routes (ORARs), campsites, tent pads, roads, and park-ing spurs including procurement and installation of aggregate base and surface courses;
• construct stamped colored concrete ORARs/surfaces and drainage structures including, but not limited to, culverts, outlets, rocklined ditches, and rock dis-sipaters; and
• implement all other aspects shown on the project plans.
This project includes multiple recreation sites. The multiple recreation sites are Little Jackass Campground and Placer Campground.
STORAGE AREAS
The project is within a high use recreation area. The Contractor will be required to restore these areas to their original conditions as outlined in Section 01700. Material storage and maintenance of equipment will be confined to the marshalling areas. Mar-shalling areas will be identified by the Forest Service. When not in use, equipment shall be stored in a marshalling area.
TRAFFIC
1. Traffic Control: The Contractor shall keep the project area open and passable for all administrative and emergency traffic at all times.
Any warning devices and/or barricades used on the project shall be maintained in the construction area at all times, and shall be in compliance with the Manual on Uniform Traffic Control Devices.
2. Traffic Safety: Safety precautions shall be in accordance with the latest edition of the State of California Construction Safety Regulations.
3. Hauling Restrictions: The Contractor shall comply with all legal load re-strictions in the hauling of materials on public roads within and outside of the
Specifications D-2 DisasterFunds_RecSiteFacilities_Project_Specifications_01232 limits of the project. Federal, State or local permits will not relieve the Con-tractor of liability for damage which may result from the moving of equipment.
4. Equipment Cleaning: All off-road equipment shall be free of noxious weeds, free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Contractor shall certify in writing that all off-road equipment is free of noxious weeds prior to commencing operations on the project site. Contractor shall employ whatever cleaning methods necessary to ensure that all off-road equipment is free of noxious weeds. Equipment shall be considered free of soil, seeds and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required. Contractor shall at least, 5 working days prior to moving each piece of equipment onto the project site, identify the location of the equip-ment’s’ most recent operation.
5. Traffic Speed: This project is located within a heavily used recreation area in which the roads are winding with limited site distances. The speed limit within the Campground is 5 mph. These speed limits shall be strictly adhered to by the Contractor under this contract.
CLOSURES
The project area will be CLOSED to public use, including camping during the approved Contract Time. This will not prevent recreational uses by persons, such as hiking, walk-ing, fishing, swimming, etc. which may occur during the duration of the contract time.
It is the contractors’ responsibility to ensure the safety of the public on the jobsite at all times.
MAINTAINING UTILITY SERVICE
1. Electrical: Contractor shall notify the Forest Service 24 hours in advance of any utility service interruption.
2. Water: Contractor shall notify the Forest Service 24 hours in advance of any utility service interruption.
3. Identifying the location of all existing underground utilities shall be the re-sponsibility of the Contractor. Any damage to existing utilities that occur shall be the responsibility of the Contractor.
ENCROACHMENT PERMIT
Any additional permits which may be required from utility companies shall be the re-sponsibility of the Contractor (refer to FAR 52.236-7).
PROTECTION OF LAKES AND STREAMS
All lakes and streams in the Project Area shall be protected by the Contractor in ac-cordance with requirements of the California Department of Fish and Game and the California Water Quality Control Board. All water encountered during the construction of this Project shall be discharged in conformance to these requirements (refer to
AGAR 452.236-74).
Specifications D-3 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be included in other bid items and no separate payment shall be made therefore.
END OF SECTION 1010
Specifications D-4 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
FIELD ENGINEERING
GENERAL
SCOPE
This work shall consist of field engineering and survey work required in execution of the project. The work includes furnishing all labor, equipment, instruments, materials, transportation, and other incidentals necessary to complete the construction layout and staking in accordance with these specifications and acceptable engineering practice.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be included in other bid items and no separate payment shall be made therefore.
QUALITY ASSURANCE
Work shall be accomplished under the direction of a registered land surveyor. The sur-veyor shall be familiar with construction layout and staking. Periodic visits to the pro-ject site are required.
PRODUCTS
STAKES
• Hubs: minimum 1” x 1” x 12”
• Lath: 3/8” x 1 1/2” x 48,” for identification and sight stakes.
SURVEY NOTEPAPER AND BOOKS
Paper for survey notes shall be moisture-resistant paper. Notes shall be contained in books with covers that will protect the contents and retain the pages in numerical se-quence during field use.
EXECUTION
SITE IMPROVEMENT LAYOUT
Establish the site improvement layout from dimensions and benchmarks as SHOWN ON THE DRAWINGS. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks until necessary or authorized to remove them.
