127EAW25R0014 - Plumas NF Lookouts Restrooms
Solicitation number
127EAW25R0014
Issued by

About this file

This document is a comprehensive set of technical specifications for the Lookout Restroom Upgrades project for the United States Department of Agriculture - Forest Service Plumas National Forest. The project involves demolishing and replacing existing toilet buildings at multiple lookout sites, including Red Rock, Mount Hough, Smith Peak, Dixie Mountain, Mills Peak, Mills Peak Parking Area Restroom, Thompson Peak, Pike County, and Argentine. The specifications detail two primary approaches to restroom construction: rebuilding historic restrooms to match existing design with specific characteristics like wood framing, wood batten paneling, synthetic tile roofs, and concrete floors, and installing a prefabricated, accessible restroom at Pike County.

The project is a small business set-aside with an estimated value between $500,000 and $1,000,000, solicited under the number 127EAW25R0014. Key project dates include a mandatory site visit on June 12th, 2024, at 11:00 AM PST, and a deadline for Request for Information (RFIs) of June 17th, 2025 at 1:00 PM PST. The technical specifications provide extensive details on construction methods, materials, finish requirements, and installation procedures, covering everything from concrete work and carpentry to roofing, flashing, and site preparation. Contractors must adhere to specific design guidelines that emphasize preserving the historical aesthetic of the lookout sites while upgrading the restroom facilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revision 0 | June 13, 2024 Contract No.: 140F0822D0250/127EAW23F001

Lookout Restroom Upgrades United States Department of Agriculture - Forest Service Plumas National Forest

7 Freelon Street San Francisco, California 94107

Mills Peak Lookout and Restroom

Specifications

Lookout Restroom Upgrades 140F0822D0250/127EAW23F001

Revision 0

PROPERTY OF UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY

Page Left Blank

USDA – Plumas National Forest

CERTIFICATION PAGE

00 01 05 - 1

SECTION 00 01 05

CERTIFICATIONS PAGE

CERTIFICATION

The designs, specifications, and drawings composing this specification have been prepared by or under the cognizance of registered professional engineers with a valid license in the State of California issued by the State Board of Registration for Professional Engineers, or licensed architects holding valid licenses in the State of California issued by the Board of Architectural Examiners.

ARCHITECT

Signature

Name: Joyce Chow

License No.C-26549

License Exp. Date: 11/30/2025

ENGINEERS

Civil Engineer Signature

Structural Engineer Signature

Name: Andrew Scheer Name: Robby Gottselig

License No. C-84314 License No. S-6790

License Exp. Date: 09/30/2025 License Exp. Date: 09/30/2025

END OF SECTION 00 01 05

TABLE OF CONTENTS

00 01 10 - 1

SECTION 00 01 10

SPECIFICATIONS TABLE OF CONTENTS

Division 0: INTRODUCTORY INFORMATION

00 01 05 Certification Page

00 01 10 Table of Contents

00 01 15 List of Drawings

Division 1: GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 20 00 Payment Procedures

