3-CURRENT-Specifications-Bid_Package_No._1_Equipment_Material_Procurement-August_2026_P.pdf
PDF 2 MB Posted
- Solicitation number
- 26-063
- Issued by
- Santa Rosa County, Florida
About this file
This is a specifications and bid package document for Santa Rosa County, Florida's procurement of equipment and materials for the Madura Five Storm Water Lift Station Rehabilitation project. The procurement solicitation (26-063) seeks bids for equipment necessary to rehabilitate the storm water lift station. A mandatory pre-bid meeting is scheduled for October 15, 2026, at 10:00 a.m. via Microsoft Teams. Questions from prospective bidders must be submitted through the Santa Rosa County Procurement Portal by 12:00 p.m. on Thursday, October 22, 2026. All proposals are due by 10:00 a.m. on Friday, November 6, 2026, at which time bids will be publicly opened. Specifications are available through the Santa Rosa County Procurement Portal at https://procurement.opengov.com/portal/santarosafl, and all proposals must be submitted through the same portal.
Santa Rosa County encourages participation from all segments of the business community, including small businesses, minority-owned businesses, women-owned businesses, and disadvantaged business enterprises. The county does not discriminate in contract administration based on race, color, religion, national origin, disability, sex, or age. The Board of County Commissioners reserves the right to waive irregularities in bids, reject any or all bids for documented reasons, and award the contract to the bid determined to be in the best interest of Santa Rosa County. No pricing terms, set-asides, incumbents, or funding source information is specified in the memorandum provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
MADURA FIVE STORMWATER LIFT
STATION REHABILITATION
Santa Rosa County Public Works
Bid Package No. 1 Equipment Bid
Package
Issued for Bid
August 2026
SANTA ROSA COUNTY PUBLIC WORKS
Supplemental Technical Specifications for
MADURA FIVE LIFT STATION REHABILITATION
ISSUED FOR BID
Mott MacDonald Florida, LLC
AA-C0000035 EB-0000155
General/Civil/Process ____________________________
All sections unless otherwise stated C. HEATH ROBERTS, P.E. Date
Florida License No. 93379
1022 West 23rd Street Suite 680
Panama City, FL 32405
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY C.
HEATH ROBERTS ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED
ON ANY ELECTRONIC COPIES.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE
RESPONSIBLE FOR TRHE FOLLOWING SPECIFICATIONS IN
ACCORDANCE WITH RULE 61G15.23.004, F.A.C.
SANTA ROSA COUNTY PUBLIC WORKS
Supplemental Technical Specifications for
MADURA FIVE LIFT STATION REHABILITATION
ISSUED FOR BID
Mott MacDonald Florida, LLC
AA-C0000035 EB-0000155
Electrical ____________________________
Division 16 in its entirety Antonio Gonzalez JR, P.E. Date
Florida License No. 86300
501 E. Kennedy Blvd., Suite 1400
Tampa, FL 33602
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY
ANTONIO GONZALEZ JR ON THE DATE ADJACENT TO THE
SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT
CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST
BE VERIFIED ON ANY ELECTRONIC COPIES.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE
RESPONSIBLE FOR TRHE FOLLOWING SPECIFICATIONS IN
ACCORDANCE WITH RULE 61G15.23.004, F.A.C.
PN: 502100708-012
Santa Rosa County
Madura Five Storm Water Lift Station Rehabilitation Mott MacDonald Project No.: 502100708-012
TABLE OF CONTENTS
Technical Specifications
01000 Measurement and Payment
01010 Summary of Work
01300 Submittals
02510 Manholes, Wet Wells and Valve Chambers
02570 Pumping Stations
09900 Painting
Electrical Specifications
16010 Basic Electrical Requirement
16055 Power Systems Studies
16060 Grounding and Bonding for Electrical Systems
16073 Hangers and Supports for Electrical Systems
16075 Identification for Electrical Systems
16100 Underground ducts and Utility Structures
PN: 502100708-012
16289 Low-Voltage Surge Protection
16410 Enclosed Switches and Circuit Breakers
16415 Transfer Switches
16429 Switchboards
16441 Panelboards
16461 Low-Voltage Transformers
16491 Fuses
16495 Variable Frequency Motor Controllers
16900 Control System Integrator
16910 Control Panel Construction
16930 Functional Descriptions
16950 Field Instruments
16991 Factory Acceptance Testing
16992 Commissioning
16993 Site Acceptance Test (SAT)
SECTION 01000
MEASUREMENT AND PAYMENT
01000-1 PN:502100708
PART 1 – GENERAL
1.01 GENERAL
A. The intent is for furnishing all materials, equipment and incidentals for the pumps, pump base elbows, electrical panels, lifting chains and pump cabling necessary for fully operational pumps and electrical panels in accordance with the plans and specifications.
B. Equipment furnished under Bid Package No. 1 shall be considered Owner-
Furnished Equipment / Owner-Furnished Materials for installation under Bid
Package No. 2 unless specifically noted otherwise. Equipment supplier / manufacturer shall provide manufacturer-recommended storage requirements, preservation requirements, and written warranty documentation for each furnished item.
Equipment may be stored for an extended period prior to installation and startup.
Supplier/manufacturer shall confirm that storage in accordance with the manufacturer's written requirements will not reduce or void the warranty.
Warranty for furnished equipment shall commence upon successful startup and acceptance by the Owner, unless a longer or more favorable warranty period is provided by the manufacturer and accepted by the Owner.
Where equipment remains at the manufacturer's facility after fabrication, manufacturer shall maintain the equipment in accordance with the written storage requirements and provide storage/preservation documentation upon request.
Upon completion of fabrication, the Owner may verify completion by photographs, manufacturer certification, or in-person inspection. Subject to County procurement requirements, partial payment may be made at fabrication completion, with final payment retained until delivery/startup/final acceptance.
