This document consists of project drawings and specifications for the Madura Five Storm Water Lift Station Rehabilitation, a capital improvement project undertaken by Santa Rosa County, Florida, located in Gulf Breeze, Florida at 4154 Madura Five. The project scope includes the complete rehabilitation of an existing storm water lift station featuring the demolition of existing pumps, piping, platforms, and electrical components, followed by installation of new equipment including three triplex pumps, new 316 stainless steel piping and valves, a new galvanized steel platform with foundations and access ladder, and a comprehensive electrical system. The design was prepared by Mott MacDonald, a professional engineering firm licensed in Florida, and includes detailed plans across multiple sheets covering general notes, site layout, demolition procedures, pump station configuration, structural details, and electrical systems. The project requires contractor-supplied bypass pumping capabilities during construction to maintain lift station operations, with bypass pumps, fuel tanks, and containment vessels to be placed within Santa Rosa County-owned easement property. Contractors must provide 24/7 monitoring and maintenance of bypass systems and coordinate all construction activities with county personnel, including a mandatory pre-bid meeting scheduled for October 15, 2026, with bid submissions due by 10:00 a.m. on November 6, 2026, through the Santa Rosa County Procurement Portal.
The project requires strict adherence to Florida Department of Environmental Protection regulations, Santa Rosa County engineering standards, and National Electrical Code requirements for Class I Group D Division 1 hazardous locations. All interior wet well piping must be Schedule 40 316 stainless steel with welded flanges, and existing exposed piping must be sandblasted and coated to SSPC-SP 10 standards. The electrical service is specified at 480Y/277VAC, 3-phase, 4-wire, with 200-amp capacity from Florida Power & Light utility service. Owner-furnished equipment includes pump base elbows, guide rails, pump power cables, control panels, and instrumentation, which the contractor must install and coordinate upon delivery. The contractor bears full responsibility for utility locating, site security, erosion control, traffic maintenance, protection of adjacent properties, material storage security, and restoration of the vacant adjacent lot used for construction logistics to pre-construction conditions. Site work must comply with FEMA flood elevation AE 7.0 per the current flood map, and the contractor must provide as-built drawings and maintain a superintendent on-site for the full duration of construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
SANTA ROSA SOUND
PROJECT LOCATION
TO I-10 / MILTON
TO NAVARRE
TO PENSACOLA
M O
TT
M
A C
D O
N A
LD
W es t G ar de n
St re et Su ite
Pe ns ac ol a, F lo rid a
Te le ph on e:
(8
) 4
-6
M O
TT
M
AC
DO
NA
LD
FL
O
RI
DA
L
LC
Ar ch ite ct s
AA
C
En gi ne er s
EB
Su rv ey or s
LB
M M
SHEET NUMBER:
DA
TE
DE
SI
G
NE
D
BY
DR
AW
N
BY
PR
O
JE
CT
A
RC
HI
TE
CT
PR
O
JE
CT
M
AN
AG
ER
M ot t M ac
Do na ld
PR
O
JE
CT
N
O
SHEET TITLE:
Th is d ra wi ng is th e pr op er ty o f M ot t M ac
D on al d
Fl or id a, L
LC
an d m ay n ot b e re pr od uc ed w ith ou t w rit te n pe rm is si on
. T hi s do cu m en t s ho ul d no t b e re lie d on o r u se d in c irc um st an ce s ot he r t ha n th os e fo r w hi ch it w as o rig in al ly pr ep ar ed a nd fo r w hi ch
M ot t M ac
D on al d wa s co m m is si on ed . M ot t M ac D on al d ac ce pt s no re sp on si bi lit y fo r t hi s do cu m en t t o an y pa rty o th er th an th e pe rs on o r e nt ity b y wh om it w as c om m is si on ed
CH
EC
KE
D
BY
IS
SU
E D
F O
R B
ID
8/ 4/
0:
:0
AM
AU
G
U
ST
H
. R O
BE
R
TS
J.
E
AR
L
C . L
YN
ER
C . L
YN
ER
8-
COVER SHEET
G0.0
8-
MA
DU
RA
F
IV
E
ST
OR
M
W
AT
ER
LI
FT
S
TA
TI
ON
RE
HA
BI
LIT
AT
IO
N
OF
M
A D
U R
A
G U
L F
B R
E E
Z E
F
L
SA
NT
A
RO
SA
C
O
UN
TY
, F
LO
RI
DA
M
AD
UR
A
FI
VE
S
TO
RM
W
AT
ER
LI
FT
S
TA
TI
ON
BOARD OF
COUNTY COMMISSIONERS
DISTRICT 1
BOBBY BURKETT
DISTRICT 2
KERRY SMITH
DISTRICT 3
RHETT ROWELL
DISTRICT 4
RAY EDDINGTON-VICE-CHAIRMAN
DISTRICT 5
COLTEN WRIGHT-CHAIRMAN
MADURA FIVE STORM WATER LIFT STATION
REHABILITATION
SANTA ROSA COUNTY, FLORIDA
GULF BREEZE, FLORIDA
AUGUST 2026
502100708-012
MOTT
MACDONALD
220 West Garden Street, Suite 700 Pensacola, Florida 32502 Telephone: (850) 484-6011
MOTT MACDONALD FLORIDA LLC
Architects Engineers Surveyors
AA - C000035 EB - 0000155 LB - 0006783
M M
VICINITY MAP
INDEX OF DRAWINGS
GENERAL SHEETS
G0.0 COVER SHEET
G1.0 GENERAL NOTES
G1.1 OVERALL SITE LAYOUT
DEMOLITION SHEETS
D1.0 PUMP STATION DEMO PLANS
D2.0 DEMOLITION PHOTOS
PROCESS SHEETS
PS1.0 PUMP STATION LAYOUT
PS1.1 PUMP STATION SECTIONS
STRUCTURAL SHEETS
S1 PLATFORM PLAN, ELEVATIONS, AND SECTIONS
ELECTRICAL SHEETS
E0.1 ELECTRICAL LEGEND, ABBREVIATIONS AND NOTES
E0.2 ELECTRICAL LEGEND, ABBREVIATIONS AND NOTES
E1.1 ONE- LINE DIAGRAM
E1.2 ELECTRICAL SITE PLAN
E1.3 ELECTRICAL SCHEDULES
E1.4 ELECTRICAL DETAILS
E1.5 ELECTRICAL DETAILS
E1.6 ELECTRICAL DETAILS
E1.7 ELECTRICAL DETAILS
E1.8 ELECTRICAL DETAILS
INSTRUMENTATION SHEETS
I0.1 INSTRUMENT. LEGEND, ABBREVIATIONS & NOTES
I0.2 INSTRUMENT. LEGEND, ABBREVIATIONS & NOTES
I1.1 CONTROL SCHEMATIC
I1.2 CONTROL SCHEMATIC
I1.3 CONTROL SCHEMATIC
I1.3A CONTROL SCHEMATIC
I1.4 CONTROL SCHEMATIC
I1.5 CONTROL SCHEMATIC
I1.6 CONTROL SCHEMATIC
I1.7 P & ID TRIPLEX PUMP STATION
I1.8 CONTROL BLOCK DIAGRAM
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED. THE
SIGNATURE MUST BE VERIFIED ON THE
ELECTRONIC DOCUMENTS.
THE ABOVE NAMED PROFESSIONAL
ENGINEER SHALL BE RESPONSIBLE FOR THE
FOLLOWING SHEETS IN ACCORDANCE WITH
RULE 61G15.23.004, F.A.C.
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED. THE
SIGNATURE MUST BE VERIFIED ON THE
ELECTRONIC DOCUMENTS.
THE ABOVE NAMED PROFESSIONAL
ENGINEER SHALL BE RESPONSIBLE FOR THE
FOLLOWING SHEETS IN ACCORDANCE WITH
RULE 61G15.23.004, F.A.C.
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED. THE
SIGNATURE MUST BE VERIFIED ON THE
ELECTRONIC DOCUMENTS.
THE ABOVE NAMED PROFESSIONAL
ENGINEER SHALL BE RESPONSIBLE FOR THE
FOLLOWING SHEETS IN ACCORDANCE WITH
RULE 61G15.23.004, F.A.C.
THIS DOCUMENT HAS BEEN DIGITALLY SIGNED
AND SEALED BY:
THIS DOCUMENT HAS BEEN DIGITALLY SIGNED
AND SEALED BY:
THIS DOCUMENT HAS BEEN DIGITALLY SIGNED
AND SEALED BY:
SHEET NUMBERS:
G0.0, G1.0, G1.1, D1.0, D2.0, PS1.0, PS 1.1
SHEET NUMBERS:
E0.1, E0.2, E1.1, E1.2, E1.3, E1.4, E1.5, E1.6, E1.7, E1.8 I0.1, I0.2, I1.1, I, I1.2, I1.3, I1.3A, I1.4, I1.5, I1.6, I1.7, I1.8
SHEET NUMBERS:
S1
D
AT
E R
EV
D
ES
C R
IP
TI
O N
M
TT
M
A C
D O
N A
LD
W es t G ar de n
St re et Su ite
Pe ns ac ol a, F lo rid a
Te le ph on e:
(8
) 4
-6
M O
TT
M
AC
DO
NA
LD
FL
O
RI
DA
L
LC
Ar ch ite ct s
AA
C
En gi ne er s
EB
Su rv ey or s
LB
M M
SHEET NUMBER:
DA
TE
DE
SI
G
NE
D
BY
DR
AW
N
BY
PR
O
JE
CT
A
RC
HI
TE
CT
PR
O
JE
CT
M
AN
AG
ER
M ot t M ac
Do na ld
PR
O
JE
CT
N
O
SHEET TITLE:
Th is d ra wi ng is th e pr op er ty o f M ot t M ac
D on al d
Fl or id a, L
LC
an d m ay n ot b e re pr od uc ed w ith ou t w rit te n pe rm is si on
. T hi s do cu m en t s ho ul d no t b e re lie d on o r u se d in c irc um st an ce s ot he r t ha n th os e fo r w hi ch it w as o rig in al ly pr ep ar ed a nd fo r w hi ch
M ot t M ac
D on al d wa s co m m is si on ed . M ot t M ac D on al d ac ce pt s no re sp on si bi lit y fo r t hi s do cu m en t t o an y pa rty o th er th an th e pe rs on o r e nt ity b y wh om it w as c om m is si on ed
CH
EC
KE
D
BY
IS
SU
E D
F O
R B
ID
8/ 4/
0:
:0
AM
AU
G
U
ST
H
. R O
BE
R
TS
J.
E
AR
L
C . L
YN
ER
C . L
YN
ER
8-
GENERAL
NOTES
G1.0
8-
MA
DU
RA
F
IV
E
ST
OR
M
W
AT
ER
LI
FT
S
TA
TI
ON
RE
HA
BI
LIT
AT
IO
N
OF
M
A D
U R
A
G U
L F
B R
E E
Z E
F
L
SA
NT
A
RO
SA
C
O
UN
TY
, F
LO
RI
DA
M
AD
UR
A
FI
VE
S
TO
RM
W
AT
ER
LI
FT
S
TA
TI
ON
GENERAL NOTES
1. THE CONTRACTOR WILL STAKE THE LIMITS OF CONSTRUCTION, EQUIPMENT
STORAGE AND MATERIAL STORAGE PRIOR TO CONSTRUCTION, AND WILL NOT
PERFORM ANY CONSTRUCTION ACTIVITIES OUTSIDE THE STAKED LIMITS OF THE
CONSTRUCTION, EQUIPMENT STORAGE AND MATERIAL STORAGE.
