4.3.1 S3184 cost schedule~1.pdf

PDF 424 KB Posted

Attached to
TR Boiler replacement and maintenance State and local contract opportunity
Solicitation number
70CNR-S3230
Issued by
Silver Peak CDP, Nevada

About this file

The document appears to be a cost schedule template for a state or local government contract opportunity, designed for vendors to complete pricing information. The file provides a framework for vendors to propose pricing across multiple line items, with designated shaded areas for cost entries. While specific details about the project scope are limited, the document indicates that travel costs are allowable and will be reimbursed at current GSA rates.

The cost schedule includes spaces for up to 16 line items, with provisions for calculating estimated project value and travel costs per year. Vendors are explicitly instructed to complete the shaded pricing areas and are responsible for ensuring the accuracy of their calculations. The document references GSA.gov for current travel rate information, suggesting this may be a government service or procurement contract. No specific contract term, total budget, or precise project details are discernible from this cost schedule template.

View the file

Other files for this state and local contract opportunity

Other files attached to TR Boiler replacement and maintenance, newest first.
File Type Posted
4.1.1 Terms-and-conditions-for-services~2.pdf PDF
S3184 RFP TR On Call Plumbing~1.pdf PDF
4.1.2 Scope of Work S3184~1.pdf PDF
4.2.2 Insurance Requirements~1.pdf PDF
Quote Instructions.pdf PDF
4.3.2 Certification regarding lobbying~1.pdf PDF
4.2.1 Standard form contract~2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XXXX cost schedule Vendor

Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct.

Line Description and term Type Price Est. Usage Extended

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 Estimated travel costs per year 4 -$

Estimated project value -$

Travel is allowed as a billable costs of this contract, at then current GSA rates.

gsa.gov

File details come from the government source that posted it. Updated .