PART 2 – BID ITEMS
2.01 PUMPS AND ASSOCIATED COMPONENTS
A. The lump sum bid item shall be compensation in full for furnishing all materials, equipment and incidentals for the pumps, pump base elbows, guide rails, pump power cables and lifting chains necessary for operational pumps and electrical panels in accordance with the plans and specifications once installed in the station.
2.02 ELECTRICAL EQUIPMENT AND ASSOCIATED COMPONENTS
A. The lump sum bid item shall be compensation in full for furnishing all materials, equipment and incidentals for the pump station’s electrical panel and control panels necessary for fully operational pump station in accordance with the plans and specifications once installed in the station.
2.03 CONSTRUCTION AND START UP SUPPORT
SECTION 01000
MEASUREMENT AND PAYMENT
01000-2 PN:502100708
A. The lump sum bid item shall be compensation in full for providing construction support to the engineer and installing contractor during pump station construction activities. This will also include providing start up services once the pumping station is fully constructed including onsite visitation to support start up and activation of new pumps.
END OF SECTION 01000
SECTION 01010
SUMMARY
01010-1 PN: 502100708
Mott MacDonald Restricted
1.01 WORK COVERED BY CONTRACT DOCUMENTS
A. The intent of this Contract is for the construction of Santa Rosa County Madura
Five Stormwater Pumping Station and associated piping, valves, and electrical work.
B. The intent and meaning of the Contract Documents require that each Contractor, under the terms of his Contract, shall take such action as necessary and/or required to provide labor, plant, materials, equipment, transportation, facilities and appurtenances thereto, which are indicated, or reasonably implied by each Drawing, and each Section of the Specifications, all of which are collectively necessary and required for the execution of the work.
1.02 DESCRIPTION OF WORK
A. The Project consists of the acquiring pumps, electrical equipment and all associated components. This will include acquiring three (3) pumps, base elbows, guide rails, lifting chains, pump power cables, electrical and control panels, and other incidentals as identified within the bidding documents with the intent of providing these items to an installing contractor. Vendor is expected to provide assistance and support during construction of the pump station and startup of the pump package.
1.03 PERMITS AND REGULATIONS
A. The Contractor's responsibility includes compliance with federal, state and local regulations which in any way affect the work or implementation of the Project.
Application and all other applicable permits, including applicable building permits if required.
1.04 PROJECT CONSTRUCTION REQUIREMENTS
A. General
1. The Contractor shall be responsible for providing all utilities for operations.
2. The Contractor shall have the required equipment and material needed for the required work, before any of the existing facilities units are removed from service.
3. All materials and equipment held in storage by the Contractor shall be protected from the weather, vandalism and/or flooding by suitable waterproof coverings or by placing in storage buildings until ready for installation as applicable. Material that is damaged shall be rejected and must be restored or replaced at no additional cost to the Owner.
a. The Contractor shall effectively protect, at his own expense, his work and materials for the duration of the construction period.
SECTION 01010
SUMMARY
01010-2 PN: 502100708
b. The Contractor shall exercise care in the installation of all materials to avoid damage of any kind. All equipment shall be protected from dust and moisture prior to and after installation.
c. Failure of the Contractor to protect the materials as outlined herein shall be grounds for rejection of the materials and Work.
4. All Contractors affected by utilities shall make appropriate arrangements with the utility companies to provide for services necessary to complete the work.
The Contractors shall comply with all protection requirements for the existing utilities.
5. The Contractor shall be advised that night work and/or work on Saturday and
Sunday may be required. It will be the decision of the OWNER to allow work to occur outside of normal working hours, and this will be accomplished at no additional cost to the OWNER.
6. No hazardous conditions shall be left after the removal of equipment and materials under the demolition work.
1.05 RECOMMENDED SEQUENCE OF CONSTRUCTION
A. The contractor in accordance with Section 01300, SUBMITTALS shall submit a planned sequence of construction prior to the start of construction. The planned sequence of construction shall ensure that the existing facilities remain operational to the fullest extent possible during construction. Any necessary temporary utilities or facilities required to maintain the utilities in operation during construction, or to operate or test new facilities until such time as permanent utilities are installed, shall be provided with no additional cost to the OWNER.
END OF SECTION 01010
SECTION 01300
SUBMITTALS
01300-1 PN: 502100708
1.01 SCHEDULES
A. The Supplier / Equipment Manufacturer shall be responsible for preparing a
Progress or Work Schedule for the preparation, manufacturing, shipment and delivery of the equipment to the owner or contractor.
1.02 SHOP DRAWINGS, SAMPLES AND MANUALS
A. The Supplier / Equipment Manufacturer shall process the Shop Drawings required by this Contract to the Engineer and he shall be responsible for the timely submission in accordance with the Shop Drawing schedule which is included in the overall progress or work schedule as described in Part 2 of this Section.
B. All Shop Drawings must be submitted with a Cover Letter containing, at minimum, the following information:
1. Supplier / Equipment Manufacturer Name
2. Client Name
3. Engineer Name
4. Date
5. Project Name
6. Submittal Number
7. Submittal Name
8. Specification Section Number containing the item submitted for review or
Drawing number for items specified on Drawings only.
9. Certification of the Supplier / Equipment Manufacturer 's approval. Any Shop
Drawings submitted without the Supplier / Equipment Manufacturer's certification will be returned without review.
C. Any proposed deviations/substitutions from that specified shall be clearly noted on the cover letter transmitting the shop drawing. Failure to so note will be cause for rejection of equipment, materials, etc. after installation.
D. All submissions shall be marked with the Specification Section Number containing the item submitted for review, or Drawing number for items specified on Drawings only.
