This is a Scope of Work document prepared by the Utah Department of Transportation (UDOT), Region 1, for vegetation control and maintenance services at the Saleratus Creek mitigation site located near Woodruff in Rich County, Utah. The contract requires contractors to provide noxious and invasive weed control, with potential additional work including mowing, reseeding, and riparian plant replacement across approximately 5.094 acres (comprising 0.50 acres of upland habitat, 3.70 acres of wetland habitat, and 0.90 acres of stream channel). A mandatory virtual pre-bid meeting is scheduled for Tuesday, November 24, 2026, from 11:00 a.m. to 12:00 p.m. via Google Meet. This is a requirements-based annual contract with a maximum term of five years that can be terminated by either party with written notice by December 31st of the current year. The contract award will be determined based on the lowest responsive and responsible bid using the Target Plant Species (TPS) Control annual lump-sum cost as the primary evaluation criterion.
Contractors must meet mandatory minimum requirements including current Utah state pesticide applicator licensure with aquatic certification, a minimum of five years' active experience as an applicator, and at least three years of experience controlling vegetation in wetland habitats on sites of 5 acres or greater, supported by three professional references. Bidders must submit an annual treatment plan detailing herbicide products, application rates, treatment schedules, and a GPS herbicide spray data logger system specification. Payment will be issued in two installments annually: 30 percent between April and June 30, with submission by June 25, and 70 percent between July and December 30. UDOT will apply payment reductions if Target Plant Species control does not achieve the required 90 percent success rate, with reductions ranging from 10 percent (for 80–89 percent control) to 30 percent (for less than 70 percent control). Contractors must provide detailed records including GPS data in both KMZ and SHP formats for all herbicide applications, mowing activities, and non-herbicide control methods. Bidders must also provide separate cost estimates for optional additional work items including reseeding at different habitat types and riparian plant replacements at specified unit costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-7. Submittal Form- Vendor Set Up Form 2024-06-27 .pdf | ||
| 2-Agency-Contract-GoodsServices-Combined-9.16.24 (2).docx | DOCX document | |
| 4-Attachment C Cost Sheet 2027 Saleratus Creek Maintenance Cost Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B 2027 Scope of Work
Saleratus Creek Mitigation Site – Vegetation Control Contract
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 1 of 14
PART – 1 INTRODUCTION
The Utah Department of Transportation (UDOT), Region 1, has a stream and wetland mitigation site adjacent to SR-16 at Saleratus Creek near Woodruff, Rich County, Utah which will require ongoing maintenance activities such as noxious and invasive weed control along with the potential for additional work items such as mowing, reseeding and riparian plant replacement.
1.1 Section Includes
A. Procedures and requirements for maintenance and vegetation control at following Saleratus Creek mitigation site (Woodruff, Rich County)
1.2 Mandatory Pre-Bid Meeting (Virtual Only)
A. All bidding contractors must attend a virtual Mandatory Pre-Bid meeting as follows:
1. Tuesday, November 24, 2026: 11 am to 12 pm
a. Virtual meeting only (no on-site visit required):
Google Meet joining info Video call link: https://meet.google.com/ciz-dyek-aay Or dial: 0938-653-(US) +1 678 PIN: 269 982 422# More phone numbers: https://tel.meet/ciz-dyek-aay?pin=6021195042372
1.3 Contractor Minimum Mandatory Requirements and Submittals
A. Must be insured in the State of Utah.
B. Submit a current Utah State pesticide applicators license, with Aquatic (surface water) certification.
C. Actively working as an applicator for the past five years.
D. Minimum of three years’ experience working to control vegetation in wetland habitats, and on sites averaging 5 acres or greater.
1. Submit at least 3 references of previous vegetation control in wetland habitats (must include: client name, contact information, location of vegetation control, size in acreage, habitat type, type of vegetation control and methods use, etc.).
