4-CDBG Instructions for Bidders FINAL - PennBid.docx.pdf
PDF 126 KB Posted
- Attached to
- Northern Dauphin County YMCA Gym Floor Project
- Solicitation number
- Not on record
- Issued by
- Dauphin County, Harveys Lake Borough, Pennsylvania
About this file
This is an Instructions to Bidders document for a construction contract issued by the Harrisburg Area YMCA, located in Northern Dauphin County, Pennsylvania, for the renovation of the gymnasium at 500 N. Church Street, Elizabethville, PA 17023. The project involves removal of the current gymnasium floor, painting the gymnasium, installation of a new HVAC system, and replacement of the current curtain divider and backstop pads. Sealed bids must be submitted electronically via the PennBid Program no later than 12:00 PM on Monday, July 27, 2026. A non-mandatory pre-bid conference will be held on Friday, July 17, 2026, at 11:00 AM at the Northern Dauphin County YMCA to allow bidders to examine project documentation and ask questions. Bids will be publicly reviewed and announced on the Harrisburg Area YMCA website on Friday, July 31, 2026, at 12:00 PM. The Successful Bidder must execute the Agreement and furnish required bonds and insurance documentation within 15 days of the Notice of Award, with Owner delivering one fully executed counterpart of the Agreement within 10 days thereafter.
Bidders must submit bids on a lump sum basis and provide bid security equal to 10 percent of the maximum bid price in the form of a certified check or bid bond. The project is funded by Dauphin County, with a sign designating Dauphin County as the funding source to be displayed at the project site. All bids must comply with federal labor standards provisions under 29 CFR 5, Section 3 of the Housing and Urban Development Act of 1974, Section 109 of the Housing and Community Development Act of 1974, non-segregated facilities certification, Equal Opportunity provisions under Executive Order 11246, and Minority Business Enterprise and Women Business Enterprise provisions. Bidders must demonstrate Pennsylvania authorization to do business, provide state contractor license numbers if applicable, submit qualifications information within five days of the Owner's request, complete a Non-Collusion Affidavit, and submit a Public Works Employment Verification Form as required under Pennsylvania's Act 127 of 2012. Owner reserves the right to reject any or all bids and will award the contract to the responsible bidder submitting the lowest responsive bid.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Article 1-Defined Terms
Article 2-Bidding Documents
Article 3-Qualifications of Bidders
Article 4-Pre-Bid Conference
Article 5-Site, Existing Conditions
Article 6-Bidders Representation and Certifications
Article 7-Interpretations and Addenda
Article 8-Bid Security
Article 9-Contract Times
Article 10-Subsitute and “Or Equal” Items
Article 11-Subcontractors, Suppliers, and Others
Article 12-Preparation of Bid
Article 13-Basis of Bid
Article 14-Submital of Bid
Article 15-Modication and Withdrawal of Bid
Article 16-Opening of Bids
Article 17-Bids to Remain Subject to Acceptance
Article 18-Evaluation of Bids and Award of Contract
Article 19-Bonds and Insurance
Article 20-Signing of Agreement
Article 21-Representation of Funding Source
ARTICLE 1—DEFINED TERMS
1.1 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.
ARTICLE 2—BIDDING DOCUMENTS
2.1 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.2 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.3 Owner recommends the Bidder register on the PennBid portal at https://pennbid.bonfirehub.com/and obtain a complete set of the Bidding Documents which are available at no cost from such website. Bidders may rely on Bidding Documents obtained from the PennBid portal are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.1 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within five days of Owner’s request, Bidder must submit the following information:
A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.
https://pennbid.bonfirehub.com/
B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.
C. Bidder’s state or other contractor license number, if applicable.
D. Subcontractor and Supplier qualification information.
E. Other required information regarding qualifications.
3.2 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.3 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.4 The Owner will not award any Contract to a Bidder that has been debarred by the Pennsylvania Department of Labor and Industry for noncompliance with the Pennsylvania Prevailing Wage Act (43 P.S. §165.17).
3.5 If any portion of the Work is to be accomplished on rights-of-way of the Pennsylvania Department of Transportation or under a PENNDOT permit, the owner will not award any Contract to a bidder that has been debarred under Title 67, Chapter 459.3(1).
