Summary

This document is a set of construction design plans and specifications for administrative site building improvements at the Hathaway Pines Work Center, located in Calaveras County within the Stanislaus National Forest under the U.S. Department of Agriculture Forest Service, Pacific Southwest Region (R05), Calaveras Ranger District in California. The project encompasses roof replacement, exterior repairs, and painting work for two barracks buildings (Lower Barracks Building 1004 and Upper Barracks Building 1312) at coordinates 38.196532°, -120.366657°, accessible via California State Route 49 and SR-4, approximately 24.5 miles from the Forest Service headquarters.

The work scope includes seven pay items: mobilization; roofing demolition (21 roofing squares); roof sheathing replacement (150 square feet); exterior damage repair (15 square feet); asphalt shingle replacement (21 roofing squares); exterior paint body work (approximately 3,850 square feet); and exterior paint trim work (approximately 2,515 linear feet). The contractor must address lead-based paint mitigation, as Upper Barracks Building 1312 tested at 5,410 PPM (above the EPA actionable threshold of 5,000 PPM), requiring additional validation testing and compliance with established mitigation regulations. Work includes pressure washing, scraping, sanding, and staining of wood elements; minor wood damage repair using Durham's Rock Hard Water Putty; metal flashing installation for woodpecker holes exceeding one inch; and utility location confirmation before excavation activities. All work must comply with Forest Service best management practices and soil and water conservation standards, with contractor responsibility for repairing any Forest Service roads or infrastructure damaged during construction.

View the file

Other files

File Type Posted
2. Schedule of Items.docx DOCX document
5. Project Specifications.pdf PDF
7. Davis-Bacon Act WD # CA20260018.pdf PDF
4. BuildingImprovements_Strawberry_Plans_FINAL2.pdf PDF
8. RFI Form.docx DOCX document
6. Fire Plan.pdf PDF
127EAW26Q0002 Stanislaus NF Admin Site Improvements.pdf PDF
1. Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture Forest Service

ADMINISTRATIVE SITE BUILDING IMPROVEMENTS

FROM THE STANISLAUS NATIONAL FOREST HEADQUARTERS, TRAVEL NORTH AND WEST ON

GREENLEY ROAD AND LYONS STREET 1.8 MILES TO CALIFORNIA STATE ROUTE 49. TURN RIGHT ONTO SR-49 WEST AND CONTINUE NORTH ON SR-49 AND PARROTS FERRY ROAD, THEN NORTHEAST ON SR-4

FOR 24.5 MILES. 38.196532°, -120.366657°.

HATHAWAY PINES WORK CENTER

RECOMMENDED BY:

APPROVED:

QUALIFIED ENGINEER

DISTRICT RANGER DATE

DATE

FOREST SUPERVISOR DATE

/19

/24

:2 2 K

AT

HR

YN

BA

KE

R

C:

\U

SE

RS

\K

AT

HR

YN

BA

KE

R\

BO

X\

SO

~P S\

EN

GI

NE

ER

IN

G\

FY

P

RO

JE

CT

S\

BA

RR

AC

KS

R

EP

AI

RS

A

ND

R

ET

RO

FI

TT

IN

G\

PL

AN

S\

CA

D\

HA

TH

AW

AY

P

IN

ES

B

AR

RA

CK

S.

DW

G;

CALIFORNIA

CALAVERAS COUNTY

R05 PACIFIC SOUTHWEST REGION

STANISLAUS NATIONAL FOREST

CALAVERAS RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 COVERSHEET 11/21/2024

G-02 GENERAL NOTES AND SCHEDULE OF ITEMS 11/21/2024

C-01 HATHAWAY ADMINISTRATIVE SITE MAP 11/21/2024

C-02 LOWER BARRACKS SHINGLE REPLACEMENT & PAINTING 11/21/2024

C-03 UPPER BARRACKS PAINTING 11/21/2024

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

/19

/24

:2 2 K

AT

HR

YN

BA

KE

R

C:

\U

SE

RS

\K

AT

HR

YN

BA

KE

R\

BO

X\

SO

~P S\

EN

GI

NE

ER

IN

G\

FY

P

RO

JE

CT

S\

BA

RR

AC

KS

R

EP

AI

RS

A

ND

R

ET

RO

FI

TT

IN

G\

PL

AN

S\

CA

D\

HA

TH

AW

AY

P

IN

ES

B

AR

RA

CK

S.