2. AT THE PRE CONSTRUCTION MEETING THE CONTRACTOR SHALL DESIGNATE A
REPRESENTATIVE WHO SHALL BE CAPABLE OF BEING REACHED 24 HOURS A DAY,
7 DAYS A WEEK.
3. THE CONTRACTOR SHALL HAVE A SUPERINTENDENT ON SITE EACH DAY OF
CONSTRUCTION FOR THE FULL DAY OF CONSTRUCTION FOR THE FULL DURATION
OF THE PROJECT.
4. PRIOR TO INITIATING CONSTRUCTION THE CONTRACTOR SHALL PROVIDE A
CONSTRUCTION SCHEDULE TO THE OWNER IN COMPLIANCE WITH THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS. THE OWNER WILL RELY UPON
THE CONTRACTORS SCHEDULE FOR NOTIFICATIONS AS REQUIRED BY PERMIT
CONDITIONS. THE OWNER WILL BE RESPONSIBLE FOR PROVIDING CONSTRUCTION
COMMENCEMENT NOTIFICATION AND FINAL "AS-BUILT" CERTIFICATIONS TO THE
PERMIT AGENCIES.
5. ALL STORM WATER DISTRIBUTION COLLECTION SYSTEM CONSTRUCTION SHALL BE
PERFORMED IN ACCORDANCE WITH F.D.E.P. REGULATIONS AND SANTA ROSA
COUNTY ENGINEERING AND PUBLIC WORK STANDARDS.
6. UPON COMPLETION OF CONSTRUCTION AND BEFORE FINAL INSPECTION, THE
CONTRACTOR SHALL TURN OVER TO THE ENGINEER A SET OF "AS-BUILT"
DRAWINGS SHOWING FIELD CHANGES AND ACTUAL INSTALLED CONDITIONS.
EROSION CONTROL NOTES
1. EROSION AND SEDIMENTATION CONTROLS SHALL BE PLACED PRIOR TO
MOBILIZATION OF EQUIPMENT, MATERIALS, DEMOLITION, EXCAVATION AND
CONSTRUCTION. THESE DEVICES SHALL BE MAINTAINED DURING THE ENTIRE
DURATION OF CONSTRUCTION.
2. CONTRACTOR SHALL CONDUCT SITE OPERATIONS IN A MANNER THAT DOES NOT
CAUSE OR ALLOW OFFSITE TRANSPORT OF SEDIMENT.
3. CONTRACTOR SHALL PERFORM CLEARING, EXCAVATION, AND EMBANKMENT
OPERATIONS IN A MANNER THAT PREVENTS EROSION AND SEDIMENT TRANSPORT,
WHETHER BY PHASING CONSTRUCTION AND/OR STRUCTURAL METHODS.
4. WHERE STRAW BALE, SYNTHETIC BALE, OR WATTLE BARRIERS ARE USED,
CONTRACTOR SHALL TIGHTLY ABUT AND CHINK BETWEEN BALES/WATTLES WITH
LOOSE STRAW AND SHALL EMBED BALES/WATTLES INTO THE SOIL TO ENSURE
THAT STORM RUNOFF DOES NOT BYPASS THE BARRIER.
5. CONTRACTOR SHALL INSPECT THE SEDIMENT CONTROL MEASURES AT LEAST
ONCE A WEEK AND AFTER EVERY RAINFALL EVENT OF 1/2" OR MORE.
6. CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE ANY SEDIMENT CONTROL
MEASURE THAT IS RENDERED DAMAGED OR INEFFECTIVE BY NORMAL USE OR
EXTREME RAINFALL EVENTS.
7. IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE
CONTRACTOR SHALL STABILIZE THE AFFECTED AREA USING SPRINKLING,
IRRIGATION, OR OTHER ACCEPTABLE METHODS.
8. CONTRACTOR SHALL SOD, GRASS, LANDSCAPE, OR OTHERWISE STABILIZE ALL
DISTURBED AREAS AS SOON AS PRACTICAL FOLLOWING GRADING OPERATIONS.
UTILITY NOTES
1. THE CONTRACTOR SHALL FOLLOW SANTA ROSA COUNTY ENGINEERING AND
PUBLIC WORKS STANDARDS AND THE TECHNICAL SPECIFICATIONS FOR THIS
PROJECT.
2. PRESSURE PIPES SHALL BE RESTRAINED. CONTRACTOR MAY PROVIDE THRUST
BLOCKS IN ADDITION TO RESTRAINED JOINTS AT HIS OPTION.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND LOCATE ALL UTILITIES
THAT ARE IN THE VICINITY OF THE PROJECT PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITIES AND PROVIDE FOR PROTECTION OF EXISTING
UTILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY SUNSHINE
ONE, CALL (1-800-432-4770), 48 HOURS PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
4. THE CONTRACTOR IS ADVISED THAT EXISTING OVERHEAD AND UNDERGROUND
UTILITIES SUCH AS (BUT NOT LIMITED TO) ELECTRICAL LINES AND POLES,
FIBEROPTIC LINES, TELEPHONE CABLES, TELEVISION/INTERNET CABLES, GAS
LINES, WATER LINES, STORM SEWER LINES, AND SANITARY SEWERS MAY EXIST
IN THE CONSTRUCTION LIMITS WHERE THE PROPOSED IMPROVEMENTS ARE
REQUIRED. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING &
PROTECTING EXISTING UTILITIES DURING THE PERFORMANCE OF WORK TO BE
INSTALLED UNDER THIS CONTRACT. THE CONTRACTOR SHALL VERIFY THE
LOCATIONS OF ALL UTILITIES, PROBE OR EXPOSE THEM BY HAND EXCAVATION,
AND FOLLOW ALL APPLICABLE OSHA REGULATIONS AT NO COST TO THE OWNER.
FAILURE OF THE PLANS TO SHOW THE EXISTENCE OF ANY UNDERGROUND
UTILITIES, STRUCTURES, ETC., SHALL NOT RELIEVE THE CONTRACTOR FROM
THE RESPONSIBILITY OF LOCATING, PRESERVING, AND PROTECTING THESE
FEATURES.
5. UTILITIES ARE TO REMAIN AND BE PROTECTED DURING CONSTRUCTION.
NECESSARY REPAIRS SHALL BE CONSIDERED INCIDENTAL TO OTHER PAY ITEMS
AND SHALL BE PERFORMED TO THE SATISFACTION OF UTILITY OWNERS.
6. THE CONTRACTOR SHALL NOTIFY SUNSHINE 811, TWO (2) FULL BUSINESS DAYS IN
ADVANCE OF ANY DIGGING RELATED TO THIS PROJECT AND ADHERE TO THE
CURRENT 811 PROCESS.
7. UTILITIES LABELED TO BE RELOCATED OR ADJUSTED BY OTHERS SHALL BE
COORDINATED BY THE CONTRACTOR WITH THE RESPECTIVE UTILITIES AS
REQUIRED IN THE SPECIFICATIONS. THE CONTRACTOR SHALL NOTIFY THE UTILITY
OWNERS 10 DAYS IN ADVANCE OF INTENT TO START WORK IN A SPECIFIC AREA.
8. ALL CABLE DAMAGE MUST BE REPORTED TO THE AT&T FLORIDA REPAIR SERVICE
DEPARTMENT AT 611 FROM A LAND LINE OR 877-737-2478 IF USING A CELL
PHONE.
9. ANY DAMAGE TO EXISTING UTILITIES CAUSED BY THE EXECUTION OF WORK UNDER
THIS CONTRACT SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL
EXPENSE TO THE OWNER OR ENGINEER OR INCREASE TO CONTRACT TIME. THE
COUNTY DOES NOT ASSUME OR IMPLY ANY LIABILITY FOR THE LOCATION,
PROTECTION, AND/OR REPAIR OF ANY EXISTING UTILITIES THAT MAY OCCUPY
JOINT RIGHT-OF-WAY OR OTHERWISE CONFLICT WITH THE CONSTRUCTION OF
THE WORK TO BE INSTALLED UNDER THIS CONTRACT.
10. THERE SHALL BE NO DIRECT PAYMENT FOR LOCATING, EXPOSING, AND BRACING
EXISTING UTILITY LINES WHERE REQUIRED. THE CONTRACTOR SHALL EXERCISE
CAUTION WHEN EXCAVATING NEAR UTILITIES.
11. THE COUNTY DISCLAIMS ANY RESPONSIBILITY FOR THE SUPPORT & PROTECTION
OF SEWERS, DRAINS, WATER PIPES, GAS PIPES, CONDUITS OF ANY KIND,
UTILITIES OR OTHER STRUCTURES OWNED BY THE COUNTY, STATE OR BY
PRIVATE OR PUBLIC UTILITIES LEGALLY OCCUPYING ANY STREET, ALLEY, PUBLIC
PLACE OR RIGHT-OF-WAY.
12. CONTRACTOR IS TO USE CAUTION WHEN WORKING IN OR AROUND AREAS OF
OVERHEAD TRANSMISSION LINES AND UNDERGROUND UTILITIES.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR UTILIZING ACCEPTABLE MEANS
AND METHODS, AS NECESSARY TO PLACE AND COMPLETELY BACKFILL TO
FINISHED GRADE IN A WATER FREE EXCAVATION. IF REQUIRED, THE MEANS AND
METHODS OF DE-WATERING ANY EXCAVATION SHALL COMPLY WITH ALL
REGULATORY REQUIREMENTS FOR TEMPORARY DIVERSION OF GROUNDWATER
AND ITS DISCHARGE (INCLUDING FDEP CHAPTER 62-621).
TRAFFIC CONTROL NOTES:
1. THE CONTRACTOR SHALL NOT ALLOW CONSTRUCTION TRAFFIC TO ADVERSELY
IMPACT ROADS BY VEHICULAR TRAFFIC, CREATING OR DEPOSITING
DUST/DIRT/ROCKS OR OTHER MATERIALS NOR BY CREATING ANY HAZARD. THE
CONTRACTOR SHALL IMMEDIATELY RECTIFY ANY ADVERSE CONDITIONS ON OR
NEAR ROADWAYS OR ADJACENT PROPERTIES INCLUDING BUT NOT LIMITED TO
PROVIDING MAINTENANCE OF TRAFFIC, REMOVING AND LAWFULLY DISPOSING
OF DEPOSITED/SPILLED/WASTE MATERIALS, AND REPAIRING ANY DAMAGE
CAUSED BY HIS ACTIONS.
2. THE CONTRACTOR SHALL MAINTAIN TRAFFIC DURING CONSTRUCTION ON ALL
STATE, COUNTY, AND PRIVATE ROADS IN ACCORDANCE WITH SANTA ROSA
COUNTY AND FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION, AND WITH ALL PERMIT REQUIREMENTS.
3. ALL SIGNS, BARRICADES, MARKERS, TRAFFIC CONTROL AND WARNING
DEVICES, ETC. SHALL CONFORM TO THE LATEST EDITION OF THE MUTCD AT NO
ADDITIONAL COST TO THE COUNTY.
4. EXISTING STREETS AND DRIVES SHALL BE MAINTAINED TO LOCAL TRAFFIC AND
PROPERTY OWNERS DURING ALL STAGES OF CONSTRUCTION. THE
CONTRACTOR SHALL MAINTAIN THROUGH TRAFFIC ON EXISTING STREETS AT
ALL TIMES.
5. NO MATERIAL OR EQUIPMENT STAGING OR STORAGE WILL BE ALLOWED WITHIN
THE ROAD.
6. TEMPORARY CLOSURE OF THE CUL-DE-SAC WILL NOT BE ALLOWED.
7. MAINTENANCE OF TRAFFIC PAY ITEM SHALL INCLUDE ALL ITEMS NECESSARY
TO PROVIDE A SAFE WORK ZONE AND SHOULD INCLUDE ALL NECESSARY
ITEMS REQUIRED FOR TRAFFIC CONTROL. THE MAINTENANCE OF TRAFFIC
PAY ITEM SHALL REQUIRE ALL ITEMS NECESSARY TO SECURE THE
CONSTRUCTION SITE FROM THE PUBLIC USE INCLUDING 6' CHAIN-LINK
AROUND, SIGNAGE, AND OTHER TRAFFIC CONTROL DEVICES. CONTRACTOR
TO KEEP AND MAINTAIN A CLEAR ROADWAY AT ALL TIMES.
