4. B554 DishWasher Specs.pdf
PDF 410 KB Posted
- Solicitation number
- 1282A724R0001
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for multiple award indefinite delivery/indefinite quantity contracts to provide facilities construction and maintenance services for Job Corps Centers located in several southeastern states. Services may include new construction, additions, alterations, roofing, plumbing, HVAC, electrical and other trades. The NAICS code is 236220 for commercial and institutional building construction, with a small business size standard of $45 million. The IDIQ contracts will have a shared ceiling of $5 million and a period of performance of five years or until the ceiling is reached.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 1
FRENCHBURG JOB CORPS CCC GENERAL REQUIREMENTS
B554 FOOD SERVICE - DISHWASHER REPLACEMENT
FRENCHBURG JOB CORPS CIVILIAN CONSERVATION CENTER
SECTION 010150
GENERAL REQUIREMENTS
PART 1 – SUMMARY OF WORK
1.1 DESCRIPTION
A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:
1. Base Bid Item 1: Dishwasher and Booster Heater Replacement
a. Remove and replace existing conveyor type commercial dishwasher.
b. Remove and replace existing booster water heater.
1.2 LOCATION
A. This project is located at the Frenchburg Job Corps Civilian Conservation Center located 10 of miles from Frenchburg, Kentucky in Menifee County. The address is 6969 Tarr Ridge Road, Frenchburg, KY 40322. Driving instructions can be obtained from the Center by calling 606-768-2111.
1.3 WORK HOURS
A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday.
Daily check-in/out at the administrative office is required.
1.4 USE OF PREMISES
A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-to-day operations.
C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.
Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government.
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 2
D. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities. Contractor shall coordinate with existing utilities for locates, or in the event any interruptions of services are required.
1.5 DEFINITIONS
A. The following terms in any combination relating to the installation of products/materials:
install, furnish, provide, or similar statements; mean that the contractor is responsible for the procurement and installation of the products unless it is specifically designated as either a government furnished item, supply only product, or spare.
1.6 STANDARDS AND CODES
A. All contract work shall adhere to the most recent version of:
1. All the International Code Council Family of codes (ICC) e.g. International
Building Code (IBC), International Fire Code (IFC), and International Mechanical Code (IMC).
2. All National Fire Protection Association (NFPA) codes and Standards e.g. , NFPA 70: National Electrical Code (NEC), NFPA 1: Fire Code, and NFPA 101- Life Safety Code.
3. Architectural Barriers Act Standards (ABA or ABAAS).
4. Product Manufacturer’s installation instructions.
1.7 QUALIFICATIONS
A. When applicable to specific contract work items:
1. Electrical work shall be performed by journey level electricians licensed in the
State of contract performance or trainees/apprentices working under the direct supervision of State-licensed electrical supervisors (or State equivalent).
2. Plumbing work shall be performed by journey level plumbers licensed in the State of contract performance or trainees/apprentices working under the direct supervision of State-licensed plumbing supervisors (or State equivalent).
1.8 ELECTRICAL INSPECTIONS
A. This Federal contract is exempt from State permitting requirements. However, electrical work must be inspected by a third-party Inspector who is either State-licensed or ICC-certified. The Contractor will arrange for the inspection and pay any fees required for the inspection and associated report; arrangement may include completion and submission of load calculations, permit applications, and any other required coordination. The Inspector does not have any jurisdictional authority on Federal projects. The USFS is the jurisdiction having authority. The inspection will be based on the most recent version of the NFPA 70 National Electric Code (NEC) and currently adopted State codes. A list of deficiencies with corresponding code reference is to be provided in a report signed by the inspector. The addressee in the report is to be the Job Corps Center. The Inspector will provide a copy of their current inspection credentials with the inspection report. The
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 3
Contractor will submit the report to the COR. The CO will determine which deficiency/violations will be enforced for the Contractor to fix.
