This file contains work item specifications for repairs and maintenance to be performed on the USS OSCAR AUSTIN (DDG 79) under specification number NAPL-014-25. The document outlines four major work items: 1) Main Reduction Gear (MRG) Standby Lube Oil Pump 2B shaft coupling replacement in Engine Room No. 2, 2) Inside Machinery Space lagging and insulation replacement across multiple machinery spaces totaling approximately 427 linear feet of piping insulation and 100 square feet of general insulation, 3) Outside Machinery Space lagging and insulation replacement across 15 different spaces including crew areas and technical spaces, and 4) Crane and rigging support services for the Number 3 Ships Service Gas Turbine Generator (SSGTG) engine repair.
The specifications include detailed requirements for safety protocols, material handling, inspection points, and quality control measures. Government Furnished Material (GFM) is specified for the MRG work item, including one shaft coupling (NSN 3010-01-484-4052) and two shim kits (NSN 5365-01-357-1824/1825). The contractor must provide certification for all crane and rigging operations, protect ship surfaces during work, and complete joint inspections with the Supervisor and Ship's Force upon completion. All work must comply with FY25 Standard Items and includes various verification points marked as (V) and (V)(G) throughout the process. The document includes all changes through January 30, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ Amend 0001.pdf | ||
| 4.06 J-4 Contract Qualification Checklist (QA).pdf | ||
| 4.06d J-1 Contractor_Pricing_Breakdown_USSSHIP_VR.xlsx | XLSX spreadsheet | |
| 4.06 J-3 S- 1 Use and Non-Disclosure Agreement (NDA).pdf | ||
| 4.06 Request For Quote USS SHIP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
FDRMC NAPLES
FPO, AE
USS OSCAR AUSTIN (DDG 79)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: NAPL-014-25
SHIP CHARACTERISTICS
FEET INCHES 509 0LENGTH OVERALL
FEET INCHES 59 0MAX. BEAM AT DESIGN WATERLINE
FEET INCHESEXTREME BEAM INCLUDING APPENDAGES
FEET INCHES 21 9DRAFT (MAX. NAVIGABLE) (FWD.)
FEET INCHES 22 2DRAFT (MAX. NAVIGABLE) (AFT.)
LONG TON 7,018LIGHT DISPLACEMENT
9,211 LONG TONFULL LOAD DISPLACEMENT
INCHESFEET 150 1HEIGHT OF MAST ABOVE DESIGN WATERLINE
0 0
INCLUDES ALL CHANGES THROUGH 1/30/2025
INDEX
SHIP: USS OSCAR AUSTIN (DDG 79) NAPL-014-25
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-25 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 09/29/2023 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 09/29/2023 Original
009-03 Toxic and Hazardous Substance; control 09/29/2023 Original
009-04 Quality Management System; provide 03/13/2024 CH-1
009-05 Temporary Access; accomplish 09/29/2023 Original
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
09/29/2023 Original
009-07 Confined Space Entry, and Certification; accomplish 09/29/2023 Original
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 09/29/2023 Original
009-10 Asbestos-Containing Material (ACM); control 09/29/2023 Original
009-18 Mine Warfare Ships Magnetic Material; control 09/29/2023 Original
009-19 Provisioning Technical Documentation (PTD); provide 09/29/2023 Original
009-20 Government Property; control 03/13/2024 CH-1
009-21 Alteration Verification, Logistic and Technical Data; provide 09/29/2023 Original
009-23 Interference; remove and install 09/29/2023 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/29/2023 Original
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/29/2023 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for
Commercial Equipment/Component; accomplish
09/29/2023 Original
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a
