This document is a Specifications for Work to Be Accomplished (SSP) for USS RAFAEL PERALTA (DDG 115), specification number NAPL-009-27, issued by the Department of the Navy, FDRMC Naples. The specification includes all changes through October 23, 2026 and covers planned maintenance and modernization work on the 513-foot destroyer with a full load displacement of 9,217 long tons.
The work scope encompasses two categories of standard items: Category I includes 48 mandatory work items applicable to this job order without further reference, covering general criteria, environmental compliance, quality management, confined space entry, fire protection, asbestos control, government property management, technical documentation, shipboard electrical cable procedures, occupational safety and health, ship facility maintenance, compartment closeout, and related requirements. Category II includes four standard items that may be invoked as needed, including insulation and lagging, weld and fabrication, cleaning and painting, and reduction gear security. Additionally, the specification includes ten specific work items numbered 150-00-002 through 992-11-001, detailing rust and corrosion removal (approximately 2,000 square feet), lagging and insulation replacement across multiple compartments, ventilation weather hood fastener extraction, air conditioning plant condenser cleaning and inspection, refrigeration plant condenser cleaning and inspection, hull washing and cleaning above the waterline, furniture upholstery replacement, scaffolding provision for the hangar bay, and rigging services for up to 100 crane lifts not exceeding 10,000 pounds each. All work items require joint inspection with the supervisor and commanding officer's representative upon completion, with work completion certification required in accordance with standard item 009-004. Government-furnished material is noted as none for all identified work items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4.02a J-1 Price Breakdown.xlsx | XLSX spreadsheet | |
| 4.02d J-4. Contract Qualification TIP Example.pdf | ||
| 4.02c J-3. Contract Qualification Checklist.pdf | ||
| 4.02a N6817127QN006.pdf | ||
| 4.02e S-1. Non-Disclosure Agreement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
FDRMC NAPLES
FPO, AE
USS RAFAEL PERALTA (DDG 115)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: NAPL-009-27
SHIP CHARACTERISTICS
LENGTH OVERALL 513 FEET 0 INCHES
MAX. BEAM AT DESIGN WATERLINE 0 FEET 0 INCHES
EXTREME BEAM INCLUDING APPENDAGES 0 FEET 0 INCHES
DRAFT (MAX. NAVIGABLE) (FWD.) 0 FEET 0 INCHES
DRAFT (MAX. NAVIGABLE) (AFT.) 0 FEET 0 INCHES
LIGHT DISPLACEMENT 0 LONG TON
FULL LOAD DISPLACEMENT 9,217 LONG TON
HEIGHT OF MAST ABOVE DESIGN WATERLINE 0 FEET 0 INCHES
INCLUDES ALL CHANGES THROUGH 10/23/2026
SHIP: USS RAFAEL PERALTA (DDG 115) NAPL-009-27
INDEX
PLANNED WORK Page 1 of 4
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-27 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-001 General Criteria; accomplish 10/01/2024 Original
009-002 Environmental Compliance Report for Material Usage; accomplish 10/01/2024 Original
009-003 Toxic and Hazardous Substance; control 10/01/2024 Original
009-004 Quality Management System; provide 10/01/2024 Original
009-005 Temporary Access; accomplish 11/18/2024 CH-1
009-006 Maintaining Protection and Cleanliness from Non-Radioactive Operations; 10/01/2024 Original
009-007 accomplish Confined Space Entry, and Certification; accomplish
10/01/2024
Original
009-008 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2024 Original
009-010 Asbestos-Containing Material (ACM); control 10/01/2024 Original
009-018 Mine Warfare Ships Magnetic Material; control 10/01/2024 Original
009-019 Provisioning Technical Documentation (PTD); provide 10/01/2024 Original
009-020 Government Property; control 10/01/2024 Original
009-021 Alteration Verification, Logistic and Technical Data; provide 10/01/2024 Original
009-023 Interference; remove and install 11/18/2024 CH-1
009-024 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 10/01/2024 Original
009-034 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2024 Original
009-039 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for 10/01/2024 Original
009-040
Commercial Equipment/Component; accomplish Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a