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 2 of 14
E. Submit a proposed Annual Treatment Plan for UDOT to review and include the following:
1. List of chemical herbicides, including any mixture of herbicides or surfactants, EPA registration number, application rates and method proposed to control all plants identified Target Plant Species Control (see Part 2.2)
2. An approximate schedule of activities, based on a typical growing season, that satisfies the contract requirements.
F. Submit documentation regarding the type of Global Positioning System (GPS) herbicide spray data logger system that will be used to record all types, locations and area (acreage) of treatments for vegetation and related maintenance work identified in this Scope of Work.
G. Submit cost estimate in Part 7 for UDOT to determine Low-Bid Estimate and Contract Award.
1.4 Contract Type
A. This is a requirements annual contract with a total possible length of five (5) years that can be terminated at any time within the contract time by either party (UDOT or Contractor).
B. Both parties must agree, in writing, before December 31st of the current year to continue with the existing contract for the following season.
PART – 2 SCOPE OF WORK
2.1 Extent of Work
A. Contractor shall provide all labor, materials, mileage, travel, mobilization and equipment costs to provide maintenance and vegetation control at following UDOT Region 1 wetland mitigation site. (See Appendix A)
1. MS0056 – SR-16, Saleratus Creek mitigation site
a. Location: 41.501685°, -111.123851°
b. Site Acreage: Approximately 5.094 acres:
i. Upland Habitat = Approximately 0.50 acres
ii. Wetland Habitat = Approximately 3.70 acres
iii. Saleratus Creek channel = Approximately 0.90 acres/1,115 LF)
c. Contract Work will occur annually
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 3 of 14
2.2 Scope of Work Items:
A. Target Plant Species (TPS) Control: Eradicate and control the spread of the following noxious and identified invasive weeds as part of TPS control (see Part 3).
1. Noxious Weeds:
a. Identified on the State of Utah Noxious Weed List. (For current list see Utah Administrative Code Rule R68-9).
b. If, at any time during this contract, the State of Utah or Rich County Declared Noxious Weed Lists is updated or modified, the Contractor shall be responsible for including the treatment of any new noxious weeds.
2. Invasive weeds (identified by UDOT):
a. Additional undesirable and invasive plant species identified by UDOT and required to be treated and controlled as part of TPS Control, as follows:
UDOT Invasive Weed List
Common Name Botanical Name
Bull Thistle Cirisum vulgare Crack Willow Salix fragilis
Common Teasel Dipascus fullonum Curlycup Gumweed Grindelia squarrosa
Curly Dock Rumex sp Flixweed Descurainia sophia
Halogeton Halogeton glomeratus
Kochia and Fivehook Bassia Kochia scoparia and Bassia hyssopifolia Prickly Lettuce Lactuca serriola
Ragweed Ambrosia species Reed Canary Grass Phalaris arundinacea
Russian Thistle Salsola tragus Chinese Elm Ulmus parvifolia Siberian Elm Ulmus pumila
B. Mowing: Herbaceous plants, including Phragmites australis, may be mowed to manage vegetation across the site, (see Part 4).
1. Tractor Mowing (per Acre)
2. Walk-Behind Brush Mower (per Hour)
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 4 of 14
3. Trimmer (per Hour) C. Additional Work Items (only when requested by UDOT): Provide cost estimate for the following Additional Work Items, (See Part 5).
1. Re-seed Habitat Areas (per 1/10th Acre cost)
2. Riparian Plant Replacements (per Each)
2.3 Scope of Work General Requirements
A. Make as many trips as necessary to the mitigation site to complete contract work.
1. UDOT does not make any payments for contractor mobilization trips, mileage, fuel, lodging, etc.
B. Protect-in-Place any existing woody shrubs/trees, fences, gates, utility equipment and monitoring T-posts.
1. Any damage caused by the contractor must be replaced-in-kind and at the contractor’s expense.
C. Coordinate with UDOT before storing and leaving equipment on site.
D. UDOT will provide combinations or keys to locks for access to the mitigation site.
1. Contractor will be responsible for keeping gates locked.
PART – 3 TARGET PLANT SPECIES (TPS) CONTROL
3.1 TPS Control Requirements
A. Refer to Part 2.2.A for list of TPS to control at the mitigation site.
B. Provide an annual lump sum cost estimate for TPS control for the mitigation site based on acreage and habitat type (see Part 2.1 for site details and Part 6 for payment).