3.6 When so required in the Bid Form, each bidder must provide evidence of Pennsylvania Department of Transportation Prequalification for the indicated types of Work.
3.7 All Bidders must complete and execute the enclosed Non-Collusion Affidavit.
This Affidavit is material to any Contract awarded pursuant to this project and is in accordance with Pennsylvania Antibid-Rigging Act, 62 P.S. §4501 et seq. The Affidavit should be executed by an officer or the person approved to sign the Bid.
In the case of joint ventures, all parties must execute separately. Failure to file an Affidavit in compliance with these instructions may result in disqualification of the bid.
3.8 This Project falls under The Commonwealth of Pennsylvania enacted Act 127 of 2012, known as the Public Works Employment Verification Act (‘the Act’) which requires all Public Work Contractors and Subcontractors to utilize the Federal Government’s E-Verify system to ensure that all employees performing work on Public Work Projects are authorized to work in the United States. All Bidders are required to submit a Public Works Employment Verification Form (00 45 46) as a precondition for the Contract Award.
ARTICLE 4—PRE-BID CONFERENCE
4.1 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Owner and team will be present to discuss the project. Bidders are encouraged to attend and participate in the conference; however, attendance at this conference is not required to submit a bid.
4.2 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE, EXISTING CONDITIONS
5.1 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.2 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. Asbestos testing has been completed for the project site. The results of the asbestos inspection and testing report are available and can be provided upon request. No additional known hazardous environmental conditions have been identified at this time.
5.3 Other Site-related Documents
A. No other Site-related documents are available
5.4 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
D. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder must clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.1 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.1 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.
7.2 Bidder shall submit all questions about the meaning or intent of the Bidding Documents via the “Ask a Question” feature in PennBid no later than the date and time indicted in the Advertisement to Bid.
7.3 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda via the PennBid portal and posted on PennBid. Bidders who have registered with and downloaded documents from PennBid will be notified by email when an addendum has been posted.. Questions received less than seven days prior to the date for opening of Bids may not be answered. 7.4 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect.
Responses to questions are not part of the Contract.
Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
ARTICLE 8-BID SECURITY
8.1 A Bid must be accompanied by Bid security made payable to Owner in an amount of 10 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check or a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.
8.2 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.3 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.4 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening
ARTICLE 9—CONTRACT TIMES
9.1 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.1 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.2 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.1 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
11.2 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work within five days after Bid opening.
11.3 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
11.4 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.
ARTICLE 12—PREPARATION OF BID
12.1 The Bid Form is included with the Bidding Documents for Reference. Bidders shall complete the electronic bid form within PennBid (“Prepare Your Submission” tab).
12.3 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
12.4 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.5 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.6 A Bid by an individual must show the Bidder’s name and official address.
12.7 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.8 All names must be printed in ink below the signatures.
12.9 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
ARTICLE 13—BASIS OF BID
13.1 Lump Sum
A. Bidders must submit a Bid on a lump sum basis as set forth in the Bid Form.
ARTICLE 14—SUBMITTAL OF BID
14.1 Sealed bids are to be submitted online via the PennBid Program (https://pennbid.bonfirehub.com). Bidders can submit, update, and withdraw bids until the date and time described in the Advertisement for Bids. All bidders shall submit all executed documents included with the bids in original form via PennBid by Monday, July 27, 2026 at noon.
14.2 Bids received after the date and time prescribed for the opening of bids, or not submitted in the designated manner, will not be accepted.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.1 A Bid may be withdrawn, altered or modified at any time within PennBid prior to the due date and time identified in the Invitation for Bids.
15.2 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.3 If within two business days after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 16—OPENING OF BIDS
16.1 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. A summary of bids received will be issued via a Public Notice on PennBid shortly after bid opening, the time of which is listed in the Invitation to Bid. It should be noted that bid results are subject to further review and should not be construed as issuance of an award.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.1 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.1 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids.
Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.2 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.3 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.4 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.5 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
18.6 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.7 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.1 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.2 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process
ARTICLE 20—SIGNING OF AGREEMENT
20.1 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 21- Representation of Funding Source
21.1 A sign will be made visible at the project site (500 N. Church Street, Elizabethville, PA 17023) designating Dauphin County as the funding source for the project.