009-060
Naval Facility; provide Schedule and Associated Report for CNO Availability; provide and manage
009-061 Shipboard Use of Fluorocarbons; control 10/01/2024 Original
009-067 Integrated Total Ship Testing; manage 10/01/2024 Original
009-068 Availability Work Certification (AWC) Data for Chief of Naval Operations (CNO) 10/01/2024 Original
009-069
Availabilities; provide Heavy Weather/Mooring Plan; provide
009-070 Confined Space Entry, Certification, Fire Protection, Fire Prevention and 10/01/2024 Original
009-072
Housekeeping for Unmanned Vessels; accomplish Physical Security at a Private Contractor Facility; accomplish
009-073 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, 10/01/2024 Original
009-074 and repair Occupational, Safety and Health Plan; accomplish
009-080 Ship Facility; maintain 10/01/2024 Original
009-081 Compartment Closeout; accomplish 10/01/2024 Original
009-082 Installation of Equal Component Vice Specified Component; report 10/01/2024 Original
009-084 Threaded Fastener Requirement; accomplish 10/01/2024 Original
009-088
009-093
Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
PLANNED WORK Page 2 of 4
ITEM_NO. TITLE CHANGE DATE CHANGE
009-099 Ship Departure Report; provide 10/01/2024 Original
009-100 Ship's Stability; maintain 10/01/2024 Original
009-101 Ship Transit and Berthing; accomplish 10/01/2024 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2024 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2024 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 10/01/2024 Original
009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 10/01/2024 Original
009-117 Combat Systems, Light-Off Suport; provide 10/01/2024 Original
009-118 CG Deck Loading; accomplish 10/01/2024 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 10/01/2024 Original
009-122 Temporary Padeye; install and remove 11/18/2024 CH-1
009-125 Boat 65 Feet (20meters) Long and Less; accomplish 11/18/2024 CH-1
009-126 Schedule Model Review (SMR); accomplish 10/01/2024 Original
PLANNED WORK Page 3 of 4
CATEGORY II. FY-27 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.
ITEM NO. TITLE CHANGE DATE CHANGE
009-011 Insulation and Lagging; accomplish 10/01/2024 Original
009-012 Weld, Fabricate, and Inspect; accomplish 10/01/2024 Original
009-032 Cleaning and Painting Requirements; accomplish 06/06/2025 CH-2
009-057 Reduction Gear Security; accomplish 10/01/2024 Original
PLANNED WORK Page 4 of 4
ITEM NO. TITLE
150-00-002 Rust and Corrosion Remove; accomplish
508-11-001 Lagging and Insulation; replace
512-11-001 Ventilation Weather Hood Fastener Extraction; accomplish
514-20-001 Number One and 4 Air Conditioning (AC) Plant Condenser; clean and inspect
516-11-001 Refrigeration Plant Condenser; clean and inspect
631-11-001 Hull Washing and Cleaning; accomplish
663-11-001 Furniture Upholstery; replace
991-12-001 Scaffolding for Ship's Force Use; provide
992-11-001 Rigging Services; provide
SSP: NAPL-009-27 1 of 2 ITEM NO: 150-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
SHIP: USS RAFAEL PERALTA (DDG 115) ITEM NO: 150-00-002
COAR: 26 PCN: ES01-L073
CMP: NONE
PLANNER: KRIEGER, DANIEL
ROSSEN, ALEXA
1. SCOPE:
1.1 Title: Rust and Corrosion Remove; accomplish
1.2 Location of Work:
1.2.1 Antenna 1-3 Base Area, Number 3 GTG Top Hat, 10 SQFT, (02-380- 0)
1.2.2 Antenna 2-3 Platform, 15 SQFT, (05-220-0)
1.2.3 Antenna 2-4 Platform, 15 SQFT, (05-240-0)
1.2.4 Auxiliary 1 Vestibule, 5 SQFT, (3-158-3-T)
1.2.5 05 level, Port and Starboard, 200 SQFT, frames 133 to 166
1.2.6 ASGSI/HRS BAR, 30 SQFT, (02-387-0)
1.2.7 SPY ARRAY Bulkhead, 30 SQFT, 02-05 level frames 132-158
1.2.8 FCS NR One Deck, 20 SQFT, (06-131-0-X)
1.2.9 FCS NR 2 Deck, 20 SQFT, (05-272-0-X)
1.2.10 FCS NR 3 Deck, 15 SQFT, (04-285-0-X)
1.2.11 Aft Transom, 1200 SQFT, (1-475-0-X)
1.2.12 Foc'sle bulkhead, 360 SQFT, (01-110-0-X)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 NAVSEA STANDARD ITEMS, (FY27 CH-2)
2.2 801-7026515 Rev P, Booklet - General Plans
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-032 of 2.1, power tool cleaning to bare metal, for an approximate 2000 square feet, located in 1.2, using
2.1 through 2.2 for guidance, as designated by the SUPERVISOR. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of 2.1.