DW

G;

(R05)

PACIFIC SOUTHWEST REGION

ADMINISTRATIVE SITE

BUILDING

IMPROVEMENTS

STANISLAUS

NATIONAL FOREST

CALAVERAS RANGER

DISTRICT

GENERAL NOTES AND

SCHEDULE OF ITEMS

11/21/2024

T. HUGHES

T. HUGHES

K. BAKER

051652-25-01

G-02

ABBREVIATIONS:

CO CONTRACTING OFFICER

COR CONTRACTING OFFICER'S REPRESENTATIVE

(E) EXISTING

LF LINEAR FOOT

OHE OVERHEAD ELECTRIC

SF SQUARE FOOT

SQ ROOFING SQUARE

TYP TYPICAL

WORK NOTES:

1. NO GROUND DISTURBING WORK SHALL BE PERFORMED WITHOUT FOREST SERVICE

APPROVED MONITORING. CONTRACTOR SHALL INFORM FOREST SERVICE OF

SCHEDULED GROUND DISTURBING WORK AT LEAST 10 DAYS PRIOR TO PERFORMANCE.

2. ALL FOREST SERVICE ROADS OR INFRASTRUCTURE DAMAGED BY CONTRACTOR DURING

CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR.

GENERAL NOTES:

1. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE

CONTRACT TO THE CO FOR APPROVAL PRIOR TO THE START OF WORK

2. REQUIRED WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS SHALL BE CONSIDERED

SUBSIDIARY TO OTHER PAY ITEMS

3. BEFORE ANY EXCAVATION ACTIVITIES BEGIN, THE CONTRACTOR SHALL CONTACT A

SERVICE TO LOCATE ANY BURIED UTILITIES. USA = 1-800-642-2444, THE NATIONAL 811

NUMBER, OR THE WEBSITE HTTP://WWW.USANORTH811.ORG/

4. EQUIPMENT FOR THIS PROJECT, IF DRIVEN ON STATE OR COUNTY ROADS, SHALL BE

CURRENTLY LICENSED

5. ALL WORK SHALL BE IN COMPLIANCE WITH THE BEST MANAGEMENT PRACTICES

DESCRIBED IN THE REGION 5 FOREST SERVICE SOIL AND WATER CONSERVATION

HANDBOOK, DATED DECEMBER 2011, AND THE NATIONAL BEST MANAGEMENT PRACTICES

FOR WATER QUALITY MANAGEMENT ON NATIONAL FOREST SYSTEM LANDS, DATED APRIL

6. ALL DIMENSIONS, UNLESS OTHERWISE SPECIFIED, ARE IN U.S. FEET

7. CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT AND SAFETY COMPLIANCE

SCHEDULE OF ITEMS

PAY ITEM NUMBER PAY ITEM DESCRIPTION UNIT SHEET NUMBER/DESCRIPTION QUANTITY REMARKS

01 70 00 MOBILIZATION LS 1

02 41 19 ROOFING DEMOLITION SQ C-02 21

06 16 30 ROOF SHEATHING REPLACEMENT SF C-02 150

06 20 00 REPAIR EXTERIOR DAMAGE SF C-02, C-03 15

07 31 13 ASPHALT SHINGLE REPLACEMENT SQ C-02 21

09 90 00-1 EXTERIOR PAINT BODY LS C-02, C-03 1 ESTIMATED QUANTITY = 3,850 SF *

09 90 00-2 EXTERIOR PAINT TRIM LS C-02, C-03 1

LEAD SAMPLING RESULTS

BUILDING NUMBER BUILDING NAME RESULT

1004 LOWER BARRACKS NOT SAMPLED

1312 UPPER BARRACKS 5410 PPM

LEAD BASED PAINT NOTES:

