4. Additional Information.pdf

PDF 135 KB Posted

Attached to
Aerospace Medicine Physician/Flight Surgeon
Solicitation number
FA301625Q602
Issued by

About this file

This is an Additional Information attachment providing logistical and administrative details for solicitation FA301625Q602 at Randolph AFB, TX. The document outlines specific access procedures and requirements for contractors.

The attachment specifies gate entry procedures, with commercial delivery vehicles using the South Gate between 0600-1800 and all other vehicles using the Main Gate between 0700-1545, Monday through Friday except Federal holidays. Contractors must log in/out with Security Forces and obtain visitor passes at Building #1021 for Main Gate access. The document also clarifies that "TO" means "THROUGH" in delivery schedules, includes a DOD policy prohibiting ozone-depleting substances in contracts after June 1, 1993, and provides contact information for the Contract Specialist (Joy D. Grubb) and Contracting Officer (Michael D. Simington) at the 502 CONS/JBKCB.

View the file

Other files

File Type Posted
Amendment 0001 - Proposal Information.pdf PDF
RFQ - Flight Physician.pdf PDF
7. Performance Questionnaire.pdf PDF
1. Clauses and Provisions 1.pdf PDF
6. Past Performance List of References.pdf PDF
5. Professional Exemption.pdf PDF
2. Schedule of Services.pdf PDF
3. PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation# FA301625Q602

ATTACHMENT 4

ADDITIONAL INFORMATION

NOTE: "Wherever the word "TO" may appear within the "DELIVERY SCHEDULE" and/or "PERIOD OF PERFORMANCE" schedule, it is intended to mean "THROUGH". Example: If delivery schedule/performance period is stated as being "01 Oct xx "* TO*" 30 Sep xx, it means "01 Oct xx "*THROUGH*" 30 Sep xx ".

All commercial delivery vehicles are to enter and exit the South Gate of Randolph AFB, TX.

Entry and exit times shall be between 0600 and 1800, Monday thru Friday except Federal Holidays. If necessary, use phone at gate for access. All contractors must log in and out with Security Forces.

All other vehicles are to enter and exit the Main Gate of Randolph AFB, TX. Entry and exit times shall be between 0700 and 1545, Monday thru Friday except Federal Holidays. All contractors must log in and out with Security Forces at the Visitor and Vehicle Reception Center:

Pass & Registration, Bldg. #1021 (outside the Main Gate). All contractors must have a point of contact with phone number on base prior to coming to Pass & Registration to receive a Visitor's Pass.

"SPECIAL" NOTE: Published gate operations are subject to change without prior notice during security forces responses to emergencies or other mission priorities.

DOD Policy on Elimination of Use of Class I Ozone-Depleting Substances: No DOD contract awarded on or after June 1, 1993 may include a specification or standard requiring the use of an ozone depleting chemical. All product items sold to the Government should be properly marked with manufacturer’s name and part number (Commodities Only). The supply or service being procured by this contract has been certified as a non ODC item. If, to your knowledge, the product or service contains or will require the use of ozone depleting chemicals in the performance of this contract, you are required to notify the Contracting Officer immediately.

POINTS OF CONTACT:

Joy D. Grubb Michael D. Simington Contract Specialist Contracting Officer

502 CONS/JBKCB 502 CONS/JBKCB

joy.grubb.1@us.af.mil michael.simington@us.af.mil 210-652-8412 210-652-8965

Solicitation# FA301625Q602
POINTS OF CONTACT:
502 CONS/JBKCB 502 CONS/JBKCB

File details come from the government source that posted it. Updated .