3.2 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
SHIP: USS RAFAEL PERALTA (DDG 115)
SSP: NAPL-009-27 2 of 2 ITEM NO: 150-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative,
1. None.
5.2 PUSH MATERIAL:
5.3 KITTED MATERIAL:
SHIP: USS RAFAEL PERALTA (DDG 115) ITEM NO: 508-11-001
SSP: NAPL-009-27 1 of 4 ITEM NO: 508-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, COAR:
CSWT FILE NO:
259-002 (DDG 51)
PCN:
CMP:
See Attachment A
NONE
REVISED: 26 NOV 2024 PLANNER: D.MELLO, BOSCO
KRIEGER, DANIEL
MOHAMED, TAHA
ROSSEN, ALEXA
STAPLES,
MICHAEL.FDRMC
1.1 Title: Lagging and Insulation; replace
1.2 Location of Work:
1.2.1 Radar Room 3 (01-274-1-C)
1.2.2 Generator Room (3-370-0-E)
1.2.3 Passage (1-254-6-L)
1.2.4 Vent Recirculating System (1-300-01-L)
1.2.5 Passage (1-300-01-L)
1.2.6 Passage (01-78-01-L)
1.2.7 Passage (1-220-5-L)
1.2.8 Hanger Bay one (1-338-3-Q)
1.2.9 Hanger Bay 2 (1-338-8-Q)
1.2.10 Passage (1-126-3-L)
1.2.11 Passage (1-126-4-L)
1.2.12 Passage (1-254-6-L)
1.2.13 Passage (1-174-01-L)
1.2.14 Passage (1-220-2-L)
1.3 Identification:
1.3.1 Quantity (One SQFT), lagging Insulation, located in 1.2.1
1.3.2 Quantity (3 FT), 2 Inch diameter Pipe Insulation, located in 1.2.2
1.3.3 Quantity (3 FT), 10 Inch diameter Pipe Insulation, located in 1.2.3
1.3.4 Quantity (20 SQFT), Ventilation Lagging, located in 1.2.4
1.3.5 Quantity (3 FT), Fire-main valve (FM-V-126), 4.5 Inch Pipe Insulation, located in 1.2.5
1.3.6 Quantity (12 SQFT), One Inch Thick Bulkhead lagging, located in 1.2.6
1.3.7 Quantity (8 FT),10 Inch diameter Firemain Pipe Insulation, located in 1.2.7
1.3.8 Quantity (25 SQFT), One Inch Thick Bulkhead lagging, located
SSP: NAPL-009-27 2 of 4 ITEM NO: 508-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, in 1.2.8
1.3.9 Quantity (25 SQFT), One Inch Thick Bulkhead lagging, located in 1.2.8
1.3.10 Quantity (20 SQFT), One Inch Thick Bulkhead lagging, located in 1.2.9
1.3.11 Quantity (30 SQFT), One Inch Thick Bulkhead lagging, located in 1.2.10
1.3.12 Quantity (20 SQFT), One Inch Thick Bulkhead lagging, located in 1.2.10
1.3.13 Quantity (30 SQFT), One Inch Thick Bulkhead lagging, located in 1.2.11
1.3.14 Quantity (20 SQFT), One Inch Thick Bulkhead lagging, located in 1.2.12
1.3.15 Quantity (15 SQFT), One Inch Thick Bulkhead lagging, located in 1.2.12
1.3.16 Quantity (35 SQFT), One Inch Thick Bulkhead lagging, located in 1.2.12
1.3.17 Quantity (5 FT), 9 Inch diameter Firemain Pipe Insulation, located in 1.2.13
1.3.18 Quantity (7 FT), 10 Inch diameter Firemain Pipe Insulation, located in 1.2.13
1.3.19 Quantity (40 SQFT), One Inch Thick Bulkhead lagging, located in 1.2.14
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY27 CH-2)
2.2 804-5959214 Rev C, Piping Insulation-Insulation Details
2.3 635-7027372 Rev U, Thermal & Acoustical Insulation ARR Shipwide
2.4 508-6218533 Rev V, Mchry Piping & Eqpt Insulation and Lagging Schedule
2.5 MIL-std 769 Rev K, Insulation Requirements for US Naval Vessels
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-011 for piping insulation, bulkhead insulation and lagging listed in 1.3 and located in 1.2 using
2.1 and 2.2 for guidance.
