4.06d J-1 Contractor_Pricing_Breakdown_USSSHIP_VR.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Voyage Repair USS Ship
Solicitation number
N6817125Q0016
Issued by

About this file

This is a pricing template spreadsheet for voyage repairs on the USS Oscar Austin. The spreadsheet includes line items for four specific repair tasks: Main Reduction Gear Standby Lub Oil Pump 2B Shaft Coupling Replacement (262-41-001), Inside Machinery Space Lagging and Insulation Replacement (508-11-001), Outside Machinery Space Lagging and Insulation Replacement (508-12-001), and Crane and Rigging Support Services for Number 3 Ships Service Gas Turbine Generator Engine Repair (993-11-001).

The template is structured to capture labor hours, labor price, and material costs for both prime contractor and subcontractor work, with separate columns for OEM mandated work. The spreadsheet also includes provisions for travel expenses and growth (additional work), though no quote is required for growth items. All fields in the provided template are currently blank with $0.00 values.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE LIST

GOVERNMENT PRICE LIST
ITEMS REQUIRED
USS Oscar Austin
GENERAL REQUIREMENTPRIME / SUBCONTRACTOROEM MANDATED SUBCONTRACTOROTHER COSTS**ENSURE YOU ARE USING THE CORRECT CALCULATIONS TO COME UP WITH TOTALS.
ITEM NO.TITLE CAT A ITEMLABOR HOURSLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETOTAL LABORTOTAL MATERIALTOTAL PRICEITEMS THAT GO TOGETHER ARE COLOR CODED**
262-41-001Main Reduction Gear Standby Lub Oil Pump 2B Shaft Coupling Replacement$0.00$0.00$0.00
508-11-001Inside Machinery Space Lagging and Insulation Replacement$0.00$0.00$0.00
508-12-001Outside Machinery Space Lagging and Insulation Replacement$0.00$0.00$0.00
993-11-001Crane and Rigging Support Services for Number 3 Ships Service Gas Turbine Generator (SSGTG) Engine Repair$0.00$0.00$0.00
TVL & AGRTRAVEL & GROWTH
TVLTRAVEL EXPENSES. A BREAKDOWN OF TOTAL PRICE MAY BE REQUESTED TO DETERMINE PRICE REASONABLENESS.
AGRGROWTH: NO QUOTE IS REQUIRED FOR THIS ITEM. HOWEVER, A WITHIN SCOPE DETERMINATION AND PRICE FAIR & REASONOBLENESS WILL BE MADE IF ADDITIONAL WORK IS NEEDED.
TOTAL0$0.00$0.00$0.00$0.00$0.00$0.00$0.00

File details come from the government source that posted it. Updated .