C. Obtain UDOT approval of annual TPS control treatment plan and schedule before beginning work on site.
1. Work may include herbicide, non-herbicide and/or other control methods.
2. Coordinate with UDOT before, during and at the end of each growing season to review Treatment Plan effectiveness D. Minimum of 90% treatment control of TPS control is considered successful for this contract and will be used for payment purposes (see Part 6).
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 5 of 14
1. UDOT will determine if 90% successful treatment control has been completed by performing on-site inspections and reviewing contractor submitted records.
2. Payment reductions will occur when 90% treatment is not achieved (See
PART 6).
E. Schedule and complete TPS control annually at the site as follow:
1. Notify UDOT a minimum of 7 calendar days before performing any work.
2. Begin treatment work at the site as early as May 1st based on site growing conditions and early TPS to treat.
3. Treat and control each TPS found growing on site when plants are actively growing, before bloom and seed stage of growth and the ideal time to apply herbicide.
4. Make as many site visits and treatments as necessary to meet contract requirements.
F. TPS Control Herbicide Application Requirements:
1. Apply appropriate mixture of herbicide(s) including adjuvants or surfactants as part of TPS control
2. Use aquatic herbicides in compliance with pesticide license.
3. Ensure that herbicide application does not drift, spill, or runoff onto non-target plants (herbaceous or woody plants).
4. Use of non-selective, bare ground, sterilant or residual herbicides is not authorized unless approved by UDOT.
5. Include dye marker in each herbicide application.
G. TPS Control Herbicide Equipment Requirements:
1. Equipped with a GPS herbicide spray data logger system to record accurate application volume, location, and area (acreage) of each herbicide application.
2. Calibrate spraying equipment as necessary to ensure appropriate herbicide application rates.
3. Use of hand tank or backpack sprayers is acceptable.
4. ATV, UTV or agricultural equipment to apply herbicide (whether spot or boom spray) requirements:
a. Must be inspected and approved by UDOT.
b. Capable of applying herbicide by spot, boom or wick-wiper (sponge) application method.
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 6 of 14
c. Equipped with constant-rate sprayer mechanism to account for variable speed.
i. If not equipped, Contractor must demonstrate how inconsistent herbicide application rates will be avoided.
d. Avoid unnecessary damage to the site such as stuck equipment in wet/muddy areas, soil erosion, or over compaction of soil and vegetation.
e. Prevent fuel, oil, or hydraulic fluid leaks.
3.2 TPS Control Requirements for Specific Plant Species
A. Common Reed (Phragmites australis)
1. Before beginning any Phragmites treatment, coordinate with UDOT to determine timing and application method.
2. Herbicide application may occur between July and October but before Phragmites exhibits any summer drought stress and before the first killing frost and may include the following methods:
a. Where Phragmites cover ≥ 50%: Boom or spot spray areas with an appropriate mixture of aquatic-labeled glyphosate herbicide, non-ionic surfactant, and water-soluble nitrogen fertilizer.
b. Where Phragmites covers < 50%: Use a wick-wiper or similar sponge type equipment to apply an appropriate undiluted glyphosate herbicide to targeted Phragmites stems and leaves.
3. Phragmites Control application method may include a 2-step process which includes the herbicide application methods mentioned above and potential mowing or trimming of the treated Phragmites area (see Parts 4 and 6).
4. Other methods to be approved by UDOT.
B. Russian Olive (Elaeagnus angustifolia), Saltcedar (Tamarix ramosissima), Crack
Willow (Salix fragilis) and other woody shrub/tree species identified as TPS control (see Part 2.2 A):
1. Plants that are less than 6 feet tall (Basal Bark or Foliar Treatment Method):
a. Apply an appropriate mixture of herbicide(s) with a non-ionic surfactant that will most effectively control targeted woody plant with minimal effect to adjacent non-target plant species (herbaceous or woody plants).