Naval Facility; provide
09/29/2023 Original
009-60 Schedule and Associated Report for CNO Availability; provide and manage 09/29/2023 Original
009-61 Shipboard Use of Fluorocarbons; control 09/29/2023 Original
009-67 Integrated Total Ship Testing; manage 09/05/2023 Original
009-69 Heavy Weather/Mooring Plan; provide 09/29/2023 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
09/29/2023 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 09/29/2023 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
09/29/2023 Original
009-74 Occupational, Safety and Health Plan; accomplish 09/29/2023 Original
009-80 Ship Facility; maintain 09/05/2023 Original
009-81 Compartment Closeout; accomplish 09/29/2023 Original
009-82 Installation of Equal Component Vice Specified Component; report 09/29/2023 Original
009-84 Threaded Fastener Requirement; accomplish 09/05/2023 Original
009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify
09/18/2023 Original
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
09/29/2023 Original
009-99 Ship Departure Report; provide 09/29/2023 Original
Page 1 of 4 EXECUTING WORK
ITEM_NO. TITLE CHANGE DATE CHANGE
009-100 Ship's Stability; maintain 09/05/2023 Original
009-101 Ship Transit and Berthing; accomplish 09/29/2023 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/29/2023 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/29/2023 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/29/2023 Original
009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 10/01/2023 Original
009-117 Combat Systems, Light-Off Suport; provide 09/29/2023 Original
009-118 CG Deck Loading; accomplish 09/29/2023 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 09/06/2023 Original
009-122 Temporary Padeye; install and remove 08/23/2023 Original
009-125 Boat 65 Feet (20meters) Long and Less; accomplish 09/06/2023 Original
009-126 Schedule Model Review (SMR); accomplish 10/01/2023 Original
Page 2 of 4 EXECUTING WORK
CATEGORY II. FY-25 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.
TITLE CHANGE DATEITEM NO. CHANGE
009-11 Insulation and Lagging; accomplish 09/29/2023 Original
009-12 Weld, Fabricate, and Inspect; accomplish 03/13/2024 CH-1
009-13 Meter, Gauge, Switch, and Thermometer; repair 09/29/2023 Original
009-15 Rotating Machinery; balance 09/29/2023 Original
009-17 Rotating Electrical Equipment; repair 09/29/2023 Original
009-25 Structural Boundary Test; accomplish 09/29/2023 Original
009-32 Cleaning and Painting Requirements; accomplish 03/13/2024 CH-1
009-58 Pump and Driver Shaft Alignment; accomplish 09/29/2023 Original
009-71 Piping System; test 09/29/2023 Original
009-78 Passive Countermeasures System (PCMS) Material;
repair
09/29/2023 Original
009-104 Vibration Testing and Analysis; accomplish 09/29/2023 Original
009-114 Mold Remediation; accomplish 09/29/2023 Original
Page 3 of 4 EXECUTING WORK
ITEM NO. TITLE
Main Reduction Gear (MRG) Standby Lube Oil Pump 2B Shaft Coupling
Replacement; accomplish
262-41-001
Inside Machinery Space Lagging and Insulation Replacement;
accomplish
508-11-001
Outside Machinery Space Lagging and Insulation Replacement;
accomplish
508-12-001
Crane and Rigging Support Services for Number 3 Ships Service Gas
Turbine Generator (SSGTG) Engine Repair, Accomplish
993-11-001
Page 4 of 4 EXECUTING WORK
SHIP: USS OSCAR AUSTIN (DDG 79) ITEM NO: 262-41-001
COAR: 26 PCN: EM02-3624
CSWT FILE NO: 262-042 (DDG 51) CMP: NONE
REVISED: 06 MAR 2024 PLANNER: BRESSEM, CASEY
ARELLANES-VIDRIO,
ANGEL
KRIEGER, DANIEL
LAFONTAINE,
CHRISTOPHER
SSP: NAPL-014-25 1 of 3 ITEM NO: 262-41-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Main Reduction Gear (MRG) Standby Lube Oil Pump 2B Shaft Coupling Replacement; accomplish