PROTECTION OF THE EXISTING SITE, ROADWAYS AND ADJACENT RESIDENCES.
1. THE CONTRACTOR IS RESPONSIBLE FOR THE SECURITY AND PROTECTION OF
THE CONSTRUCTION SITE AGAINST UNAUTHORIZED PEDESTRIAN AND
VEHICULAR ACCESS AND SHALL REPAIR ANY DAMAGE TO THE SATISFACTION
OF THE OWNER AND AT NO EXPENSE TO THE OWNER OR ENGINEER.
2. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO THE CONSTRUCTION
SITE DUE TO UNAUTHORIZED PEDESTRIAN AND VEHICULAR ACCESS AND SHALL
REPAIR ANY DAMAGE TO THE SATISFACTION OF THE OWNER AND AT NO
EXPENSE TO THE OWNER OR ENGINEER.
3. CONTRACTOR SHALL REPAIR THE CONSTRUCTION SITE TO SANTA ROSA
COUNTY'S SATISFACTION DUE TO THE UNAUTHORIZED PEDESTRIAN AND
VEHICULAR ACCESS AT THE CONTRACTOR'S OWN EXPENSE.
4. BEFORE MATERIAL LOGISTICIS, EQUIPMENT LOGISTICIS, AND CONSTRUCTION
ACTIVITIES ARE COMPLETED, THE CONTRACTOR SHALL INTALL SIX (6) FEET
TALL CHAIN LINK FENCING WITH FULL HEIGHT TARPS SECURED TO THE
GROUND ALL THE WAY AROUND THE STORED MATERIAL, EQUIPMENT AND
CONSTRUCTION SITE.
5. PROVIDE GATES IN THE REQUIRED SIZES AND LOCATIONS IN THE PERIMETER
FENCING NECCESSARY TO ACCOMODATE DELVERY VEHICLES AND OTHER
CONSTRUCTION OPERATIONS.
6. MAINTAIN PERIMETER SECURITY FENCING BY LIMITING THE NUMBER OF KEYS
AND RESTRICTING DISTRIBUTION TO AUTHORIZED PERSONNEL ONLY. PROVIDE
SANTA ROSA COUNTY PUBLIC WORKS ASSISTANT DIRECTOR, MR. ANDREW
HILL, ONE SET OF KEYS.
7. CONTRACTOR SHALL PROTECT THE EXISTING ROADWAYS DURING EQUIPMENT
AND MATERIAL DELIVERY, LOADING AND UNLOADING. ANY DAMAGE TO THE
ROADWAY SHALL BE REPAIRED TO SANTA COUNTY'S SATISFACTION AT THE
CONTRACTOR'S OWN EXPENSE.
8. CONTRACTOR SHALL PROTECT THE EXISTING LOT ADJACENT TO THE EXISTING
STORM WATER LIFT STATION AND SHALL REPAIR THE ADJACNET LOT TO ITS
EXISTING CONDITIONS AT THE CONCLUSION OF THE CONSTRUCTION PROCESS
AT NO EXPENSE TO THE OWNER OR ENGINEER.
PROTECTION OF THE STORED CONSTRUCTION MATERIALS & EQUIPMENT ONSITE
1. THE CONTRACTOR IS RESPONSIBLE FOR THE SECURITY AND PROTECTION OF
THE STORED MATERIALS AND EQUIPMENT ONSITE AND SHALL REPLACE ANY
DAMAGED EQUIPMENT OR MATERIALS DAMAGED ONSITE TO THE SATISFACTION
OF THE OWNER AND AT NO EXPENSE TO THE OWNER OR ENGINEER.
2. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO THE CONSTRUCTION
MATERIALS AND EQUIPMENT ONSITE DUE TO UNAUTHORIZED PEDESTRIAN AND
VEHICULAR ACCESS AND SHALL REPAIR ANY DAMAGE TO THE SATISFACTION
OF THE OWNER AND AT NO EXPENSE TO THE OWNER OR ENGINEER.
3. BEFORE MATERIAL LOGISTICIS, EQUIPMENT LOGISTICIS, AND CONSTRUCTION
ACTIVITIES ARE COMPLETED, THE CONTRACTOR SHALL INTALL SIX (6) FEET
TALL CHAIN LINK FENCING WITH FULL HEIGHT TARPS SECURED TO THE
GROUND ALL THE WAY AROUND THE STORED MATERIAL, EQUIPMENT AND
CONSTRUCTION SITE.
5. PROVIDE GATES IN THE REQUIRED SIZES AND LOCATIONS IN THE PERIMETER
FENCING NECCESSARY TO ACCOMODATE DELVERY VEHICLES AND OTHER
CONSTRUCTION OPERATIONS.
6. MAINTAIN PERIMETER SECURITY FENCING BY LIMITING THE NUMBER OF KEYS
AND RESTRICTING DISTRIBUTION TO AUTHORIZED PERSONNEL ONLY. PROVIDE
SANTA ROSA COUNTY PUBLIC WORKS ASSISTANT DIRECTOR, MR. ANDREW
HILL, ONE SET OF KEYS.
TH
IS
D
OC
UM
EN
T
HA
S
BE
EN
D
IG
IT
AL
LY
S
IG
NE
D
AN
D
SE
AL
ED
B
Y C.
H
EA
TH
R
OB
ER
TS
PR
IN
TE
D
CO
PI
ES
O
F
TH
IS
D
OC
UM
EN
T
AR
E
NO
T
CO
NS
ID
ER
ED
S
IG
NE
D
AN
D
SE
AL
ED
. T
HE
SI
GN
AT
UR
E
MU
ST
B
E
VE
RI
FI
ED
O
N
TH
E
EL
EC
TR
ON
IC
D
OC
UM
EN
TS
. T
HE
A
BO
VE
NA
ME
D
PR
OF
ES
SI
ON
AL
E
NG
IN
EE
R
SH
AL
L B E
RE
SP
ON
SI
BL
E
FO
R
TH
E
FO
LL
OW
IN
G
SH
EE
TS
IN
AC
CO
RD
AN
CE
W
IT
H
RU
LE
G1 5.2
3.0
, F .A
.C
REPAIR OF THE EXISTING EMPTY LOT USED FOR CONSTRUCTION LOGISTICS
1. THE CONTRACTOR SHALL TAKE FIELD IMAGES OF THE EMPTY ADAJCENT LOT
LOCATED AT 4154 MADURA FIVE GULF BREEZE, FLORIDA BEFORE MOBILIZATION
AND CONSTRUCTION BEGINS AT THE SITE.
2. CONTRACTOR SHALL SUBMIT THE FIELD IMAGES OF THE EMPTY ADAJCENT LOT
LOCATED AT 4154 MADURA FIVE GULF BREEZE, FLORIDA TO SANTA ROSA COUNTY
AND MOTT MACDONALD FOR THEIR RECORDS.
3. AT THE CONCLUSION OF THE PROJECT, THE CONTRACTOR SHALL REPAIR THE
EMPTY ADJACENT LOT LOCATED AT 4154 MADURA FIVE GULF BREEZE, FLORIDA,
CONSTRUCTION SITE AROUND THE LIFT STATION AND NEW PLATFORM BACK TO
ITS PRE-CONSTRUCTION CONDITION.
D
AT
E R
EV
D
ES
C R
IP
TI
O N
NOTE:
CONDUIT QUANTITIES SHOWN REPRESENT
DESIGN INTENT AND DO NOT REFLECT THE
ACTUAL NUMBER OF CONDUITS PRESENT.
CONTRACTOR SHALL REFER TO ELECTRICAL
PLANS FOR EXACT CONDUIT QUANTITIES
OWNER FURNISHED
CONTRACTOR INSTALLED (OFCI)
S1
S1
EXISTING LIFT STATION TO REMAIN
EXISTING ALUMINUM PLATFORM
TO BE DEMOLISHED
EXISTING VALVE BOX TO REMAIN
EXISTING TRANSFORMER
EXISTING TRANSFORMER
EX
IST
. E
AS
EM
EN
T
EX
IST
. E
AS
EM
EN
T
EX
IST
. P
RO
PE
RT
Y L
IN
E
EXIST. WITNESS LINE
EXIST. PROPERTY LINE
EXIST. PROPERTY LINE
EX
IS
T.
P
RO
PE
RT
Y
LIN
E
EXIST. PROPERTY LINE
EXIST. PROPERTY LINE
NEW PLATFORM AND NEW FOUNDATION
EX
IS
T.
L
IF
T
ST
AT
IO
N
TO
E
DG
E O
F
FD
N.
" F
RO
M
C L
O F
NEW BYPASS PUMP
NEW BYPASS PUMP FUEL TANK
AND FUEL TANK CONTAINMENT VESSEL
INFLUENT POINT FOR LIFT
STATION BYPASS
STORM WATER INLET - INFLUENT POINT FOR LIFT
STATION BYPASS - STORM WATER LIFT STATION
NEW ACCESS LADDER
NEW ELECTRICAL PANEL DOORS TO
FACE AND OPEN NORTH
EXISTING PROPERTY CONFIGURATION:
1. THE CURRENT LAYOUT ILLUSTRATES THE CURRENT PROPERTY CONFIGURATION FOR THE
EMPTY LOT ADJACENT TO THE STORM WATER LIFT STATION.
2. CONTRACTOR SHALL PLACE ALL OF THE BYPASS PUMPS AND BYPASS PUMPS FUEL TANKS IN
THE PROPERTY LINE OWNED BY SANTA ROSA COUNTY.
3. NONE OF THE CONSTRUCTION LIMITS SHALL EXTEND BEYOND THE VACANT PROPERTY LIMITS
OWNED BY SANTA ROSA COUNTY.
4. CONTRACTOR SHALL COMPLETE AN AS-BUILT SURVEY AT THE CONCLUSION OF THE PROJECT
INCLUDING PROPERTY LINE LIMITS, EXISTING CONSTRUC
7' - 0" FROM PROPERTY LINE TO EDGE OF FDN
LEGEND:
EASEMENT BOUNDARY
PROPERTY LINE
WITNESS LINE
M O
TT
M
A C
D O
N A
LD
W es t G ar de n
St re et Su ite
Pe ns ac ol a, F lo rid a
Te le ph on e:
(8
) 4
-6
M O
TT
M
AC
DO
NA
LD
FL
O
RI
DA
L
LC
Ar ch ite ct s
AA
C
En gi ne er s
EB
Su rv ey or s
LB
M M
SHEET NUMBER:
DA
TE
DE
SI
G
NE
D
BY
DR
AW
N
BY
PR
O
JE
CT
A
RC
HI
TE
CT
PR
O
JE
CT
M
AN
AG
ER
M ot t M ac
Do na ld
PR
O
JE
CT
N
O
SHEET TITLE:
Th is d ra wi ng is th e pr op er ty o f M ot t M ac
D on al d
Fl or id a, L
LC
an d m ay n ot b e re pr od uc ed w ith ou t w rit te n pe rm is si on
. T hi s do cu m en t s ho ul d no t b e re lie d on o r u se d in c irc um st an ce s ot he r t ha n th os e fo r w hi ch it w as o rig in al ly pr ep ar ed a nd fo r w hi ch
M ot t M ac
D on al d wa s co m m is si on ed . M ot t M ac D on al d ac ce pt s no re sp on si bi lit y fo r t hi s do cu m en t t o an y pa rty o th er th an th e pe rs on o r e nt ity b y wh om it w as c om m is si on ed
CH
EC
KE
D
BY
IS
SU
E D
F O
R B
ID
8/ 4/
0:
:0
AM
AU
G
U
ST
H
. R O
BE
R
TS
J.