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 7 of 14
b. Foliar treatment must include a mixture of herbicide(s), non-ionic surfactant and water applied sufficiently to wet leaves without runoff from the leaves.
c. Basal Bark treatment must include an appropriate herbicide mixed with an oil carrier applied evenly to each plant stem, trunk, and any suckers, from the ground level up to a minimum of 12 inches.
2. Plants that are 6 feet and taller (Cut-Stump Method):
a. Cut and remove the entire plant at the ground surface, including all suckers and branches.
b. Apply an appropriate mixture of herbicide(s) thoroughly to the outer 2 inches of top of cut stump, include any suckers within 30 minutes of cutting the stump and any suckers.
c. Remove all cut, fallen or dead plants, trees, saplings and/or branches from the mitigation site.
C. Kochia (Bassia scoparia), Fivehook Bassia (Bassia hyssopifolia) and Russian Thistle (Salsola tragus):
1. Apply an appropriate mixture of herbicide to actively growing plants before seed becomes viable.
a. Avoid potential herbicide resistance by alternating herbicide use.
2. Physical removal of plants will be required where herbicide treatment is not effective or was not completed before the seed becomes viable, as follows:
i. Digging and severing the root below the soil surface
ii. Hand pulling.
iii. Collect and remove plants from the mitigation site.
3. Other methods to be approved by UDOT.
3.3 General Non-Herbicide TPS Control Requirements
A. Any means, used by the contractor, for TPS control that does not include the use of chemical herbicide (i.e., grazing, burning, mowing, discing, covering with plastic sheeting, etc.)
B. Must be approved by UDOT.
1. If approved, UDOT will request a cost estimate from Contractor and coordinate approval of payment.
2. Any incidental costs of Non-Herbicidal Treatment procedures will be at the contractor’s expense.
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 8 of 14
PART – 4 MOWING
4.1 Mowing:
A. UDOT may desire the Contractor to mow or trim herbaceous vegetation including Phragmites australis throughout the mitigation site.
1. Mowing or trimming may be used either before or after each TPS Control based on intended goal of mowing.
2. Coordinate annually with UDOT for timing and method of mowing or trimming.
B. Mow or cut existing vegetation to a height ranging between 6 and 10 inches above existing ground surface.
C. UDOT standard mowing method includes:
1. Tractor Mowing (agricultural or tractor mowing equipment).
D. UDOT non-standard mowing methods may be required where site conditions are too wet/muddy or cannot be accessed with UDOT standard mowing method:
1. Walk-Behind Brush Mower (walk-behind mower).
2. Trimmer (hand-held or shoulder-supported trimmer equipped with line, blade head, or hedge trimmer attachment).
E. Provide the mowing costs for each of the following methods:
1. Tractor Mowing (per Acre).
2. Walk-Behind Brush Mower (per Acre).
3. Trimmer (per Acre).
F. Do not damage existing shrubs or trees, fences, gate posts or metal T-posts used for site monitoring.
G. Submit mowing plan to UDOT for approval before work.
1. Include all mowing methods, mower size, acreage, and time estimate.
2. UDOT may request any type of mowing to be completed based on site conditions.
PART – 5 ADDITIONAL WORK ITEMS
5.1 General Requirements
A. Provide a cost estimate for potential additional work items, which will only be included at the request of UDOT and acceptance by the Contractor and paid using the provided per unit cost estimate.
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 9 of 14
B. UDOT will coordinate and provide sufficient time for Contractor to review, accept and complete the requested additional work.
C. Before additional work may begin, UDOT and Contractor will document details of the additional work request.
1. Documentation may be via email and may include written description of additional work requests, maps, quantity of work, reference to the provided per unit cost estimate for items, total cost, and an anticipated completion date for work.
