MAIN ELECTRICAL GEAR UPGRADE
Solicitation number
CCSD-IFB021726
Issued by
Cache County, Utah

About this file

This is a cost sheet attachment for Solicitation #CCSD-IFB021726 issued by Cache County School District for upgrades to the main service switchboard at Millville Elementary School located at 67 S Main Street, Millville, Utah 84326. The solicitation seeks a qualified vendor to provide a 1600A Service Entrance Switchboard/Switchgear upgrade to the electrical service at the school. Bidders are required to submit detailed bills of materials listing all components, a detailed list of electrical equipment with specifications referenced in Section VIII of the bid documents, and a lump sum price including freight for the work.

The cost sheet requires bidders to provide two separate lump sum pricing entries—one for the bill of materials and one for the detailed electrical equipment—with a total cost of job calculation. Bidders must complete all required fields including firm name, authorized signature, contact person name and title, telephone number, email address, and submission date. All pricing must include freight costs. Inquiries regarding the bid should be directed to Karma Leatham at karma.leatham@ccsdut.org.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

COST SHEET - Solicitation #CCSD-IFB021726

Location:

Millville Elementary

67 S Main St

Millville, UT 84326

NAME OF BIDDER __________________________________________

The undersigned, having carefully examined the bid documents, hereby proposes and agrees to provide upgrades to the main service switchboard at Millville Elementary School.

Bill of Materials (Detailed List of components):

Lump Sum Price, including freight $______________________________

Karma Leatham @KARMA.LEATHAM@CCSDUT.ORG Please view this document. You can also add comments.

Detailed List of Electrical Equipment (Specs listed in section VIII):

Lump Sum Price, including freight $______________________________

Total Cost of Job $________________________________________________

Submitted by:

Firm Name Authorized Signature

Name Title

Telephone Number Email address

Date

NAME OF BIDDER:
Bill of Materials Detailed List of components 1:
Bill of Materials Detailed List of components 2:
Bill of Materials Detailed List of components 3:
Bill of Materials Detailed List of components 4:
Bill of Materials Detailed List of components 5:
Bill of Materials Detailed List of components 6:
Bill of Materials Detailed List of components 7:
Bill of Materials Detailed List of components 8:
Bill of Materials Detailed List of components 9:
Bill of Materials Detailed List of components 10:
Bill of Materials Detailed List of components 11:
Bill of Materials Detailed List of components 12:
Bill of Materials Detailed List of components 13:
Bill of Materials Detailed List of components 14:
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:
Lump Sum Price including freight:
Detailed List of Electrical Equipment Specs listed in section VIII 1:
Detailed List of Electrical Equipment Specs listed in section VIII 2:
Detailed List of Electrical Equipment Specs listed in section VIII 3:
Detailed List of Electrical Equipment Specs listed in section VIII 4:
Detailed List of Electrical Equipment Specs listed in section VIII 5:
Detailed List of Electrical Equipment Specs listed in section VIII 6:
Detailed List of Electrical Equipment Specs listed in section VIII 7:
Detailed List of Electrical Equipment Specs listed in section VIII 8:
Detailed List of Electrical Equipment Specs listed in section VIII 9:
Detailed List of Electrical Equipment Specs listed in section VIII 10:
1_2:
2_2:
3_2:
4_2:
5_2:
6_2:
7_2:
8_2:
9_2:
10_2:
Lump Sum Price including freight_2:
Total Cost of Job:
Submitted by:
Firm Name:
Name:
Telephone Number:
undefined:
Title:

File details come from the government source that posted it. Updated .