01 26 00 Contract Modifications Procedures

01 31 00 Project Management and Coordination

01 32 00 Construction Progress Documentation

01 32 33 Photographic Documentation

01 33 00 Submittal Procedures

01 45 00 Quality Requirements

01 50 00 Temporary Facilities and Controls

01 72 50 Survey and Field Engineering

01 74 00 Cleaning and Waste Management

01 77 00 Closeout Procedures

01 78 23 Operation and Maintenance Data

01 78 39 Project Record Documents

01 79 00 Demonstration and Training

Division 2: EXISTING CONDITIONS

02 41 00 Selective Building Demolition

02 42 00 Removal and Salvage of Construction Materials

Divisions 3 – CONCRETE

03 15 00 Anchor Bolts and Post-Installed Anchors

03 30 00 Cast-In-Place Concrete

TABLE OF CONTENTS

00 01 10 - 2

Division 5: METALS

05 52 00 Handrailing

Division 6: WOOD, PLASTICS, AND COMPOSITES

06 10 00 Rough Carpentry

Division 7: THERMAL AND MOISTURE PROTECTION

07 31 00 Synthetic Roof Tile

07 60 00 Flashing and Sheet Metal

Division 9: FINISHES

09 90 00 Paints and Coatings

Division 31: EARTHWORK

31 23 35 Disposal of Materials

END OF SECTION 00 01 10

LIST OF DRAWINGS

00 01 50 -1

SECTION 00 01 50

LIST OF DRAWINGS

SHEET NUMBER DESCRIPTION

GENERAL

G-01 TITLE SHEET

G-02 PROJECT LOCATION MAPS

G-03 SHEET INDEX AND GENERAL AND DEMOLITION NOTES

CIVIL

C-01 ARGENTINE LOOKOUT OVERALL SITE PLAN

C-02 ARGENTINE LOOKOUT ENLARGED SITE PLAN

C-03 DIXIE LOOKOUT OVERALL SITE PLAN

C-04 DIXIE LOOKOUT ENLARGED SITE PLAN

C-05 DIXIE LOOKOUT STAIRS ENLARGED SITE PLAN

C-06 HOUGH LOOKOUT OVERALL SITE PLAN

C-07 HOUGH LOOKOUT ENLARGED SITE PLAN

C-08 MILLS LOOKOUT OVERALL SITE PLAN

C-09 MILLS LOOKOUT ENLARGED SITE PLAN

C-10 MILLS PARKING LOT ENLARGED SITE PLAN

C-11 PIKE CO LOOKOUT OVERALL SITE PLAN

C-12 PIKE CO LOOKOUT ENLARGED SITE PLAN

C-13 RED ROCK LOOKOUT OVERALL SITE PLAN

C-14 RED ROCK LOOKOUT ENLARGED SITE PLAN

C-15 SMITH LOOKOUT OVERALL SITE PLAN

C-16 SMITH LOOKOUT ENLARGED SITE PLAN

C-18 THOMPSON LOOKOUT OVERALL SITE PLAN

C-19 THOMPSON LOOKOUT ENLARGED SITE PLAN

C-20 CIVIL DETAILS

STRUCTURAL

S-01 RESTROOM STRUCTURAL DETAILS

S-02 RESTROOM STRUCTURAL DETAILS

S-03 DIXIE STAIR STRUTURAL DETAILS

ARCHITECTURAL

A-01 ARGENTINE LOOKOUT FLOOR PLAN, ELEVATIONS, SECTIONS, AND

DETAILS

A-02 DIXIE LOOKOUT FLOOR PLAN, ELEVATIONS, SECTIONS, AND DETAILS

A-03 DIXIE LOOKOUT STAIRS FLOOR PLAN, ELEVATION, AND SECTION

A-04 MT. HOUGH LOOKOUT FLOOR PLAN, ELEVATIONS, SECTIONS, AND

DETAILS

A-05 MILLS PEAK STAFF LOOKOUT FLOOR PLAN, ELEVATIONS, SECTIONS, AND

DETAILS

A-06 MILLS PEAK PUBLIC LOOKOUT FLOOR PLAN, ELEVATIONS, SECTIONS, AND

DETAILS

A-07 PIKE COUNTY LOOKOUT FLOOR PLAN AND ELEVATIONS

A-08 PIKE COUNTY LOOKOUT SECTIONS

A-09 RED ROCK LOOKOUT FLOOR PLAN, ELEVATIONS, SECTIONS, AND DETAILS

LIST OF DRAWINGS

00 01 50 -2

A-10 SMITH PEAK LOOKOUT FLOOR PLAN, ELEVATIONS, SECTIONS, AND

DETAILS

A-11 THOMPSON PEAK LOOKOUT FLOOR PLAN, ELEVATIONS, SECTIONS, AND

DETAILS

A-12 DETAILS

END OF SECTION 00 01 50

SUMMARY OF WORK

01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 - GENERAL

1.1 PROJECT NAME AND IDENTIFICATION

Project Name: U.S. Department of Agriculture – Forest Service Plumas National Forest, California

