4.3.1 S3184 cost schedule~1.pdf
PDF 424 KB Posted
- Attached to
- TR Boiler replacement and maintenance State and local contract opportunity
- Solicitation number
- 70CNR-S3230
- Issued by
- Silver Peak CDP, Nevada
About this file
The document appears to be a cost schedule template for a state or local government contract opportunity, designed for vendors to complete pricing information. The file provides a framework for vendors to propose pricing across multiple line items, with designated shaded areas for cost entries. While specific details about the project scope are limited, the document indicates that travel costs are allowable and will be reimbursed at current GSA rates.
The cost schedule includes spaces for up to 16 line items, with provisions for calculating estimated project value and travel costs per year. Vendors are explicitly instructed to complete the shaded pricing areas and are responsible for ensuring the accuracy of their calculations. The document references GSA.gov for current travel rate information, suggesting this may be a government service or procurement contract. No specific contract term, total budget, or precise project details are discernible from this cost schedule template.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 4.1.1 Terms-and-conditions-for-services~2.pdf | ||
| S3184 RFP TR On Call Plumbing~1.pdf | ||
| 4.1.2 Scope of Work S3184~1.pdf | ||
| 4.2.2 Insurance Requirements~1.pdf | ||
| Quote Instructions.pdf | ||
| 4.3.2 Certification regarding lobbying~1.pdf | ||
| 4.2.1 Standard form contract~2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XXXX cost schedule Vendor
Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct.
Line Description and term Type Price Est. Usage Extended
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 Estimated travel costs per year 4 -$
Estimated project value -$
Travel is allowed as a billable costs of this contract, at then current GSA rates.
gsa.gov
File details come from the government source that posted it. Updated .