5.2 Re-seed Habitat Areas
A. Provide UDOT with a separate cost estimate (per 1/10th Acre) for the following:
1. Re-seed Roadside/Upland (Mix A) Habitat Areas.
2. Re-seed Wet Meadow (Mix D) Habitat Areas.
3. Re-seed Emergent Marsh (Mix C) Habitat Areas.
B. If additional seeding is requested, use the applicable seed schedules provided by UDOT in Appendix C
1. Coordinate with UDOT to verify quantity, seed substitutions before purchasing seed.
C. Contractor must provide seed schedule certification to UDOT for approval before completing work.
D. Following requirements in UDOT Standard Section 02922 (Seed).
1. As much as possible, seed to soil contact is required.
a. UDOT must approve of seeding method and timing.
b. Coordinate with UDOT about potential mowing before re-seeding.
5.3 Riparian Plant Replacements
A. Existing riparian plants damaged or killed due to contractor activities will be replaced at an increased 3:1 ratio at the contractor’s expense.
B. Provide UDOT with a separate cost estimate (per Each) for the following potential riparian plants that may be replaced at the site:
1. Utah Serviceberry (Amelanchier utahensis), #1 container size
2. Red-osier Dogwood (Cornus sercia), #1 container size
3. Chokecherry (Prunus virginiana), #1 container size
4. Three-leaf Sumac (Rhus trilobata), #1 container size
5. Golden Currant (Ribes aureum), #1 container size
6. Wood’s Rose (Rosa woodsii), #1 container size
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 10 of 14
7. Silver Buffaloberry (Shepherdia argentea), #1 container size
8. Coyote Willow (Salix exigua), Live Cutting
9. Bebb’s Willow (Salix bebbiana), Live Cutting
10. Yellow Willow (Salix lutea), Live Cutting
11. Peachleaf Willow (Salix amygdaloides), Pole Planting
12. Fremont Cottonwood (Populus fremontii), Pole Planting
13. Fremont Cottonwood (Populus fremontii), #5 container size
14. Narrowleaf Cottonwood (Populus angustifolia), Pole Planting
15. Narrowleaf Cottonwood (Populus angustifolia), #5 container size
C. If requested, UDOT will provide specific plant names, type, size and quantities to be installed.
1. Contractor may recommend plant replacement alternatives for UDOT approval.
D. UDOT prefers that any riparian plant installation occur during the fall, however a late winter or early spring planting may be acceptable.
1. Coordinate with UDOT with specific plant installation time.
E. Plant selection and installation must follow UDOT Standard Section 02932 (Landscape Plants).
PART – 6 RECORDS AND PAYMENT
6.1 Record Keeping for Scope of Work
Submit records to UDOT prior to payment and include the following:
A. TPS Control Herbicide Records: Complete and submit to UDOT an herbicide application record as per Part 3 with the following information for each herbicide application:
1. Date (month, day, and year) when herbicide was applied
2. Brand name of herbicide applied
3. EPA registration number
4. Rate of herbicide per acre
5. Method of herbicide application
6. Total amount of herbicide used
7. Total acres treated
8. TPS treated
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 11 of 14
9. Provide GPS herbicide spray data logger information in both Google Earth format (KMZ) and ArcMap format (SHP). Data must indicate the specific herbicide used or targeted species (TPS Control). Each data file (KMZ and SHP) must have unique identification that is associated with targeted species.
B. Mowing Records: Use GPS technology to record all mowing. Mowing records must be provided to UDOT with hardcopy and digital maps (including KMZ and SHP). Records must include the following information:
1. The month, day, and year of mowing.
2. Total acreage of each mowing method used (see Part 4.1).
3. Provide GPS information in both Google Earth format (KMZ) and ArcMap format (SHP) for each mowing. Each data file (i.e., polygon, line or tracks, etc.) must have unique identification that is associated with each mowing.
C. Other Non-Herbicide Records: Record any approved Non-Herbicide Control Methods (i.e. mowing, discing, cutting, removing, biological control, grazing etc.). Use GPS technology to keep and maintain records of each non-herbicide treatment as part of TPS Control. Records of non-herbicidal treatments must be provided to UDOT with hardcopy and digital maps (including KMZ and SHP).