E. Revised shop drawings submitted for review shall be marked "RESUBMISSION”.
1.03 MANUFACTURING PHOTOGRAPHS
01300-2 PN: 502100708
A. The Supplier / Equipment Manufacturer shall be responsible for all manufacturing progress photographs. Manufacturing progress photographs must be submitted with each Pay Request.
1.04 SUBMITTAL PROCEDURES
A. All submittals shall be delivered to the Engineer.
B. The Engineer will screen the submittals to ensure that they have been properly certified and identified by the Supplier / Equipment Manufacturer. If they are submitted properly, the items will be processed for review. Any deviation from the requirements may delay return of the submittal and may be cause for rejection of the submittal.
C. The processed submittals will be returned to the Supplier / Equipment
Manufacturer.
PART 2 – SCHEDULE
2.01 PREPARATION
A. The Supplier / Equipment Manufacturer shall prepare a Progress or Work
Schedule for the preparation, manufacturing, shipment and delivery of the equipment to the owner or contractor, using Contract Project Management software, showing the order in which the Supplier / Equipment Manufacturer proposes to carry on their work and salient features, including submissions of shop drawings and samples and procurement of materials, to meet date of completion.
B. Each activity in the Progress or Work Schedule shall be identified and a time for the performance of such activity indicated. Each activity shall be preceded by all work that must be accomplished prior to that activity. All abbreviations, codes and/or symbols used shall be described on the Schedule.
a. Approximate date of each submittal.
2.02 SUBMISSION
A. Submit one electronic copy of Manufacturing schedule to the Engineer for review within thirty (30) days after award of Contract.
B. In the event that the work is behind schedule, the Schedule shall be revised to ensure that the work is completed within the Contract time. Under these circumstances, overtime work shall be performed at no additional cost to the
Owner.
01300-3 PN: 502100708
PART 3 – SHOP DRAWINGS AND MANUALS
3.01 GENERAL
A. Shop drawings are defined as drawings, diagrams, illustrations, schedules, performance charts, brochures and other data prepared by the Supplier /
Equipment Manufacturer which illustrate how specific portions of the work shall be fabricated and/or installed.
B. Shop drawings are not part of the Contract Documents, but are a supplementary means of communications to assist in the understanding of what the Supplier /
Equipment Manufacturer proposes to provide and to establish that whatever he intends to install either does or does not conform to the Drawings and
Specifications.
C. In the instance of a request for a substituted item, the Supplier / Equipment
Manufacturer shall verify that the substitute item will fit into the space allocated to the originally required item, giving due regard to all other trades' requirements.
Where modifications to the Contract Documents are proposed, the Supplier /
Equipment Manufacturer must clearly indicate such deviation in writing in their transmittal letter. If the modification and/or substitutions are agreed to by the
Engineer, the Contract Documents will be appropriately modified. However, when additional work is required, the Supplier / Equipment Manufacturer is advised that he must pay the Engineer for redesign to accommodate the revised substitution as well as pay other contractors for extra work required on their part for the change.
No increase in Owner's construction cost will be allowed.
3.02 CATALOG SHEETS
A. For standard manufactured items considered by the Engineer as not requiring special Shop Drawings, the Supplier / Equipment Manufacturer shall submit one
(1) electronic copy of manufacturer's catalog sheets showing model numbers and illustrated cuts of the items to be furnished, scale details, sizes, dimensions, performance characteristics, capacities, wiring and control diagrams and all other pertinent information. This information shall be highlighted when appropriate.
B. When electronic copies are submitted, The Engineer will return an electronic copy to the Supplier / Equipment Manufacturer.
3.03 SHOP DRAWINGS
A. The Supplier / Equipment Manufacturer shall submit for review one (1) electronic version of shop and working drawings of materials fabricated especially for his
Contract, and of equipment and materials for which such drawings are specifically requested.
01300-4 PN: 502100708
1. The Supplier / Equipment Manufacturer shall submit one (1) electronic copy of a letter with the Shop Drawings for each piece of equipment, signed and certified by an authorized representative of the Equipment Manufacturer, which certifies that the subject equipment meets or exceeds the current
OSHA/ANSI and local industrial codes for safety. The letter shall also specifically identify any exceptions that the Supplier / Equipment
Manufacturer has taken in not providing the required safety devices as they relate to the above codes.
2. The Supplier / Equipment Manufacturer shall furnish a written certification from the manufacturers that they have examined plans and specifications of the project and their equipment and material are suitable and approved for the intended use. (Use the form provided at the end of this section)
B. Coordinate all equipment systems with the Drawings and submit a complete and coordinated shop drawing submission of the specific equipment system. All shop drawings related to the specific equipment system shall be submitted at the same time for review. The shop drawing submission shall provide the coordination of concrete foundations, piping, relative elevations, electrical, chemical facilities, instrumentation facilities, dimensions, structural changes, etc. in sufficient detail that the Engineer can adequately review the shop drawing. Equipment systems submitted which are incomplete and uncoordinated shall be returned to the respective Supplier / Equipment Manufacturer, unchecked. A resubmission shall be made after equipment system shop drawings have been completed and coordinated. Any required changes in the equipment system layout vs. the equipment system shown on the Drawings shall be provided by the respective
Supplier / Equipment Manufacturer at no added expense to the Owner or Engineer.
C. Prior to submitting drawings to the Engineer, the Supplier / Equipment
Manufacturer shall check thoroughly all such drawings to satisfy himself that the subject matter conforms to the Drawings and Specifications in all respects.
Drawings which are correct shall be marked with the date, checker's name, and certification of the Supplier / Equipment Manufacturer 's approval, and then shall be submitted to the Engineer. Any Shop Drawings submitted without the Supplier /
Equipment Manufacturer 's certification will be returned without review.