1.2 WORK REQUIRED BY CONTRACT DOCUMENTS

A. Work includes, but is not necessarily limited to, the following:

1. Existing toilet buildings will be removed from the following Lookouts:

a. Red Rock

b. Mount Hough

c. Smith Peak

d. Dixie Mountain

e. Mills Peak

f. Mills Peak Parking Area Restroom

g. Thompson Peak

2. New toilet buildings will be installed at the following Lookouts:

a. Red Rock

b. Mount Hough

c. Smith Peak

d. Dixie Mountain

e. Mills Peak

f. Mills Peak Parking Area Restroom

g. Thompson Peak

h. Pike Country

i. Argentine

3. Provide new wood stairs at Dixie Mountain.

4. Concrete landings for toilet facilities without stairs shall be an Add Option to the Bid.

Base Bid shall be to provide a level and graded area the same size as the proposed concrete landing of natural material sloped away from the restroom.

1.3 SUMMARY OF WORK

A. The existing restrooms will be demolished it their entirety. Where the existing wood siding is in good condition, salvaged and turn over to the Government.

B. There will be two approaches to the design of the exterior of the restrooms. For the historic restrooms the contractor will rebuild the restrooms to match the existing restroom design as much as possible. The existing size, shape, roof line, and material will be incorporated into the new design to the greatest extent possible. Any modifications to the existing size and shape of the restroom to accommodate the waste system will be designed to respect the existing aesthetics and view shed.

Each historical restroom will have the following characteristics:

1. Wood framed construction

2. Wood swinging door

3. Wood batten paneling, either vertical or horizontal

SUMMARY OF WORK

01 11 00 - 2

4. Synthetic tile shingled roof

5. Roof slope to match existing roof slope as close as possible.

6. Exposed interior wood framing. We are proposing to have exposed wood framing as opposed to installing a finish material like reinforced plastic panels. We noticed a lot of rodent droppings and believe having exposed wall framing would allow easier maintenance and would remove a hiding place for rodents.

7. Concrete floor for ease of maintenance

8. Wood or concrete stairs

9. Concrete pad

10. Reuse of existing wood paneling if in good condition

C. To ensure the restrooms are rebuilt to match the existing restrooms as close as possible we will require the contractor to submit shop drawings showing the existing dimensions, floor plans, and elevations with the new dimensions, plans and elevations for comparison and verification the construction will meet the intent of the design.

D. The second approach will be to provide an accessible prefabricated restroom at Pike County. The prefabricated restroom must meet the following requirements:

1. Made in the USA

2. Fully prefabricated and sectional

3. Assembles in one day with two people

4. Heavy duty, 4-season use

5. Withstands high snow and wind loads

1.4 APPLICATIONS OF THE CONTRACT DOCUMENTS

A. The Contractor is to furnish all labor, materials, equipment, supplies, and supervision to perform all work as indicated in the Construction Documents. In addition, the Contractor shall perform a complete site survey, prior to the start of new work.

B. Provisions of the General Conditions of the Contract, Supplementary Conditions, and Divi-sion 1 - General Requirements of the Specifications, apply to the work specified in each Section of the Specifications.

C. Contractor is hereby specifically directed to notify and apprise all subcontractors and other parties engaged in the Work as to Contents of the General Conditions of the Contract, Sup-plementary Conditions, and Division 1 - General Requirements.

D. No contractual adjustment shall be due or become exigent as a result of failure to fully un-derstand the General Conditions of the Contract, Supplementary Conditions, and Division 1

- General Requirements.

E. Jurisdiction: will follow regulations and approvals set forth in Division 1 in addition to the requirements referenced in the General Conditions of the Contract and the Specifications.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

CONTRACT MODIFICATION PROCEDURES

01 26 00 - 1

SECTION 01 26 00

CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for handling and processing Contract modifications. Construction Manager shall develop and implement a system acceptable to the Government for the preparation, review and processing of Change Proposals, contingency and allowance expenditure authorizations, Change Orders, and requests for information, in accordance with the Contract.