REFERENCE STAKING
A minimum of two reference hubs shall be set to “tie out” existing monuments (bound-ary corners, etc.), if required and important horizontal control points established during construction. Points that may be disturbed by construction activities shall be referenced well outside the area that will be disturbed. Record all reference stake locations in the field engineering log in such a manner that original points can be readily reestablished.
Specifications D-5 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
SURVEY PRECISION
Survey work performed under this specification shall establish line and grade within the tolerance below:
ITEM TOLERANCE
Roadbed and Parking Width (ft.) +/- 0.20 Subgrade Elevation (ft.) +/- 0.10 Paving Elevation (ft.) +/- 0.02 Centerline and Offset Alignments (ft.) + 0.20 Excavation and Embankment Slopes (% slope) +/- 3% Curbs, Gutters, Sidewalks, & Structure Elevation (ft.) +/- 0.02
Utilities (except gravity drainline) Elevation (ft.) +/- 0.10 Horizontal (ft.) +/- 0.50
Gravity Drainline Elevation (ft.) +/- 0.02 Horizontal (ft.) +/- 0.02
Maximum tolerances for structures (curbs, sidewalks and buildings) refer only to loca-tion. Structure will be constructed to dimensions AS SHOWN ON THE DRAWINGS or scaled from the drawings if no dimensions are given.
SURVEY NOTES
Survey note formats shall conform to standard practice.
Manually recorded survey notes shall be printed and shall be legible. Errors shall be deleted by lining out. Date, crew names, positions, instrumentation, and weather shall be recorded in the notes at the beginning of each day’s work. The party chief shall sign or initial each page of the notes immediately after the last entry for each day’s work.
Electronically recorded survey notes shall be consecutively numbered and headed to identify the contents. The notes shall be supported and accompanied by a bound Day Book that records the project name and for each day date, crew names and positions, instrumentation, weather, type of survey, stationing of sections between which survey was performed, and survey data or that cannot be electronically recorded. The party chief shall sign or initial each page of electronically recorded notes, and the final page of bound notes immediately after the last entry for each day’s work. Copies of elec-tronic notes shall be submitted in hard copy (printed) format.
CONSTRUCTION STAKING
General Campsites, tent pads, parking spurs, roads, other paving areas, access routes (ORARS), trash enclosures, culverts, finished grades, landscape features, appurtenances, and buildings shall be accurately aligned with elevation control as necessary.
Specifications D-6 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
Marking Stakes All stakes shall be legibly marked in the abbreviated format of standard practice with a stake pencil that leaves an imprint or with waterproof ink.
Spacing Stake all corners of campsites, tent pads, and trash enclosures. For roadways, space edge of pavement stakes longitudinally every 50 feet along tangents and every 25 feet along curves. For parking spurs and other paving areas, stake all angle points and edge of pavement limits as specified for roadways above. ORARS centerlines shall be staked at spacing as specified for roadways above.
Staking Structures, Bridges and Slabs Structures shall be staked on two sides with two permanent offsets each way perpen-dicular to the structure corner and two permanent offsets in line with the sides of the enclosing two sides of the structure.
Staking Culverts Slope stakes and slope reference stakes shall be set at all culvert locations. A culvert reference stake shall be set on the centerline of the culvert 10 feet from each end. Rec-ord the vertical and horizontal distance from the reference stake to the culvert invert at both ends.
Stake Approval Construction work shall not begin until the stakes, marks, and controls established by the Contractor have been approved in writing by the Forest Service.
Approval of the construction staking will not relieve the contractor of the responsibility for maintaining the survey work and for correcting errors, whether the errors are dis-covered during the actual survey work or in subsequent phases of the project.
Stake Maintenance Stakes found to be erroneously set or destroyed by the contractor’s operation shall be reset to the same precision as the original stakes.
END OF SECTION 1050
Specifications D-7 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
REGULATORY REQUIREMENTS
SCOPE
This Section describes the Regulatory Requirements and the Codes and Standards that apply to the work in this contract.
REGULATORY REQUIREMENTS
A. All laws, ordinances, codes, and regulations shall apply and be implemented into this contract.
B. The following codes and standards shall apply to the work in this contract.
Where no date is specified, the applicable edition shall be the one in effect on the date of solicitation.
1. American Society for Testing Materials (ASTM).
2. American Water Works Association Standards.
3. Forest Service Handbook 6709.11 Health and Safety Code Hand-book.
4. International Association of Plumbing and Mechanical Officials.
5. International Code Council (ICC).
6. Manual on Uniform Traffic Control Devices.
7. Manufacturer’s Instructions.
8. National Electrical Code (NEC).
9. National Sanitation Foundation.
10. State of California Construction Safety Orders.
11. Underwriters Laboratory.
12. California Building Code, (CBC), latest edition.
13. California Building Code Standards.
14. Uniform Plumbing Code (UPC).
15. Uniform Fire Code (UFC).
16. Uniform Fire Code Standards.
17. Underwriters’ Laboratories (UL).
18. Uniform Federal Accessibility Standards (ADAAG).
CODES AND STANDARDS
Standards and practices set forth by the references mentioned elsewhere in these specifica-tions shall be adhered to unless otherwise noted.
