4-BidTab BID-218-25.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Electrical Gear for New Boulder Hub
- Solicitation number
- BID-218-25
- Issued by
- Boulder County, Colorado
About this file
This is a bid tabulation form for Boulder County, Colorado, documenting electrical equipment procurement for the new Boulder Hub facility. The project involves the replacement of aged electrical infrastructure in a 20-year-old building with standardized Eaton CH or G.E. ABB equipment. The scope includes eight line items: high voltage and low voltage panel boards measured in linear feet and lump sum quantities, multiple transformers ranging from 30 KVA to 75 KVA capacity, a 1600-ampere Main Distributor Panel (MDP) rated at 65 KAIC in a NEMA 3R enclosure, a 50 kilowatt/62.5 kilovoltampere 277/480-volt natural gas generator, and a 100-ampere NEMA 3R transfer switch compatible with Cummins, Caterpillar, or Kohler manufacturers. All electrical equipment must feature copper bussing and copper windings with high efficiency transformer specifications.
The bid tabulation form contains line items with unit designations and cost columns for total pricing, though specific pricing data is not populated in the document provided. All equipment is restricted to Eaton CH or G.E. ABB brands with no substitutions permitted, ensuring standardization across the facility's electrical infrastructure. Boulder County's procurement process and additional project details are available through the county's procurement department at procurement@bouldercounty.gov. The document was generated on February 24, 2021, and follows Boulder County's standard bid tabulation format (Form F010).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Vendor Information for Bonfire - Fillable.pdf | ||
| 2-Public Opening Information.pdf | ||
| 3-Boulder County Community Hub Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Tab
| BID- |
| New Electirical Switch gear panel boards and transformers |
| BC |
| BID TABULATION |
| BID-218-25 |
| ITEM | ITEM | UNIT | TOTAL | UNIT | TOTAL |
| NO. | DESCRIPTION | UNITS | COST | COST | |
| 1 | Panel HHV-HLV | LF | 58 | ||
| 2 | Panel HV1-LV1A1-H134-L134-LV1-LV1A | LS | 1 | ||
| 3 | Panel HV2-LV2A-LV2B LV2D | LS | 1 | ||
| 4 | Panel: LS1-LS2 | LS | 1 | ||
| 5 | Transformers THLV-30KVA TLV1A1-75KVA TLV1- 75KVA TL134 75KVA TS1-45KVA 2nd floor TLV2A 75 KVA TLV2B 75KVA | LS | 1 | ||
| 6 | MDP 1600a Nema 3R 65KAIC rated (see all note) | LS | 1 | ||
| All equipment shall have copper bussing and copper windings, high efficiency trancformers. | |||||
| 7 | 50KW/62.5 KVA 277/480volt natural gas generator (see notes) | ||||
| 8 | 100a nema 3r transfer switch 4pole | ||||
| Cummings/ Catipiller/Kohler | |||||
| TOTAL BID | |||||
| All Electrical equipment to be Eaton CH or GE ABB no substitutes. |
&"-,Regular"&8&F, &A 02/24/21 &"-,Regular"&8Form F010 Page &P of &N
File details come from the government source that posted it. Updated .