This is a bid tabulation document for the Fruit Heights City Harvey Park Pickleball Courts Construction project located in Utah. The project involves comprehensive site development and pickleball court construction, including removal of existing infrastructure (storm drain pipe, concrete flatwork, curb and gutter, and asphalt), earthwork operations (445 cubic yards of cut and 254 cubic yards of fill across 18,500 square feet), installation of new storm drain systems, construction of 4,000 square feet of new concrete sidewalk, new concrete stairs with handrails, and the primary scope of new post-tension pickleball courts with fencing. Secondary project elements include pickleball power and lighting systems, four park benches, and landscape replacement planning. Questions regarding the bidding documents were due by August 26, 2026, at 5:00 PM MT, with bid submissions required by September 2, 2026, at 10:00 AM MT to the Office of the City Engineer at 6080 Fashion Point Drive, South Ogden, Utah. Bidding documents were available online through www.jonescivil.com, with inquiries directed to Seth Stanton at seths@jonescivil.com.

The bid tabulation reflects eleven competing contractors with base bid totals ranging from $377,698.94 to $557,243.99. Significant cost variation exists across line items, particularly for the new post-tension pickleball courts (ranging from $159,311.00 to $275,000.00), pickleball power and lighting systems (ranging from $32,000.00 to $78,051.94), and landscape replacement planning (ranging from $10,000.00 to $54,269.89). The engineer's estimate established baseline costs for comparison against submitted bids. Notable bidders include MSCI, Leon Poulsen Construction, Braegger & Sons, E.K. Bailey, ACME, Next Construction, Phillips & Co., Gladwell Construction, Hadfield Construction, Beck Construction & Excavation, and Wasatch West Contracting. The project's primary cost drivers are the pickleball court construction, electrical and lighting infrastructure, and site preparation work, with mobilization costs ranging from $1.00 to $91,551.72 across bidders.

View the file

Other files

File Type Posted
2-2026-08-26 Addendum 1.pdf PDF
1-Advertisement (FHC Harvey Park).docx DOCX document
3-000 U3P Courtesy Posting Closed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item M&P Description Qty Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total

1 MP001 Mobilization 1 ls 10,000.00$ 10,000.00$ 31,371.48$ 31,371.48$ 9,000.00$ 9,000.00$ 7,500.00$ 7,500.00$ 30,232.00$ 30,232.00$ 35,000.00$ 35,000.00$ 36,825.00$ 36,825.00$ 2 MP002 SWPPP 1 ls 15,000.00$ 15,000.00$ 2,805.84$ 2,805.84$ 250.00$ 250.00$ 5,500.00$ 5,500.00$ 5,250.00$ 5,250.00$ 3,100.00$ 3,100.00$ 6,875.00$ 6,875.00$ 3 MP200 Remove Existing Storm Drain Pipe 138 lf 25.00$ 3,450.00$ 12.94$ 1,785.72$ 49.00$ 6,762.00$ 30.00$ 4,140.00$ 26.00$ 3,588.00$ 51.00$ 7,038.00$ 22.25$ 3,070.50$ 4 MP603a Remove Concrete Flatwork (sidewalk or park strip) 40 sf 8.00$ 320.00$ 16.79$ 671.60$ 20.00$ 800.00$ 20.00$ 800.00$ 14.50$ 580.00$ 13.25$ 530.00$ 12.50$ 500.00$ 5 MP604 Remove Curb and Gutter 20 lf 20.00$ 400.00$ 33.57$ 671.40$ 50.00$ 1,000.00$ 40.00$ 800.00$ 40.00$ 800.00$ 7.85$ 157.00$ 15.00$ 300.00$ 6 MP600 Saw Cut Asphalt 65 lf 10.00$ 650.00$ 6.66$ 432.90$ 5.00$ 325.00$ 5.00$ 325.00$ 10.00$ 650.00$ 11.50$ 747.50$ 7.00$ 455.00$ 7 MP602 Remove Asphalt 105 sf 7.00$ 735.00$ 9.98$ 1,047.90$ 30.00$ 3,150.00$ 8.00$ 840.00$ 7.50$ 787.50$ 2.50$ 262.50$ 5.00$ 525.00$ 8 MP204a Plug Existing Manhole at Former Pipe Connection 1 ea 1,200.00$ 1,200.00$ 604.80$ 604.80$ 1,150.00$ 1,150.00$ 1,200.00$ 1,200.00$ 450.00$ 450.00$ 1,300.00$ 1,300.00$ 500.00$ 500.00$ 9 MP500 Clear and Grub 18,500 sf 0.50$ 9,250.00$ 0.82$ 15,170.00$ 0.75$ 13,875.00$ 1.10$ 20,350.00$ 1.15$ 21,275.00$ 1.00$ 18,500.00$ 0.42$ 7,770.00$