E
AR
L
C . L
YN
ER
C . L
YN
ER
8-
OVERALL SITE
LAYOUT
G1.1
8-
MA
DU
RA
F
IV
E
ST
OR
M
W
AT
ER
LI
FT
S
TA
TI
ON
RE
HA
BI
LIT
AT
IO
N
OF
M
A D
U R
A
G U
L F
B R
E E
Z E
F
L
SA
NT
A
RO
SA
C
O
UN
TY
, F
LO
RI
DA
M
AD
UR
A
FI
VE
S
TO
RM
W
AT
ER
LI
FT
S
TA
TI
ON
TRUE
NORTH
PROJECT
NORTH
SCALE: 1" = 10'-0"
OVERALL SITE PLAN
0'5'10' 10' 20'
BYPASS PUMP NOTES:
1. CONTRACTOR SHALL SUPPLY BYPASS PUMPS, FUEL TANKS, CONTAINMENT
VESSELS FOR FUEL TANKS AND FUEL FOR BYPASSING THE MADURA FIVE
LIFT STATION.
2. BYPASS PUMPS SHALL HAVE ALARMS AND THE CONTRACTOR SHALL BE
NOTIFIED WHEN LOW FUEL LEVELS ARE REACHED.
3. THE CONTRACTOR SHALL INTALL SIX (6) FEET TALL CHAIN LINK FENCING
WITH FULL HEIGHT TARPS SECURED TO THE GROUND ALL THE WAY AROUND
THE BYPASS PUMP AND BYPASS PUMP FUEL TANKS.
4. CONTRACTOR SHALL IDENTIFY A REPRESENTATIVE RESPONSIBLE FOR
MONITORING AND MAINTAINING THE BYPASS PUMP SYSTEM 24 HOURS PER
DAY AND 7 DAYS PER WEEK.
5. CONTRACTOR SHALL PLACE THE BYPASS PUMP FUEL TANK IN A
CONTAINMENT VESSEL TO PREVENT FUEL SPILLAGE OR LEAKAGE.
6. BYPASS PUMPS SHALL SHALL HAVE A MUFFLER SYSTEM TO MINIMIZE THE
NOISE POLLUTION FOR THE SURROUNDING HOMES AND RESIDENTS.
7. BYPASS PUMPS, FUEL TANKS AND FUEL CONTAINMENT VESSELS SHALL BE
PLACED ON THE SITE IN THE AVAILABLE SPACE PROVIDED BY THE SANTA
ROSA COUNTY EASEMENT.
8. CONTRACTOR SHALL NOTIFY MOTT MACDONALD AND THE ASSISTANT
COUNTY PUBLIC WORKS DIRECTOR, ANDREW HILL, 72 HOURS BEFORE
TRANSITIONING THE STORM WATER LIFT STATION OVER TO BYPASS.
9. CONTRACTOR SHALL DE-ENERGIZE THE STATION, SHALL REMOVE THE
EXISTING GATE VALVE AND CHECK VALVE AND INSTALL A NEW DUCTILE IRON
ELBOW TO CONNECT THE BY PASS EFFLUENT LINES TO THE EFFLUENT LINES
OF THE STATION.
10. CONTRACTOR SHALL PLUG THE INFLUENT LINES COMING INTO THE
STATION AND SHALL PLACE INFLUENT LINES AT THE STORM WATER INLET
AND THE RETENTION POND NORTH OF THE EXISTING STORM WATER LIFT
STATION.
11. THE BYPASS PUMPING SHOWN IS THE MINIMUM BASIS OF DESIGN FOR
THE PROJECT. CONTRACTOR SHALL DETERMINE THE BYPASS PUMPING
FINAL REQUIREMENTS FOR REHABILITATION OF THE STORM WATER LIFT
STATION. THE BYPASS PUMPS AND FUEL TANK MUIST STAY WITHIN
PROPERTY LINE OWNED BY SANTA ROSA COUNTY.
TH
IS
D
OC
UM
EN
T
HA
S
BE
EN
D
IG
IT
AL
LY
S
IG
NE
D
AN
D
SE
AL
ED
B
Y C.
H
EA
TH
R
OB
ER
TS
PR
IN
TE
D
CO
PI
ES
O
F
TH
IS
D
OC
UM
EN
T
AR
E
NO
T
CO
NS
ID
ER
ED
S
IG
NE
D
AN
D
SE
AL
ED
. T
HE
SI
GN
AT
UR
E
MU
ST
B
E
VE
RI
FI
ED
O
N
TH
E
EL
EC
TR
ON
IC
D
OC
UM
EN
TS
. T
HE
A
BO
VE
N
AM
ED
PR
OF
ES
SI
ON
AL
E
NG
IN
EE
R
SH
AL
L B E
RE
SP
ON
SI
BL
E
FO
R
TH
E
FO
LL
OW
IN
G
SH
EE
TS
IN
AC
CO
RD
AN
CE
W
IT
H
RU
LE
G1 5.2
3.0
, F .A
.C
D
AT
E R
EV
D
ES
C R
IP
TI
REMOVE ALL COMPONENTS INSIDE
THE LIFT STATION TO THE 90 DEGREE
FLANGE TO THE PUMP BASES
DEMOLITION THE FILLET AROUND THE BOTTOM OF
THE LIF STATION. CARE SHOULD BE TAKEN NOT
TO DAMAGE THE EXISTING WET WELL BASE
EXISTING PIPING OUTSIDE
THE WET WELL SHALL REMAIN
EXISTING GATE VALVE TO BE DEMOLISHED
AND DISPOSED OF IN A FLORIDA APPROVED
DISPOSAL FACILITY
EXISTING 10" GATE VALVE TO DEMOLISHED
AND DISPOSED OF IN A FLORIDA APPROVED
DISPOSAL FACILITY
EXISTING EFFLUENT
PIPING TO REMAIN
EXIST WET WELL STRUCTURE TO REMAIN
EXIST VALVE VAULT TO REMAIN
ALL COMPONENTS FROM THE FLANGE ON THE PVC
PIPE INTO THE LIFT STATION SHALL BE DEMOLISHED
EXTERIOR FACE OF EXISTING LIFT STATION
INTERIOR FACE OF EXISTING LIFT STATION
NOTE: SRC HAS FIRST RIGHT OF REFUSAL FOR ALL PUMPS AND
ACCOMPYING EQUIPMENT. ONCE EQUIPMENT IS REMOVED FROM
THE STATION, CONTRACTOR SHALL COORDINATE WITH SANTA ROSA
COUNTY ASSISTANT PUBLIC WORKS DIRECTOR, ANDREW HILL, FOR
WHICH ITEMS ARE TO BE KEPT AND WHERE THESE ITEMS ARE TO BE
DELIVERED TO. CONTRACTOR IS STILL RESPONSIBLE FOR DISPOSAL
OF ALL ITEMS NOT RETAINED BY SANTA ROSA COUNTY,
EXIST. PLATFORM TO BE DEMOLISHED
AND DISPOSED OF IN AN APPROVED
FLORIDA APPROVED DISPOSAL FACILITY.
DEMOLISH ALL ELECTRICAL COMPONENTS
2'-0" ABOVE GRADE AND DISPOSE OF IN AN
APPROVED FLORIDA APPROVED DISPOSAL
FACILITY.
EXIST WET WELL STRUCTURE TO REMAIN
EXIST VALVE VAULT
STRUCTURE TO REMAIN
EXIST WET WELL STRUCTURE TO REMAIN
EXISTING CONDUIT SHALL
BE CAPPED AND SEALED.
EXISTING ELECTRICAL PANELS
SHALL BE REMOVED, HAULED AND
STORED AT A LOCATION IDENTIFIED
BY SANTA ROSA COUNTY.
NOTE: SRC HAS FIRST RIGHT OF REFUSAL FOR ALL PUMPS AND
ACCOMPYING EQUIPMENT. ONCE EQUIPMENT IS REMOVED FROM
THE STATION, CONTRACTOR SHALL COORDINATE WITH SANTA ROSA
COUNTY ASSISTANT PUBLIC WORKS DIRECTOR, ANDREW HILL, FOR
WHICH ITEMS ARE TO BE KEPT AND WHERE THESE ITEMS ARE TO BE
DELIVERED TO. CONTRACTOR IS STILL RESPONSIBLE FOR DISPOSAL
OF ALL ITEMS NOT RETAINED BY SANTA ROSA COUNTY,
M O
TT
M
A C
D O
N A
LD
W es t G ar de n
St re et Su ite
Pe ns ac ol a, F lo rid a
Te le ph on e:
(8
) 4
-6
M O
TT
M
AC
DO
NA
LD
FL
O
RI
DA
L
LC
Ar ch ite ct s
AA
C
En gi ne er s
EB
Su rv ey or s
LB
M M
SHEET NUMBER:
DA
TE
DE
SI
G
NE
D
BY
DR
AW
N
BY
PR
O
JE
CT
A
RC
HI
TE
CT
PR
O
JE
CT
M
AN
AG
ER
M ot t M ac
Do na ld
PR
O
JE
CT
N
O
SHEET TITLE:
Th is d ra wi ng is th e pr op er ty o f M ot t M ac
D on al d
Fl or id a, L
LC
an d m ay n ot b e re pr od uc ed w ith ou t w rit te n pe rm is si on
. T hi s do cu m en t s ho ul d no t b e re lie d on o r u se d in c irc um st an ce s ot he r t ha n th os e fo r w hi ch it w as o rig in al ly pr ep ar ed a nd fo r w hi ch
M ot t M ac
D on al d wa s co m m is si on ed . M ot t M ac D on al d ac ce pt s no re sp on si bi lit y fo r t hi s do cu m en t t o an y pa rty o th er th an th e pe rs on o r e nt ity b y wh om it w as c om m is si on ed
CH
EC
KE
D
BY
IS
SU
E D
F O
R B
ID
8/ 4/
0:
:1
AM
AU
G
U
ST
H
. R O
BE
R
TS
J.
EA
R
L
C . L
YN
ER
C . L
YN
ER
8-
PUMP STATION
DEMO PLANS
D1.0
8-
MA
DU
RA
F
IV
E
ST
OR
M
W
AT
ER
LI
FT
S
TA
TI
ON
RE
HA
BI
LIT
AT
IO
N
OF
M
A D
U R
A
G U
L F
B R
E E
Z E
F
L
SA
NT
A
RO
SA
C
O
UN
TY
, F
LO
RI
DA
M
AD
UR
A
FI
VE
S
TO
RM
W
AT
ER
LI
FT
S
TA
TI
ON
TRUE
NORTH
PROJECT
NORTH 0'1'2' 2' 4'
SCALE: 3/8" = 1'-0"
LOWER DEMOLITION PLAN
TRUE
NORTH
PROJECT
NORTH 0'1'2' 2' 4'
SCALE: 3/8" = 1'-0"
UPPER DEMOLITION PLAN
TH
IS
D
OC
UM
EN
T
HA
S
BE
EN
D
IG
IT
AL
LY
S
IG
NE
D
AN
D
SE
AL
ED
B
Y C.