C. When hard copies are submitted, The Engineer will retain one (1) copy and return one (1) copy to the Supplier / Equipment Manufacturer submitting the catalog sheets. When electronic copies are submitted, The Engineer will return an electronic copy to the Supplier / Equipment Manufacturer.
D. Shop Drawings shall show the principal dimensions, weight, structural and operating features, performance characteristics and wiring diagrams, space required, clearances, type and/or brand of finish or shop coat, grease fittings, etc., 01300-5 PN: 502100708 depending on the subject of the drawing. When it is customary to do so, when the dimensions are of particular importance or when so specified, the drawings shall be certified by the manufacturer or fabricator as correct for this Contract.
E. When so specified or if considered by the Engineer to be acceptable, manufacturer's specifications, catalog data, descriptive matter, illustrations, etc., may be submitted for review in place of shop and working drawings. In such case the requirements shall be as specified for shop and working drawings, insofar as applicable.
F. The Supplier / Equipment Manufacturer shall be responsible for the prompt submission of all shop and working drawings in accordance with the shop drawing schedule to avoid any delay in the work due to the absence of such drawings.
G. No material shall be purchased or fabricated until the required shop and working drawings have been submitted and reviewed as conforming to the Contract requirements. All materials and work involved in the construction shall then be as represented by said drawings.
H. The Engineer's review of shop and working drawings will follow a general check made to ascertain conformance with the design concept and functional result of the project and compliance with the information given in the Contract Documents. The
Supplier / Equipment Manufacturer is responsible for details and accuracy, for conforming and correlating all quantities and dimensions at the job site; for information that pertains solely to the fabrication processes or to techniques of construction; and for coordination of the work of all trades.
3.04 MANUALS
A. The Supplier / Equipment Manufacturer shall submit for review one (1) electronic copy of all requested operating and maintenance manuals with the shop drawing submittals.
B. The Engineer will retain and return one (1) electronic copy to the Supplier /
Equipment Manufacturer.
C. Prior to final payment, provide one (1) updated operating, maintenance manual and parts list for the Owner's use.
PART 4 – SAMPLES
4.01 SUBMISSION OF SAMPLES
A. Unless otherwise specified, the Supplier / Equipment Manufacturer shall provide samples in duplicate and identify each sample by an appropriate tag or label listing
01300-6 PN: 502100708
the name of the Project, the Owner, the Engineer, and the Contractor and/or
Subcontractor, as well as the exact identification of the sample. Tag or label shall be large enough to provide a blank space for review stamps.
B. Samples of items submitted for destruction tests or for use in testing mixture with other materials will not be returned. Review of these items will be given by letter.
C. When reviewed, one sample of each item, not submitted for destruction, will be returned to the Supplier / Equipment Manufacturer and shall be kept and maintained in good condition in the submitting Contractor's office at the project site for later use in comparison with material actually delivered for the work. When samples of large fabricated items or of costly items are required, reviewed samples may be installed in the work if the exact location of such samples is recorded on the Record Drawings.
PART 5 – CERTIFICATION AND TESTS
5.01 GENERAL
A. Two (2) copies of certifications and reports of tests when required under the various sections of the Specifications shall be submitted.
END OF SECTION 01300
01300-7 PN: 502100708
MANUFACTURE’S CERTIFICATION
Manufacture or Supplier:
Company or Brand
Representative:
Printed Name
Project Name:
Equipment/Product:
This is to certify that we have examined the Plans and Specifications for this Project and have ascertained that this equipment or materials is suitable for the purpose and use intended.
Authorized Signature
Dated:
01300-8 PN: 502100708
SECTION 02510
MANHOLES, WET WELLS, AND VALVE CHAMBERS
02510-1 PN: 502100708
1.01 SCOPE
A. Description of Work
1. Provide all labor, materials, tools and equipment necessary to furnish and install manholes, wet wells and valve chambers as indicated on the Drawings, Construction Details and as herein specified.
2. Throughout this specification section where the word “manhole” is used it shall mean “manholes, wet wells, and valve chambers”.
B. Coordination
1. If pumps are proposed for installation in a wet well, the Contractor shall have the manufacturer of the pumps verify that the wet wells specified herein and detailed on the Drawings are of adequate size to suit his equipment.
1.02 MANHOLE TYPES
A. Manholes shall be made up of precast concrete sections; bottom section shall also be precast concrete or a single piece fiberglass with ballast ring.
B. Pumping station and valve chamber walls shall be precast concrete manhole sections. Top and bottom sections shall also be precast unless shown otherwise or approved by the Owner.
PART 2 – PRODUCTS
2.01 MORTAR
A. Composition of mortar shall conform to “Standard Specification for Mortar for Unit
Masonry", ASTM C270, Type N and shall be a silica cement mortar only.
2.02 GROUT
A. Grout shall be "Masterflow 713 Plus" manufactured by BASF Building Systems, or
"Non Shrink 5 Star Grout" manufactured by Five Star Products, Inc., or equal. Grout shall be capable of meeting test requirements of ASTM C827.
2.03 MANHOLE STEPS
A. There shall be no steps in manholes.
2.04 MANHOLE FRAMES, COVERS AND ACCESS HATCHES
A. General
1. Castings shall be traffic rated ductile iron, meeting ASTM A48, designed for H-
20 loading as designated by AASHTO. A Pam-Rex, or equivalent, hinged lid with lock shall be used.
2. Castings shall be free from cracks, holes, swells and cold shuts. All manhole castings shall be made accurately to the pattern and to the dimensions as
02510-2 PN: 502100708
specified, and shall be machined to secure perfectly flat and true to surfaces.
All lids which "rock" and do not lie solid will not be accepted and must be replaced.