1.9 WORK RESTRICTIONS
A. Smoking is permitted on campus only in the designated smoking area.
1.10 SCHEDULE OF ITEMS
A. Schedule of Items:
1. Provide pricing for all items listed in the Schedule of Items.
2. Contract award will be made for all Base Items.
3. Optional Items may or may not be awarded, depending on funding availability.
B. Base Items (BI):
1. Base Item No. 1 –Dishwasher and Booster Heater Replacement
a. Measurement: This item is measured as a Lump Sum quantity.
b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to:
i. Remove and properly dispose of existing Hobart CRS66A conveyor-type dishwasher and Hubbell J1658T electric water booster heater (58.5kW, 140.7A, 240V, 3PH, 60hz, 16 gallon), located in the Food Service, building 554.
ii. Furnish and install new dishwasher, in same location as the existing unit, and according to code requirements and manufacturer’s recommendations and instructions.
iii. Furnish and install new booster water heater (see note on verification of existing electrical system).
iv. Contractor shall connect the new units to existing utilities (electric, water, drains, exhaust ducts and exhaust controls), making modifications to those utilities as necessary for proper system operation. The new dishwashing unit requires a separate cold-water connection, which will be taken off of an adjacent cold-water sink supply, see Appendix B for photos of existing conditions.
v. The Contractor shall verify existing electrical system conditions and provide for fully functional booster heating and dishwasher systems.
1. Existing dishwasher data plate indicates 208V, 3 Phase power requirement. Existing booster heater data plate indicates 240V, 3 Phase rating. Contractor shall verify existing
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 4
electrical system voltage output and furnish this information with the booster heater and dishwasher product submittals.
c. Deficiencies: NA.
C. Optional Items (OI):
1. Optional Item No. 1- NA
1.11 REQUIREMENTS FOR DISHWASHER AND BOOSTER HEATER SYSTEM
B. Furnish and install a new dishwasher with the following characteristics:
1. Basis of Design: Hobert CLPS66EN-BAS+BUILDUP 1-Tank High Temp Conveyor Dishwasher with Power Scrapper (R to L feed):
a. Single tank, 220 racks/hour minimum, insulated hinged doors w/interlock switches, 0.56 gallons/rack, stainless steel enclosure panels, controls with low temperature and dirty water indicators, NSF Pot and Pan mode, programmable de-lime notification, NSF rated pots/pans mode, programmable auto-shut down, self-diagnostics, booster heater control. Stainless-steel panels, wash arms, pump, strainer basket, strainer pan, and impeller.
b. 15 kw electric tank heat.
c. Toolless removable upper and lower wash arms and end caps.
d. Perforated stainless steel strainer pan supporting a deep perforated stainless-steel basket.
i. Basket and pan shall be removable without requiring removal of wash arms.
e. Drain water tempering kit.
f. Pressure regulator valve for use with external booster heater.
g. Water shock absorber kit.
h. Operation: Right to Left.
i. Fits within available space (66” table to table space, 34” table height).
j. New dishwasher to be Energy Star Certified and meet ASSE Standard No. 1004.
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 5
k. Dish washer manufacturer must have an authorized service representative within 75 miles of the project site. Include information on product submittal.
l. Electrical requirements: Contractor shall verify existing electrical connection conditions, match and/or modify as required for new equipment connections.
m. Contractor to connect new unit to existing utilities and make modifications to electrical, water, and sewer connections as needed to accommodate new equipment. Connect to existing steel vent hoods.
n. Warranty: 1 year.
B. Furnish and install a new electric booster heater or approved equal with the following salient features:
1. Basis of Design: Hubbell J1658 (verify existing electrical system requirements for voltage identifier in product model).
a. 16 gallons, all stainless steel construction.
b. Nominal Heat Output: 58.5kW @ 240V or 44kW @ 208V (verify existing electrical conditions, current heater is 240V, 3 Phase but dishwasher is rated 208V, 3 phase).
c. Low lead content.
d. ASME stamped construction.
e. UL listed.
f. Adjustable temperature output w/ digital temperature display.