1.2 Location of Work:
1.2.1 Engine Room No. 2 (4-254-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Pump, Number 2B MRG Standby Lube Oil, Vertical Mount, Mfr: Warren Pumps LLC, Mfr Dwg: D-4568, Mfr ID: D- 4568, APL 01A130039, Serial Number 139-1-14123
1.3.2 Quantity (One EA), Motor, Number 2B MRG Standby Lube Oil, Vertical Mount, AC, 440V, 60/30 HP, 1800/900 RPM, Hansome Energy Systems Inc, Mfr Dwg: A-405-139, Mfr ID: A-405-139, APL 173870116, Serial Number 139-1-14123
1.3.2.1 Quantity (One EA), Coupling, Shaft, Disc Pak, Number 2B Standby Lube Oil Pump and Motor Assembly, Mfr: Rexnord Ind. LLC, Mfr DWG: C062675, Mfr ID. 567950, Material ID: 54RD200, APL 78A020017, Mounted between Vertical Pump and Motor Assembly listed in 1.3.1 and 1.3.2, Assembly Figure 7-2 of 2.2
2. REFERENCES:
2.1 Standard Items, (FY25 CH-1)
2.2 S6225-KH-MMA-010 Rev 5, Lube Oil Service Pump Type 575-TS, CG 47 Class and Reduction Gear Standby Lube Oil Pump for DDG 51 Class
2.3 802-5959353 Rev BT, Military Standard 777D Modified for DDG 51 Class Schedule of Piping, Valves, Fittings, and Associated Piping Components
2.4 TP 26242-3-001 Rev A, Lube Oil Service Pump and Motor Operation Test
2.5 803-6397419, Standard Machinery Shim Kits
3. REQUIREMENTS:
(V)(G) "SAFE TO START"
3.1 Verify with the SUPERVISOR and Ship's Force that the work site is safe and equipment identified 1.3 and located in 1.2 is adequately isolated, de-energized, drained and depressurized as necessary, using 2.2 for guidance.
3.2 Remove existing and install new the material provided in 5.1.1 and listed in 1.3.2.1, and located in 1.2, in accordance with 2.2.
3.2.1 Provide rigging services in support of coupling shaft
SHIP: USS OSCAR AUSTIN (DDG 79)
SSP: NAPL-014-25 2 of 3 ITEM NO: 262-41-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
replacement.
(V)(G) "RIGGING GEAR INSPECTION AND VERIFICATION"
3.2.1.1 Inspect all rigging gear being utilized and ensure it is certified for use. All rigging equipment shall be within calibration for dates work is to be accomplished. Provide certification and calibration records for crane and all rigging gear used on site upon request by the SUPERVISOR.
3.2.2 Record and retain electrical hookup data of any removed electrical equipment in support of new equipment installation, electrical hookup data to be used for reinstallation of equipment.
3.3 Protect the ship's deck, bulkheads and existing equipment from damage by installing herculite, canvas or other suitable protective coverings, and/or fire retardant plywood during component rigging and handling evolutions. All necessary precautions shall be taken to avoid damaging ship and ship's equipment.
(V)(G) "ALIGNMENT VERIFICATION"
3.4 Accomplish cold alignment of the equipment 1.3 and located in 1.2, in accordance with 2.2, CH 6, para 6-2
3.4.1 Submit one legible copy, in hard copy or approved
transferrable media, in English, of a report listing the results of
3.4 to the SUPERVISOR.
(V)(G) "OPERATIONAL TEST"
3.5 Accomplish an operational test of equipment listed in 1.3 and located in 1.2, in accordance with 2.2, para 2-6. OPERATIONAL CHECKS and ships EOSS. Excessive vibrations: None.
3.5.1 Do not operate new, existing, or repaired equipment on the ship. Ship's Force will accomplish such operation when required for test, maintenance, and checkout purposes. Such requirements will be coordinated by the SUPERVISOR.
(V)(G) "COMPARTMENT CLOSEOUT"
3.6 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 04 of 2.1. Compartment shall be left in "as good or better" condition than the compartment was in prior to work being accomplished.