Specifications D-8 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
DUTIES OF THE CONTRACTOR
A. Responsibilities. It is the duty of the Contractor to perform all work in ac-cordance with the approved plans, specifications and regulations required for completion, during the term of this contract.
B. Performance of the work: The Contractor shall study carefully the approved plans and specifications and shall plan his schedule of operations well ahead of time. If at any time it is discovered the work is being done which is not in accordance with the approved plans and specifications, the Contractor shall correct the work immediately.
All inconsistencies or items which appear to be in error in the Specifications shall be promptly called to the attention of the Forest Service. Local condi-tions which may affect the construction operations shall likewise be brought to the attention of the Forest Service at once. In no case, however, shall the instruction of the Forest Service be construed to cause work to be done which is not in conformity with the approved plans, specifications and change orders.
The Contractor shall not carry on work except with the knowledge of the Forest Service.
Where so indicated or in lieu of drawing or specification requirements, materials shall be used and installed in the best quality manner and method recommended by the man-ufacturer. Such recommendation shall be submitted in writing by the Contractor. Sub-stitution of materials shall be considered a Contract Change and will be subject for approval by the Forest Service prior to use or fabrication.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be included in other bid items and no separate payment shall be made therefore.
PRODUCTS
PRODUCTS AND MATERIALS
All products and materials incorporated into this contract shall meet the standards and requirements of the codes and standards as referenced in Part 1 – General of this Sec-tion, and elsewhere herein unless otherwise SHOWN ON THE DRAWINGS, the more stringent requirements shall take precedence within the codes and standards that govern this Contract.
All materials, unless specified otherwise, shall be handled, stored, installed, and main-tained in accordance with the manufacturer’s instructions and recommendations.
Specifications D-9 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
EXECUTION
WORK REQUIREMENTS
All work in the contract shall meet the standards and requirements of the codes and standards referenced in Part 1 - General of this Section and elsewhere herein, unless otherwise SHOWN ON THE DRAWINGS or in the specifications. When more strin-gent requirements are called out in these specifications or shown on the drawings, the more stringent requirements shall take precedence over the codes and standards. All work shall be performed in a workman-like manner according to the best practices of the trade and the best standards of the industry.
END OF SECTION 1060
Specifications D-10 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
SHOP DRAWINGS AND SUBMITTALS
SCOPE
A. Perform all work necessary and required for the construction of the project as indi-cated. Such work includes but is not limited to the following:
1. Shop Drawings
2. Samples
3. Catalog Data
4. Operation and Maintenance Manuals
5. Certificates and Warranties
SUBMITTALS
Submittals shall include all pertinent data required to understand the quality of compo-nents, dimensional relationships, integration with other materials, assembly techniques, structural aspects, color, finish, texture, and other such characteristics as may be nec-essary to fully describe the item and its intended use.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be included in other bid items and no separate payment shall be made therefore.
EXECUTION
SUBMITTALS
Submittals and shop drawings shall be submitted in a timely fashion to allow ten (10) working days for review by the Forest Service. No work shall begin until shops draw-ings and submittals are approved. TWO (2) copies of all submittals shall be submitted to the Forest Service. Contractor has the option to submit electronically.
SHOP DRAWINGS
A. Original Submittal: TWO (2) legible copies of all shop drawings shall be submitted for approval as required under 1300.2.1 above prior to fabrica-tion, installation or order placement to allow for checking and coordination.
If approved, the submittal summary and only ONE (1) copy of the shop drawings will be returned to the contractor.
B. Resubmittal: When a resubmittal is required, the submittal summary and only ONE (1) copy of the shop drawings indicating so will be returned to the Contractor. After revision of the original, TWO (2) copies shall be re-submitted for approval. Contractor has the option to submit electronically.
C. Approval: Once approved, the submittal summary and only ONE (1) copy of the shop drawings will be returned to the contractor. Variation from the approved documents shall be likewise submitted and approved before being
Specifications D-11 DisasterFunds_RecSiteFacilities_Project_Specifications_01232 carried out. Approval of satisfactory submittals and substitutions will be made within 10 working days of receipt.
SAMPLES
A. Original Submittal: Two samples of each item for which samples are re-quired, unless otherwise specified, shall be furnished for approval. Ap-proval shall be obtained prior to delivery of the material to the project site.
These samples shall be representative of the actual material proposed for use in the project and of sufficient size to demonstrate design, color, texture and finish as they will appear in the completed installation.
