UDOT Region 1 Saleratus Creek Mitigation Site
Solicitation number
UDOT270106CN
Issued by
Davis County, Utah

About this file

This is a Cost Sheet for a vegetation control contract issued by the Utah Department of Transportation (UDOT) Region 1 for the Saleratus Creek Mitigation Site, a wetland maintenance project located in Davis and Weber Counties, Utah. The contract encompasses ongoing noxious and invasive weed control activities along with potential additional work including mowing, tree and shrub removal, reseeding, and riparian plant replacement. The cost sheet provides bidding line items organized into three sections: Section 7.1 covers primary scope of work items including Target Plant Species (TPS) Control (annual lump sum), Tractor Mowing (per acre), Walk-Behind Brush Mower (per acre), and Trimmer (per acre); Section 7.2 identifies the low-bid estimate and contract award total; and Section 7.3 lists 15 optional additional work items only to be performed upon UDOT request, including reseeding for three habitat types and planting of various native species such as serviceberry, dogwood, chokecherry, currant, willow, and cottonwood. A mandatory virtual pre-bid meeting is scheduled for Tuesday, November 24, 2026, from 11:00 AM to 12:00 PM. The contract may result in multiple five-year contracts with renewal options.

Award will be granted to the lowest responsive and responsible bidder based solely on the costs submitted in Section 7.1 and 7.2 of the Cost Sheet; pricing provided in Section 7.3 for optional work items will not be used in calculating the low-bid estimate or determining contract award. Contract compensation will be based on the actual amount of each work item completed at the bid prices provided by the contractor. All bids must reference Solicitation #UDOT270106CN and be submitted in accordance with the State of Utah Procurement Code and Utah Administrative Code.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Sheet

2027 Scope of Work
Saleratus Creek Mitigation Site - Vegetation Control Contract
CONTRACTOR BID COST SHEET
7.1 Scope of Work Bid Prices & 7.2 Low-Bid Estimate
Item #Item NameCostUnit
7.1 A.1Target Plant Species (TPS) Control$ - 0Annual Lump Sum
7.2 B (Low-Bid Estimate and Contract Award) =$ - 0Annual Lump Sum
7.1 B.1Tractor Mowing$ - 0per Acre
7.1 B.2Walk-Behind Brush Mower$ - 0per Acre
7.1 B.3Trimmer$ - 0per Acre
7.3 Additional Work Items (only as requested by UDOT, see Part 5)
Item #Item NameCostUnit
7.3 A.1Re-seed Roadside/Upland (Mix A)Habitat Areas$ - 0per 1/10th Acre
7.3 A.2Re-seed Wet Meadow (Mix D) Habitat Areas$ - 0per 1/10th Acre
7.3 A.3Re-seed Emergent Marsh (Mix C) Habitat Areas$ - 0per 1/10th Acre
7.3 B.1Utah Serviceberry (Amelanchier utahensis), #1 container size$ - 0per Each
7.3 B.2Red-osier Dogwood (Cornus sercia), #1 container size$ - 0per Each
7.3 B.3Chokecherry (Prunus virginiana), #1 container size$ - 0per Each
7.3 B.4Three-leaf Sumac (Rhus trilobata), #1 container size$ - 0per Each
7.3 B.5Golden Currant (Ribes aureum), #1 container size$ - 0per Each
7.3 B.6Wood’s Rose (Rosa woodsii), #1 container size$ - 0per Each
7.3 B.7Silver Buffaloberry (Shepherdia argentea), #1 container size$ - 0per Each
7.3 B.8Coyote Willow (Salix exigua), Live Cutting$ - 0per Each
7.3 B.9Bebb’s Willow (Salix bebbiana), Live Cutting$ - 0per Each
7.3 B.10Yellow Willow (Salix lutea), Live Cutting$ - 0per Each
7.3 B.11Peachleaf Willow (Salix amygdaloides), Pole Planting$ - 0per Each
7.3 B.12Fremont Cottonwood (Populus fremontii), Pole Planting$ - 0per Each
7.3 B.13Fremont Cottonwood (Populus fremontii), #5 container$ - 0per Each
7.3 B.14Narrowleaf Cottonwood (P. angustifolia), Pole Planting$ - 0per Each
7.3 B.15Narrowleaf Cottonwood (P. angustifolia), #5 container$ - 0per Each
Notes regarding Costs and UDOT Award Total (i.e., Low-Bid Total)
1. See Part 7.2 for UDOT Contract Award procedures
2. Bid Prices in 7.3 will not be use to calculate the Low-Bid Estimate or contract award.
3. Contract work will be paid based amount of each work item completed and bid prices provided in Contractor Bid Cost Sheet.