4. NOTES:
4.1 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
SSP: NAPL-014-25 3 of 3 ITEM NO: 262-41-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 1 EA
Coupling, Shaft, Flex, Disc Pak 54RD200 2.2
3010-01- 484-4052 3.2
2. 1 KT Shim Kit 922908 2.5 5365-01- 357-1825 3.2
3. 1 KT Shim Kit 922909 2.5 5365-01- 357-1824 3.2
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: USS OSCAR AUSTIN (DDG 79) ITEM NO: 508-11-001
COAR: 26 PCN: EM02-L071
EA01-6103
EA01-6105
EA01-L056
SWT FILE NO: 508-003 CMP: NONE
REVISED: 30 JUL 2024 PLANNER: BUTTS, NATHAN
ARELLANES-VIDRIO,
ANGEL
KRIEGER, DANIEL
LAFONTAINE,
CHRISTOPHER
SSP: NAPL-014-25 1 of 2 ITEM NO: 508-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Inside Machinery Space Lagging and Insulation Replacement;
accomplish
1.2 Location of Work:
1.2.1 Auxiliary Machinery Room Number 1 (4-126-0-E)
1.2.2 Engine Room Number 2 (4-254-0-E)
1.2.3 Auxiliary Machinery Room Number 2 (4-220-0-E)
1.2.4 Air Conditioning Machinery And Pump Room (5-300-01-E)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, (FY25 CH-1)
2.2 508-6218533 Rev V, DDG-51 Class Mchry Piping & Eqpt Insulation and Lagging Schedule
2.3 635-7027372 Rev U, DDG51 Class Thermal & Acoustical Insulation Arr Shipwide
2.4 MIL-STD-769K Rev 1, Insulation Requirements for U.S. Naval Vessels
2.5 S9086-RK-STM-010/505 Rev 6, Chapter 505 Piping Systems
3. REQUIREMENTS:
(V)(G) "SAFE TO START"
3.1 Verify with the SUPERVISOR and Ship's Force that the work site is safe and equipment identified 1.3 and located in 1.2 is adequately isolated, de-energized, drained and depressurized as necessary, using 2.2 for guidance.
3.2 Remove and dispose existing damaged and deteriorated insulation and lagging located in 1.2, using 2.2 through 2.5 for guidance, as designated by the SUPERVISOR.
3.2.1 Contractor shall dispose removed lagging and hazardous
materials in accordance with local environmental laws.
3.3 Accomplish the requirements of 009-114 of 2.1 for Mold Remediation.
SSP: NAPL-014-25 2 of 2 ITEM NO: 508-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.3.1 Contractor shall dispose removed lagging and hazardous
materials in accordance with local environmental laws.
3.4 Accomplish the requirements of 009-11 of 2.1.
3.4.1 Total of 112 linear feet of IPS Piping Insulation located in 1.2.1.
3.4.2 Total of 100 square feet of Insulation located in 1.2.2.
3.4.3 Total of 155 linear feet of Piping Insulation located in 1.2.3.
3.4.4 Total of 60 linear feet of Piping Insulation located in 1.2.4.
3.5 Template exact size, configuration, and location from each existing shipboard condition.
3.6 Apply each designation, marking and color coding on new and disturbed lagging and insulation in accordance with Paragraph 505-7.8 of 2.5.
(V)(G) "COMPARTMENT CLOSEOUT"
3.7 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 04 of 2.1. Compartment shall be left in "as good or better" condition than the compartment was in prior to work being accomplished.
4. NOTES:
4.1 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.