B. Resubmittals: All rejected samples will be returned upon request and any or all resubmittals required shall consist of two new samples.
C. Approval: Upon approval, one sample so noted will be returned and the re-mainder will be retained by the Forest Service until completion of the work.
When requested, all approved samples will be returned for installation providing identity is maintained in an approved manner until final ac-ceptance of the project.
CATALOG DATA
A. Submittals: TWO legible copies of catalog data are required for the original submittal and each resubmittal. Catalog data shall be submitted along with shop drawings. Contractor has the option to submit electronically. Only ONE (1) copy of the shop drawings will be returned to the contractor.
B. Data: Each submittal shall have all pertinent data contained therein that is applicable to the item submitted for approval.
IDENTIFICATION
A. Catalog Data: Each separate catalog brochure or page submitted shall have the identification shown. Catalog of brochures submitted containing multi-ple items for approval need have only cover identification. In such cases the identification shall include page and catalog item numbers.
B. In the event one or more of the multiple items are not approved in any sub-mittal, the additional copies required will not be requested until all items are approved.
TIMING
A. The Contractor shall provide submittals far enough in advance of the sched-uled dates of installation to provide time for reviews, securing necessary approvals, for possible revisions and resubmittals and for placing orders and securing delivery.
B. No portion of the work requiring an approved submittal shall be started nor shall any material be fabricated or installed prior to the approval of such item.
Specifications D-12 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
END OF SECTION 1300
Specifications D-13 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
SCHEDULES AND REPORTS
SCOPE
This Section includes the requirements for the submittal of the Contractor’s proposed work schedule for the project.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be included in other bid items and no separate payment shall be made therefore.
EXECUTION
WORK SCHEDULE
Within fifteen (15) working days of the issuance of the Notice to Proceed, the Contrac-tor shall submit to the Forest Service for approval a proposed work schedule for the project. It shall be the contractor’s responsibility to follow this schedule as closely as possible. Under no circumstance shall the contractor’s completion of construction of the project go any later than December 13th, 2024. This construction end date shall not be extended under any circumstance, whether delays are caused by the contractor, For-est Service, weather, or any other manmade or natural occurrence.
Such schedule shall be in the form of a critical path network or other approved format and shall include the timing for each major phase of the work. The Contractor shall update such approved schedule as necessary when significant changes occur during the progress of the work.
Include in the critical path schedule time for submissions and approval of substitutions as well as tests and inspections.
END OF SECTION 1315
Specifications D-14 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
QUALITY CONTROL AND QUANTITY MEASUREMENT
DESCRIPTION
This work shall consist of providing certification that the quality and quantity of con-struction conforms to the drawings, specifications, and requirements of the contract.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be included in other bid items and no separate payment shall be made therefore.
EXECUTION
CONSTRUCTION REQUIREMENTS
Offsite Produced Materials
The Contractor shall furnish certificates executed by the manufacturer, supplier, or ven-dor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements shown on the drawings or stated in these specifications. Each certificate shall apply to a single commodity or invoice. Incidental purchases needed to remedy minor shortages of material shall be certified by the Contractor.
Sampling, Testing and Inspection The Contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing and inspec-tion in a timely manner. Tests, measurements, and certifications shall be made as re-quired by the drawings and specifications. The Contractor shall take samples and per-form inspections and tests necessary to achieve the quality of construction required by the contract. Sampling and testing frequency for specific items shall be as shown on the drawings or in these specifications, or as noted below:
1. Cast-In-Place Concrete: Contractor shall test for compressive strength, air content, and slump, and as required to meet specifications of Section 0.3300.
2. Excavation and Embankment (including trenching operations): Contractor shall test for moisture density, and in place density and compaction, and as required to meet the specifications of Section 0.2200.
3. Asphalt Concrete: Contractor shall test for aggregate gradation, compaction, thick-ness and temperature, and as required to meet the specifications of Section 0.2513.
4. Aggregate Base: Contractor shall test for field density, and as required to meet the specifications of Sections 0.2340.
Records
1. Record Drawings: The Contractor shall maintain TWO (2) sets of the contract drawings depicting as-built conditions resulting from Forest Service-authorized
Specifications D-15 DisasterFunds_RecSiteFacilities_Project_Specifications_01232 changes. The drawings shall be maintained in a current condition. GREEN pencil shall be used to indicate deletions; RED to show addition and changes. TWO (2) complete sets of “as-Built” drawings, fully marked-up, shall be submitted to the Forest Service within one week after acceptance of the Work, or retention payment may be withheld.