3. No plugging, burning in or filling will be allowed. Covers must fit the frames in any position.
4. The covers shall have non-penetrating pick holes.
B. Standard Type Manhole Frame and Cover
1. Standard manhole frame and covers shall be Pam-Rex with 24” clear opening as manufactured by Certainteed or equal.
2. A label saying “SANITARY” shall be cast on the cover.
C. Watertight Covers
1. Manholes at specific locations, subject to periodic flooding, as indicated on the
Drawings, to be watertight, shall be equipped with a watertight frame and cover. A label saying "SANITARY" shall be cast on the cover. Lids will be bolted down against a rubber o-ring. Pam-Tight specifications, or equivalent, must be met.
2. Frame and Cover shall be watertight type with stainless steel bolts, machined bearing surfaces and flat gasket.
D. Access Hatches
1. Access hatches shall be provided for the pumping stations as specified on the drawings.
2. Access hatches, for valve chambers and in other locations that are indicated on the Drawings, shall be as specified on the drawings.
2.05 PRECAST CONCRETE MANHOLES AND COMPONENTS
A. Concrete
1. Provide all sanitary manholes constructed with Portland ASTM C150, Type 1 or 2 cement with a tricalcium aluminate content not to exceed 8 percent.
2. Mixed aggregate shall be a minimum of 50 percent crushed limestone.
3. Provide 3000 psi non-shrink grout.
B. Sections
1. The sections for manholes shall be a minimum of 4 feet in diameter for pipe sizes up to, and including 24 inches internal diameter. For pipes with an internal diameter between 24 and 36 inches, the manhole shall be 5 feet in diameter, unless otherwise noted.
2. The sections for the wet wells and valve chambers shall be of the size indicated on the details.
3. The Sections shall conform to the requirements of "Standard Specification for
Precast Reinforced Concrete Manhole Sections" (ASTM C478), except that the joints shall be of the tongue and groove joint type and sealed with a preformed flexible plastic gasket. No other type of manhole joint will be accepted. Face of tongue and groove shall be sloped and not perpendicular to manhole wall.
02510-3 PN: 502100708
C. Risers and Top Sections
1. The top of base walls, the ends of reinforced concrete risers and the bottom ends of precast tops shall be so formed that when risers and tops are assembled with the base, they will make a continuous manhole. The tongue and groove joints shall be of such design as will permit effective joining and placement without irregularities in the interior wall surface of the manhole.
2. Precast barrels shall consist of riser and top sections. The top section of manholes 6 feet or greater in depth shall be an eccentric conical top section with thickened upper walls with the smallest inside diameter equal to 24 inches, to receive the manhole frame and cover. Top sections of manholes less than
6 feet in depth shall be flat concrete slabs. No more than two lift holes shall be cast in each riser or top section. Lift holes shall be non-penetrating.
3. Precast riser and top sections shall be designed, manufactured, tested, finished and marked in accordance with this specification and “Standard
Specification for Precast Reinforced Concrete Manhole Sections" (ASTM
C478).
D. Precast Manhole Bases
1. The bases shall be integrally cast and shall consist of a manhole bottom and a wall which shall extend a minimum of 6 inches above the top of the highest inflowing sewer. The top of the base section shall be carefully formed to receive the tongue of the barrel section. There shall be a minimum distance of
4 inches between the invert of the lowest outflowing sewer and floor of the precast base to provide for construction of a formed invert and bench wall within the manhole. No more than two lift holes shall be cast in the bases. Lift holes shall be non-penetrating.
a. Manholes 4 feet in diameter shall have a bottom at least 8 inches thick and a wall at least 5 inches thick.
b. Manholes 5 feet in diameter shall have a bottom at least 8 inches thick and a wall at least 6 inches thick.
E. Joint Material
1. The joint material shall be a preformed flexible plastic gasket such as Ram-
Nek manufactured by the Henry Company or equal. It shall consist of hydrocarbon plastic and vulcanized rubber and shall be capable of meeting the following conditions:
a. Hydrocarbon plastic content 50-70% by weight per ASTM D297
b. Volatile matter 2.0% max. by weight per ASTM D6
c. Specific gravity @ 77 deg. F: 1.20 to 1.35 per ASTM D71
d. Ductility@ 77 deg. F: 5.0 cm min. per ASTM D113
e. Softening Point, ring and ball: 320 deg. F min. per ASTM D36
f. Penetration, cone 77 deg. F, 150 gm, 5 sec.: 50-120 per ASTM D217
g. Flash point, C.O.C.: 600 deg. F min. per ASTM D92
h. Fire point, C.O.C.: 625 deg. F min. per ASTM D92
i. Inert mineral filler: 30-50% by weight
j. Material, when in place, shall not leak at joints while being subjected to
10 psig test for a 24-hr. period.
02510-4 PN: 502100708
k. No sagging of vertical and overhead 1 inch wide joints shall be detected while being subjected to temperature of 135 deg. F for period of 5 days.
l. No visible deterioration of compound when immersed separately in solution of acid, alkalis and saturated hydrogen sulfide, for a period of 30 days.
2. Sealing compound shall be supplied in extruded rope-form of suitable cross-section and of such sizes as to seal the joint space when the sections are set in place. The sealing compound shall be protected by a suitable removable two-piece wrapper. The two-piece wrapper shall be so designed that one-half may be removed longitudinally without disturbing the other half to facilitate application of the sealing compound.
3. Joints of manholes shall not be sealed with grout.
F. Non-penetrating lifting holes
1. Lifting holes shall be constructed using plastic inserts cast into the manhole, stopping short of extending all the way through the wall.
2. Plastic inserts and lifting eyes shall be as manufactured by Press-Seal Gasket
Corporation or equal.
G. Pipe Connections to Precast Manhole Bases and/or Sections
1. A flexible pipe-to-manhole connector shall be provided with the manhole.
Preformed rubber boots and fasteners shall be equal to those manufactured by Kor-N-Seal or Press Seal Gasket Corporation. The connector shall provide a water tight seal and accommodate ground movement to prevent pipe shear.