4.2 Ship’s Force will accomplish paragraph 3.2 of 009-11, the cleaning and painting requirement for new insulation, lagging, and reusable covers to match surrounding areas using MIL-PRF-24596 for preservation.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS OSCAR AUSTIN (DDG 79) ITEM NO: 508-12-001
COAR: 26 PCN: See Attachment A
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: BUTTS, NATHAN
ARELLANES-VIDRIO,
ANGEL
KRIEGER, DANIEL
LAFONTAINE,
CHRISTOPHER
SSP: NAPL-014-25 1 of 4 ITEM NO: 508-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Outside Machinery Space Lagging and Insulation Replacement;
accomplish
1.2 Location of Work:
1.2.1 Ythermograph Room (2-442-6-Q)
1.2.2 Nixie Room (2-450-1-Q)
1.2.3 Multi Function Towed Array Winch Room (2-458-0-Q)
1.2.4 Load Center Room Number 1 (03-142-2-Q)
1.2.5 Access Trunk (01-294-0-T)
1.2.6 Access Trunk (01-338-3-Q)
1.2.7 CREW/CHIEF PETTY OFFICER GALLEY CPO (1-191-0-Q)
1.2.8 Fan Room (01-240-01-Q)
1.2.9 Signal Shelter (04-164-1-Q)
1.2.10 Pilot House (04-130-0-C)
1.2.11 Faul Weather Gear Locker (04-150-3-A)
1.2.12 Passage (01-309-2-L)
1.2.13 SD Strm No 1 (3-220-01-A)
1.2.14 Supply Department Office (1-254-0-Q)
1.2.15 Chief Petty Officer Wash Room (1-110-2-L)
1.3 Identification:
1.3.1 (40 SQFT) Bulkhead Lagging in 1.2.1
1.3.2 (8 Ft) Chill Water Piping Lagging & (24 Ft) Bulkhead Lagging in 1.2.2
1.3.3 (10 SQFT) Bulkhead Lagging in 1.2.3
1.3.4 (4 Ft) 3" piping Lagging, (3 Ft) 2" Piping lagging, (22 SQFT) Bulkhead Lagging (10 SQFT) Cooling Coil Lagging in 1.2.4
1.3.5 (40 FT) Fire Main and Chill potable Water piping in 1.2.5
1.3.6 (13 SQFT) Ventilation Lagging in 1.2.6
1.3.7 (12 FT) Chill Potable Water Piping in 1.2.7
1.3.8 (15 FT) Piping Lagging, (5 SQFT) OVH insulation in 1.2.8
SSP: NAPL-014-25 2 of 4 ITEM NO: 508-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1.3.9 (10 FT) Lagging 2" Pipe in 1.2.9
1.3.10 (One SQFT) BHD Lagging in 1.2.10
1.3.11 (2 SQFT) BHD Lagging in 1.2.11
1.3.12 (12 FT) 2" Chill Water Piping Lagging in 1.2.12
1.3.13 (5 SQFT) Bulkhead Lagging in 1.2.13
1.3.14 (5 SQFT) Bulkhead Lagging in 1.2.14
1.3.15 (1 SQFt) Valve Lagging in 1.2.15
2. REFERENCES:
2.1 Standard Items, (FY25 CH-1)
2.2 508-6218533 Rev V, DDG-51 Class Mchry Piping & Eqpt Insulation and Lagging Schedule
2.3 635-7027372 Rev U, DDG51 Class Thermal & Acoustical Insulation Arr Shipwide
2.4 MIL-STD-769K, Insulation Requirements for U.S. Naval Vessels
2.5 S9086-RK-STM-010/505 Rev 6, Chapter 505 Piping Systems
3. REQUIREMENTS:
(V)(G) "SAFE TO START"
3.1 Verify with the SUPERVISOR and Ship's Force that the work site is safe and equipment identified 1.3 and located in 1.2 is adequately isolated, de-energized, drained and depressurized as necessary, using 2.2 for guidance.
3.2 Remove and dispose existing damaged and deteriorated insulation and lagging located in 1.2, using 2.2 through 2.5 for guidance, as designated by the SUPERVISOR.
3.2.1 Contractor shall dispose removed lagging and hazardous
materials in accordance with local environmental laws.
3.3 Accomplish the requirements of 009-11 of 2.1 for the installation of new insulation and lagging removed in 3.2, using 2.2 through 2.5 for guidance, as designated by the SUPERVISOR.