H
EA
TH
R
OB
ER
TS
PR
IN
TE
D
CO
PI
ES
O
F
TH
IS
D
OC
UM
EN
T
AR
E
NO
T
CO
NS
ID
ER
ED
S
IG
NE
D
AN
D
SE
AL
ED
. T
HE
SI
GN
AT
UR
E
MU
ST
B
E
VE
RI
FI
ED
O
N
TH
E
EL
EC
TR
ON
IC
D
OC
UM
EN
TS
. T
HE
A
BO
VE
N
AM
ED
PR
OF
ES
SI
ON
AL
E
NG
IN
EE
R
SH
AL
L B E
RE
SP
ON
SI
BL
E
FO
R
TH
E
FO
LL
OW
IN
G
SH
EE
TS
IN
AC
CO
RD
AN
CE
W
IT
H
RU
LE
G1 5.2
3.0
, F .A
.C
D
AT
E R
EV
D
ES
C R
IP
TI
DEMOLISH AND DISPOSE OF ALL
EXISTING GUIDE RAILS INSIDE THE
EXISTING STORM WATER LIFT STATION
DEMOLISH AND DISPOSE OF EXISTING
PUMP 3 AND BASE ELBOW
DEMOLISH AND DISPOSE OF
EXISTING PUMP 2 AND BASE ELBOW
DEMOLISH AND DISPOSE OF
EXISTING PUMP 1 AND BASE ELBOW
DEMOLISH AND DIPOSE OF ALL EXISTING
VERTICAL PIPES TO THE FLANGES OF 90
DEGREE ELBOWS
ALL EXIST. ELECTRICAL COMPONENTS 2'-0" ABOVE GRADE TO BE DEMOLISHED
AND DISPOSED OF IN AN APPROVED FLORIDA DISPOSAL FACILITY. ALL EXISTING
CONDUIT SHALL BE CAPPED AND SEALED WITH HIGH STRENGTH NON-SHRINK CEMENTITIOUS GROUT w/ A MINIMUM COMPRESSIVE STRENGTH OF 5000 PSI.
EXIST. ELECTRICAL PANEL PLATFORM AND COMPONENTS TO BE DEMOLISHED
AND DISPOSED OF IN AN APPROVED FLORIDA DISPOSAL FACILITY
ALL EXIST. ELECTRICAL COMPONENTS 2'-0" ABOVE GRADE TO BE DEMOLISHED
AND DISPOSED OF IN AN APPROVED FLORIDA DISPOSAL FACILITY. ALL EXISTING PIPING
CONDUIT CUTOFF 2'-0" ABOVE GRADE SHALL BE CAPPED.
EXIST. ELECTRICAL PANEL PLATFORM TO BE DEMOLISHED AND DISPOSED OF
IN A FLORIDA APPROVED DISPOSAL FACILITY.
DEMOLISH AND DISPOSE OF ALL
EXISTING FRAMING
DEMOLISH AND DISPOSE OF ALL EXISTING ELECTRICAL
COMPONENTS INSIDE THE EXISTING STORM WATER
LIFT STATION
DEMOLISH AND DISPOSE OF ALL
COMPONENTS FROM THE 90 DEGREE
ELBOW FLANGE DOWN TO THE PUMP
BASES INSIDE THE EXISTING LIFT
STATION
EXIST. ELECTRICAL PANELS TO BE REMOVED FROM THE EXIST ELECTRICAL
PLATFORM, HAULED TO A DESIGNATION IDENTIFIED BY SANTA ROSA COUNTY
AND PLACED IN STORAGE AT THIS LOCATION.
NOTE: SRC HAS FIRST RIGHT OF REFUSAL FOR ALL PUMPS AND
ACCOMPYING EQUIPMENT. ONCE EQUIPMENT IS REMOVED FROM
THE STATION, CONTRACTOR SHALL COORDINATE WITH SANTA ROSA
COUNTY ASSISTANT PUBLIC WORKS DIRECTOR, ANDREW HILL, FOR
WHICH ITEMS ARE TO BE KEPT AND WHERE THESE ITEMS ARE TO BE
DELIVERED TO. CONTRACTOR IS STILL RESPONSIBLE FOR DISPOSAL
OF ALL ITEMS NOT RETAINED BY SANTA ROSA COUNTY,
M O
TT
M
A C
D O
N A
LD
W es t G ar de n
St re et Su ite
Pe ns ac ol a, F lo rid a
Te le ph on e:
(8
) 4
-6
M O
TT
M
AC
DO
NA
LD
FL
O
RI
DA
L
LC
Ar ch ite ct s
AA
C
En gi ne er s
EB
Su rv ey or s
LB
M M
SHEET NUMBER:
DA
TE
DE
SI
G
NE
D
BY
DR
AW
N
BY
PR
O
JE
CT
A
RC
HI
TE
CT
PR
O
JE
CT
M
AN
AG
ER
M ot t M ac
Do na ld
PR
O
JE
CT
N
O
SHEET TITLE:
Th is d ra wi ng is th e pr op er ty o f M ot t M ac
D on al d
Fl or id a, L
LC
an d m ay n ot b e re pr od uc ed w ith ou t w rit te n pe rm is si on
. T hi s do cu m en t s ho ul d no t b e re lie d on o r u se d in c irc um st an ce s ot he r t ha n th os e fo r w hi ch it w as o rig in al ly pr ep ar ed a nd fo r w hi ch
M ot t M ac
D on al d wa s co m m is si on ed . M ot t M ac D on al d ac ce pt s no re sp on si bi lit y fo r t hi s do cu m en t t o an y pa rty o th er th an th e pe rs on o r e nt ity b y wh om it w as c om m is si on ed
CH
EC
KE
D
BY
IS
SU
E D
F O
R B
ID
8/ 4/
0:
:1
AM
AU
G
U
ST
H
. R O
BE
R
TS
J.
E
AR
L
C . L
YN
ER
C . L
YN
ER
8-
DEMOLITION
PHOTOS
D2.0
8-
MA
DU
RA
F
IV
E
ST
OR
M
W
AT
ER
LI
FT
S
TA
TI
ON
RE
HA
BI
LIT
AT
IO
N
OF
M
A D
U R
A
G U
L F
B R
E E
Z E
F
L
SA
NT
A
RO
SA
C
O
UN
TY
, F
LO
RI
DA
M
AD
UR
A
FI
VE
S
TO
RM
W
AT
ER
LI
FT
S
TA
TI
ON
DEMOLITION PHOTOS
TH
IS
D
OC
UM
EN
T
HA
S
BE
EN
D
IG
IT
AL
LY
S
IG
NE
D
AN
D
SE
AL
ED
B
Y C.
H
EA
TH
R
OB
ER
TS
PR
IN
TE
D
CO
PI
ES
O
F
TH
IS
D
OC
UM
EN
T
AR
E
NO
T
CO
NS
ID
ER
ED
S
IG
NE
D
AN
D
SE
AL
ED
. T
HE
SI
GN
AT
UR
E
MU
ST
B
E
VE
RI
FI
ED
O
N
TH
E
EL
EC
TR
ON
IC
D
OC
UM
EN
TS
. T
HE
A
BO
VE
N
AM
ED
PR
OF
ES
SI
ON
AL
E
NG
IN
EE
R
SH
AL
L B E
RE
SP
ON
SI
BL
E
FO
R
TH
E
FO
LL
OW
IN
G
SH
EE
TS
IN
AC
CO
RD
AN
CE
W
IT
H
RU
LE
G1 5.2
3.0
, F .A
.C
D
AT
E R
EV
D
ES
C R
IP
TI
PS1.1
S1
S1
S1
FASTEN PUMP DISCHARGE CONNECTION
TO THE EXIST. CONCRETE FLOOR WITH
316 STAINLESS STEEL DRILLED AND EXPOXY
THREADED RODS. USE HILTI RE-500 EOPXY.
PROVIDE MIN. 4" OF EMBEDMENT, 3"
PROJECTION AND FOLLOW PUMP
MANUFACTURER REQUIREMENTS FOR
THREADED ROD INSTALLATION.
BASIS OF DESIGN FOR PUMP THREADED RODS
SHALL BE 1" DIAMETER x 7" AND (4) 316 SS
THREADED RODS PER PUMP BASE
EXIST WET WELL STRUCTURE
INSTALL 316 STAINLESS STEEL 4" CHANNEL
SWAY BRACING AT 1/3 POINTS ALONG THE LENGTH
OF THE RISER PIPE. ATTACH BRACING TO RISER
PIPE WITH 316 STAINLESS STEEL U BOLTS.
NEW 90 DEGREE 316 STAINLESS STEEL
BENDS WITH FLANGES (TYP. ALL PUMPS)
EXIST VALVE VAULT TO REMAIN
NEW 10" COATED CHECK VALVE
NEW AIR AND VACUUM VALVE . CONTRACTOR RESPONSIBLE
FOR ANY AND ALL FITTINGS AND PIPING REQUIRED FOR INSTALLATION
CONTACTOR SHALL INSTALL ALL 316 SS BOLTS AND
316 SS APPURTENANCES TO HAVE A FULLY
OPERATIONAL PIPING AND PUMP SYSTEM
NEW 316 STAINLESS STEEL PUMP GUIDERAILS
PER MANUFACTURER REQUIREMENTS.
ALL PUMPS AND PUMP BASES ARE TO
DEMOLISHED AND REPLACED
NEW GALVANIZED STEEL PLATFORM, FOUNDATIONS
AND ACCESS LADDER, REFER TO STRUCTURAL
DRAWINGS
EXISTING EFFLUENT PIPING
TO REMAIN
EXISTING EFFLUENT PIPING TO REMAIN
NEW 10" COATED CHECK VALVE
ADD ALTERNATE:
PREP AND COAT THE INSIDE OF THE EXIST. LIFT
STATION. REFER TO THE INTERIOR STORM WATER LIFT
STATION COATING SPEC FOR COATING REQUIREMENTS.
PS1.1
S1
S1
EXIST WET WELL STRUCTURE TO REMAIN
EXIST VALVE VAULT TO REMAIN
NEW GALVANIZED STEEL PLATFORM,
FOUNDATIONS, AND ACCESS LADDER
REFER TO STRUCTURAL DRAWINGS
NEW ELECTRICAL PANELS, WIRING AND ALL REQUIRED
APPURTENANCES TO INSTALL A COMPLETE ELECTRICAL
SYSTEM FOR THE NEW LIFT STATION
EXIST WET WELL STRUCTURE LIDS TO REMAIN
EXIST VALVE VAULT LID TO REMAIN
GENERAL NOTES:
1. ALL INTERIOR WET WELL PIPING SHALL BE SCHEDULE 40 316 STAINLESS STEEL WITH WELDED FLANGES.
2. ALL EXISTING EXPOSED PIPING IN THE LIFT STATION, VALVE BOX AND ANY REMAINING VALVES SHALL BE SANDBLASTED AND SURFACE PREPPED TO A SSPC-SP
10 RATING AND THE FOLLOWING COATING APPLIED.
A) SHOP PRIMER - TNEMEC N140-1211 POTA-POX PLUS 6-8MILS
B) FIELD PRIMER - SAME
C) INTERMEDIATE - TNEMIC 66 EPOXOLINE, 3-5 MILS
D) FINISH - TNEMEC 1074U ENDURA-SHIELD II, 2-3 MILS
E) TOTAL DRY FILM THICKNESS: 11.0 TO 16.0 MILS; TOTAL COATS (3); COLOR SHALL BE GREEN
3. ALL BOLTS FOR FITTINGS SHALL BE 316 STAINLESS STEEL. THE THREADS SHALL BE COATED WITH ANTI-SEIZE COMPOUND.
4. PUMP ALIGNMENT IN SUMP MAY BE VARIED TO SUIT INSTALLATION AND SHALL BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION.
5. ALL BOLTS FOR FITTINGS SHALL BE 316 STAINLESS STEEL.
6. ALL ALUMINUM IN CONTACT WITH CONCRETE SHALL BE PROTECTED WITH A COATING OF BITUMINOUS PAINT, ZINC CHROMATE, OR A SEPARATING LAYER OF AN
APPROVED MATERIAL.
7. VALVE SIZES SHALL BE THE SAME AS DISCHARGE PIPING.
8. ALL MISCELLANEOUS METAL IN WET WELL SHALL BE 316L STAINLESS STEEL.
9. GUIDE RAIL FOR FLOAT SWITCH (SEPARATE FROM PUMP GUIDE RAIL), IF REQUIRED, SHALL BE MOUNTED SUCH THAT IT SHALL NOT INTERFERE WITH OR NEED
TO BE REMOVED FOR PUMP REMOVAL.