All clamps and miscellaneous metal shall be type 304 stainless steel.
Connectors shall be installed in accordance with manufacturer’s recommendations. No inlet or outlet piping in manholes, valve chambers or wet wells shall be at a manhole section joint. A minimum space of 6 inches from the joint shall be provided.
2.06 RECTANGULAR PRECAST MANHOLES
A. Rectangular precast manholes shall be constructed to the sizes detailed on the
Drawings.
B. Manholes shall be designed in accordance with the Building Code requirements of
ACI 318 and AASHTO H-20 traffic loading.
C. The materials shall conform to the following standards:
1. Concrete shall be 4000 psi using ASTM C150 Type II cement
2. Wire mesh shall conform to ASTM A185
3. Reinforcing rods shall be ASTM A615 grade 60
2.07 FIBERGLASS STRUCTURES
A. Wetwells and manholes shall be one piece units manufactured to meet or exceed all applicable sections of ASTM D3753.
02510-5 PN: 502100708
B. Structures shall be suitable for continuous immersion in raw municipal sewage. This shall include concentrations of H2S found in municipal sewer systems and sulfuric acid.
C. Structures shall be manufactured of 100% premium resin and chopped glass. The structures shall be tested by the manufacturer to a minimum of 80% of the resin manufacturer’s specific hardness for fully cured resin in accordance with Barcol
Hardness.
D. Materials used for construction of the structure shall have the following average material properties:
1. Tensile Modulus – 900,000 psi
2. Flexural Modulus – 900,000 psi
3. Tensile Strength – 10,000 psi
4. Compressive Strength – 20,000 psi
5. Poisson’s Ratio – 0.33
2.08 PUMP STATION WETWELL
A. All wetwells shall be 6 feet in diameters, and larger. 4 foot and 5 foot diameter wetwells shall be used only for special grinder pump applications as approved by the Owner on a case by case basis. The minimum wall thickness for concrete wetwells with liners as follows:
Diameter Wall Thickness
4'-0" 5"
5'-0" 6"
6'-0" 7"
8'-0" 9"
10'-0" 12"
12'-0" 12"
B. All wetwells shall be precast concrete with a full protective liner designed to accommodate the peak hour development flow from all contributing areas.
C. The wetwell shall have a minimum of 4 feet from the lowest invert to the wetwell bottom.
D. The pumps station wetwell size and control equipment shall be designed to limit the pumping cycles of each pump to a maximum of 5 starts per hour for duplex stations and 3 starts per hour for triplex stations.
E. All pump stations shall have a single gravity-flow influent pipe discharging into the wetwell.
F. Multiple gravity pipelines and force mains upstream shall all terminate at a separate manhole before flowing into the pump station wetwell.
02510-6 PN: 502100708
2.09 VALVE CHAMBER
A. A precast valve chamber shall be constructed adjacent to the wetwell.
B. The valve chamber shall have a 2 inch PVC drain installed at a 2 percent slope and with a Tideflex valve installed in the wetwell.
C. The pump out connection shall be equipped with a gate valve and a male aluminum quick-coupler; 4 inch for 4 inch or smaller valve assemblies, 6 inch for all others.
2.10 ENTRANCE HATCHES
A. The lift station wetwell and valve chamber shall be equipped with an aluminum access cover of adequate size to permit easy removal and installation of sewage pumps and equipment.
B. The wetwell access cover shall be a minimum 36” x 48” single or double door.
C. The valve pit access cover shall be a minimum 48” x 48” double door.
D. All access covers shall be constructed of aluminum with a minimum load rating of
300 lbs./sq.ft. and equipped with stainless steel hinges, a recessed lifting handle which lies flush with the door surface, and a stainless steel staple which may be used to secure the door with a padlock when closed. The doors shall have a raised diamond thread pattern to provide a skid-resistant surface and shall open to 90 degrees and lock automatically in that position, with a handle to release the doors for closing.
E. The hatch assemblies shall be as manufactured by U.S. Foundry, Halliday, or an approved equivalent.
PART 3 – EXECUTION
3.01 GENERAL
A. Ground Water
1. All ground water shall be kept away from newly poured concrete until concrete has properly set, and a watertight job is obtained. Manholes which admit ground water after completion, must be repaired to the satisfaction of the
Owner.
B. Line and Grade
1. Where manholes occur in pavements, set top of frame and covers flush with finished surface (not necessarily level). Where manholes occur in dirt roads, set top of frame and cover 6 inches below finished surface. Elsewhere set top of frame and cover 3" above final grade, unless otherwise indicated.
02510-7 PN: 502100708
2. Care shall be taken to have all pipes to and from manholes laid to correct lines and grades as established for the project.
C. Drop Manholes
1. Where shown, drop manholes shall be constructed in accordance with the details shown on the Drawings.
3.02 PRECAST MANHOLES
A. Handling
1. All precast manhole components shall be lifted and moved by use of lifting eyes that are slipped into the insert which are cast into the manhole. The lift system shall not damage the precast manhole.
2. All damage to precast sections shall be thoroughly repaired in the presence of the Owner’s representative. Repair and patching of minor breaks shall be done by chipping and scarifying the defective area before application of grout.
Sufficient time shall be allowed for curing before the precast sections are joined. Cast-in-place concrete bases shall be specially formed and keyed to accommodate the bottom precast section.
B. Site Inspection of Precast Sections
1. Precast sections not conforming to any of the specification requirements shall be rejected. In addition, individual manhole sections may be rejected due to any of the following:
a. Fractures or cracks passing through the wall, except for a single end crack that does not exceed the depth of the joint.
b. Defects that indicate imperfect proportioning, mixing, and molding.
c. Surface defects indicating honey-combed or open texture.
d. Damaged or cracked end, where such damage would prevent making a satisfactory joint.
e. Any continuous crack having a surface width of 0.01 inch (0.25 mm) or more and extending for a length of 12 inches (305 mm) or more, regardless of position in the section wall.