These records must include the following information:
1. The month, day, and year of control
2. Total area (acres) treated with a non-herbicide control used
3. Targeted species for each TPS treated with specific non-herbicide treatment.
4. Purpose of control
5. Equipment or method used
6. Provide GPS information in both Google Earth format (KMZ) and ArcMap format (SHP) and indicate the specific non-herbicide control method used and TPS or Phragmites treated. Each data file (i.e. polygon, line or tracks, etc.) must have unique identification that is associated with a particular treatment type and date.
6.2 Record Keeping for Additional Work Items
Submit records to UDOT prior to payment and include the following:
A. Re-seed Habitat Areas:
1. Total acreage (per 1/10th Acre) of each habitat type re-seeded as per Part 5.2 and include the following:
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 12 of 14
a. GPS map of each separate re-seeded habitat area.
b. Date completed
c. Method of re-seeding and how seed was incorporated into the soil.
B. Riparian Plant Replacements: Complete and submit to UDOT records of installed riparian plantings as per PART 5.3, with the following information:
1. Total number or each plant installed with plant name, type and size.
2. Dates of plant installation.
6.3 Payment Procedures
A. General:
1. UDOT will follow State of Utah Purchasing requirements and coordinate with the Contractor for payment of completed work items annually, as follows:
a. Payment #1 will include all work completed between April and end of
June.
i. Submit payment request to UDOT by June 25th.
b. Payment #2 will include all work completed between July and December 30th.
i. Submit payment request to UDOT when all work is completed
2. Contractor must include all records for payment(s).
3. UDOT will review the completed Scope of Work or Additional Work Items from the Contractor records and complete on-site inspections before issuing payment.
a. Allow UDOT 14 calendar days to review submitted payment requests.
4. Approved payments will be made using bid item costs in Part 7 for the completed Scope of Work and Additional Work Items.
B. TPS Control Payment:
1. UDOT will make partial Annual Lump Sum payments for TPS control to the contractor, as follows:
a. 30% may be requested and paid during Payment #1 (See 6.3 A.1.a).
b. 70% may be requested and paid during Payment #2 (See 6.3 A.1.b).
2. UDOT will include payment reductions to TPS control at Payment #2 period request that does not meet the 90% successful TPS control for the entire growing season (see PART 3):
a. 10% payment reduction for 80-89% TPS control.
b. 20% payment reduction for 70-79% TPS control.
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 13 of 14
c. 30% payment reduction for less than 70% TPS control and may require retreatment.
i. UDOT may require the contractor, at their expense, to retreat any area which UDOT determines to be less than 70%.
C. Mowing:
1. Based on compliance with Part 4.1 and bid item costs shown in Part 7.
D. Additional Work Items (Re-seed Roadside/Upland, Wet Meadow, and Emergent
Marsh Areas):
1. Based on compliance with Part 5.2 and bid item costs shown in Part 7.
E. Additional Work Items (Riparian Plant Replacements):
1. Based on compliance with Part 5.3 and bid item costs shown in Part 7.
PART – 7 CONTRACTOR BID PRICES FOR SCOPE OF WORK AND
ADDITIONAL ITEMS
Bidding contractors must provide the following bid estimates based on Scope of Work requirements (see Appendix B for the cost sheet).
7.1 Scope of Work Bid Prices
A. Provide the following vegetation control cost estimates:
1. TPS Control: $________ Annual Lump Sum. (See Part 3)
B. Provide the following Mowing cost estimates (See Part 4):
1. Tractor Mowing: $________ per Acre.
2. Walk-Behind Brush Mower: $________ per Acre.
3. Trimmer: $________ per Acre.
7.2 Low-Bid Estimate and Contract Award Procedures
UDOT contract award will be determined based on the following:
A. Contractor Minimum Mandatory Requirements and Submittals (See Part 1.3).
1. UDOT will evaluate all submitted information and evaluate whether the Contractor meets these requirements.
B. UDOT will use the TPS Control (Annual Lump Sum) bid provided by the bidding contractors to determine Low-Bid Estimate and Contract Award.
2027_Saleratus Creek_Maintenance_Scope of Work.docx Page 14 of 14
7.3 Additional Work Items (only when requested by UDOT, see Part 5) Submit cost estimates for the following potential Additional Work Items. These bid prices are for informational purposes only and will not be factored into the Low-Bid Estimate or contract award. They will be used solely to compensate the contractor for any additional work directed by UDOT.