10 MP502 Earthwork (approx. 445 cy cut; 254 cy fill) 1 ls 11,000.00$ 11,000.00$ 12,047.62$ 12,047.62$ 14,000.00$ 14,000.00$ 24,000.00$ 24,000.00$ 7,840.00$ 7,840.00$ 22,750.00$ 22,750.00$ 19,650.00$ 19,650.00$ 11 MP211u New Storm Drain Catch Basin 1 ea 3,000.00$ 3,000.00$ 3,861.31$ 3,861.31$ 9,000.00$ 9,000.00$ 8,500.00$ 8,500.00$ 3,650.00$ 3,650.00$ 5,235.00$ 5,235.00$ 5,630.00$ 5,630.00$ 12 MP632 New Curb and Gutter 10 lf 25.00$ 250.00$ 146.15$ 1,461.50$ 100.00$ 1,000.00$ 220.00$ 2,200.00$ 160.00$ 1,600.00$ 82.00$ 820.00$ 150.00$ 1,500.00$ 13 MP633a New Concrete Sidewalk 4,000 sf 17.00$ 68,000.00$ 8.60$ 34,400.00$ 12.00$ 48,000.00$ 10.00$ 40,000.00$ 7.25$ 29,000.00$ 8.50$ 34,000.00$ 7.10$ 28,400.00$ 14 MP637 New Concrete Stairs w/ Handrail 1 ls 10,000.00$ 10,000.00$ 9,406.02$ 9,406.02$ 26,000.00$ 26,000.00$ 27,000.00$ 27,000.00$ 10,360.00$ 10,360.00$ 12,785.00$ 12,785.00$ 18,652.00$ 18,652.00$ 15 MP205 New 8" SDR-35 Storm Drain Pipe 87 lf 24.00$ 2,088.00$ 51.06$ 4,442.22$ 48.00$ 4,176.00$ 120.00$ 10,440.00$ 65.00$ 5,655.00$ 61.00$ 5,307.00$ 65.00$ 5,655.00$ 16 MP818 New Post Tension Pickleball Courts (includes fencing) - Sheet C3 1 ls 240,000.00$ 240,000.00$ 175,080.20$ 175,080.20$ 176,000.00$ 176,000.00$ 191,173.56$ 191,173.56$ 192,560.00$ 192,560.00$ 175,000.00$ 175,000.00$ 175,242.00$ 175,242.00$ 17 MP850a Pickleball Power and Lighting (conduit, lights, timers, etc) - Sheet E1 1 ls 32,000.00$ 32,000.00$ 47,336.40$ 47,336.40$ 61,000.00$ 61,000.00$ 36,910.04$ 36,910.04$ 56,433.00$ 56,433.00$ 55,000.00$ 55,000.00$ 69,500.00$ 69,500.00$ 18 MP819a 8' Park Bench 4 ea 1,000.00$ 4,000.00$ 368.70$ 1,474.80$ 1,300.00$ 5,200.00$ 2,000.00$ 8,000.00$ 450.00$ 1,800.00$ 1,435.00$ 5,740.00$ 1,596.00$ 6,384.00$ 19 MP713 Landscape replacement plan - Sheet C5 1 ls 10,000.00$ 10,000.00$ 32,887.43$ 32,887.43$ 18,000.00$ 18,000.00$ 24,000.00$ 24,000.00$ 42,560.00$ 42,560.00$ 32,000.00$ 32,000.00$ 27,652.00$ 27,652.00$ 20 MP613 Manhole Collar 1 ea 1,000.00$ 1,000.00$ 739.80$ 739.80$ 500.00$ 500.00$ 1,500.00$ 1,500.00$ 1,375.00$ 1,375.00$ 1,500.00$ 1,500.00$ 1,800.00$ 1,800.00$

6 - Next Construction 2 - Leon Poulsen Construction1 - MSCI 3 - Braegger & Sons

415,178.60$

4. E.K. Bailey 5 - ACME

416,445.50$ 416,772.00$

ENGINEER'S ESTIMATE

BID TABULATION

Fruit Heights City | Harvey Park Pickleball Courts Bid Opening: September 2, 2026