THE EPA ACTIONABLE THRESHOLD FOR LEAD BASED PAINT IS 5000 PPM. SOME OF THE

BUILDINGS ON THIS SITE WERE SAMPLED FOR THE PRESENCE OF LEAD BASED PAINT AND

FOUND TO BE ABOVE THE ACTIONABLE LEVEL. DUE TO THE AGE OF THE BUILDINGS THE

CONTRACTOR SHALL PERFORM ADDITIONAL TESTING TO VALIDATE THESE RESULTS ON

ALL BUILDINGS AND BASED ON THE RESULTS PERFORM THEIR WORK IN COMPLIANCE WITH

ESTABLISHED REGULATIONS FOR MITIGATING THE PRESENCE OF LEAD BASED PAINT.

* ESTIMATED QUANTITY IS FOR REFERENCE

ONLY, CONTRACTOR TO DETERMINE THEIR

ESTIMATE BASED ON DRAWINGS AND/OR

SITE VISIT.

ESTIMATED QUANTITY = 2,515 LF *

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

EBBETS PASS HIG

HW

AY (S.R.4)

UPPER BARRACKS

BLDG. 1312

LOWER BARRACKS

BLDG. 1004

OIL HOUSE

BLDG. 2508

WAREHOUSE

BLDG. 2203

TO MURPHYS

HUNTER

DAM ROAD

TO ARNOLD

MINOR WOOD DAMAGE REPAIR (ALL BUILDINGS):

INSPECT FOR HOLES, NICKS, AND OTHER MINOR IMPERFECTIONS IN THE

EXISTING SIDING. FILL WITH DURHAM'S ROCK HARD WATER PUTTY OR

EQUIVALANT AND SAND TO BLEND WITH EXISTING SIDING. ALLOW TIME FOR

PUTTY TO COMPLETELY DRY BEFORE PAINTING.

FOR WOODPECKER HOLES GREATER THAN 1 INCH IN DIAMETER, COVER HOLE

WITH METAL FLASHING. PLACE A CONTINUOUS 14 INCH BEAD OF LIQUID NAIL OR

EQUIVALENT AROUND THE OUTER EDGE OF THE FLASHING AND ATTACH TO

THE SIDING USING EXTERIOR WOOD SCREWS.

PROJECT

BUILDINGS

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

/19

/24

:2 2 K

AT

HR

YN

BA

KE

R

C:

\U

SE

RS

\K

AT

HR

YN

BA

KE

R\

BO

X\

SO

~P S\

EN

GI

NE

ER

IN

G\

FY

P

RO

JE

CT

S\

BA

RR

AC

KS

R

EP

AI

RS

A

ND

R

ET

RO

FI

TT

IN

G\

PL

AN

S\

CA

D\

HA

TH

AW

AY

P

IN

ES

B

AR

RA

CK

S.

DW

G;

C-01 051652-25-01

K. BAKER

T. HUGHES

T. HUGHES

11/21/2024

HATHAWAY PINES

ADMINSTRATIVE SITE

MAP

HATHWAY PINES WORK CENTER

CALAVERAS RANGER DISTRICT

STANISLAUS NATIONAL

FOREST

ADMINISTRATIVE

SITE BUILDING

IMPROVEMENTS

PACIFIC SOUTHWEST REGION

(R05)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

OHE

WEATHERHEAD

ROOF VENTS

CHIMNEY

ELECTRIC METER

TREX DECKING W/ WOOD RAILS

AND STAIRS. CONTRACTOR TO

ONLY PRESSURE WASH, SAND

AS NEEDED, AND STAIN WOOD.

WOOD STAIRS AND RAILING,

CONTRACTOR TO PRESSURE

WASH, SAND AS NEEDED, AND

STAIN WOOD.

CONTRACTOR TO REMOVE (E) ASPHALT

SHINGLES, UNDERLAYMENT, AND

GUTTERS. REPLACE WITH NEW

UNDERLAYMENT, ASPHALT SHINGLES, AND

GUTTERS AS SPECIFIED.