C. Bitumastic Coating (Outside Only)
1. Prior to setting the precast sections in place each section shall have the exterior concrete surface blown free of all dirt and debris and brushed clean and then coated with bitumastic. As an alternative, the bitumastic coating may be applied at the manufacturer's plant in accordance with this Specification.
2. The coating shall be Bitumastic 50 as manufactured by Carboline Co., or equal.
3. At least three coats shall be applied giving a total minimum dry film thickness
(DFT) of 32.0 mils.
4. After installation, damaged surfaces including plugged lifting holes, shall be recoated in accordance with the coating manufacturer's recommendation to give the required minimum 32.0 mils DFT.
5. The Contractor shall provide a certification to the Owner stating that he has installed the exterior manhole, wetwell and valve chamber coatings in
02510-8 PN: 502100708
accordance with the manufacturer's recommendations, and that there is a minimum 32.0 mils DFT of material on all component structures.
D. Placement
1. Manhole sections shall not be set by wedging or placing shims to secure proper level and manholes shall not be backfilled without the approval from the Owner.
E. Masonry Work
1. The top of all precast manholes may be brought to proper grade for receiving manhole frames after paving has been replaced on paved streets by using
HDPE plastic rings, traffic rated. In lieu of the HDPE plastic rings, precast manholes may be brought to grade by the use of no more than two precast concrete extension rings. The total depth of the rings shall not exceed 6 inches. The construction shall be performed by experienced and qualified laborers only. All work shall be laid plumb, straight, square and true. Where manholes are installed in areas with sloped pavement, the manhole ring and cover shall be set flush and in the same plane as the finished surface (not level). Rings shall be laid in full beds of mortar necessary to ensure cover is flush with finished pavement surface. All joints shall be full and not more than
1/2 inch in thickness. The Contractor shall set in place and bond in the masonry all necessary steps and miscellaneous items specified elsewhere.
The masonry walls shall be parged on the outside with a one-half inch coat of
Portland cement mortar.
2. All mortar shall be a mixture of non-shrink grout.
3. Masonry shall not be constructed during cold weather (air temperature below
40 deg. F) unless necessary precautions are observed as permitted by the
Owner.
4. Concrete collar, to be constructed around frame and cover after adjustment.
Concrete strength shall be 3,000 psi.
3.03 FLOW CHANNELS AND BENCH WALLS
A. The method of constructing flow channels and bench walls is dependent on which manhole base (i.e. manhole, wetwell, or valve chamber) has been installed.
B. In precast bases, the flow channels and bench walls in each manhole shall be carefully formed of mortar and concrete. Precast inverts will not be accepted unless specifically approved by the Owner.
C. The minimum depth of flow channel shall be equal to 3/4 the diameter of the largest sewer in the manhole to which it connects. The channel shall be graded to give a smooth, uninterrupted flow through the manhole.
D. Bench walls shall be pitched a minimum of 1 inch but not more than 2 inches per foot from the inside periphery of the manhole to the edge of the flow channel.
3.04 TESTING
02510-9 PN: 502100708
A. Manholes shall be constructed to be completely watertight. The contractor shall test the manhole by one of the following methods:
1. Infiltration Test: If the manhole is located below the groundwater table, the inverts shall be plugged and the infiltration into the manhole shall be measured after a 24-hour period. If any visible infiltration has occurred into the manhole, visible by wet walls or any accumulation on the bench, the infiltration shall be considered excessive.
2. Exfiltration test: If the manhole is above the current groundwater table, an exfiltration test will be conducted. All incoming sewer lines shall be plugged and the manhole filled with water to a level above the highest section joint and allowed to stand for three hours to compensate for potential absorption by dry concrete. After the soaking period, water shall be added as required to raise the water to a level that is above the highest joint section. If the water level drop exceeds 1/8” per vertical foot of manhole depth in 24 hours, the manhole shall have failed the test.
B. As an alternative to infiltration and exfiltration test, concrete sewer manholes could be tested in accordance with test procedure described in ASTM C1244.
END OF SECTION 02510
SECTION 02570
PUMPING STATIONS
02570-1 PN: 502100708
1.01 SCOPE
A. This Section covers the work necessary to furnish, install, test and place in operation the pumps, gauges, and valves for pump stations. Pipe for pump stations shall be installed as shown on the Drawings and as specified herein. Electrical work shall be in accordance with Electrical Sections of these Specifications. All power to pump stations shall be 3 phase, no single phase shall be allowed.
B. Associated wetwell, piping, valves and site work shall be as specified in Sections 02510 and 02571.
1.02 QUALIFICATIONS
A. The pump manufacturer shall have similar units in operation for a minimum of five years in the United States.
1.03 DESIGN REQUIREMENTS
A. Pumps shall be totally submersible, explosion proof, electric motor driven, non-clog, sewage pumps.
B. The pump manufacturer shall review design and layout drawings to ensure that installation arrangements are suitable for their equipment. Any potential conflicts or recommended modification shall be noted on the shop drawings or by a pre-submittal request for information if appropriate. Any modifications required to satisfy manufacturer's recommendations shall be at the Contractor's expense.
C. Operating requirements for pumps shall be as shown in Table 1 of this Section.
D. The operating range of the pump shall include minimum head, rated and shut-off conditions. The pumps shall be non-overloading throughout this operating range.
E. Pump design shall incorporate an automatic discharge connection, allowing each unit to be removed for inspection or service by simply lifting the pump. Re-connection shall require only lowering of the pump into position.