A. Re-seed Habitat Areas (see Part 5.3 and Appendix C)
1. Re-seed Roadside/Upland Habitat (Mix A) Areas: $________ per 1/10th Acre.
2. Re-seed Wet Meadow (Mix D) Habitat Areas: $________ per 1/10th Acre.
3. Re-seed Emergent Marsh (Mix C) Habitat Areas: $________ per 1/10th Acre.
B. Riparian Plant Replacements (See Part 5.4)
1. Utah Serviceberry (Amelanchier utahensis), #1 cont. $____ per Each.
2. Red-osier Dogwood (Cornus sercia), #1 cont. $____ per Each.
3. Chokecherry (Prunus virginiana), #1 cont. $____ per Each.
4. Three-leaf Sumac (Rhus trilobata), #1 cont. $____ per Each.
5. Golden Currant (Ribes aureum), #1 cont. $____ per Each.
6. Wood’s Rose (Rosa woodsii), #1 cont. $____ per Each.
7. Silver Buffaloberry (Shepherdia argentea), #1 cont. $____ per Each.
8. Coyote Willow (Salix exigua), Live Cutting $____ per Each.
9. Bebb’s Willow (Salix bebbiana), Live Cutting $____ per Each.
10. Yellow Willow (Salix lutea), Live Cutting $____ per Each.
11. Peachleaf Willow (Salix amygdaloides), Pole Planting $____ per Each.
12. Fremont Cottonwood (Populus fremontii), Pole Planting $____ per Each.
13. Fremont Cottonwood (Populus fremontii), #5 cont. $____ per Each.
14. Narrowleaf Cottonwood (Populus angustifolia), Pole P. $____ per Each.
15. Narrowleaf Cottonwood (Populus angustifolia), #5 cont. $____ per Each.
APPENDIX A
Saleratus Creek Mitigation Site – Maps and Plans
U.S. Army Corps of Engineers SPK-2024-00323 UDOT Region 1 Project F-0016(12)7, PIN 17369
SR-16; Bridges & Culverts Replacement
Wetland Mitigation and Monitoring Plan 2 November 2025
Figure 1. SR-16 bridges location map.
U.S. Army Corps of Engineers SPK-2024-00323 UDOT Region 1 Project F-0016(12)7, PIN 17369
SR-16; Bridges & Culverts Replacement
Wetland Mitigation and Monitoring Plan 4 November 2025
Figure 2. SR-16 bridges topographic map.
UDOT Project F-0016(12)7
PIN 17369
SR-16
Existing Aquatic Resources
Map, October 2025
Bureau of Land Management, Utah AGRC, Esri, HERE, Garmin, INCREMENT P, NGA, USGS
SR
-16
Francis Rd
111°7'21"W 41°30'2"N
111°7'33"W 41°30'13"N
1 inch = 130 feet
Saleratus Creek
0 65 130 Feet
Mitigation Site 20-foot buffer along
ROW
Mitigation Area updated (4.3 ac.)
Existing Stream (0.90 ac./1115 lf)
Existing Palustrine Emergent Wetlands (1.29 ac.)
Existing Uplands (2.11 ac.)
Delineation Delineation Boundary (8.34 ac.)
Existing Wetlands Outside Mitigation Site (2.48 ac.)
Existing Stream Outside Mitigation Site (280 lf/ 0.16 ac.)
Existing Uplands Outside Mitigation Site (1.40 ac.)
UDOT Project F-0016(12)7
PIN 17369
SR-16
Mitigation Site Design
Map, October 2025
The wetland delineation results are preliminary and have not been verified by the US Army Corps of Engineers.
NAD 1983 State Plane Utah North FIPS 4301 (US Feet). 2021 Utah Imagery Hexagon.
1 inch = 130 feet
Saleratus Creek
Francis Rd
SR
-16
0 130 26065 Feet
Mitigation Site Mitigation Area updated (4.3 ac.)