END OF SECTION 1442
Specifications D-16 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
MOBILIZATION
DESCRIPTION
This work shall consist of obtaining all bonds, insurance and permits, preparatory work and operations necessary for the movement of personnel, equipment, supplies, and in-cidentals to the project site, and for all other work and operations that must be per-formed or that cause costs to be incurred prior to beginning work on the various items on the project site including temporary facilities and utilities.
MEASUREMENT AND PAYMENT
Measurement and/or payment will be made for the work described in this Section, as shown on the schedule of items under the titles:
• MOBILIZATION
END OF SECTION 1505
Specifications D-17 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
1507 TEMPORARY FACILITIES AND UTILITIES
1507.1 GENERAL
1507.1.1 SCOPE
A. The work of this Section includes providing all temporary facilities and con-trols needed for the project. The Contractor shall furnish all equipment, la-bor, materials and incidentals necessary to hook-up, install and maintain the facilities. Such facilities include but are not limited to:
1. Sanitary facilities.
2. Directional signs, safety signs and barricades.
3. Temporary utilities such as power, water, electricity, and telephone service.
1507.1.2 QUALITY ASSURANCE
1. OSHA Compliance: Comply with Occupational Health and Safety Require-ments for Construction (29 CFR 1926).
2. Hazardous Materials Compliance: For hazardous materials regulated by OSHA see 29 CFR Part 1910, Subpart Z.
1507.2 PRODUCTS
1507.2.1 WATERING EQUIPMENT
Watering equipment, including piping, shall be watertight. Tanks shall be of known capacity. Equipment used for dust control and finishing operations of subgrade and surfaces shall provide uniform and controlled application of water from the driver’s position at all times.
1507.2.2 MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be included in other bid items and no separate payment shall be made therefore.
1507.3 EXECUTION
1507.3.1 SANITARY FACILITIES
A. The Contractor shall provide temporary sanitary facilities for all workers and maintain the facilities in a clean and sanitary state. Contractor furnished facilities shall be available for Forest Service personnel use.
B. At no time shall the Contractor use any of the existing sanitary facilities within, or adjacent to the project site.
1507.3.2 REMOVAL
The Contractor shall remove temporary facilities and controls as progress of the work will permit or as directed by the Forest Service.
Specifications D-18 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
1507.3.3 FENCES
Temporary fences will be permitted for securing materials, equipment, vehicles, tools, for protection of work, and protection for the public.
1507.3.4 OPERATIONS AND STORAGE AREAS
Operations and storage areas shall be restricted to the project site, AS SHOWN ON THE DRAWINGS or as directed by the Forest Service.
1507.3.5 COSTS
A. All fees and costs for the hook-up, installation, use, maintenance and re-moval of temporary facilities and controls shall be paid by the Contractor and no separate payment will be allowed therefore.
END OF SECTION 1507
Specifications D-19 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
MATERIAL SOURCES
BORROW SOURCE
No borrow sites have been identified for the project. In the event the contractor pro-poses to use a borrow site, the contractor shall provide the Forest Service with the fol-lowing submittals:
• Location of borrow site
• Material to be obtained
• Location and purpose for use of borrow material
• Material samples and/or test results of borrow material in accordance with the sections of these specifications for intended use
• Authorization from the land owner
• Valid permit documentation for grading operation to remove such material
• Any other items, tests and/or studies required for the Forest Service to make an educated decision on use of the material
No borrow material can be used on the project until the material has been reviewed and APPROVED by the Forest Service.
After borrow excavation is completed, the excavation site shall be dressed to uniform slopes providing adequate drainage, the bottom smoothed to reduce erosion potential, erosion control devices installed as directed by the Forest Service, and the site mulched in accordance with Section 02801.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be
END OF SECTION 1605
Specifications D-20 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
PRODUCT HANDLING
DESCRIPTION
Work included: Contractor shall protect products scheduled for use in the work by means including, but not necessarily limited to those described in this Section.
TESTING LABORATORY RECOMMENDATIONS
A. Except as otherwise approved by the Forest Service, Contractor shall deter-mine and comply with testing Laboratory’s recommendations on product handling, storage and protection.
B. Facility and Equipment: The Contractor shall provide, install, maintain, and operate a complete and adequate facility for the handling, execution, dis-posal, and distribution of all material and equipment required for the proper and timely performance of all work connected with the Contract.
PACKAGING
A. Delivery and Storage: Deliver all manufactured materials in the original packages, containers, or bundles (with the seals unbroken) bearing the name or identification marks of the manufacturer.
Maintain packaged materials with seal unbroken and labels intact until time of use.
Promptly remove damaged material and unsuitable items from the job site, and promptly replace with material meeting the specified, requirements, at no additional cost to the Forest Service.
B. The Forest Service will reject all non-complying materials and products that do not bear identification satisfactory to the Forest Service as to grade, qual-ity, or other pertinent information.
