2. Bid Schedule FY25 Repair Transient Ramp.xlsx
XLSX spreadsheet 57 KB Posted
- Attached to
- Repair Transient Ramp Phase 1 Federal contract opportunity
- Solicitation number
- FA449725R0009
About this file
This document is a detailed Bid Schedule Excel spreadsheet for the FY25 Repair Transient Ramp Phase 1 project at Dover Air Force Base. The spreadsheet provides a comprehensive cost estimation template using Construction Specifications Institute (CSI) format, allowing contractors to complete 50 division cost estimates with prefilled and customizable sections. Contractors are instructed to fill in overhead, profit percentages, and detailed cost breakdowns, with specific guidance on handling subcontractor rates and prime contractor self-performance.
The associated federal contract opportunity is a Small Business set-aside for airfield and heavy-duty asphalt and concrete pavement repair, with a project magnitude between $500,000 and $1,000,000. The Firm Fixed Price contract has a 45-calendar day performance period, with a site visit scheduled for 26 August 2025 at Dover Air Force Base. Key submission dates include: site visit questions due by 2 September 2025, and proposals due by 1:00pm EST on 15 September 2025. The project will be managed by the Department of the Air Force Air Mobility Command, with NAICS Code 237310 and a size standard of $45,000,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA449725R0009.pdf | ||
| 1. SOW FY25 Repair Transient Ramp Asphalt, Phase 1_2 Sep 25.pdf | ||
| Q and As - FY25 Repair Transient Ramp Asphalt Pavement Phase 1.pdf | ||
| Solicitation Amendment FA449725R00090002 SF 30.pdf | ||
| Solicitation Amendment FA449725R00090001 SF 30.pdf | ||
| 1. SOW FY25 Repair Transient Ramp Asphalt Phase 1_29 Jan 2025.pdf | ||
| 6. Operational Climactic Data 2018.pdf | ||
| 5. Airfield Paving Specifications.pdf | ||
| 4. Past Performance Survey.pdf | ||
| 3. Wage Determination_DE20250004, dated 3 Jan 2025.pdf | ||
| Solicitation - FA449725R0009.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.
Exceptions:
(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.
(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.
The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.
Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.
* CSI = Construction Specifications Institute
&"Verdana,Bold"Construction Cost Estimate
&P of &N
Summary
| Bid Schedule | |
| 15-Aug-25 | |
| COMPANY | |
| 436th Civil Engineering |
| PROJECT | ||||
| FY25 RepairTransient Ramp Phase 1 | ||||
| LOCATION | PROJECT NO. | FJXT240015 | ||
| DOVER AIR FORCE BASE, DE | ||||
| DIVISION | DESCRIPTION | % by | ||
| Division | Division Total |
| DIVISION 1 | General Requirements | ERROR:#DIV/0! | $0.00 | |
| DIVISION 32 | Exterior Improvements | ERROR:#DIV/0! | $0.00 | |
| FILL IN AS REQUIRED (this will link to the entire document) |
davisjam: davisjam:
Percentages listed are place fillers. Please complete as required
| GC Overhead |
| GC Profit |
| Risk/Bonding |
| Design |
| This spreadsheet contains many formulas... please save a copy prior to editing in case you make a mistake. All shaded areas are either linked or contain formulas |
| 2 |
| 2 |
Select Area Cost Factor Type:
| DIVISION 36 | RESERVED |
| DIVISION 37 | RESERVED |
| DIVISION 38 | RESERVED |
| DIVISION 39 | RESERVED |
| DIVISION 46 | RESERVED |
| DIVISION 47 | RESERVED |
HARD COST TOTAL ERROR:#DIV/0! $0.00
| PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%) | 0% | $0.00 |
| SUBTOTAL | $0.00 | |
| PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%) | 0% | $0.00 |
| SUBTOTAL | $0.00 | |
| 0 | $0.00 | |
| SUBTOTAL | $0.00 | |
| BUILDER'S RISK / PERFORMANCE BONDS (Fill in%) | 0.0% | $0.00 |
| CONTRACT TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Sustainment Repair/Const ACF Already Factored
Div1
| Bid Schedule | DATE | |||
| August 15, 2025 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| FY25 RepairTransient Ramp Phase 1 | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| DOVER AIR FORCE BASE, DE | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| 436th Civil Engineering | FJXT240015 | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | EQUIPMENT | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| GENERAL REQUIREMENTS | |||||||
| Site Superintendent | HR | - 0 | - 0 | - 0 | |||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | ||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| - 0 | |||||||
| - 0 | |||||||
| - 0 | |||||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div32
| Bid Schedule | DATE | |||
| August 6, 2024 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| FY25 RepairTransient Ramp Phase 1 | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| DOVER AIR FORCE BASE, DE | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| 436th Civil Engineering | FJXT240015 | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXTERIOR IMPROVEMENTS | |||||||
| Pavement Milling | 63570 | SY-IN | - 0 | - 0 | - 0 | ||
| Sawcutting | 9890 | LF-IN | - 0 | - 0 | - 0 | ||
| Hot-laid Biituminous Concrete PG 76-22 | 3624 | TN | - 0 | - 0 | - 0 | ||
| Pavement Markings | 2599 | SF | - 0 | - 0 | - 0 | ||
| Crack Sealing Bituminous Pavement | 4945 | LF | 0.00 | - 0 | - 0 | ||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| (02580/1.4 & 1.5) | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||
| $0.00 | |||||||
| (02680/1.3.1 & 1.4.1) | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| TOTAL LABOR/MATERIALS | $0.00 | $0.00 | $0.00 | ||||
| SUBTOTAL | $0.00 | ||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| TOTAL | $0.00 |