1.3 MINOR CHANGES IN THE WORK

A. Government will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time.

1.4 PROPOSAL REQUESTS

A. Government-Initiated Proposal Requests: Government will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.

1. Work Change Proposal Requests issued by Government are not instructions either to stop work in progress or to execute the proposed change.

2. Within time specified in Proposal Request or 14 days, when not otherwise specified, after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.

a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

c. Include costs of labor and supervision directly attributable to the change.

d. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

e. Quotation Form: Use forms provided by Government.

B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to the Government.

1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.

CONTRACT MODIFICATION PROCEDURES

01 26 00 - 2

2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

3. Indicate applicable delivery charges, equipment rental, and amounts of trade discounts.

4. Include costs of labor and supervision directly attributable to the change.

5. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

6. Comply with requirements in Section 01 25 00 "Substitution Procedures" if the proposed change requires substitution of one product or system for product or system specified.

7. Proposal Request Form: Use form provided by Government.

1.5 CHANGE ORDER PROCEDURES

A. On Government 's approval of a Work Changes Proposal Request, Government will issue a Contract Change Order for signatures of Government and Contractor on Government’s standard form.

B. CONSTRUCTION CHANGE DIRECTIVE

C. Change Directive: Government may issue a Change Directive. Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.

1. Construction Change Directive contains a complete description of change in the

Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.

D. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive.

1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 01 26 00

PAYMENT PROCEDURES

01 29 00 - 1

SECTION 01 29 00

PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.

1.2 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of construction schedule.

1. Coordinate line items in the schedule of values with items required to be indicated as separate activities in Contractor's construction schedule.

2. Submit the schedule of values to Government within 14 calendar days of receiving award.

3. An acceptable schedule of values shall be agreed upon by the contractor and the Government before the first progress payment is processed.

B. Format and Content: Use Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.

1. Arrange schedule of values in a format requested by the Government.

2. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports.

3. Closeout Costs. Include separate line items under Contractor and principal subcontracts for Project closeout requirements.

4. Schedule of Values Revisions: Revise the schedule of values when Change Orders or Construction Change Directives result in a change in the Contract Sum. Include at least one separate line item for each Change Order and Construction Change Directive.

1.3 APPLICATIONS FOR PAYMENT

A. Each Application for Payment following the initial Application for Payment shall be consistent with previous applications and payments as certified by the Government.

B. Payment Application Times: Progress payments are accepted. The period of construction work covered by each Application for Payment shall be listed on the invoice. Coordinate with Government to determine frequency of payments.

1. Submit draft copy of Application for Payment to Government for review before uploading into the Government Invoice Payment processing platform.

C. Application for Payment Forms: Provide in format as requested by the Government.

D. Transmittal: Submit one signed electronic copy of each Application for Payment to the Government via email.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.

PAYMENT PROCEDURES

01 29 00 - 2

2. Include the following with the application: Construction progress schedule & partial release of liens from major subcontractors and vendors.

E. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. List of subcontractors.

2. Schedule of values.

3. Contractor's construction schedule (preliminary if not final).

4. Products list (preliminary if not final).

5. Schedule of unit prices.

6. Submittal schedule (preliminary if not final).

7. List of Contractor's staff assignments.

8. List of Contractor's principal consultants.

9. Report of preconstruction conference.

10. Certificates of insurance and insurance policies.

11. Performance and payment bonds.

F. Application for Payment at Substantial Completion: After Government issues the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.

1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.

2. This application shall reflect Certificate(s) of Substantial Completion issued previously for Government occupancy of designated portions of the Work.

G. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements.

2. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid.

3. Updated final statement, accounting for final changes to the Contract Sum.

4. Evidence that claims have been settled.

5. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when Government took possession of and assumed responsibility for corresponding elements of the Work.

6. Final liquidated damages settlement statement.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 01 29 00

PROJECT MANAGEMENT AND COORDINATION

01 31 00 - 1

SECTION 01 31 00

PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. General coordination procedures.