PROTECTION
Contractor shall protect finished surfaces until accepted by the Forest Service.
Store all materials in such manner as necessary to properly protect same from damage.
Materials shall be transported and handled to preserve their quality and fitness for the work. Materials or equipment damaged by handling, weather, dirt, or from any other cause will not be acceptable.
Aggregates shall be stockpiled, loaded, and transported in a manner that will preserve specified gradation and avoid contamination. Stockpiles of aggregate having different gradations shall not be intermingled.
Store material so as to cause no obstructions. Store material off sidewalks, roadways, and underground services. The Contractor shall be responsible for protecting all mate-rial and equipment furnished under the Contract.
Specifications D-21 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
REPAIRS AND REPLACEMENTS
A. In event of damage, Contractor shall promptly make replacements and re-pairs as directed by the Forest Service, and at no additional cost to the Forest Service.
B. Additional time required to secure replacements and to make repairs will not be considered by the Forest Service to justify an extension of the Con-tract time.
SUBSTITUTION OF MATERIALS
When a specific manufacturer, trade name or material is specified, or indicated, it is to establish a standard of quality and shall not be construed as limiting competition. If the Contractor desires to use a manufacturer, trade name or material other than that speci-fied, he shall request approval of such substitutions, in writing, to the Forest Service.
Submittals for approval of substitute manufacturer, trade name or materials should con-tain sufficient information, descriptive brochures, drawings, samples or other data as necessary to provide direct comparison to the specified products. Each submittal shall be well marked and identified as to the type and kind of items being submitted for approval. It is the sole responsibility for the Contractor to submit complete descriptive and technical information so that the Forest Service can make proper appraisal. Lack of proper information will be sufficient cause for rejection. References to catalogs that the Forest Service may or may not have, will not be accepted.
Substitutions shall not be offered unless a thorough check is made of all related items and interferences, revised arrangements and other changes that may result. Prepare drawings of revised equipment and piping arrangements caused by substitutions. Such drawings shall be equal in quality to Contract Drawings. The cost of supplying draw-ings shall be included by the Contractor in his estimate of proposed substituted materi-als.
By offering a substitution the contractor shall accept responsibility for its effect on the work of all trades, including any possible delays in the completion time of the Project.
All costs of changes in the work of other trades and drawings, etc., affected by inclusion of Contractor requested substitution shall be paid by the Contractor requesting approval of such substitution.
It shall be the Contractor’s responsibility to insure that substitutes perform in accord-ance with the design intent of the specified product. Certification to that effect shall be required as part of the approval.
Unless specifically submitted and approved in accordance with above, substitutions will not be allowed.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be
Specifications D-22 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
END OF SECTION 1640
Specifications D-23 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
CONTRACT CLOSEOUT AND CLEANUP
SCOPE
This section includes the requirements covering the disposal of excess material result-ing from construction operations and the cleanup work required in areas affected by the construction, and the protection of existing resources, structures, improvements, and utilities.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be included in other bid items and no separate payment shall be made therefore.
PRODUCTS
CLEANING SUPPLIES
All cleaning materials and equipment used shall be selected and employed with care to avoid scratching, marring, defacing, staining or discoloring the surfaces cleaned.
EXECUTION
EXCESS MATERIALS AND REFUSE
All refuse and unused materials generated by the Contractor’s operations including wood, asphalt, concrete, vegetative materials and the like, shall be removed from the project site and disposed of off National Forest lands in accordance with State and Lo-cal regulations and/or as directed by the Forest Service. The surplus excavated material shall be removed to a proper disposal location off of the site designated by the Forest Service.
CLEANUP DURING CONSTRUCTION
Cleanup shall be performed by the Contractor as required to prevent accidents to per-sonnel and protect all work in-place. Construction cleanup shall consist of the removal of all dirt, trash, scrap, debris, and excess materials from any floor space or walking surface that may cause the tripping or sliding of workers, ladders, or equipment.
PROTECTION OF EXISTING RESOURCES, STRUCTURES,
IMPROVEMENTS, AND UTILITIES
(a) The Contractor shall preserve and protect all existing vegetation and landform on or adjacent to the work sites, which are not to be removed and which do not unrea-sonably interfere with the work required under this contract.
(b) The Contractor shall protect from damage all existing structures, improvements, and utilities (1) at or near the work site and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The
Specifications D-24 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work.
(c) If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contrac-tor.
FINAL CLEANUP
Immediately prior to the Contractor’s request for final inspection of the Project, final cleanup shall be performed.
QUALITY OF CLEANUP
In addition to the normal “broom clean” requirements, the exposed surfaces of the fol-lowing materials shall be cleaned as listed below:
A. Glass: Remove excess putty and paint and all glass shall be washed clean.
B. Painted Surfaces: Remove marks, stains, fingerprints and dirt. All cleaned and new surfaces shall appear to be the same.