3.3.1 Template exact size, configuration, and location from each existing shipboard condition.
3.3.2 Apply each designation, marking and color coding on new and disturbed lagging and insulation in accordance with Paragraph 505-7.8 of 2.5.
(V)(G) "COMPARTMENT CLOSEOUT"
3.4 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 04 of 2.1. Compartment shall be left in "as good or better" condition than the compartment was in prior to work being accomplished.
SSP: NAPL-014-25 3 of 4 ITEM NO: 508-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
4. NOTES:
4.1 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.
4.2 Ship’s Force will accomplish the cleaning and painting requirement for 3.2 of 009-11, for new insulation, lagging, and reusable covers to match surrounding areas using MIL-PRF-24596 for preservation.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: NAPL-014-25 4 of 4 ITEM NO: 508-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
PCN Identification
ER09-WA02 CLNG COIL 01-254-2 LGGING DMGD
SERV-L252 RPL LAGGING IN ELE LOAD CNTR 1
ER09-L021 CLNG COIL 01-254-2 LGGING DMGD
CA02-L046 XBT ROOM LAGGING REPLACEMENT
CA02-L047 NIXIE ROOM LAGGING REPLACEMENT
CA02-L048 MFTA ROOM LAGGING REPLACEMENT
CM01-L005 DEGRADED LAGGING 01-338-3-Q
CF03-1525 DEGRADED LAGGING 01-294-0-T
NN01-0739 MISSING LAGGING IN PH
CF01-4876 RPL LAGGING IN ELE LOAD CNTR 1
EA01-6108 RPL LAGGING 1-191-0-Q
SS02-4365 WORN OUT LAGGING ON CPW PIPE
SS01-0227 TORN/WORN OUT LAGGING
SS01-0225 DEFECTIVE LAGGING CWR-V-417
NN01-0645 MISSING LAGGING SIGNAL SHELTER
ES01-NP87 INSULATION DAMAGED
NN01-0759 MISSING LAGGING
NN01-L020 MISSING LAGGING 04-150-3-A
SHIP: USS OSCAR AUSTIN (DDG 79) ITEM NO: 993-11-001
COAR: 26 PCN: EM04-L031
CMP: NONE
PLANNER: KRIEGER, DANIEL
LAFONTAINE,
CHRISTOPHER
SSP: NAPL-014-25 1 of 5 ITEM NO: 993-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Crane and Rigging Support Services for Number 3 Ships Service Gas Turbine Generator (SSGTG) Engine Repair, Accomplish
1.2 Location of Work:
1.2.1 Ships Service Generator Room No. 3 (3-370-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), No. 3 Ships Service Gas Turbine Generator Engine (SSGTG), MFR: Allison Gas Turbine Division, Model No. 501-K34, Part No. 23031310, Weight: 1550 Lbs., Dimensions: 87.56L X 28.12W, 33.73H (inches)
2. REFERENCES:
2.1 Standard Items, (FY25 CH1)
2.2 801-7027785 Rev J, Booklet of General Plans
3. REQUIREMENTS:
(V)(G) "SAFE TO START"
3.1 Verify with the SUPERVISOR and Ship's Force that the work site is safe and equipment identified 1.3 and located in 1.2 is adequately isolated, de-energized, drained and depressurized as necessary, using 2.2 for guidance.
3.2 Provide crane, rigging, and support services capable of handling 10 Tons as designated by the SUPERVISOR for the removal of equipment identified in 1.3 and located in 1.2, using 2.1 and 2.2 for guidance.
(V)(G) "CRANE, CRANE OPERATOR AND RIGGING GEAR CERTIFICATION INSPECTION"
3.3 Inspect crane and all rigging gear being utilized and ensure it is certified for use. Crane, fork lift and all rigging equipment shall be within calibration for dates work is to be accomplished. Provide certification and calibration records for crane and all rigging gear used on site upon request by the SUPERVISOR.
