4.3.1 S3155-cost-schedule.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
On Call Electrical- Eastern Region
Solicitation number
70CNR-S3155
Issued by
Elko County, Nevada

About this file

This is a cost schedule template (document S3155) providing an Excel-based pricing form for vendors to complete their proposed pricing. The schedule contains 16 line items, with 15 unspecified service/product lines and one dedicated line for estimated annual travel costs.

The document indicates that travel is allowable as a billable cost under the contract, subject to current GSA rates. Vendors are responsible for ensuring accurate calculations in their pricing submissions. The template includes fields for unit pricing, estimated usage, and extended costs, with automatic calculation formulas embedded to determine the total estimated project value.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost schedule

S3155 cost schedule
Vendor
Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct.
LineDescription and termTypePriceEst. UsageExtended
1$ - 0
2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
8$ - 0
9$ - 0
10$ - 0
11$ - 0
12$ - 0
13$ - 0
14$ - 0
15$ - 0
16Estimated travel costsper year4$ - 0
Estimated project value$ - 0
Travel is allowed as a billable costs of this contract, at then current GSA rates.
gsa.gov

&"Times New Roman,Italic"&10Page &P of &N http://www.gsa.gov/

File details come from the government source that posted it. Updated .