C. Roof: Remove all dust, dirt and debris.
D. Hardware: Clean.
E. Quarry Tile: Mop and clean, remove stain marks and heel marks as neces-sary.
F. Site: Remove all trash, debris and surplus excavated material of off National
Forest lands. No items shall be left or discarded elsewhere on the site. The surplus excavated material shall be removed to a proper disposal location off of the site designated by the Forest Service.
G. General: Remove paper labels from glass fixtures and equipment only after respective items have been inspected, verified and approved to assure that each complies with requirements of the Specifications and Drawings. La-bels and plates that are permanently attached to equipment shall not be re-moved. Remove paint and clean all permanent labels so that they are legible.
H. Lighting fixtures diffusers wiped clean.
SALVAGEABLE ITEMS
A. All salvageable items shall remain the property of the SNF, and shall be removed by the contractor and stored on designated Government land as directed by the Forest Service.
B. Items not salvageable shall be disposed of by the contractor in accordance with Local, State and Federal regulations.
END OF SECTION 01700
Specifications D-25 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
CLEARING AND DEMOLITION
SCOPE
This work shall consist of all site clearing required to complete the Project as shown on the plans, indicated in these specifications or as directed by the Forest Service. The work includes, but is not limited to; removal and disposal of any required vegetation including stumps. Inorganic material is the responsibility of the Contractor and shall be removed from Forest Service lands, in accordance with State and local regulations.
There is no demolition of existing constructed features expected on this project.
SALVAGE
There are no salvageable items applicable to this project.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be included in other bid items and no separate payment shall be made therefore.
EXECUTION
VEGETATION CLEARING AND TREE REMOVAL
A. There are no trees shown on the plans to be removed as a direct result of the construction related activities. While every effort has been made to pre-de-termine and identify the trees that need to be removed, once site work com-mences, construction related activities may identify additional trees that need to be removed. These trees will require complete stump removal and will have a unique color/symbology identifier painted on them. The stumps shall be removed to a depth of 4 feet or to a depth required to remove all roots 1-1/2" diameter or larger. Stump removal includes backfilling the hole back to existing grade.
B. There are no stumps shown on the plans to be removed as a direct result of the construction related activities. While every effort has been made to pre-determine and identify the stumps that need to be removed, once site work commences, construction related activities may identify additional stumps that need to be removed. The stumps shall be removed to a depth of 4 feet or to a depth required to remove all roots 1-1/2" diameter or larger. Stump removal includes backfilling the hole back to existing grade.
C. In case that trees or stumps are required to be removed, all trees, stumps, and slash shall be removed off the project site and disposed of off National Forest lands in accordance with State and Local regulations and/or as di-rected by the Forest Service.
D. Remove all grass, weeds and natural vegetation, including trees less than 10” diameter, in designated areas to a minimum depth of 4”. Branches on
Specifications D-26 DisasterFunds_RecSiteFacilities_Project_Specifications_01232 remaining trees and shrubs shall be trimmed to give a clear height of 14 feet above roadbed. Tree limbs shall be trimmed as near flush with the trunk as practicable.
E. Soil Litter: Accumulations of vegetative materials lying on top of the min-eral soil (i.e. pine needles and duff) shall be removed.
F. All cut true fir or pine stumps greater than 15" diameter shall be treated with an EPA registered borax fungicide, such as Sporax for the prevention of the spread of annosum root disease. Sporax would be applied by hand in an approved granular form within one hour of stump creation. The fungicide shall not be applied when it is raining. All Forest Service policies and prac-tices and California regulations related to pesticide use would be followed including developing a spill plan for Sporax use.
DEMOLITION
There is no demolition of constructed features applicable to this project, only site clear-ing to complete the project as shown on the Plans.
TRANSPORTATION
All materials designated to be salvaged shall be carefully removed. The materials shall be delivered to the location as directed by the Forest Service, and neatly stacked. The Contractor shall coordinate the transportation and delivery of these materials with the Forest Service a minimum of 5 working days prior to the proposed moving date.
DISPOSAL
All demolition materials, not designated for salvage, shall be disposed of off National Forest lands, in accordance with State, local and federal regulations. Burning of re-moved materials will not be permitted on the project site.
END OF SECTION 2100
Specifications D-27 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
EARTHWORK
SCOPE
This work consists of all excavation, compaction, grading, trenching, fill, and backfilling for all parking areas, roadways, building pads, outdoor recreation access routes (ORARS) and miscellaneous site items.
PROTECTION
Furnish, install and maintain all supports, shoring and sheet piling required to support the sides of excavation and to protect adjacent work or existing improvements.