PART 2 – PROJECT SCHEDULE
2.1 PROJECT SCHEDULE
ITEM* REQUIRED DUE DATE (calendar days)
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 6
Pre-Construction Conference
Within 10 days of Award (virtually)
Notice To Proceed (NTP)
Issued first weekday after Pre-Construction Conference
Bonds 10 days after Award
Action and Informational Submittals
12 days after NTP (CORs have 12 days to return)
Closeout Submittals
Prior to CO acceptance of project
Contract Release form and final pay request
10 days after CO acceptance of project
* All items above must be included in Contractor’s construction schedule
PART 3 – SUBMITTAL PROCEDURES
3.1 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Government approval.
B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements.
3.2 PROCEDURES
A. Contractor Responsibilities
1. Review each submittal and check for compliance with the Contract Documents.
2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
3. Include the following information on label or cover sheet for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 7
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. Date of Contractor’s approval.
i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents.
4. The Government will not review submittals that do not bear Contractor's approval and will return them without action.
5. Unless additional copies are required for final submittal, and unless the
Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
6. Submittals must be submitted in electronic PDF format. Submit to CO via email or electronic file transfer site.
7. Only final submittals with mark indicating action taken by Government are to be used for construction.
8. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
B. Processing Time: Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Government will review initial submittal within 12 calendar days.
Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. Resubmittals: If resubmittal is necessary, it will be resubmitted within 3 calendar days, and reviewed by the Government within 3 calendar days.
3.3 ACTION SUBMITTALS
A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.
B. Collect information into a single submittal for each element of construction and type of product or equipment.
1. Mark up each submittal to show which products and options are applicable.
2. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Required Action Submittals
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 8
1. Product Data: Dishwasher and booster heater, per section 3.3B2 above, distance to authorized service center per 1.11-B-1-k, and voltage circuits feeding the existing dishwasher and booster heater per section 1.10-B-1-V-1.
3.4 INFORMATIONAL SUBMITTALS
A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated below:
B. Required Informational Submittals:
1. Accident Prevention Plan.
2. Construction Schedule.
3. Current licensure and/or certifications for individuals indicated in QUALIFICATIONS paragraph above or as required in individual technical sections.
3.5 CLOSEOUT SUBMITTALS
A. Prepare and submit Closeout Submittals, as follows:
1. One-Year Warranty on Entire Project as required by FAR 52.246–21
2. Project Record Documents.
PART 4 – TEMPORARY FACILITIES AND CONTROLS
4.1 USE OF UTILITIES
A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service. The contractor is expected to provide whatever phone service he deems necessary for the duration of the project.
4.2 SANITARY FACILITIES
A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily.
4.3 STAGING AND STORAGE
A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR).
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 9
4.4 CONSTRUCTION WASTE DISPOSAL FACILITIES
A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Use of Government waste containers will not be permitted.
4.5 SAFETY AND ENVIRONMENTAL PROTECTION
A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform personnel, students, and the public of possible hazards.
C. Fire Protection.
1. Store combustible materials in containers in fire-safe locations.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.
3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.
PART 5 – EXECUTION REQUIREMENTS
5.1 EXAMINATION
A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
B. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
C. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
5.2 INSTALLATION
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 10
A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction.
B. Make vertical work plumb and make horizontal work level.
C. Install per manufacturer's written instructions and recommendations.
5.3 PROGRESS CLEANING
A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
5.4 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion.
5.5 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
PART 6 – CLOSEOUT PROCEDURES
6.1 SUBSTANTIAL COMPLETION
A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise the CO of pending insurance changeover requirements.
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 11
3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.
4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities.
5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.
6. Complete startup testing of systems.
7. Submit changeover information related to Government occupancy, use, operation, and maintenance.
8. Complete final cleaning requirements, including touchup painting.
9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final Completion.
6.2 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspections: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 12
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
6.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
6.4 PROJECT RECORD DOCUMENTS
A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.
B. Provide Draft of Project Record Drawings at Substantial Completion. CO will return reviewed copy. Provide Final Project Record Drawings at Final Completion.
C. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.
1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.
a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.
b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.
2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.
3. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.
4. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets;
bind each set with durable paper cover sheets. Include identification on cover sheets.
6.5 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B554 FOOD SERVICE - DISHWASHER REPLACEMENT 010150 – 13
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
2. Remove tools, construction equipment, machinery, and surplus material from Project site.
3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.
Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
D. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 010150