2. Coordination drawings.

3. RFIs.

4. Digital project management procedures.

5. Project meetings.

1.2 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract.

3. Drawing number and detail references, as appropriate, covered by subcontract.

1.3 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work.

Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the schedule of values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Preinstallation conferences.

7. Project closeout activities.

8. Startup and adjustment of systems.

01 31 00 - 2

1.4 REQUEST FOR INFORMATION (RFI)

A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Official Project Name and Number, and any additional required identifiers established in the contract documents.

2. Date.

3. Name of Contractor.

4. RFI number, numbered sequentially.

5. RFI subject.

6. Specification Section number and title and related paragraphs, as appropriate.

7. Drawing number and detail references, as appropriate.

8. Field dimensions and conditions, as appropriate.

9. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

10. Contractor's signature.

11. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

C. RFI Forms: Provide a format as requested by the Government.

D. Government Action: Government will review each RFI, determine action required, and respond. Allow fourteen calendar days minimum for Government response for each RFI.

1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract

Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Architect's actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. Government action may include a request for additional information, in which case Government’s time for response will date from time of receipt by Government of additional information.

3. Architect's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal according to Section 01 26 00 "Contract Modification Procedures."

a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Government in writing within five days of receipt of the RFI response before proceeding with work.

E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

Submit log at minimum 2x per month. Include the following:

1. Project name.

2. Name and address of Contractor.

3. Name and address of Government representative.

4. RFI number including RFIs that were returned without action or withdrawn.

5. RFI description.

6. Date the RFI was submitted.

7. Date Government’s response was received.

01 31 00 - 3

F. On receipt of Government’s action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Government within three days if Contractor disagrees with response.

1.5 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Use of Architect's Digital Data Files: Digital data files of Architect's CAD drawings will be provided by Architect for Contractor's use during construction.

1. Digital data files may be used by Contractor in preparing coordination drawings, Shop

Drawings, and Project record Drawings.

2. Architect makes no representations as to the accuracy or completeness of digital data files as they relate to Contract Drawings.

B. PDF Document Preparation: Where PDFs are required to be submitted to Government, prepare as follows:

1. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier.

3. Certifications: Where digitally submitted certificates and certifications are required, provide a digital signature with digital certificate on where indicated.

1.6 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site unless otherwise indicated.

B. Preconstruction Conference: Government with schedule and conduct a preconstruction conference before starting construction, at a time convenient to Government and Contractor, but no later than 15 calendar days after contract award.

1. Attendees: Government, Architect representative, Contractor and its superintendent;

major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Responsibilities and personnel assignments.

b. Tentative construction schedule.

c. Phasing.

d. Critical work sequencing and long lead items.

e. Designation of key personnel and their duties.

f. Lines of communications.

g. Use of web-based Project software.

h. Procedures for processing field decisions and Change Orders.

i. Procedures for RFIs.

j. Procedures for testing and inspecting.

k. Procedures for processing Applications for Payment.

l. Distribution of the Contract Documents.

m. Submittal procedures.

n. Preparation of Record Documents.

o. Use of the premises

p. Work restrictions.

q. Working hours.

r. Government's occupancy requirements.

s. Responsibility for temporary facilities and controls.

01 31 00 - 4

t. Procedures for moisture and mold control.

u. Procedures for disruptions and shutdowns.

v. Construction waste management and recycling.

w. Parking availability.

x. Office, work, and storage areas.

y. Equipment deliveries and priorities.

z. First aid.

aa. Security.

bb. Progress cleaning.

3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity when required by other sections and when required for coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Government of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Retain first subparagraph below for projects with sustainable design documentation requirements.

i. Possible conflicts.

j. Compatibility requirements.

k. Time schedules.

l. Weather limitations.

m. Manufacturer's written instructions.

n. Warranty requirements.

o. Compatibility of materials.

p. Acceptability of substrates.

q. Temporary facilities and controls.

r. Space and access limitations.

s. Regulations of authorities having jurisdiction.

t. Testing and inspecting requirements.

u. Installation procedures.

v. Coordination with other work.

w. Required performance results.

x. Protection of adjacent work.

y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Progress Meetings: Conduct progress meetings at regular intervals. Minimum monthly.