416,885.50$ TOTAL BASE BID 422,343.00$ 377,698.94$ 399,188.00$

Item M&P Description Qty Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 MP001 Mobilization 1 ls 21,600.00$ 21,600.00$ 1.00$ 1.00$ 19,500.00$ 19,500.00$ 22,500.00$ 22,500.00$ 91,551.72$ 91,551.72$ 2 MP002 SWPPP 1 ls 2,850.00$ 2,850.00$ 3,500.00$ 3,500.00$ 3,472.00$ 3,472.00$ 5,500.00$ 5,500.00$ 4,847.07$ 4,847.07$ 3 MP200 Remove Existing Storm Drain Pipe 138 lf 69.71$ 9,619.98$ 10.65$ 1,469.70$ 62.00$ 8,556.00$ 30.00$ 4,140.00$ 36.74$ 5,070.12$ 4 MP603a Remove Concrete Flatwork (sidewalk or park strip) 40 sf 30.00$ 1,200.00$ 10.65$ 426.00$ 37.50$ 1,500.00$ 5.00$ 200.00$ 25.24$ 1,009.60$ 5 MP604 Remove Curb and Gutter 20 lf 20.00$ 400.00$ 28.38$ 567.60$ 30.00$ 600.00$ 10.00$ 200.00$ 25.24$ 504.80$ 6 MP600 Saw Cut Asphalt 65 lf 20.00$ 1,300.00$ 1.72$ 111.80$ 14.00$ 910.00$ 4.00$ 260.00$ 16.72$ 1,086.80$ 7 MP602 Remove Asphalt 105 sf 15.00$ 1,575.00$ 13.09$ 1,374.45$ 12.00$ 1,260.00$ 4.00$ 420.00$ 25.24$ 2,650.20$ 8 MP204a Plug Existing Manhole at Former Pipe Connection 1 ea 5,500.00$ 5,500.00$ 3,638.73$ 3,638.73$ 3,700.00$ 3,700.00$ 775.00$ 775.00$ 965.79$ 965.79$ 9 MP500 Clear and Grub 18,500 sf 1.00$ 18,500.00$ 0.90$ 16,650.00$ 0.85$ 15,725.00$ 1.75$ 32,375.00$ 0.24$ 4,440.00$

10 MP502 Earthwork (approx. 445 cy cut; 254 cy fill) 1 ls 42,806.00$ 42,806.00$ 42,353.00$ 42,353.00$ 33,150.00$ 33,150.00$ 16,000.00$ 16,000.00$ 36,434.51$ 36,434.51$ 11 MP211u New Storm Drain Catch Basin 1 ea 7,500.00$ 7,500.00$ 13,952.84$ 13,952.84$ 7,995.00$ 7,995.00$ 5,900.00$ 5,900.00$ 5,794.75$ 5,794.75$ 12 MP632 New Curb and Gutter 10 lf 120.00$ 1,200.00$ 650.00$ 6,500.00$ 60.00$ 600.00$ 50.00$ 500.00$ 51.58$ 515.80$ 13 MP633a New Concrete Sidewalk 4,000 sf 9.96$ 39,840.00$ 12.00$ 48,000.00$ 12.80$ 51,200.00$ 11.00$ 44,000.00$ 13.54$ 54,160.00$ 14 MP637 New Concrete Stairs w/ Handrail 1 ls 27,800.00$ 27,800.00$ 18,000.00$ 18,000.00$ 10,134.00$ 10,134.00$ 6,045.00$ 6,045.00$ 11,362.79$ 11,362.79$ 15 MP205 New 8" SDR-35 Storm Drain Pipe 87 lf 75.00$ 6,525.00$ 78.02$ 6,787.74$ 70.00$ 6,090.00$ 80.00$ 6,960.00$ 48.29$ 4,201.23$ 16 MP818 New Post Tension Pickleball Courts (includes fencing) - Sheet C3 1 ls 159,311.00$ 159,311.00$ 198,500.00$ 198,500.00$ 209,530.00$ 209,530.00$ 275,000.00$ 275,000.00$ 192,327.01$ 192,327.01$ 17 MP850a Pickleball Power and Lighting (conduit, lights, timers, etc) - Sheet E1 1 ls 58,611.00$ 58,611.00$ 50,000.00$ 50,000.00$ 52,394.00$ 52,394.00$ 56,475.00$ 56,475.00$ 78,051.94$ 78,051.94$ 18 MP819a 8' Park Bench 4 ea 1,365.00$ 5,460.00$ 1,365.38$ 5,461.52$ 2,050.00$ 8,200.00$ 2,000.00$ 8,000.00$ 1,648.58$ 6,594.32$ 19 MP713 Landscape replacement plan - Sheet C5 1 ls 18,904.00$ 18,904.00$ 14,000.00$ 14,000.00$ 19,954.00$ 19,954.00$ 40,000.00$ 40,000.00$ 54,269.89$ 54,269.89$ 20 MP613 Manhole Collar 1 ea 3,260.00$ 3,260.00$ 2,845.88$ 2,845.88$ 1,900.00$ 1,900.00$ 700.00$ 700.00$ 1,405.65$ 1,405.65$

525,950.00$ 557,243.99$ 433,761.98$ 434,140.26$ 456,370.00$

7 - Phillips & Co. 8 - Gladwell Construction 9 - Hadfield Construction 10 - Beck Construction

& Excavation 11 - Wasatch West Contracting

TOTAL BASE BID

BID TABULATION

Fruit Heights City | Harvey Park Pickleball Courts Bid Opening: September 2, 2026

File details come from the government source that posted it. Updated .