VERIFICATION OF CONDITIONS
The Contractor shall carefully examine existing conditions and information, shall become familiar with the nature and location of the work, the conformation of the ground, the nature of subsoil conditions, groundwater conditions, nature and extent of materials or existing im-provements to be encountered and any and all determinable matters that can affect the work, prior to beginning work.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section, all costs associated with the work, materials and full compliance of this section shall be included in other bid items and no separate payment shall be made therefore.
PRODUCTS
SITE BORROW MATERIAL
Imported borrow material shall be non-expansive and predominantly granular soil or soil rock mixture which is free from organic matter and other deleterious materials and rocks over 3 inches in diameter. Any borrow source location proposed to be used by the contractor will be designated by the contractor and reviewed and approved by the Forest Service in accordance with other sections of these Technical Specifications, see Section 1605
BACKFILL MATERIAL - STRUCTURES
A. General. All fill material shall be approved by the Forest Service. Exca-vated materials from the site may be used if approved. Imported fill shall be non-expansive and predominantly granular soil or soil-rock mixture which is free from organic matter and deleterious substances and which does not contain materials over two inches in greatest dimension. Material having a dimension greater than 1-1/2 inches shall not be used in the upper six inches of fill. Liquid limit shall not exceed 20; plasticity index in accordance with ASTM D4318; sieve analysis in accordance with ASTM C136.
B. Material for use behind retaining walls and exterior foundation walls as compacted backfill shall consist of approved sound, hard, durable, well-graded sands and gravels.
Specifications D-28 DisasterFunds_RecSiteFacilities_Project_Specifications_01232
C. Material for use as building and foundation subgrade compacted backfill shall consist of approved well-graded, clean sands and gravels.
BACKFILL MATERIAL - TRENCHES
Trench Backfill Materials are designated ON THE DRAWINGS and shall be as fol-lows:
A. Native Backfill Materials: Excavated native material with all organic and 4 inch oversize material removed.
B. Select Native Backfill Material: Excavated native material with all organic and 2 inch oversize material removed.
C. Sand Bedding Material: Shall conform to the Table below:
SIEVE SIZE PERCENT PASSING
3/8 inch -
No. 4 100% No. 8 90 – 100%
No. 30 10 – 30% No. 200 2 – 9%
ROCK BASE FOR SLABS ON GRADE
Aggregate material shall be crushed stone or gravel free of organic matter and other deleterious materials. Material shall be graded as follows:
SIEVE SIZE PERCENT PASSING
1 inch 100%
3/4 inch 90-100% No. 4 0-10%
No.100 0-3%
VAPOR BARRIERS
Where vapor barrier is shown on the plans, it shall be 6 mil polyethylene sheeting.
EXECUTION
GENERAL
Contractor shall verify all actual site conditions, levels and grades prior to beginning work and inform the Forest Service as to any discrepancies that exist, prior to start of work.
EXCAVATION AND DISPOSAL
All excavations of every description and of whatever substances encountered shall be performed to the depth indicated on the drawings or staked on the ground. All materials shall be piled in an orderly manner a sufficient distance from the banks of an excavation
Specifications D-29 DisasterFunds_RecSiteFacilities_Project_Specifications_01232 to avoid overloading and to prevent slides or cave-ins. Any excess excavated material may be utilized in other work areas, provided it is suitable material. Sheeting and shor-ing should be used as is necessary for the protection of the work and for the safety of personnel. Excavations shall be by open cut. Whenever depth of excavation exceeds 5 feet, the surface shall be sloped back at a 1-1/2 to 1 slope or the excavation shall be shored, as per OSHA requirements.
SITE EXCAVATION
The existing surface materials shall be removed in accordance with Section 02100. All suitable excavated material remaining after the demolition is accomplished shall be used in the construction of subgrades, shoulders, slopes, bedding and backfill for trenches and structures and backfill of future landscape areas.
TRENCH EXCAVATION
A. Trenches shall be of the necessary width for properly laying utility lines.
Water line trenches shall be uniformly graded to avoid high points that would necessitate the placing of air valves in the water lines. Trenches shall be of a depth to provide the minimum cover over the utility line shown on the drawings.
B. All roots shall be cut and removed from trenches. Bottoms of trenches shall be accurately graded to an elevation 4 inches below the grade line of the proposed utility line. Care shall be taken not to over excavate. When unsta-ble material that is incapable of properly supporting the utility is encoun-tered in the bottom of the trench, such materials shall be excavated to a depth to allow for construction of a stable bedding. In all cases, where ex-cavation is made below the indicated trench depths, such over excavation shall be backfilled with compacted granular material.
EXCAVATION FOR FORMWORK AND STRUCTURES
A. Excavation for slabs on grade shall be…