01 31 00 - 5

1. Attendees: In addition to representatives of Government and Architect, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting.

Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Sequence of operations.

3) Status of submittals.

4) Deliveries.

5) Off-site fabrication.

6) Access.

7) Site use.

8) Temporary facilities and controls.

9) Progress cleaning.

10) Quality and work standards.

11) Status of correction of deficient items.

12) Field observations.

13) Status of RFIs.

14) Status of Proposal Requests.

15) Pending changes.

16) Status of Change Orders.

17) Pending claims and disputes.

18) Documentation of information for payment requests.

3. Minutes: Entity responsible for conducting the meeting will record and distribute the meeting minutes to each party present and to parties requiring information.

a. Schedule Updating: Revise Contractor's construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 01 31 00

CONSTRUCTION PROGRESS DOCUMENTATION

01 32 00 - 1

SECTION 01 32 00

CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Contractor's Construction Schedule.

2. Construction schedule updating reports.

3. Daily construction reports.

4. Site condition reports.

1.2 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction Project. Activities included in a construction schedule consume time and resources.

1. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

B. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project.

C. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

D. Event: The starting or ending point of an activity.

E. Float: The measure of leeway in starting and completing an activity.

1. Float time is not for the exclusive use or benefit of either Government or Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date.

2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity.

3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date.

1.3 INFORMATIONAL SUBMITTALS

A. Format for Submittals: Submit required submittals in the following format:

1. Working electronic copy of file

2. Retain one of two subparagraphs below.

3. PDF file.

B. Contractor's Construction Schedule

1. Submit a working digital copy of schedule, using Microsoft Project or Excel, and labeled to comply with requirements for submittals.

2. Schedule shall contain activity number, activity description, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days. It shall also contain the logic between each activity.

C. Construction Schedule Updating Reports: Submit with Applications for Payment.

D. Daily Construction Reports: Submit at weekly intervals.

E. Site Condition Reports: Submit at time of discovery of differing conditions.

1.4 COORDINATION

A. Coordinate Contractor's Construction Schedule with the schedule of values, submittal schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from entities involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

1.5 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Computer Scheduling Software: Prepare schedules using current version of a program that is capable of managing construction schedules.

1. Use Microsoft Project for current operating system.

2. Gantt chart shall be included and critical path identified.

B. Time Frame: Extend schedule from date established for the Notice of Award to date of final completion.

1. Contract completion date to not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.

C. Activities: Treat each floor or separate area as a separate numbered activity for each main element of the Work. Comply with the following:

1. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically allowed by Government.

2. Procurement Activities: Include procurement process activities for long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.

3. Submittal Review Time: Include review and resubmittal times indicated in Section 01 33 00 "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with submittal schedule.

4. Revise first subparagraph below if startup and testing of more complex equipment and systems require significantly more than 15 days.

5. Startup and Testing Time: Include no fewer than 15 business days for startup and testing.

6. Commissioning Time: Include no fewer than 15 business days for commissioning.

7. Substantial Completion: Indicate completion in advance of date established for

Substantial Completion, and allow time for Government administrative procedures necessary for certification of Substantial Completion.

8. Punch List and Final Completion: Include not more than 20 business days for completion of punch list items and final completion.

D. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule by phase.

2. Government-Furnished Products: Include a separate activity for each product.

Include delivery dates. Delivery dates indicated stipulate the earliest possible delivery date.

3. Work Restrictions: Show the effect of the following items on the schedule:

a. Coordination with existing construction.

b. Limitations of continued occupancies.

c. Uninterruptible services.

d. Partial occupancy before Substantial Completion.

e. Use-of-premises restrictions.

f. Provisions for future construction.

g. Seasonal variations.

h. Environmental control.

E. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion.

F. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or commence prior to submittal of next schedule update. Summarize the following issues:

1. Unresolved issues.

2. Unanswered Requests for Information.

3. Rejected or unreturned submittals.

4. Notations on returned submittals.

5. Pending modifications affecting the Work and the Contract Time.

G. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule at each regularly scheduled progress meeting.

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses, indicate final completion percentage for each activity.

H. Recovery Schedule: When periodic update indicates the Work is 14 or more calendar days behind the current approved schedule, submit a separate recovery schedule indicating means by which Contractor intends to regain compliance with the schedule. Indicate changes to working hours, working days, crew sizes, equipment required to achieve compliance, and date by which recovery will be accomplished.

I. Distribution: Distribute copies of approved schedule to Government.

1.6 REPORTS

A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site:

1. List of subcontractors at Project site.

2. List of separate contractors at Project site.

3. Approximate count of personnel at Project site.

4. Equipment at Project site.

5. Material deliveries.

6. High and low temperatures and general weather conditions, including presence of rain or snow.

7. Testing and inspection.

8. Accidents.

9. Meetings and significant decisions.

10. Stoppages, delays, shortages, and losses.

11. Meter readings and similar recordings.

12. Emergency procedures.

13. Orders and requests of authorities having jurisdiction.

14. Change Orders received and implemented.

15. Construction Change Directives.

16. Work Change Directives received and implemented.

17. Services connected and disconnected.

18. Equipment or system tests and startups.

19. Partial completions and occupancies.

20. Substantial Completions authorized.

B. Site Condition Reports: Immediately on discovery of a difference between site conditions and the Contract Documents, prepare and submit a detailed report. Submit with a Request for Information. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 01 32 00

PHOTOGRAPHIC DOCUMENTATION

01 32 33 - 1

SECTION 01 32 33

PHOTOGRAPHIC DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for the following:

1. Preconstruction photographs.

2. Concealed Work photographs.

3. Periodic construction photographs.

4. Final Completion construction photographs.

B. Related Requirements:

1. Section 01 77 00 "Closeout Procedures" for submitting photographic documentation as Project Record Documents at Project closeout.

1.2 INFORMATIONAL SUBMITTALS

A. Key Plan: Submit key plan of Project site and building with notation of vantage points marked for location and direction of each photograph. Indicate elevation or story of construction. Include same information as corresponding photographic documentation.

B. Digital Photographs: Submit image files within 5 days of taking photographs.

1. Submit photos by uploading to web-based Project management site or as coordinated with the COR. Include copy of key plan indicating each photograph's location and direction.

2. Identification: Provide the following information with each image description in file metadata tag:

a. Name of Project.

b. Name and contact information for photographer.

c. Name of Architect.

d. Name of Contractor.

e. Date photograph was taken.

f. Description of location, vantage point, and direction.

g. Unique sequential identifier keyed to accompanying key plan.

1.3 QUALITY ASSURANCE

A. Photographer Qualifications: An individual who has been regularly engaged as a professional photographer of construction projects for not less than three years or as approved by the COR.

1.4 FORMATS AND MEDIA

A. Digital Photographs: Provide color images in JPG format, produced by a digital camera with an image resolution of not less than 3200 by 2400 pixels. Use flash in low light levels or backlit conditions.

B. Digital Images: Submit digital media as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software.

PHOTOGRAPHIC DOCUMENTATION

01 32 33 - 2

C. Metadata: Record accurate date and time and GPS location data from camera.

D. File Names: Name media files with date, Project area and sequential numbering suffix.

1.5 CONSTRUCTION PHOTOGRAPHS

A. Photographer: Engage a qualified photographer to take construction photographs.

B. General: Take photographs with maximum depth of field and in focus.

1. Maintain key plan with each set of construction photographs that identifies each photographic location.

C. Preconstruction Photographs: Before commencement of the Work, take photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by Government.

1. Flag construction limits before taking construction photographs.

2. Take 10 photographs to show existing conditions adjacent to property before starting the Work.

3. Take 20 photographs of existing buildings either on or adjoining property to accurately record physical conditions at start of construction.