F. Pumps shall be able to fit within the existing wet well without alteration to the wet well.
1.04 FACTORY TESTING
A. The pump manufacturer shall conduct full scale, full range factory performance tests with respect to capacity, head and horsepower on each of the pump units to be provided on this Project. Certified test reports shall be submitted for approval, prior to shipment of the pumps. Tests shall be conducted in accordance with applicable
Hydraulic Institute standards for acceptance Level "2B".
02570-2 PN: 502100708
B. The Owner shall have the option to witness the pump tests. The Owner shall be notified at least two weeks prior to the date of the testing.
1.05 SUBMITTALS
A. Submit shop drawings for all equipment furnished. Specific submittal information shall include:
1. Pump manufacturer's name, pump size or model number, weight and a descriptive bulletin of the pump to be furnished.
2. Outline dimension drawings of the pump.
3. Pump characteristic curves showing head capacity and horsepower, including minimum head, rated and shutoff conditions.
4. Motor manufacturer's name, motor horsepower, RPM and frame size, weight and descriptive bulletin of the motor to be furnished. Include motor manufacturer's certified dimension sheet that lists motor features and include typical motor data sheet.
5. Control panel schematics, panel dimensions and layout, and product data sheets.
B. Operation and maintenance manuals shall be furnished for the equipment.
1.06 STORAGE AND PROTECTION
A. Pumps and accessories shall be stored by the vendor until required for placement in
Madura Five Stormwater Lift Station. Thes items shall be delivered to a location as determined by Santa Rosa County once requested.
B. Pumps shall be completely drained prior to shipment. Suction and discharge ports shall be provided with plastic plugs. Each pump shall be secured to a wooden skid to facilitate handling and storage.
1.07 QUALITY ASSURANCE
A. The manufacturer shall provide a written certification to the Owner that all equipment furnished complies with all applicable requirements of these Specifications. If a conflict is found between the Specifications and/or plans the more stringent shall apply.
2.01 ACCEPTABLE PUMP MANUFACTURERS
A. Pumps shall be as manufactured by KSB or approved equal.
B. All pumps shall be supplied by a single manufacturer.
2.02 PUMP MATERIALS AND CONSTRUCTION
A. Pump Construction
02570-3 PN: 502100708
1. All major castings, including the motor housing, bearing housing, volute and impeller shall be of as a minimum ASTM A48 Class 35 cast iron or 316L stainless steel. The volute and impeller shall be ceramic coated.
2. All major parts, such as the stator casing, oil casing, volute, sliding bracket and discharge connection shall be of gray iron. All exposed bolts and nuts shall be
316L stainless steel. All mating surfaces of major parts shall be machined and fitted with rubber O ring seals where watertight sealing is required. All parts shall be interchangeable and watertight sealing shall not require additional machining of replacement parts, sealing compounds, or the application of specific torques to connectors.
3. No portion of the pump unit shall bear directly on the floor of the wet well. There shall be no more than one 90 degree bend allowed between the volute discharge flange and station piping.
4. A sliding guide bracket shall be an integral part of the pump unit. The volute casing shall have a machined discharge flange which automatically connects directly to, or through an intermediate coupling to a discharge base. The discharge base shall be bolted to the floor of the sump and shall have a flanged connection to the discharge piping. There shall be no need for adjustment, fasteners, clamps, or other devices to connect the pump to the discharge base.
B. Impeller
1. The pump shall be provided with wear rings of 400 series stainless steel having a Brinell Hardness Rating of a minimum 300. The impeller shall have a Brinell
Hardness Rating of 200 minimum, of non-clogging design, capable of handling
3-inch diameter solids, fibrous material, heavy sludge and other matter found in normal sewage applications.
2. The impeller shall be constructed with a long through let without acute turns.
The impeller shall be dynamically balanced. Static and dynamic balancing operations shall not deform or weaken it. The impeller shall be a slip fit or taper fit to the shaft and key driven. Non corroding fasteners shall be used.
C. Abrasion resistance
1. All parts exposed to abrasive wear, case and impeller shall have a minimum
Brinell hardness of 200 and ceramic coated.
D. Shaft Seals
1. Each pump shall be provided with a mechanical, rotating shaft seal system running in an oil reservoir having separate, constantly hydro dynamically lubricated, lapped seal faces. The lower seal unit between the pump and oil chamber shall contain one stationary and one positively driven, rotating tungsten carbide or silicon carbide ring. The upper seal unit between the oil sump and motor housing shall contain one stationary tungsten carbide or silicon carbide ring and one positively driven rotating tungsten carbide ring.
2. Each interface shall be held in contact by its own independent spring system, supplemented by external liquid pressures. The seals shall require neither maintenance nor adjustment, but shall be easily inspected and replaceable.
02570-4 PN: 502100708
No seal damage shall result from operating the pumping unit out of its liquid environment. The seal system shall not rely upon the pumped media for lubrication. The oil reservoir shall have a drain and inspection plug, with positive seal, which shall be easily accessible from outside the pump.
3. A leakage sensing system shall be provided to detect the intrusion of moisture in either the seal chamber or stator housing.
2.03 GUIDE BARS
A. Guide bars shall be 316L stainless steel pipe or structural section attached to the automatic discharge connection at their lower end and to an upper 316L stainless steel guide bar bracket at their upper end. Intermediate 316L stainless steel guide bar supports shall be provided as required to insure a rigid installation. Guide bars shall not support any of the weight of the pump. Any anchors or brackets shall be 316L stainless steel. Guide bars shall be fastened with 316L anchors and not attached to piping.
2.04 MOTOR
A. Pump Motor
1. The submersible motor shall be housed in a completely watertight and oil filled chamber. The pump manufacturer shall submit certification that the motor shall be suitable for use in Class I, Division I, Group D atmospheres as Explosion Proof. The motor stator shall use at minimum Class F insulation warranted for 311 degrees F.