10. EMERGENCY CONTACT SIGN: A SIGN MADE OF DURABLE WEATHER RESISTANT MATERIAL SHALL BE POSTED AT A LOCATION VISIBLE TO THE PUBLIC WITH A TELEPHONE NUMBER FOR A POINT OF CONTACT IN CASE OF AN EMERGENCY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATION WITH THE OWNER
REGARDING THE PHONE NUMBER TO BE USED.
11. ANY NEW PIPE PENETRATIONS THROUGH THE WET WELL AND TOP SLAB SHALL BE SEALED WITH LINK-SEAL (EXCLUDING CONDUIT). CONDUIT SHALL BE SEALED
WITH NON-SHRINK GROUT.
12. THE CONTRACTOR SHALL WARRANT THAT THE COMPONENTS AND INSTALLATION THEREOF IS IN FULL COMPLIANCE WITH FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (F.D.E.P.) REQUIREMENTS. AS SUCH, THE STATION MUST BE IN FULL COMPLIANCE WITH THE ITEMS LISTED BELOW WHICH
SHOULD NOT BE CONSIDERED TO INCLUDE ALL OF THE F.D.E.P. REQUIREMENTS.
13. ELECTRICAL SYSTEMS AND COMPONENTS (E.G.: MOTORS, LIGHTS, CABLES, CONDUITS, SWITCH BOXES, CONTROL CIRCUITS, ETC.) IN STORM SEWER LIFT STATIONS, OR IN ENCLOSED OR PARTIALLY ENCLOSED SPACES WHERE HAZARDOUS CONCENTRATIONS OF FLAMMABLE GASES OR VAPORS MAY BE PRESENT, SHALL COMPLY WITH THE NATIONAL ELECTRICAL CODE REQUIREMENTS FOR CLASS I GROUP D, DIVISION 1 LOCATIONS.
PUMP STATION NOTES
1. ELECTRICAL EQUIPMENT LOCATED IN WET WELLS SHALL BE SUITABLE FOR USE UNDER CORROSIVE CONDITIONS.
2. EACH FLEXIBLE CABLE SHALL BE PROVIDED WITH A WATERTIGHT SEAL AND SEPARATE STRAIN RELIEF.
3. A FUSED DISCONNECT OR MAIN BREAKER SWITCH LOCATED ABOVE GROUND SHALL BE PROVIDED FOR THE MAIN POWER FEED FOR ALL PUMP STATIONS.
4. ELECTRICAL EQUIPMENT EXPOSED TO WEATHER SHALL MEET THE REQUIREMENTS OF WEATHERPROOF EQUIPMENT NEMA 4X.
5. A 110 VOLT POWER RECEPTACLE TO FACILITATE MAINTENANCE SHALL BE PROVIDED INSIDE THE CONTROL PANEL FOR PUMP STATIONS THAT HAVE CONTROL PANELS OUTDOORS AND GROUND FAULT INTERRUPTION PROTECTION SHALL BE PROVIDED FOR ALL OUTDOOR OUTLETS.
6. PUMP STATIONS SHALL BE PROTECTED FROM LIGHTNING AND TRANSIENT VOLTAGE SURGES.
7. PUMP STATIONS SHALL BE EQUIPPED WITH LIGHTNING ARRESTORS, SURGE CAPACITORS, OR OTHER SIMILAR PROTECTION DEVICES AND PHASE
PROTECTION.
8. ALARM HORN AND LIGHT SHALL BE PROVIDED WITH BATTERY BACK-UP, TO INCLUDE A RECHARGEABLE BATTERY CAPABLE OF SUPPLYING POWER TO THE LIGHT AND HORN FOR A MINIMUM OF 2 HOURS. THE CONTRACTOR SHALL PROVIDE A SYSTEM THAT WILL RECHARGE THE BATTERY ONCE MAIN POWER IS RESTORED. FULL CHARGE OF BATTERY SHALL TAKE NO MORE THAN 24 HOURS. ALARM SHALL ACTIVATE UNDER HIGH LIQUID LEVEL CONDITION OR LOSS
OF POWER. PROVIDE PUSH TO SILENCE AND RESET BUTTON FOR ALARM.
9. EACH CABLE ENTERING THE WET WELL SHALL HAVE ITS OWN CONDUIT AT 20% FILL.
10. LIGHTING FOR THE NEW ELECTRICAL PLATFORM AND NEW ELECTRICAL PANELS SHALL BE PROVIDED.
11. PUMPS BASE ELBOWS, GUIDE BARS, PUMP POWER CABLES, CONTROLS, AND CONTROL PANELS TO BE PROVIDED BY THE OWNER. CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND COORDINATION WITH THE CITY'S SELECTED VENDOR ONCE DELIVERED FROM THE CITY. SEE SPECIFICATIONS
APPENDIX A FOR PROVIDED EQUIPMENT DETAILS.
M O
TT
M
A C
D O
N A
LD
W es t G ar de n
St re et Su ite
Pe ns ac ol a, F lo rid a
Te le ph on e:
(8
) 4
-6
M O
TT
M
AC
DO
NA
LD
FL
O
RI
DA
L
LC
Ar ch ite ct s
AA
C
En gi ne er s
EB
Su rv ey or s
LB
M M
SHEET NUMBER:
DA
TE
DE
SI
G
NE
D
BY
DR
AW
N
BY
PR
O
JE
CT
A
RC
HI
TE
CT
PR
O
JE
CT
M
AN
AG
ER
M ot t M ac
Do na ld
PR
O
JE
CT
N
O
SHEET TITLE:
Th is d ra wi ng is th e pr op er ty o f M ot t M ac
D on al d
Fl or id a, L
LC
an d m ay n ot b e re pr od uc ed w ith ou t w rit te n pe rm is si on
. T hi s do cu m en t s ho ul d no t b e re lie d on o r u se d in c irc um st an ce s ot he r t ha n th os e fo r w hi ch it w as o rig in al ly pr ep ar ed a nd fo r w hi ch
M ot t M ac
D on al d wa s co m m is si on ed . M ot t M ac D on al d ac ce pt s no re sp on si bi lit y fo r t hi s do cu m en t t o an y pa rty o th er th an th e pe rs on o r e nt ity b y wh om it w as c om m is si on ed
CH
EC
KE
D
BY
IS
SU
E D
F O
R B
ID
8/ 4/
0:
:1
AM
AU
G
U
ST
H
. R O
BE
R
TS
J.
E
AR
L
C . L
YN
ER
C . L
YN
ER
8-
PUMP STATION
LAYOUT
PS1.0
8-
MA
DU
RA
F
IV
E
ST
OR
M
W
AT
ER
LI
FT
S
TA
TI
ON
RE
HA
BI
LIT
AT
IO
N
OF
M
A D
U R
A
G U
L F
B R
E E
Z E
F
L
SA
NT
A
RO
SA
C
O
UN
TY
, F
LO
RI
DA
M
AD
UR
A
FI
VE
S
TO
RM
W
AT
ER
LI
FT
S
TA
TI
ON
TRUE
NORTH
PROJECT
NORTH
0'2'4' 4' 8'
TRUE
NORTH
PROJECT
NORTH
0'2'4' 4' 8'
SCALE: 1/4" = 1'-0"
LOWER NEW WORK PLAN
SCALE: 1/4" = 1'-0"
UPPER NEW WORK PLAN
SCALE: 12" = 1'-0"
GENERAL NOTES - NEW WORK PLAN
TH
IS
D
OC
UM
EN
T
HA
S
BE
EN
D
IG
IT
AL
LY
S
IG
NE
D
AN
D
SE
AL
ED
B
Y C.
H
EA
TH
R
OB
ER
TS
PR
IN
TE
D
CO
PI
ES
O
F
TH
IS
D
OC
UM
EN
T
AR
E
NO
T
CO
NS
ID
ER
ED
S
IG
NE
D
AN
D
SE
AL
ED
. T
HE
SI
GN
AT
UR
E
MU
ST
B
E
VE
RI
FI
ED
O
N
TH
E
EL
EC
TR
ON
IC
D
OC
UM
EN
TS
. T
HE
A
BO
VE
N
AM
ED
PR
OF
ES
SI
ON
AL
E
NG
IN
EE
R
SH
AL
L B E
RE
SP
ON
SI
BL
E
FO
R
TH
E
FO
LL
OW
IN
G
SH
EE
TS
IN
AC
CO
RD
AN
CE
W
IT
H
RU
LE
G1 5.2
3.0
, F .A
.C
D
AT
E R
EV
D
ES
C R
IP
TI
GRADE
0' - 0"
B/VALVE VAULT
-3' - 6"
T/WET WELL SLAB
-16' - 4"
INFLUENT INV.
-9' - 9 1/2"
FASTEN PUMP DISCHARGE CONNECTION TO THE EXIST. CONCRETE
FLOOR WITH 316 STAINLESS STEEL DRILLED AND EXPOXY
THREADED RODS. USE HILTI RE-500 EOPXY. PROVIDE MIN. 4" OF
EMBEDMENT, 3" PROJECTION AND FOLLOW PUMP MANUFACTURER
REQUIREMENTS FOR THREADED ROD INSTALLATION.BASIS OF
DESIGN FOR PUMP THREADED RODS SHALL BE 1" DIAMETER x 7"
AND (4) 316 SS THREADED RODS PER PUMP BASE
EXIST WET WELL STRUCTURE
INSTALL 316 STAINLESS STEEL 4" CHANNEL
SWAY BRACING AT 1/3 POINTS ALONG THE LENGTH
OF THE RISER PIPE. ATTACH BRACING TO RISER
PIPE WITH 316 STAINLESS STEEL U BOLTS.
NEW 10" 316 STAINLESS STEEL
PIPING WITH FLANGES (ALL PUMPS)
NEW 90 DEGREE 316 STAINLESS
STEEL BENDS WITH FLANGES (TYP.
ALL PUMPS)
EXIST VALVE VAULT TO REMAIN
NEW 10" COATED CHECK VALVE
NEW 10" COATED GATE VALVE
NEW AIR AND VACUUM VALVE . CONTRACTOR RESPONSIBLE
FOR ANY AND ALL FITTINGS AND PIPING REQUIRED FOR
INSTALLATION
CLEARANCE AS RECOMMENDED
BY PUMP MANUFACTURER
NEW 316 STAINLESS STEEL PUMP
GUIDERAILS (OWNER PROVIDED)
PER MANUFACTURER
REQUIREMENTS.
ALL EXISTING PUMPS AND PUMP BASES ARE TO
DEMOLISHED AND REPLACED WITH NEW PUMPS
AND PUMP BASES DISPOSE EXISTING PUMPS IN A
FLORIDA APPROVED DISPOSAL FACILITY.
NEW PUMP AND PUMP BASES SHALL BE
PROVIDED BY OWNER.
EXIST. TOP LID AND
HATCHES ARE TO REMAIN
EXIST EFFLUENT PIPING TO REMAIN
EXIST EFFLUENT
PIPING TO REMAIN
EXTERIOR FACE OF EXIST. LIFT STATION
INTERIOR FACE OF EXIST. LIFT STATION
EXIST. INFLUENT LINES TO REMAIN
NEW 5,000 PSI HIGH STRENGTH NON-SHRINK CEMENTITIUOS
GROUT AROUND THE INSIDE PERIMETER OF THE WETWELL
EXIST WET WELL FOUNDATION
EXIST. INFLUENT LINES TO REMAIN
NEW 10"x8" CONCENTRIC REDUCER BETWEEN
NEW PUMP AND NEW 10" 316 SS RISER PIPE
(NOT SHOWN FOR CLARITY)
ALL EXISTING COMPONENTS BEYOND THE FLANGE IN THE
EXIST WET WELL SHALL BE DEMOLISHED AND DISPOSED
OF IN AN FLORIDA APPROVED DISPOSAL FACILITY
ALL COMPONENTS BEYOND THE FLANGE OUTSIDE
THE EXIST WET WELL SHALL REMAIN EXCEPT FOR
NEW GATE VALVE AND NEW CHECK VALVE
CONTRACTOR SHALL CORE A HOLE IN THE
EXIST WET WELL LID AND INSTALL NEW
VENT IN TOP OF THE WET WELL. SEAL
AROUND THE VENT PIPE WITH LINK SEAL,.
