4. Past Performance Survey.pdf
PDF 363 KB Posted
- Attached to
- Repair Transient Ramp Phase 1 Federal contract opportunity
- Solicitation number
- FA449725R0009
About this file
This is a Past and Present Performance Survey, a four-page document designed to evaluate a contractor's performance across multiple dimensions. The survey uses a 1-6 rating scale to assess various aspects of contractor performance, including management capabilities, personnel management, quality control, problem-solving, scheduling, safety compliance, and specific work element execution. Key evaluation areas include the contractor's ability to provide experienced managers, maintain qualified personnel, follow quality control plans, meet project schedules, resolve warranty defects, and comply with safety requirements.
The survey includes 25 detailed performance criteria covering technical, administrative, and operational capabilities, with options to rate performance from "Unsatisfactory" (1) to "Exceptional" (6). Additional sections require yes/no responses about whether the contractor was issued a cure notice, would be recommended for future contracts, and demonstrated environmental compliance. The form is marked "FOR OFFICIAL USE ONLY" and includes contact information for submission, specifically an email address for Mariah Thompson at the US Air Force, suggesting this is part of a federal contract performance assessment process.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA449725R0009.pdf | ||
| Q and As - FY25 Repair Transient Ramp Asphalt Pavement Phase 1.pdf | ||
| Solicitation Amendment FA449725R00090002 SF 30.pdf | ||
| 1. SOW FY25 Repair Transient Ramp Asphalt, Phase 1_2 Sep 25.pdf | ||
| Solicitation Amendment FA449725R00090001 SF 30.pdf | ||
| 5. Airfield Paving Specifications.pdf | ||
| 3. Wage Determination_DE20250004, dated 3 Jan 2025.pdf | ||
| Solicitation - FA449725R0009.pdf | ||
| 6. Operational Climactic Data 2018.pdf | ||
| 2. Bid Schedule FY25 Repair Transient Ramp.xlsx | XLSX spreadsheet | |
| 1. SOW FY25 Repair Transient Ramp Asphalt Phase 1_29 Jan 2025.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST AND PRESENT PERFORMANCE SURVEY
(Date) (Atch # 4)
FOR OFFICIAL USE ONLY
(When Filled In)
A. GENERAL INFORMATION: Please correct any information below known to be inaccurate:
Contractor’s Name:
Address: Telephone Number:
Point of Contact:
Contractor Performed as the Prime Contractor, the Sub-Contractor.
B. RESPONDENT INFORMATION:
Name of Respondent: Title:
Address: Telephone Number:
Fax Number:
E-Mail:
C. FAX COMPLETED SURVEY FORM TO:
Attn:
Phone No.
OR
D. E-MAIL COMPLETED SURVEY FORM TO: mariah.thompson@us.af.mil
F. CONTRACT NO:
G. CONTRACT STATUS: (% complete, complete, just awarded, etc.)
H. AWARD AMOUNT:
I. TYPE OF CONTRACT:
A. PERFORMANCE PERIOD: From To
B. BRIEF DESCRIPTION OF CONTRACT REQUIREMENTS:
(Date) (Atch # 4)
FOR OFFICIAL USE ONLY
(When Filled In)
D. PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 6 that most accurately describes the contractor’s performance or situation.
1 2 3 4 5 6
Unsatisfactory Marginal None Satisfactory Very Good Exceptional
Performance did Performance did No record of Performance Performance Performance not meet most not meet some past met contract met all met all contractual contractual performance requirements. contract contract requirements. requirements. or the record There were requirements requirements
There were There were is some minor and exceeded and exceeded serious problems, some inconclusive. problems and some to the many to the problems and of a serious corrective government’s government’s the contractor’s nature, for which actions taken by benefit. There benefit.
corrective corrective action the contractor were a few Problems, if actions were was only were minor any, were ineffective. marginally satisfactory. problems negligible and effective. which the were resolved contractor in a timely, resolved in a highly timely, effective effective manner.
manner.
The contractor:
1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
1 2 3 4 5 6 NA
2. Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
1 2 3 4 5 6 NA
3. Delegated authority to project managers and supervisors commensurate with contract requirements.
1 2 3 4 5 6 NA
4. Home office participated in solving significant local problems.
1 2 3 4 5 6 NA
5. Followed approved quality control plan. 1 2 3 4 5 6 NA
6. Provided effective quality control and/or inspection procedures to meet contract requirements.
1 2 3 4 5 6 NA
7. Corrected deficiencies in timely manner and pursuant to their quality control procedures.
1 2 3 4 5 6 NA
8. Provided timely resolution of contract discrepancies. 1 2 3 4 5 6 NA
9. Identified risks/problems as they occurred. 1 2 3 4 5 6 NA
10. Suggested alternative approaches to problems. 1 2 3 4 5 6 NA
11. Displayed initiative to solve problems. 1 2 3 4 5 6 NA
12. Developed realistic progress schedules. 1 2 3 4 5 6 NA
13. Met established project schedules. 1 2 3 4 5 6 NA
(Date) (Atch # 4)
FOR OFFICIAL USE ONLY
(When Filled In)
14. Provided timely resolution of warranty defects. 1 2 3 4 5 6 NA
15. Was responsive to contract changes. 1 2 3 4 5 6 NA
16. Provided adequate project supervision. 1 2 3 4 5 6 NA
17. Obtained consent of surety for increases in bonding as work-in-progress increased.
1 2 3 4 5 6 NA
18. Paid subcontractors/suppliers in a timely manner. 1 2 3 4 5 6 NA
19. Provided accurate and complete line item cost proposals including all aspects of work required for each task.
1 2 3 4 5 6 NA
20. With respect to the safety plan, the contractor:
a. Followed the approved safety plan. 1 2 3 4 5 6 NA
b. Had no significant safety problems at the job site. 1 2 3 4 5 6 NA
21. The contractor met contractual requirements for the following work elements:
NA
a. Constructed pavements and drainage structures to the specified grade and alignment requirements
1 2 3 4 5 6 NA
b. Constructed pavement sections to the specified thickness, density, and surface smoothness requirements
1 2 3 4 5 6 NA
c. Performed specified curing and protection of concrete pavement surfaces
1 2 3 4 5 6 NA
d. Mobilized and completed work in a timely manner to work orders issued under the “On Call” or Indefinite Delivery Indefinite Quantity (IDIQ) contract
1 2 3 4 5 6 NA
22. Cooperated with Government personnel after award. 1 2 3 4 5 6 NA
23. Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
Y
E
S
N
O
24. Would you award another contract to this contractor?
If not, explain in “remarks.”
Y
E
S
N
O
25. Has contractor demonstrated a history of environmental compliance with respect to erosion and sediment control on construction sites? If not, explain in “remarks.”
Y
E
S
N
O
Remarks:
(Date) (Atch # 4)
FOR OFFICIAL USE ONLY
(When Filled In)
File details come from the government source that posted it. Updated .