3.3.1 Ensure all required periodic Crane inspections have been performed prior to commencing work.
3.4 Protect the ship's deck, bulkheads and existing equipment from damage by installing herculite, canvas or other suitable protective coverings, and/or fire retardant plywood during component rigging and handling evolutions. All necessary precautions shall be taken to avoid damaging ship and ship's equipment.
3.5 Provide a rigid weather tight enclosure measuring 10 meters by 10 meters to be located on the pier. Enclosure shall have two points of entry large enough to accommodate forklift in 3.9 . Enclosure shall also
SSP: NAPL-014-25 2 of 5 ITEM NO: 993-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
be equipped with a workbench, lighting and 110V electrical service.
3.6 Provide crane, rigging and support services capable of handling 10 Tons as designated by the SUPERVISOR for the installation of equipment identified in 1.3 and located in 1.2, using 2.1 and 2.2 for guidance.
3.7 Inspect crane and all rigging gear being utilized and ensure it is certified for use. Crane and all rigging equipment shall be within calibration for dates work is to be accomplished. Provide certification and calibration records for crane and all rigging gear used on site upon request by the SUPERVISOR.
3.8 Provide certification documentation for all cranes, fork lifts, crane operators and rigging personnel prior to the start of work.
3.8.1 Ensure all cranes, crane operators and rigging personnel certifications are up to date.
(V)(G) "FORK LIFT, FORK LIFT OPERATOR AND RIGGING GEAR CERTIFICATION
INSPECTION"
3.9 Provide a fork lift capable of handling 10 Tons and fork lift operator to support removal and installation of equipment identified in
1.3 and located in 1.2 using 2.1 and 2.2 for guidance.
3.9.1 Provide certification documentation for all fork lifts and fork lift operator personnel prior to the start of work.
3.9.2 Ensure all fork lifts and fork lift operating personnel certifications are up to date.
(V)(G) "COMPARTMENT CLOSEOUT"
3.10 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 04 of 2.1. Compartment shall be left in "as good or better" condition than the compartment was in prior to work being accomplished.
4. NOTES:
4.1 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR
4.2 Do not operate new, existing, or repaired equipment on the ship.
Ship's Force will accomplish such operation when required for test, maintenance, and checkout purposes. Such requirements will be coordinated by the SUPERVISOR.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
SSP: NAPL-014-25 3 of 5 ITEM NO: 993-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5.2 PUSH MATERIAL:
1. None.
SSP: NAPL-014-25 4 of 5 ITEM NO: 993-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR).
This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Enclosure (One)
TEST AND INSPECTION VERIFICATION SHEET (TIVS)
PARAGRAPH REQUIREMENT/COMPONENT IDENTIFICATION RESULTS ACTIVITY SIGNATURE/PRINTED NAME
KTR
3.1.1
(V) "CRANE INSPECTION"
Ensure all inspections are performed in accordance with appropriate host nation safety standards and retain the current documentation of inspections. Documents must be kept on site.
Inspections Completed
SAT / UNSAT
Date: ____________________ CLWP
KTR
3.1.1.6 The contractor shall provide certification that the
crane conforms to the appropriate host nation safety standards.
Certification Provided
SAT / UNSAT
Date: ____________________ CLWP
KTR
3.1.2.1 The contractor shall provide certification that the
rigging equipment conform to the appropriate host nation safety standards.
Certification Provided
SAT / UNSAT
Date: ____________________ CLWP
3.1.2.2
Submit one legible copy, in hard copy or approved transferrable media, a report to the SUPERVISOR that all lifting and handling materials have been inspected, tested, and are safe for use.
Report received
YES / NO
Date:____________________
KTR
SSP: NAPL-014-25 5 of 5 ITEM NO: 993-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR).
This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
CLWP
KTR
3.3 Submit one legible copy, in hard copy or approved
transferrable media, of Enclosure (One) to the SUPERVISOR within 3 days of repair completion.
Report received
YES / NO
Date:____________________ CLWP
Work Completed:
Sign: ____________________________ Print: _________________________ Date: _______________ Project Manager/Type Desk
File details come from the government source that posted it. Updated .