3.1.1 Record and retain each directional flow arrow, system
identification, and each miscellaneous sign and marking prior to removing or distributing existing lagging and insulation, listed in
1.3 located in 1.2.
3.1.2 Accomplish the requirements of 009-032 of 2.1 for new
insulation, lagging, and each reusable cover to match each surrounding area.
(V)(G) "COMPARTMENT CLOSEOUT"
SSP: NAPL-009-27 3 of 4 ITEM NO: 508-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative,
3.2 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
SSP: NAPL-009-27 4 of 4 ITEM NO: 508-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, Attachment A
PCN Identification
CF03-0423 LAGGING DAMAGED
OD01-L079 LAGGING ON BULKHEAD WORN
SS02-L005 LAGGING ON FM VLV & PIPE WORN
SS02-L006 LAGGING ON BULKHEAD WORN
OI01-L012 LAGGING ON BULKHEAD WORN
EM04-1023 LAGGING DAMAGED
ER09-L015 LAGGING ON FM PIPING TORN
OD01-L080 LAGGING ON BULKHEAD WORN
SS01-L002 LAGGING ON BULKHEAD WORN
HM01-L001 LAGGING ON FM PIPING WORN
OI01-L011 LAGGING ON BULKHEAD WORN
SS02-L004 LAGGING ON FM VALVE & PIP TORN
EX01-L002 LAGGING ON BULKHEAD WORN
OD01-L078 LAGGING ON BULKHEAD WORN
SS01-L004 LAGGING ON BULKHEAD WORN
OI01-L013 LAGGING ON BULKHEAD WORN
SS01-L003 LAGGING ON BULKHEAD WORN
ER09-L013 LAGGING ON VENTILATION WORN
EM04-L005 LAGGING ON FM VLV & PIPE WORN
SHIP: USS RAFAEL PERALTA (DDG 115) ITEM NO: 512-11-001
SSP: NAPL-009-27 1 of 2 ITEM NO: 512-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, COAR: 26 PCN: ER09-L016
CMP: NONE
PLANNER: KRIEGER, DANIEL
LAFONTAINE,
CHRISTOPHER
1.1 Title: Ventilation Weather Hood Fastener Extraction; accomplish
1.2 Location of Work:
1.2.1 Weather Deck 01 Level, Frame 240, Centerline
1.3 Identification:
1.3.1 Quantity (2 EA), Weather Hood Assembly with Access Plate
1.3.1.1 Quantity (48 EA), Bolt, Hex Head, CRES 316,
1.3.1.2 Quantity (48 EA), Washer, Flat, Round
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY27 CH-2)
2.2 512-7027471, installation Design Zone 4510
2.3 512-6597200 Rev J, HTG Vent Air Cond Construction Det
3. REQUIREMENTS:
3.1 Accomplish a visual inspection of the equipment identified in 1.3.1 at the location listed in 1.2.1 for structural integrity, deterioration, pitting, each crack, and area of damage or distortion in each location located in 1.2.
3.1.1 Submit One legible copy of a report, in English, in hard copy or electronic media listing the results of the requirements of 3.1 to the SUPERVISOR.
3.2 Accomplish removal of deteriorated fasteners identified in 3.1, at the location 1.2.1, using 2.2 and 2.3 for guidance.
3.2.1 Chip and grind each surface flush in way of each repair.
3.2.2 Chase and tap each exposed threaded area.
3.2.3 Restore each mating surface exposed by each removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by a hand tool.
3.3 Accomplish a joint inspection with the SUPERVISOR and the Commanding acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.
4. NOTES:
4.1 None
SSP: NAPL-009-27 2 of 2 ITEM NO: 512-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative,
5. GOVERNMENT FURNISHED MATERIAL(GFM):
SHIP: USS RAFAEL PERALTA (DDG 115) ITEM NO: 514-20-001
SSP: NAPL-009-27 1 of 3 ITEM NO: 514-20-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, COAR: 26 PCN: EA01-L125
EA01-L124
PLANNER: MOHAMED, TAHA
D.MELLO, BOSCO
KRIEGER, DANIEL
ROSSEN, ALEXA
1.1 Title: Number One and 4 Air Conditioning (AC) Plant Condenser; clean and inspect
1.2 Location of Work:
1.2.1 Auxiliary Machinery Room (4-126-0-E)
1.2.2 Auxiliary Machinery Room (4-220-0-E)
1.2.3 Auxiliary Machinery Room (5-300-01-E)
1.3 Identification:
1.3.1 Quantity (2 EA), Number One and 4 AC Unit Condenser, MFR: York International Corporation, MFR ID: 376-58504, APL 321550028
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY27 CH-2)
2.2 S9514-D5-MMA-010 Rev 17, Air Conditioning Plant, HFC-134a, 200-Ton Capacity Description, Operation, and Maintenance
2.3 S9086-HY-STM-010/CH-254 Rev 7, Condensers, Heat Exchangers, and Air Ejectors
2.4 S9531-BH-MMI-010 Rev 3, Heat Exchanger Repair of Heat Exchangers, Coolers, and Distilling Plants
2.5 802-5959353 Rev BT, Military Standard 777D Modified for DDG 51 Class Schedule of Piping, Valves, Fittings, and Associated Piping Components
2.6 256-6567450 Rev N, DDG51 Seawater Cooling System Diagram
2.7 S9505-A1-DDT-010 Rev 3, NAVSEA Design Practices and Criteria Manual for Titanium Piping Systems
A-1.3 Resistance Measurement.
3. REQUIREMENTS:
3.1 Remove each condenser water head from the equipment listed in 1.3 and located in 1.2, in accordance with 2.2.
3.1.1 Remove and dispose of each system fluid from the seawater-side of the equipment listed in 1.3 and located in 1.2.
3.1.2 Restore each piping flange mating surface exposed by
disassembly of piping system. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by a hand tool. Maintain phonographic finish on each flange that has
SSP: NAPL-009-27 2 of 3 ITEM NO: 514-20-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, it.
3.1.3 Restore each mating surface exposed by condenser water head removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tool.
3.1.4 Clean each exposed part free of marine growth, scale and mineral deposits, leaving no residue or injurious effects.
3.1.5 Accomplish a visual inspection of each piping flange
connection, condenser water head, and tube insert listed in 1.3 and located in 1.2, using 2.2 for guidance. Allowable warpage, cracking, any elongated/distorted bolt hole, missing thread, leakage path, and excessive corrosion: None.
3.1.5.1 Submit one legible copy, in English, in hard copy or
approved transferrable media, of a report listing results of the requirements of 3.1.4 to the SUPERVISOR.
3.2 Accomplish the mechanical cleaning of the seawater side of the equipment listed in 1.3 and located in 1.2, in accordance with Paragraph 254-6.2 of 2.3 and using 2.2 and 2.4 for guidance.
(V)(G) "BORESCOPE INSPECTION"
3.3 Accomplish a borescope inspection of each internal surface on a total of 662 tubes (100 percent) for the equipment listed in 1.3 and located in 1.2, using 2.3 for guidance. Allowable marine growth, scale, and mineral deposit: None.
3.4 Install each condenser water head to the equipment listed in 1.3 and located in 1.2, in accordance with 2.2.
3.4.1 Remove existing, fit, and install zincs.
3.4.2 Remove each existing and install new gasket, o-ring, pin, key, stud, bolt, and nut. Material must conform to specifications in Figure 7-1 of 2.2.
(V)(G) "TORQUE VERIFICATION"
3.4.3 Torque each condenser water head fastener in accordance with 2.2.
3.4.4 Torque each conduit union in accordance with 2.2.
3.4.5 Align the piping to each equipment listed in 1.3 and located in 1.2. Piping must be supported independently and must not impose a strain. Accomplishment of alignment by adjustment of the first adjacent hanger is to be considered within the scope of the work.
3.4.5.1 Each new material must conform to 2.5, including
Category and Group D-1.
(V)(G) "RESISTANCE MEASUREMENT"
3.4.6 Accomplish each electrical resistance measurement across each disturbed isolation joint for equipment listed 1.3 and located in 1.2 in accordance with 2.6, using 2.7 for guidance. Allowable resistance:
between 1,500 and 2,500 ohms wetted and over one megaohm dry.
3.4.6.1 Accomplish each electrical resistance measurement before
SSP: NAPL-009-27 3 of 3 ITEM NO: 514-20-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, (dry) and after (wetted) piping is filled with sea or fresh water and the system is not in operation.
3.4.6.2 Utilize a Fluke 77 multimeter or equal to accomplish
testing.
3.4.6.3 Verify required insulation and any interference is
removed to facilitate testing.
3.4.6.4 Verify each connection point is clean bare metal to
ensure good electrical contact for each multi-meter lead.
3.4.7 Submit one legible copy, in english, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.4.5 to the SUPERVISOR.
(V)(G) "OPERATIONAL TEST"
3.5 Accomplish an operational test of the equipment listed in 1.3 and located in 1.2, in accordance with shipboard operating procedure and using 2.2 for guidance. Allowable leakage: None.
3.6 Accomplish the requirements of 009-011 of 2.1 for new and disturbed lagging and insulation.
3.7 Accomplish a joint inspection with the SUPERVISOR and the Commanding acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.
4. NOTES:
4.1 Ships Force is responsible for painting.
4.2 Ships Force is responsible for providing all consumable replacement parts, including zincs and gaskets.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
SHIP: USS RAFAEL PERALTA (DDG 115) ITEM NO: 516-11-001
SSP: NAPL-009-27 1 of 3 ITEM NO: 516-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, COAR: 26 PCN: EA01-L130
EA01-L131
CSWT FILE NO: 516-016 (DDG 51) CMP: NONE
REVISED: 01 SEP 2026 PLANNER: MOHAMED, TAHA
D.MELLO, BOSCO
ROSSEN, ALEXA
1.1 Title: Refrigeration Plant Condenser; clean and inspect
1.2 Location of Work:
1.2.1 Refrigeration Machinery Room (2-240-1-E)
1.3 Identification:
1.3.1 Quantity (2 EA), Refrigeration Plant Condensers, Mfr: York Intl Corp, APL 32A990081
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY27 CH-2)
2.2 S9516-D4-MMA-010 Rev 10, REFRIGERATION PLANT, SHIP’S STORES, ROTARY
VANE COMPRESSOR, 1.5 TON CAPACITY DESCRIPTION, OPERATION, MAINTENANCE
2.3 S9086-RW-STM-010/CH-516 Rev 5, Refrigeration Systems
2.4 802-5959353 Rev BT, Military Standard 777D Modified for DDG 51 Class Schedule of Piping, Valves, Fittings, and Associated Piping Components
2.5 516-6567449 Rev H, Refrigeration System Diagram
2.6 S9086-HY-STM-010/CH-254 Rev 7, Condenser, Heat Exchanger, and Air Ejectors
3. REQUIREMENTS:
(V)(G) "INITIAL OPERATIONAL TEST"
3.1 Accomplish an initial operational test of each equipment listed in
1.3 and located in 1.2 in accordance with 2.2 prior to disturbance.
3.2 Disconnect and remove each water head from each condenser listed in
1.3 and located in 1.2, using 2.2 and 2.5 for guidance. Remove and dispose of each system fluid in accordance with local standards.
3.2.1 Restore each mating surface exposed by disassembly of water head. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by a hand tool. Maintain phonographic finish on each mating surface that has it.
3.2.2 Clean each exposed part free of marine growth, scale, and mineral deposits, leaving no residue or injurious effects.
3.2.3 Chase and tap each exposed threaded area.
3.3 Clean each condenser tube, tube sheet and water head in accordance with Paragraph 6-43 of 2.2 and using 2.3 and 2.6 for guidance.
SSP: NAPL-009-27 2 of 3 ITEM NO: 516-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, (V)(G) "BORESCOPE INSPECTION"
3.3.1 Visually inspect each tube, tube sheet, water head and tube protector for evidence of damage and free of foreign matter and marine growth. Allowable damage, foreign matter, or marine growth:
None
3.3.1.1 Submit one legible copy, in hard copy or approved
transferrable media in English, of a report listing results of the requirements of 3.3.1 to the SUPERVISOR.
3.4 Install each condenser water head using a new gasket conforming to the material list in accordance with 2.2.
3.4.1 Connect each disturbed seawater piping using a new flange gasket using 2.5 for guidance. Each new material provided by Ship's Force must conform to 2.4, including Category and Group D-1.
(V)(G) "STRAIN FREE"
3.4.2 Align each disturbed seawater piping to each condenser. Piping must be supported independently and must not impose a strain.
Accomplishment of alignment by adjustment of the first adjacent hanger is to be considered within the scope of the work.
(V)(G) "OPERATIONAL TEST"
3.5 Test each refrigeration plant condenser under systems normal operating conditions. Allowable leakage at disturbed joints: None.
3.6 Accomplish the requirements of 009-011 of 2.1 for new and disturbed lagging and insulation.
3.7 Accomplish a joint inspection with the SUPERVISOR and the Commanding acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.
4. NOTES:
4.1 Ships Force will be responsible for touching up new and disturbed surfaces.
4.2 Ships Force will provide replacement Zinc Anodes.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
SSP: NAPL-009-27 3 of 3 ITEM NO: 516-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, SHIP: USS RAFAEL PERALTA (DDG 115) ITEM NO: 631-11-001
SSP: NAPL-009-27 1 of 2 ITEM NO: 631-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, COAR: 26 PCN: ES01-L072
ES01-L071
PLANNER: MOHAMED, TAHA
KRIEGER, DANIEL
1.1 Title: Hull Washing and Cleaning; accomplish
1.2 Location of Work:
1.2.1 Hull Above Waterline
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY27 CH-2)
3. REQUIREMENTS:
3.1 Accomplish high pressure washing of entire ship hull above waterline including but not limited to bow, stern, freeboard and main deck. High Pressure washing media must be fresh water. Work is limited to cleaning and the existing coating system shall not be removed or damaged.
3.1.1 Accomplish the cleaning in 3.1 using Low Pressure Water Cleaning (LPWC) or High Pressure Water Cleaning (HPWC). Determine and adjust the operating pressures, nozzle types, and standoff distances necessary to remove surface rust and contaminants without causing damage, erosion, or delamination to the existing coating system.
(V)(G) "COMPARTMENT CLOSEOUT"
3.2 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL(GFM):
SSP: NAPL-009-27 2 of 2 ITEM NO: 631-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, SHIP: USS RAFAEL PERALTA (DDG 115) ITEM NO: 663-11-001
SSP: NAPL-009-27 1 of 2 ITEM NO: 663-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, COAR: 26 PCN: HM01-0091
PLANNER: MOHAMED, TAHA
D.MELLO, BOSCO
KRIEGER, DANIEL
1.1 Title: Furniture Upholstery; replace
1.2 Location of Work:
1.2.1 Medical Passage Bench (1-220-5-L)
1.3 Identification:
1.3.1 Quantity (10 SF), Blue Leather Top of Medical Bench located 1.2 in
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY27 CH-2)
2.2 MIL-STD-1623E(NAVY)w/CHANGE 1, FIRE PERFORMANCE REQUIREMENTS AND
APPROVED SPECIFICATIONS FOR INTERIOR FINISH MATERIALS AND FURNISHINGS
(NAVAL SHIPBOARD USE)
2.3 MIL-PRF-20092N, RUBBER OR PLASTIC SHEETS AND ASSEMBLED AND MOLDED
SHAPES, SYNTHETIC, FOAM OR SPONGE, OPEN CELL
2.4 NAVSEA T9640-AC-DSP-010/HAB Rev 1, SHIPBOARD HABITABILITY DESIGN
CRITERIA AND PRACTICES MANUAL (SURFACE SHIPS) FOR NEW SHIP DESIGNS AND
MODERNIZATION
3. REQUIREMENTS:
3.1 Remove the equipment listed in 1.3 and located in 1.2, as designated by the SUPERVISOR.
3.1.1 Remove existing and install new upholstery material. Material must be heavy-duty, marine/medical-grade blue vinyl or leather-grain synthetic fabric meeting fire performance, low smoke, and toxicity requirements of 2.1 and as directed by the SUPERVISOR.
3.1.2 Template exact size, configuration and location from each existing shipboard condition.
3.1.3 Ensure new cushion material conforms to MIL-PRF-20092, Type II Class 5, Condition Firm
3.1.4 Ensure new upholstery material conforms to Federal
Specification located in 2.2.