4. Take additional photographs as required to record settlement or cracking of adjacent structures, pavements, and improvements.

D. Concealed Work Photographs: Before proceeding with installing work that will conceal other work, take photographs sufficient in number, with annotated descriptions, to record nature and location of concealed Work, including, but not limited to, the following:

1. Underground conditions.

E. Periodic Construction Photographs: Take a sufficient number of photographs weekly and include in daily reports. Select vantage points to show status of construction and progress since last photographs were taken.

F. Final Completion Construction Photographs: Take a minimum of 50 photographs after date of Substantial Completion for submission as Project Record Documents.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 01 32 33

SUBMITTAL PROCEDURES

01 33 00 - 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Submittal schedule requirements.

2. Administrative and procedural requirements for submittals.

1.2 DEFINITIONS

A. Retain terms that remain after this Section has been edited for a project.

B. Action Submittals: Written and graphic information and physical samples that require Architect's and/or Government’s responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."

C. Informational Submittals: Written and graphic information and physical samples that do not require responsive action. Submittals may be rejected for not complying with requirements.

Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."

1.3 SUBMITTAL SCHEDULE

A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by Government and additional time for handling and reviewing submittals required by those corrections.

1.4 SUBMITTAL FORMATS

A. Submittal Information: Include the following information in each submittal:

1. Project name.

2. Date.

3. Name of Architect.

4. Name of Construction Manager.

5. Name of Contractor.

6. Name of firm or entity that prepared submittal.

7. Names of subcontractor, manufacturer, and supplier.

8. Revise first subparagraph below to suit Project and office practice.

9. Unique submittal number, including revision identifier. Include Specification Section number with sequential alphanumeric identifier; and alphanumeric suffix for resubmittals.

10. Category and type of submittal.

11. Submittal purpose and description.

12. Number and title of Specification Section, with paragraph number and generic name for each of multiple items.

13. Drawing number and detail references, as appropriate.

14. Indication of full or partial submittal.

01 33 00 - 2

15. Location(s) where product is to be installed, as appropriate.

16. Other necessary identification.

17. Remarks.

18. Signature of transmitter.

B. Options: Identify options requiring selection by the Government.

C. Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by Government on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.

D. Paper Submittals:

1. Place a permanent label or title block on each submittal item for identification; include name of firm or entity that prepared submittal.

2. Only submit paper copies for physical sample submittals.

E. Electronic Submittals: Prepare submittals as PDF package, incorporating complete information into each PDF file. Name PDF file with submittal number.

F. Submittals for Utilizing Web-Based Project Management Software: Prepare submittals as PDF files, or other format indicated by Project management software.

1.5 SUBMITTAL PROCEDURES

A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.

1. Email: Prepare submittals as PDF package, and transmit to Government by sending via email. Include PDF transmittal form. Include information in email subject line as requested by Architect.

2. Coordinate requirements of "Web-Based Project Software" Subparagraph below with requirements for web-based Project software specified in Section 01 32 00 "Construction Progress Documentation."

3. Web-Based Project Management Software: Prepare submittals in PDF form, and upload to web-based Project management software website. Enter required data in web-based software site to fully identify submittal.

4. Paper: Prepare submittals in paper form, and deliver to Government.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.

3. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.

Time for review shall commence on Government’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 15 business days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Government

01 33 00 - 3 will advise Contractor when a submittal being processed must be delayed for coordination.

2. Resubmittal Review: Allow 15 business days for review of each resubmittal.

D. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

E. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

F. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Government’s action stamp.

1.6 SUBMITTAL REQUIREMENTS

A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

c. Standard color charts.

d. Statement of compliance with specified referenced standards.

e. Testing by recognized testing agency.

f. Application of testing agency labels and seals.

g. Notation of coordination requirements.

h. Availability and delivery time information.

4. For equipment, include the following in addition to the above, as applicable:

a. Wiring diagrams…

This is the start of the file's text. The full file is on GovTribe.