4.02d J-1 Contractor_Pricing_Breakdown_USNSSHIP_VR.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
USNS SHIP VOYAGE REPAIR
Solicitation number
N6817125Q0015
Issued by

About this file

This is a pricing template spreadsheet for a USNS ARCTIC ship voyage repair contract. The template is structured to capture detailed cost breakdowns across multiple categories including General Requirements, Hull and Structural, Electrical, and Auxiliary Machinery work items. Specific line items include escape trunk lagging and insulation replacement, auxiliary boiler feedwater pump motor rewind, and MSD inspection and service. The template requires contractors to itemize labor hours, labor prices, material prices, and subcontractor costs for each work item.

The spreadsheet includes provisions for travel expenses and growth allowances, with a note that growth items do not require initial quotes but will be subject to scope determination and price reasonableness evaluations if needed. The template is designed to ensure accurate calculations of total costs across all categories, with color coding used to group related items together.

View the file

Other files

File Type Posted
MSD 2.jpg JPG image
MSD 4.jpg JPG image
4.03 RFQ AMEND0001 USNS Ship VR.pdf PDF
MSD 3.jpg JPG image
MSD 5.jpg JPG image
MSD 1.jpg JPG image
4.02b AMEND0001 RFQ USNS SHIP VR.pdf PDF
4.02c J-2 Work Item Description.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE LIST

GOVERNMENT PRICE LIST
ITEMS REQUIRED
USNS ARCTIC
GENERAL REQUIREMENTPRIME / SUBCONTRACTOROEM MANDATED SUBCONTRACTOROTHER COSTS
ITEM NO.TITLE CAT A ITEMLABOR HOURSLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETOTAL LABORTOTAL MATERIALTOTAL PRICE**ENSURE YOU ARE USING THE CORRECT CALCULATIONS TO COME UP WITH TOTALS.
0000GENERAL REQUIREMENTITEMS THAT GO TOGETHER ARE COLOR CODED**
020TAOE-SWI-GAS-FREE-CERTIFICATES$0.00$0.00$0.00
0100HULL AND STRUCTURAL
116ESCAPE TRUNK LAGGING AND INSULATION REPLACEMENT0$0.00$0.00
0300ELECTRICAL
301AUX BOILER FEEDWATER PUMP MOTOR REWIND0$0.00$0.00
0500AUXILIARY MACHINERY
501MSD INSPECTION AND SERVICE$0.00$0.00$0.00
510MACHINERY ROOM LAGGING AND INSULATION REPAIR
TVL & AGRTRAVEL & GROWTH
TVLTRAVEL EXPENSES. A BREAKDOWN OF TOTAL PRICE MAY BE REQUESTED TO DETERMINE PRICE REASONABLENESS.
AGRGROWTH: NO QUOTE IS REQUIRED FOR THIS ITEM. HOWEVER, A WITHIN SCOPE DETERMINATION AND PRICE FAIR & REASONOBLENESS WILL BE MADE IF ADDITIONAL WORK IS NEEDED.
TOTAL0$ - 0$0.00$0.00$0.00$0.00$0.00

File details come from the government source that posted it. Updated .