REFER TO ELECTRICAL FOR
NEW LEVEL TRANSMITTER
W/ WIRING
EXIST. VALVE VAULT LID TO REMAIN
CONTACTOR SHALL INSTALL ALL 316 SS BOLTS AND
316 SS APPURTENANCES TO HAVE A FULLY
OPERATIONAL PIPING AND PUMP SYSTEMADD ALTERNATE:
PREP AND COAT THE INSIDE OF THE EXIST. LIFT
STATION. REFER TO THE INTERIOR STORM WATER LIFT
STATION COATING SPEC FOR COATING REQUIREMENTS.
M O
TT
M
A C
D O
N A
LD
W es t G ar de n
St re et Su ite
Pe ns ac ol a, F lo rid a
Te le ph on e:
(8
) 4
-6
M O
TT
M
AC
DO
NA
LD
FL
O
RI
DA
L
LC
Ar ch ite ct s
AA
C
En gi ne er s
EB
Su rv ey or s
LB
M M
SHEET NUMBER:
DA
TE
DE
SI
G
NE
D
BY
DR
AW
N
BY
PR
O
JE
CT
A
RC
HI
TE
CT
PR
O
JE
CT
M
AN
AG
ER
M ot t M ac
Do na ld
PR
O
JE
CT
N
O
SHEET TITLE:
Th is d ra wi ng is th e pr op er ty o f M ot t M ac
D on al d
Fl or id a, L
LC
an d m ay n ot b e re pr od uc ed w ith ou t w rit te n pe rm is si on
. T hi s do cu m en t s ho ul d no t b e re lie d on o r u se d in c irc um st an ce s ot he r t ha n th os e fo r w hi ch it w as o rig in al ly pr ep ar ed a nd fo r w hi ch
M ot t M ac
D on al d wa s co m m is si on ed . M ot t M ac D on al d ac ce pt s no re sp on si bi lit y fo r t hi s do cu m en t t o an y pa rty o th er th an th e pe rs on o r e nt ity b y wh om it w as c om m is si on ed
CH
EC
KE
D
BY
IS
SU
E D
F O
R B
ID
8/ 4/
0:
:1
AM
AU
G
U
ST
H
. R O
BE
R
TS
J.
E
AR
L
C . L
YN
ER
C . L
YN
ER
8-
PUMP STATION
SECTIONS
PS1.1
8-
MA
DU
RA
F
IV
E
ST
OR
M
W
AT
ER
LI
FT
S
TA
TI
ON
RE
HA
BI
LIT
AT
IO
N
OF
M
A D
U R
A
G U
L F
B R
E E
Z E
F
L
SA
NT
A
RO
SA
C
O
UN
TY
, F
LO
RI
DA
M
AD
UR
A
FI
VE
S
TO
RM
W
AT
ER
LI
FT
S
TA
TI
ON
0'1'2' 2' 4'
Scale: 1/2" = 1'-0"PS1.1
1 SN-THRU WET WELL
GENERAL NOTES:
1. ALL INTERIOR WET WELL PIPING SHALL BE SCHEDULE 40 316 STAINLESS STEEL WITH WELDED FLANGES.
2. ALL EXISTING EXPOSED PIPING IN THE LIFT STATION, VALVE BOX AND ANY REMAINING VALVES SHALL BE SANDBLASTED AND SURFACE PREPPED TO A SSPC-SP 10 RATING AND THE
FOLLOWING COATING APPLIED.
A) SHOP PRIMER - TNEMEC N140-1211 POTA-POX PLUS 6-8MILS
B) FIELD PRIMER - SAME
C) INTERMEDIATE - TNEMIC 66 EPOXOLINE, 3-5 MILS
D) FINISH - TNEMEC 1074U ENDURA-SHIELD II, 2-3 MILS
E) TOTAL DRY FILM THICKNESS: 11.0 TO 16.0 MILS; TOTAL COATS (3); COLOR SHALL BE GREEN
3. ALL BOLTS FOR FITTINGS SHALL BE 316 STAINLESS STEEL. THE THREADS SHALL BE COATED WITH ANTI-SEIZE COMPOUND.
4. PUMP ALIGNMENT IN SUMP MAY BE VARIED TO SUIT INSTALLATION AND SHALL BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION.
5. ALL BOLTS FOR FITTINGS SHALL BE 316 STAINLESS STEEL.
6. ALL ALUMINUM IN CONTACT WITH CONCRETE SHALL BE PROTECTED WITH A COATING OF BITUMINOUS PAINT, ZINC CHROMATE, OR A SEPARATING LAYER OF AN APPROVED MATERIAL.
7. VALVE SIZES SHALL BE THE SAME AS DISCHARGE PIPING.
8. ALL MISCELLANEOUS METAL IN WET WELL SHALL BE 316L STAINLESS STEEL.
9. GUIDE RAIL FOR FLOAT SWITCH (SEPARATE FROM PUMP GUIDE RAIL), IF REQUIRED, SHALL BE MOUNTED SUCH THAT IT SHALL NOT INTERFERE WITH OR NEED TO BE REMOVED FOR PUMP
REMOVAL.
10. EMERGENCY CONTACT SIGN: A SIGN MADE OF DURABLE WEATHER RESISTANT MATERIAL SHALL BE POSTED AT A LOCATION VISIBLE TO THE PUBLIC WITH A TELEPHONE NUMBER FOR A POINT OF CONTACT IN CASE OF AN EMERGENCY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATION WITH THE OWNER REGARDING THE PHONE NUMBER TO BE USED.
11. ANY NEW PIPE PENETRATIONS THROUGH THE WET WELL AND TOP SLAB SHALL BE SEALED WITH LINK-SEAL (EXCLUDING CONDUIT). CONDUIT SHALL BE SEALED WITH HIGH STRENGTH NON-
SHRINK CEMENTITIOUS GROUT A MINIMUM COMPRESSIVE STRENGTH OF 5000 PSI.
12. THE CONTRACTOR SHALL WARRANT THAT THE COMPONENTS AND INSTALLATION THEREOF IS IN FULL COMPLIANCE WITH FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (F.D.E.P.) REQUIREMENTS. AS SUCH, THE STATION MUST BE IN FULL COMPLIANCE WITH THE ITEMS LISTED BELOW WHICH SHOULD NOT BE CONSIDERED TO INCLUDE ALL OF THE F.D.E.P.
REQUIREMENTS.
13. ELECTRICAL SYSTEMS AND COMPONENTS (E.G.: MOTORS, LIGHTS, CABLES, CONDUITS, SWITCH BOXES, CONTROL CIRCUITS, ETC.) IN STORM SEWER LIFT STATIONS, OR IN ENCLOSED OR PARTIALLY ENCLOSED SPACES WHERE HAZARDOUS CONCENTRATIONS OF FLAMMABLE GASES OR VAPORS MAY BE PRESENT, SHALL COMPLY WITH THE NATIONAL ELECTRICAL CODE
REQUIREMENTS FOR CLASS I GROUP D, DIVISION 1 LOCATIONS.
PUMP STATION NOTES
1. ELECTRICAL EQUIPMENT LOCATED IN WET WELLS SHALL BE SUITABLE FOR USE UNDER CORROSIVE CONDITIONS.
2. EACH FLEXIBLE CABLE SHALL BE PROVIDED WITH A WATERTIGHT SEAL AND SEPARATE STRAIN RELIEF.
3. A FUSED DISCONNECT OR MAIN BREAKER SWITCH LOCATED ABOVE GROUND SHALL BE PROVIDED FOR THE MAIN POWER FEED FOR ALL PUMP STATIONS.
4. ELECTRICAL EQUIPMENT EXPOSED TO WEATHER SHALL MEET THE REQUIREMENTS OF WEATHERPROOF EQUIPMENT NEMA 4X.
5. A 110 VOLT POWER RECEPTACLE TO FACILITATE MAINTENANCE SHALL BE PROVIDED INSIDE THE CONTROL PANEL FOR PUMP STATIONS THAT HAVE CONTROL PANELS OUTDOORS AND
GROUND FAULT INTERRUPTION PROTECTION SHALL BE PROVIDED FOR ALL OUTDOOR OUTLETS.
6. PUMP STATIONS SHALL BE PROTECTED FROM LIGHTNING AND TRANSIENT VOLTAGE SURGES.
7. PUMP STATIONS SHALL BE EQUIPPED WITH LIGHTNING ARRESTORS, SURGE CAPACITORS, OR OTHER SIMILAR PROTECTION DEVICES AND PHASE PROTECTION.
8. OWNER FUNISHED CONTRACTOR INSTALLED PANEL WILL INCLUDE ALARM HORN AND BATTERY BACKUP SYSTEM. ALARM HORN AND LIGHT SHALL BE PROVIDED WITH BATTERY BACK-UP, TO INCLUDE A RECHARGEABLE BATTERY CAPABLE OF SUPPLYING POWER TO THE LIGHT AND HORN FOR A MINIMUM OF 2 HOURS. THE CONTRACTOR SHALL PROVIDE A SYSTEM THAT WILL RECHARGE THE BATTERY ONCE MAIN POWER IS RESTORED. FULL CHARGE OF BATTERY SHALL TAKE NO MORE THAN 24 HOURS. ALARM SHALL ACTIVATE UNDER HIGH LIQUID LEVEL
CONDITION OR LOSS OF POWER. PROVIDE PUSH TO SILENCE AND RESET BUTTON FOR ALARM.
9. EACH CABLE ENTERING THE WET WELL SHALL HAVE ITS OWN CONDUIT AT 20% FILL.
10. LIGHTING FOR THE NEW ELECTRICAL PLATFORM AND NEW ELECTRICAL PANELS SHALL BE PROVIDED.
11. PUMPS BASE ELBOWS, GUIDE BARS, PUMP POWER CABLES, CONTROLS, AND CONTROL PANELS TO BE PROVIDED BY THE OWNER. CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND COORDINATION WITH THE CITY'S SELECTED VENDOR ONCE DELIVERED FROM THE CITY. SEE SPECIFICATIONS APPENDIX A FOR PROVIDED EQUIPMENT DETAILS.
TH
IS
D
OC
UM
EN
T
HA
S
BE
EN
D
IG
IT
AL
LY
S
IG
NE
D
AN
D
SE
AL
ED
B
Y C.
H
EA
TH
R
OB
ER
TS
PR
IN
TE
D
CO
PI
ES
O
F
TH
IS
D
OC
UM
EN
T
AR
E
NO
T
CO
NS
ID
ER
ED
S
IG
NE
D
AN
D
SE
AL
ED
. T
HE
SI
GN
AT
UR
E
MU
ST
B
E
VE
RI
FI
ED
O
N
TH
E
EL
EC
TR
ON
IC
D
OC
UM
EN
TS
. T
HE
A
BO
VE
N
AM
ED
PR
OF
ES
SI
ON
AL
E
NG
IN
EE
R
SH
AL
L B E
RE
SP
ON
SI
BL
E
FO
R
TH
E
FO
LL
OW
IN
G
SH
EE
TS
IN
AC
CO
RD
AN
CE
W
IT
H
RU
LE
G1 5.2
3.0
, F .A
.C
PUMP STATION NO.
MADURA FIVE
DESIGN CONDITION
2540 GPM @ 48 FEET TDH
1270 GPM @ 48 FEET TDH x 2
STATION INVERT
0.0 FEET
LOW LEVEL ALARM
3.0 FEET
STOP PUMPS L.W.L.