3.1.5 Dispose of removed materials in compliance with local
regulations and policies
3.2 Accomplish a joint inspection with the SUPERVISOR and the Commanding
SSP: NAPL-009-27 2 of 2 ITEM NO: 663-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
SHIP: USS RAFAEL PERALTA (DDG 115) ITEM NO: 991-12-001
SSP: NAPL-009-27 1 of 2 ITEM NO: 991-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, COAR: 26 PCN: EE02-L027
PLANNER: MOHAMED, TAHA
D.MELLO, BOSCO
KRIEGER, DANIEL
1.1 Title: Scaffolding for Ship's Force Use; provide
1.2 Location of Work:
1.2.1 Hangar Bay (1-338-0-Q)
1.3 Identification:
1.3.1 Quantity (One Set), Steel tube and clamp type scaffolding built in Hangar Bay. The scaffolding must able to be rolled around hangar bay deck located in 1.2. Approximate height 15 ft by width of 20 ft, with access to multiple level platforms
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY27 CH-2)
2.2 29 CFR Part 1915, Occupational Safety and Health Standards for Shipyard Employment
3. REQUIREMENTS:
3.1 Notify the Ship's Duty Officer, via the SUPERVISOR, in writing, 24-hours in advance of intention to send personnel aloft to accomplish work required by this Work Item.
3.1.1 No scaffold shall be erected, moved, dismantled or altered except under the supervision of competent persons.
3.2 Install steel tube and clamp type scaffold in accordance with 2.2 in each location listed in 1.2, with sufficient levels and projections to safely reach and perform each inspection and repair to equipment listed in 1.3 for the entire contract period for use by Ship's Force.
3.2.1 Ensure scaffold is capable of sustaining a working load of 750 pounds at any point or level on each working surface.
3.2.2 Ensure each end of tubing resting on deck structure and transmitting weight of the scaffold must terminate on framing immediately below and utilize a steel sole plate of at least 300 MM x 300 MM x 6 MM (12 INCH x 12 INCH x 1/4 INCH) to stabilize and distribute the weight of the scaffold.
3.2.3 Ensure planking is secured (cleated) to preclude shifting or coming loose during high winds.
3.2.3.1 Planking and wood must be fire retardant.
3.2.4 Ensure scaffold is tagged to inform workers of the status and condition of the staging.
3.2.5 Scaffolding must be inspected daily and certified safe for
SSP: NAPL-009-27 2 of 2 ITEM NO: 991-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, use.
3.3 Conduct safety inspection with the Ship's designated safety inspector, Contractor Safety inspector, and the SUPERVISOR. DO not install scaffolding in a manner that blocks or inhibits the use of ship's fire stations or emergency egresses.
3.4 Disassemble and remove staging as directed by the SUPERVISOR.
(V)(G) "COMPARTMENT CLOSEOUT"
3.5 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.
4. NOTES:
4.1 Scaffolding must be able to be dismantled and removed within 24 hours.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
SHIP: USS RAFAEL PERALTA (DDG 115) ITEM NO: 992-11-001
SSP: NAPL-009-27 1 of 2 ITEM NO: 992-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, COAR: 26 PCN: EXSY-L086
PLANNER: MOHAMED, TAHA
D.MELLO, BOSCO
KRIEGER, DANIEL
1.1 Title: Rigging Services; provide
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY27 CH-2)
3. REQUIREMENTS:
3.1 Provide crane with operator and rigging services for 100 lifts for loading and unloading ships force supplies and equipment to and from ship when directed by the SUPERVISOR.
3.1.1 The maximum crane lift must not exceed 10,000 pounds.
3.1.2 The crane must be capable of reaching the furthermost outboard part of the ship.
(V)(G) "WEIGHT HANDLING EQUIPMENT INSPECTION"
3.2 Inspect all weight handling equipment and rigging gear being utilized and ensure they are certified for use. All weight handling and rigging equipment shall be within calibration for dates work is to be accomplished.
3.3 Provide rigging services for the entire availability duration upon request by the SUPERVISOR. Rigging services not exceed 10,000 pounds to include but not limited rigging equipment, forklift, belt, chain falls and transportation of equipment being rigged off the ship.
3.3.1 Maintain an accurate, daily log of all crane lifts executed and rigging crew hours expended under this Work Item.
3.3.2 The log must record the date, time, work location, description of item lifted, crane Operator, Rigging Lead name, and signature of the SUPERVISOR.
3.3.3 Submit one legible copy, in English, of the verified lift and labor log to the SUPERVISOR.
3.4 Accomplish a joint inspection with the SUPERVISOR and the Commanding acceptance, by the contractor, of work within each compartment. Ensure
SSP: NAPL-009-27 2 of 2 ITEM NO: 992-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):