4. AF 66 26 May 2022.pdf

PDF 161 KB Posted

Attached to
VGLZ 192040 Repair Perimeter Road (DLA)
Solicitation number
W50S8523B0005
Issued by

About this file

This document is an Attachment 2 Schedule of Material Submittals for federal contract number W50S8523B0005 to repair the perimeter road at the Michigan Army National Guard. It lists 18 required submittals for the project, including a construction progress schedule, construction photos, safety and quality control plans, and materials data. Submittals are due within 14 days of the notice to proceed date. The schedule specifies the number of copies required for each submittal and shows the review process including suspension dates if submittals are disapproved and need resubmission. This attachment provides a clear list of required documentation for overseeing the contract's execution and ensuring the work meets specifications.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

SCHEDULE OF MATERIAL

SUBMITTALS

(AF Form 66 Modified)

PROJECT NO. PROJECT TITLE SOLICITATION/CONTRACT

NO.

VGLZ 192040 Repair South Perimeter Road (DLA)

TO BE COMPLETED BY PROJECT ENGINEER

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R

Spec Section

ITEM OR

DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE

OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C

M

P

LI

A N

C E

A N

D

LO

S E

O U

T

S H

O P

D R

A W

IN

G

A

M P

LE

L O

R S

E L

E C

T

IO

M

N U

F A

C T

U R

E

M A

N U

F A

C T

U R

E R

'S

T A

LO

G

D A

H E

R M

A T

E R

IA

L or D

A

P

E R

A T

IN

G

IN

S

T R

U C

T

IO

SUBMITTAL

REQUIRED

BY 14

DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSION

DATE

FOLLOW-

UP

DATE CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

APPROVED DISAPPROVED

01.00.00 AF Form 3000 Material

Approval Form

X

01.00.00

01.26.00

AF Form 3064 Contract Progress Schedule

X

01.00.00

01.26.00

AF Form 3065 Contract Progress Report

X

01.00.00

SANGB Form 23 Hazardous Material Identification

X

01.00.00

SANGB From 72 Recycling and Disposal Form

X

01.00.10 Affirmative Procurement

Reporting Form

X

01.00.10 DD Form 1354

01.25.00 Substitution Request Form:

CSI Form 13.1A

X

01.32.00 Construction Progress

Schedules

X X

01.32.33 Construction Photos

X X

1.33.00 SubmittalRegisrtry Form 66

X

01.33.00 Schedule

X X

01.35.23 Safety Plan

X

01.40.00 QA/QC Plan X

15 01.78.23 O & M Data X

16 01.00.00 SANGB Form 23 Hazardou Material Identification

17 SOW Construction Materials X X

SOW Radiation Safety Plan X X 18 19 QC Test Report Data