4. BuildingImprovements_Strawberry_Plans_FINAL2.pdf
PDF 5 MB Posted
- Solicitation number
- 127EAW26Q0002
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a set of construction drawings and specifications for administrative site building improvements at the Strawberry Work Center, located in Tuolumne County, California, within the Stanislaus National Forest under the Pacific Southwest Region (R05) of the U.S. Department of Agriculture Forest Service.
The project encompasses multiple building improvement tasks including mobilization, roofing demolition and fastener replacement, roof sheathing replacement, exterior damage repairs, synthetic cedar shake roofing installation, metal roof coating application, spray-applied fireproofing, and comprehensive exterior painting and trim work. Specific buildings targeted include the Pump House (#2614), Large Barracks (#1346), Warehouse (#2211), Rock House (#1218), Residence (#1111), Small Barracks (#1018), and A-Frame structure (#1110). The estimated exterior paint quantity is 11,150 square feet for body work and 3,110 linear feet for trim. Lead-based paint sampling results indicate actionable thresholds present in four buildings (Small Barracks at 56.8 PPM, Residence at 613 PPM, Rock House at 1490 PPM, and Large Barracks at 2150 PPM), requiring contractors to perform additional testing and comply with established lead mitigation regulations. Work must comply with established best management practices for soil and water conservation, and all ground-disturbing activities require Forest Service approval with minimum 10-day advance notice. The contractor is responsible for all project and safety compliance, road damage repairs, and equipment licensing for state or county roads.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2. Schedule of Items.docx | DOCX document | |
| 5. Project Specifications.pdf | ||
| 7. Davis-Bacon Act WD # CA20260018.pdf | ||
| 8. RFI Form.docx | DOCX document | |
| 3. BuildingImprovements_Hathaway_Plans_Final.pdf | ||
| 6. Fire Plan.pdf | ||
| 127EAW26Q0002 Stanislaus NF Admin Site Improvements.pdf | ||
| 1. Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TIMOTHY
HUGHES (Affiliate)
Digitally signed by TIMOTHY HUGHES (Affiliate) Date: 2024.12.19 09:00:07 -08'00'
SHAWN
WINSTEAD
Digitally signed by
SHAWN WINSTEAD
Date: 2024.12.19 17:32:23 -08'00'
C-01
ALL BUILDINGS,
ALL BUIILDINGS,
PUMP HOUSE #2614, LARGE BARRACKS #1346
PUMP HOUSE #2614, LARGE BARRACKS #1346
WAREHOUSE #2211
WAREHOUSE #2211
ROCK HOUSE #1218
ALL BUILDINGS (AS NEEDED)
PUMP HOUSE #2614, LARGE BARRACKS #1346
RESIDENCE
BLDG. #1111
RESIDENCE BLDG. #1111
SCALE: 1' = 10'
NOTE: PHOTOS ARE APPROXIMATE
TO SCALE AND SHOULD NOT BE
USED FOR TAKE-OFF CALCULATIONS
PRESSURE WASH, SCRAPE, REPAIR,
AND SAND AS NEEDED. PAINT ALL
EXTERIOR SURFACES OF THE
BUILDING AS SPECIFIED EXCEPT
ROCK, MORTAR, AND GLASS.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
051653-25-01
K. BAKER
C. RODRIGUEZ
T. HUGHES
RESIDENCE PAINTING
STRAWBERRY WORK CENTER
MI-WOK/SUMMIT RANGER DISTRICT
STANISLAUS NATIONAL
FOREST
ADMINISTRATIVE
SITE BUILDING
IMPROVEMENTS
PACIFIC SOUTHWEST REGION
(R05)
File details come from the government source that posted it. Updated .