PRESSURE WASH, SCRAPE, REPAIR,

AND SAND AS NEEDED. PAINT ALL

EXTERIOR SURFACES OF THE

BUILDING AS SPECIFIED EXCEPT

ROCK, MORTAR, AND GLASS.

LOWER BARRACKS BLDG. 1004

SCALE: 1' = 10'

NOTE: PHOTOS ARE APPROXIMATE

TO SCALE AND SHOULD NOT BE

USED FOR TAKE-OFF CALCULATIONS

ROOF SHEATHING NOTE:

CONTRACTOR TO INSPECT (E)

ROOF SHEATHING FOR DEFECTS,

DECAY, OR DAMAGE AND INFORM

COR. UPON APPROVAL BY COR

REPLACE AS SPECIFIED.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

/19

/24

:2 2 K

AT

HR

YN

BA

KE

R

C:

\U

SE

RS

\K

AT

HR

YN

BA

KE

R\

BO

X\

SO

~P S\

EN

GI

NE

ER

IN

G\

FY

P

RO

JE

CT

S\

BA

RR

AC

KS

R

EP

AI

RS

A

ND

R

ET

RO

FI

TT

IN

G\

PL

AN

S\

CA

D\

HA

TH

AW

AY

P

IN

ES

B

AR

RA

CK

S.

DW

G;

C-02 051652-25-01

K. BAKER

T. HUGHES

T. HUGHES

11/21/2024

LOWER BARRACKS

ROOF REPLACMENT AND

PAINTING

HATHWAY PINES WORK CENTER

CALAVERAS RANGER DISTRICT

STANISLAUS NATIONAL

FOREST

ADMINISTRATIVE

SITE BUILDING

IMPROVEMENTS

PACIFIC SOUTHWEST REGION

(R05)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

UPPER BARRACKS BLDG. 1312

SCALE: 1' = 10'

NOTE: PHOTOS ARE APPROXIMATE

TO SCALE AND SHOULD NOT BE

USED FOR TAKE-OFF CALCULATIONS

WOOD RAILING, CONTRACTOR

TO PRESSURE WASH, SAND AS

NEEDED, AND STAIN WOOD.

PRESSURE WASH, SCRAPE, REPAIR,

AND SAND AS NEEDED. PAINT ALL

EXTERIOR SURFACES OF THE

BUILDING AS SPECIFIED EXCEPT

ROCK, MORTAR, AND GLASS.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

/19

/24

:2 2 K

AT

HR

YN

BA

KE

R

C:

\U

SE

RS

\K

AT

HR

YN

BA

KE

R\

BO

X\

SO

~P S\

EN

GI

NE

ER

IN

G\

FY

P

RO

JE

CT

S\

BA

RR

AC

KS

R

EP

AI

RS

A

ND

R

ET

RO

FI

TT

IN

G\

PL

AN

S\

CA

D\

HA

TH

AW

AY

P

IN

ES

B

AR

RA

CK

S.

DW

G;

C-03 051652-25-01

K. BAKER

T. HUGHES

T. HUGHES

11/21/2024

UPPER BARRACKS

PAINTING

HATHWAY PINES WORK CENTER

CALAVERAS RANGER DISTRICT

STANISLAUS NATIONAL

FOREST

ADMINISTRATIVE

SITE BUILDING

IMPROVEMENTS

PACIFIC SOUTHWEST REGION

(R05)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
Hathaway Pines Barracks-COVERSHEET
Hathaway Pines Barracks-GENERAL NOTES & SCHEDULE OF ITEMS
Hathaway Pines Barracks-SITE PLAN
Hathaway Pines Barracks-HP-LOWER
Hathaway Pines Barracks-HP-UPPER
2024-12-03T08:10:18-0800
TIMOTHY HUGHES (Affiliate)
2025-04-01T07:20:13-0700
ELIZABETH MARTINEZ
2025-04-30T12:35:58-0700
JAMES JUNETTE

File details come from the government source that posted it. Updated .