3.5 FEET
START 1ST PUMP
4.5 FEET
START 2ND PUMP
5.5 FEET
START 3RD PUMP & HLA
11.0 FEET
D
AT
E R
EV
D
ES
C R
IP
TI
S1
S1
S14
HSS4x4x3/8" POSTS W/ 1'-0" X 1'-0" BASE PLATE W/
(4) 7/8" DIA. x 24" GALVANIZED STEEL THREADED
RODS. GALV. THREADED RODS SHALL HAVE 20"
EMEDMENT AND 4" PROJECTION. PROVIDE GALV.
NUTS AND WASHERS EACH END. ALL COLUMNS
SHALL HAVE 3/8" CAP PLATE SEAL WELDED TO
THE TOP OF THE HSS4x4.
TYP (6) PLACES
L4x4x3/8 VERTICAL
BRACING BELOW
NOTE:
1. ALL STEEL, GRATING, BOLTS, NUTS, WASHERS AND
THREADED RODS FOR THE PLATFORM CONSTRUCTION SHALL
BE HOT DIPPED GALVANIZED TO MEET ASTM A123
REQUIREMENTS.
2. ALL BOLTS SHALL BE A325 AND ALL THREADED RODS FOR
ANCHOR BOLTS SHALL BE F1554 GRADE 36.
3. ALL PLATES, ANGLES AND CHANNELS SHALL BE A36.
4. ALL WIDE FLANGE STEEL SHALL BE A992.
5. ALL HSS SHALL BE A500 GRADE B.
6. ALL 1 1/4" SCH. 80 PIPE FOR GUARDRAIL SHALL BE A53 GRADE
B.
7. ALL GRATING SHALL BE 19W-4 1 1/2" x 3/16" BEARING BAR
STEEL GALVANIZED STEEL GRATING.
8. ALL GRATING SHALL BE BANDED AND ATTACHED TO THE
STRUCTUAL MEMBERS USING GALVANIZED STEEL SADDLE
CLIPS AND GALVANIZED STEEL FASTENERS.
9. 4000 PSI CONCRETE, TYPE I/II CEMENT WITH A WATER
CEMENT RATIO OF 0.45.
10. DESIGN CODES: 2023 FLORIDA BUILDING CODE 8TH EDITION
AND ASCE 7-22.
11. ALLOWABLE SOIL BEARING PRESSURE USED FOR DESIGN:
1,500 PSF
12. FEMA FLOOD ELEVATION: AE 7.0 PER FEMA FLOOD MAP
12113C0543H EFFECTIVE 11/19/2021 (SANTA ROSA COUNTY
UNICORPORATED AREAS)
13. EXISTING SITE ELEVATION: 5.00'
14. TOP OF FOUNDATION SHALL BE 3" ABOVE GRADE.
15. TOP OF STEEL SHALL BE 6'-0" ABOVE TOP OF FOUNDATION.
16. TOP OF GRATING SHALL BE 6'-1 1/2" ABOVE TOP OF GRATING.GALV. STEEL OSHA LADDER WITH
LADDER EXTENSIONS THAT EXTEND 42"
ABOVE THE TOP OF GRATING LEVEL.
3/8"x4" SIDE STEEL PLATE SIDE RAILS.
12" TEXTURED RUNG SPACING.
24" FOUNDATION MAT WITH #6 @ 10" O.C. E.W. T&B. HOOK
TOP BARS 90 DEGREES TO THE BOTTOM MAT. PROVIDE
3" CLEARANCE ALL FACES FOR REINFORCING. TOP OF
FOOTING SHALL BE 7" ABOVE GRADE. LOCATE ALL
UTILITIES BEFORE FOOTING EXCAVATION. COORDINATE
UTILITY RELOCATION WITH SANTA ROSA COUNTY.
RELOCATE UTILITIES AS REQUIRED.
L4x4x3/8 VERTICAL BRACING BELOW
L4x4x3/8 VERTICAL BRACING BELOW
NEW ELECTRICAL PANELS
CONNECTED TO
THE W12x26 PLATFORM
MEMBERS
W12x26 CONNECTION TO THE HSS4x4 COLUMNS WITH 3/8"x9"
SHEAR TABS WITH (3) ROWS OF A325 BOLTS. 3" BOLT
SPACING AND 1 1/2" EDGE DISTANCE AND 1/4" WELD OF
SHEAR TAB TO THE COLUMN
(TYP 14 PLACES)
L4x4x3/8" VERTICAL BRACING TO GUSSET
CONNECTIONS SHALL BE (2) 3/4" A325 BOLTS.
3/8" GUSSET PLATES SHOP WELDED TO THE
BEAMS, COLUMNS AND BASE PLATES WITH A
MINIMUM OF A 1/4" FILLET WELD EACH SIDE
C12x20.7 TO W12x26 CONNECTION
SHALL BE SHOP BOLTED AND FIELD
BOLTED L4x4x3/8"x9" WITH (3) ROWS
OF A32 BOLTS. 3" BOLT SPACING
AND 1 1/2" EDGE DISTANCE.
1' - 8"
7' - 8" CL TO CL HSS4x4
1' - 8"
1' - 6"
ALIGN CL W12x26 BENEATH
EDGE OR BEARING POINT OF
ELECTRICAL PANELS
1 1/4" DIA. SCH. 80 GUARDRAIL SYSTEM
W/ 1 1/4" DIA. SCH. 80 GUARDRAIL POSTS
@ MAX. 48" ON CENTER @ 1 1/4" SCH. 80
GUARDRAILS @ 21" AND 42" ABOVE THE
GRATING. INCLUDE 1/4"x4" KICK PLATE
GRATING SPAN
15'-0" C SHAPED LIGHT POLE BRACKET
MADE OF (3) 5/8" X 12" SQUARE. ATTACH
PLATES TO W12x26
ADD C12x20.7 BENEATH THE
ELECTRICAL PANELS AS
REQUIRED TO SUPPORT
ELECTRICAL PANELS EDGES IF
OFF THE ALIGNMENT OFTHE
W12X26
C 12X20.7
C 12X20.7
W 12X26
W 12X26
W12X26
W12X26
W 12X26
W 12X26
L4x4x3/8 VERTICAL
BRACING BELOW
L4x4x3/8 VERTICAL BRACING BELOWW12X26
W 12X26
W 12X26
L4x4x3/8 VERTICAL BRACING BELOW
1' - 3" 8' - 0" C
L TO
C
L H SS4x4
8' - 0" C
L TO
C L H
SS4x4 1' - 3"
3' - 0"
11' - 0" O/O FDN
18' - 6" O /O
FD
N
19W-4 1 1/2"x3/16" GALV. STEEL GRATING.
ALL GRATING PLANKS SHALL BE BANDED.
GRATING AREA: 8'-2 1/2" WIDE x 16'-8 1/2" LONG
W12x26 TO W12x26 BEAM TO BEAM CONNECTION
SHALL BE SHOP WELDED AND FIELD BOLTED
L4x4x3/8"x9" WITH (3) ROWS OF A32 BOLTS. 3" BOLT
SPACING AND 1 1/2" EDGE DISTANCE.
NOTE:
CONDUIT QUANTITIES SHOWN REPRESENT
DESIGN INTENT AND DO NOT REFLECT THE
ACTUAL NUMBER OF CONDUITS PRESENT.
CONTRACTOR SHALL REFER TO ELECTRICAL
PLANS FOR EXACT CONDUIT QUANTITIES
IMPORTANT PLATFORM ORIENTATION NOTE:
CONTRACTOR SHALL COORDINATE NORTH FACING
ORIENTATION OF THE PLATFORMS IN THIS LOCALIZED PLAN
VERSUS THE OVERALL PLAN ON SHEET G1.1
GRADE
0' - 0"
T/PLATFORM
6' - 6"
6'
1/
2"
1/ 2"
T/FDN
HS
4X
4X 3/8 w / L
4x 4x
3/8
VE
RT
IC
AL
B
RA
CI
NG
HS
4X
4X 3/8 w / L
4x 4x
3/8
VE
RT
IC
AL
B
RA
CI
NG
3"
1 1/4" DIA. SCH. 80 GUARDRAIL SYSTEM
W/ 1 1/4" DIA. SCH. 80 GUARDRAIL POSTS
@ MAX. 48" ON CENTER @ 1 1/4" SCH. 80
GUARDRAILS @ 21" AND 42" ABOVE THE
GRATING. INCLUDE 1/4"x4" KICK PLATE
HSS4x4x3/8" POSTS W/ 1'-0" X 1'-0" BASE PLATE W/
(4) 7/8" DIA. x 24" GALVANIZED STEEL THREADED
RODS. GALV. THREADED RODS SHALL HAVE 20"
EMEDMENT AND 4" PROJECTION. PROVIDE GALV.
NUTS AND WASHERS EACH END. ALL COLUMNS
SHALL HAVE 3/8" CAP PLATE SEAL WELDED TO
THE TOP OF THE HSS4x4.
TYP (6) PLACES
L4x4x3/8" VERTICAL BRACING TO GUSSET CONNECTIONS SHALL BE (2) 3/4" A325
BOLTS. 3/8" GUSSET PLATES SHOP WELDED TO THE BEAMS, COLUMNS AND
BASE PLATES WITH A MINIMUM OF A 1/4" FILLET WELD EACH SIDE
W12x26 CONNECTION TO THE HSS4x4 COLUMNS WITH 3/8"x9" SHEAR TABS WITH (3) ROWS OF
A325 BOLTS. 3" BOLT SPACING AND 1 1/2" EDGE
DISTANCE AND 1/4" WELD OF SHEAR TAB TO
THE COLUMN (TYP 14 PLACES)
19W-4 1 1/2"x3/16" GALV.
STEEL GRATING.
ALL GRATING PLANKS
SHALL BE BANDED.
24" FOUNDATION MAT WITH #6 @ 10" O.C. E.W. T&B. HOOK TOP
BARS 90 DEGREES TO THE BOTTOM MAT. PROVIDE 3" CLEARANCE
ALL FACES FOR REINFORCING. TOP OF FOOTING SHALL BE 7"
ABOVE GRADE. LOCATE ALL UTILITIES BEFORE FOOTING
EXCAVATION. COORDINATE UTILITY RELOCATION WITH SANTA
ROSA COUNTY. RELOCATE UTILITIES AS REQUIRED.
C12x20.7 TO W12x26 CONNECTION SHALL BE SHOP BOLTED AND FIELD BOLTED L4x4x3/8"x9"
WITH (3) ROWS OF A32 BOLTS. 3" BOLT
SPACING AND 1 1/2" EDGE DISTANCE.
W12X26 W12X26
W12X26
HS
4X
4X 3/8 w / L
4x 4x
3/8
VE
RT
IC
AL
B
RA
CI
NG
L4X4X1/2
L4X4X1/2
GRADE
0' - 0"
T/PLATFORM
6' - 6"
3"
HS
4X
4X 3/8
HS
4X
4X 3/8
1 1/4" DIA. SCH. 80 GUARDRAIL SYSTEM
W/ 1 1/4" DIA. SCH. 80 GUARDRAIL POSTS
@ MAX. 48" ON CENTER @ 1 1/4" SCH. 80
GUARDRAILS @ 21" AND 42" ABOVE THE
GRATING. INCLUDE 1/4"x4" KICK PLATE
HSS4x4x3/8" POSTS W/ 1'-0" X 1'-0" BASE PLATE W/
(4) 7/8" DIA. x 24" GALVANIZED STEEL THREADED
RODS. GALV. THREADED RODS SHALL HAVE 20"
EMEDMENT AND 4" PROJECTION. PROVIDE GALV.
NUTS AND WASHERS EACH END. ALL COLUMNS
SHALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .