The file's text, extracted by GovTribe without its formatting.
E210 SET OFF SCHEDULE
The Government shall monitor the Contractor’s performance by using the percentage inspection procedures. The Government will inspect as many shipments as possible. Unsatisfactory service will be documented by issuance of a Contract Discrepancy Report (CDR), MF Form 360-R. When completed, the CDR will be forwarded to the Contracting Officer for Action. The Contracting Officer or his representative will take action (set-off deduction, cure letter, etc.) against the Contractor in accordance with FAR 52.246-4, Inspection of Services. If set-off deductions are required, the Contracting Officer will use the set-off deduction schedule outlined below. (This deduction schedule will apply on a shipment by shipment basis.)
SCHEDULE OF SHIPMENT
I
| 3. Pickup Date / Time |
| 10% |
| 10 |
| 4. Delivery Date / Time |
| 10% |
| NA |
5. Packing Violations
| b. 3-4 per shipment |
| 10% |
| 10 |
| c. 5-6 per shipment |
| 15% |
| 15 |
| d. 7 or more per shipment |
| 25% |
| 25 |
6. Provide Proper Moving Inventory
| b. 3-4 per shipment |
| 10% |
| 10 |
| c. 5-6 per shipment |
| 15% |
| 15 |
| d. 7 or more shipment |
| 20% |
| 20 |
| 7. Container Markings |
| 10% |
| 10 |
| 8. Containerization Shipment at Residence |
| 10% |
| 10 |
9. Unpacking
| b. Reassemble / Removal of Debris |
| 20% |
| NA |
| 10. Recording Loss and Damage |
| 10% |
| NA |
| 11. Each Violation Not Otherwise Specified |
| 10% |
| 10 |
NOTE: Total deductions on any one shipment not to exceed 100% of the total shipment cost
The Government shall monitor the Contractor’s performance by using the percentage inspection procedures. The Government will inspect as many shipments as possible. Unsatisfactory service will be documented by issuance of a Contract Discrepancy Report (CDR), MF Form 360-R. When completed, the CDR will be forwarded to the Contracting Officer for Action. The Contracting Officer or his representative will take action (set-off deduction, cure letter, etc.) against the Contractor in accordance with FAR 52.246-4, Inspection of Services. If set-off deductions are required, the Contracting Officer will use the set-off deduction schedule outlined below. (This deduction schedule will apply on a shipment by shipment basis.)
SCHEDULE OF SHIPMENT II
| 3. Pickup Date / Time |
| 10% |
| NA |
| 4. Delivery Date / Time |
| 10% |
| 10 |
5. Packing Violations
| a. 1-2 per shipment |
| 5% |
| NA |
| b. 3-4 per shipment |
| 10% |
| NA |
| c. 5-6 per shipment |
| 15% |
| NA |
| d. 7 or more per shipment |
| 25% |
| NA |
6. Provide Proper Moving Inventory
| a. 1-2 per shipment |
| 5% |
| NA |
| b. 3-4 per shipment |
| 10% |
| NA |
| c. 5-6 per shipment |
| 15% |
| NA |
| d. 7 or more shipment |
| 20% |
| NA |
| 7. Container Markings |
| 10% |
| NA |
| 8. Containerization Shipment at Residence |
| 10% |
| NA |
9. Unpacking
| b. Reassemble / Removal of Debris |
| 20% |
| 20 |
| 10. Recording Loss and Damage |
| 10% |
| 10 |
| 11. Each Violation Not Otherwise Specified |
| 10% |
| 10 |
NOTE: Total deductions on any one shipment not to exceed 100% of the total shipment cost.
The Government shall monitor the Contractor’s performance by using the percentage inspection procedures. The Government will inspect as many shipments as possible. Unsatisfactory service will be documented by issuance of a Contract Discrepancy Report (CDR), MF Form 360-R. When completed, the CDR will be forwarded to the Contracting Officer for Action. The Contracting Officer or his representative will take action (set-off deduction, cure letter, etc.) against the Contractor in accordance with FAR 52.246-4, Inspection of Services. If set-off deductions are required, the Contracting Officer will use the set-off deduction schedule outlined below. (This deduction schedule will apply on a shipment by shipment basis.)
SCHEDULE OF SHIPMENT III
| 3. Pickup Date / Time |
| 10% |
| 10 |
| 4. Delivery Date / Time |
| 10% |
| 10 |
5. Packing Violations
| b. 3-4 per shipment |
| 10% |
| 10 |
| c. 5-6 per shipment |
| 15% |
| 15 |
| d. 7 or more per shipment |
| 25% |
| 25 |
6. Provide Proper Moving Inventory
| b. 3-4 per shipment |
| 10% |
| 10 |
| c. 5-6 per shipment |
| 15% |
| 15 |
| d. 7 or more shipment |
| 20% |
| 20 |
| 7. Container Markings |
| 10% |
| NA |
| 8. Containerization Shipment at Residence |
| 10% |
| NA |
9. Unpacking
| b. Reassemble / Removal of Debris |
| 20% |
| 20 |
| 10. Recording Loss and Damage |
| 10% |
| 10 |
| 11. Each Violation Not Otherwise Specified |
| 10% |
| 10 |
NOTE: Total deductions on any one shipment not to exceed 100% of the total shipment cost.