Stream Restoration (0.15 ac./878 lf)
Wetland Enhancement (1.19 ac.)
Wetland Restoration (1.91 ac.)
Existing Stream ( 0.90 ac./1115 lf)
Uplands (0.05 ac.)
Areas Not Included As Mitigation (0.45 ac.)
Delineation Delineation Boundary (8.34 ac.)
Existing Wetlands Outside Mitigation (2.48 ac.)
Existing Palustrine Emergent Wetlands (1.29 ac.)
Existing Stream Outside Mitigation (280 lf/ 0.16 ac.)
Proposed culverts (30 lf)
This 20-foot buffer from the State ROW will be excluded from the mitigation acreage to accommodate potential future work on SR-16 Roadway.
6301.5
.50
.5
6301.5
.5
03 63
D R
A W
N B
Y
A P
P R
O V
E D
B Y
A P
P R
O V
E D
SHEET NO.
U T
A H
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N
D A
T E
R E
V
IS
IO
N
S
R E
M A
R K
S D
A T
E N
O
C H
E C
K E
D B
Y
Q C
P R
O J E
C T
N U
M B
E R
P R
O J E
C T
P
IN
:4
S D a v e n p o rt
-N
O V
-2
D G
N F il e
G
S h a re d d ri v e s \u ta h
.n e p a -p ro je c ts
\2
S
R -1
B ri d g e s \M ic ro
S ta ti o n f il e s \1
S
R -1
B R
ID
G
E S
A
N D
C
U L
V E
R T
S
R E
P L
A C
E M
E N
T \E n v ir o n m e n ta l\
W M
D T
-0
G R
A D
IN
G
P L
A N
S O
U T
H .d g n
R E
G
IO
N
S R
-1
B R
ID
G
E S
P R
O F
E S
S
IO
N A
L E
N G
IN
E
E R
C U
L V
E R
T S
R E
P L
A C
E M
E N
T
F -0
(1
)7
S E
E S
H E
E T
W M
-0
M A
T C
H L
E
A
M
S D
WMDT-02
W E
T L
A N
D M
IT
IG
A T
IO
N
D E
T A
IL
WETLAND RESTORATION
LEGEND
S a le ra tu s C re e k
N
WETLAND MITIGATION GRADING PLAN (SOUTH)
EXISTING WETLAND
EXISTING WETLAND
RESTORATION
WETLAND
WETLAND RESTORATION
WETLAND RESTORATION
FIBER ROLL BARRIER REQ'D
WETLAND EXCAVATION (PLAN QUANTITY) REQ'D
CLEARING AND GRUBBING REQ'D
SPREAD SALVAGED TOPSOIL (PLAN QUANTITY) REQ'D
STRIP AND STOCKPILE TOPSOIL (PLAN QUANTITY) REQ'D
BANK STABILIZATION SOIL LIFT REQ'D
BANK STABILIZATION SOIL LIFT REQ'D
NOTES:
GROUNDWATER MONITORING PIT.
APPROXIMATEY 6303'.
THE ORDINARY HIGH WATER MARK (OHWM) IS
A
F L O
W
O H
W M
OHWM
LP 6301
LP 6302
LP 6301
LP 6300
UDOT ROW
MITIGATION SITE BOUNDARY
MITIGATION SITE BOUNDARY
GATE
CULVERTS LOCATION
EXISTING WETLAND
0510 10 20 30 40
Scale In Feet
FIBER ROLL BARRIER REQ'D
STABILIZED CONSTRUCTION ACCESS REQ'D
X
X
X
X
EXISTING WETLAND
FLOW
A
FOR GRADING DETAIL, SEE DT-03.
FOR CULVERT LOCATIONS, SEE DRDT-02.
/1 7/
6301.5
6301.5
D R
A W
N B
Y
A P
P R
O V
E D
B Y
A P
P R
O V
E D
SHEET NO.
U T
A H
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N
D A
T E
R E
V
IS
IO
N
S
R E
M A
R K
S D
A T
E N
O
C H
E C
K E
D B
Y
Q C
P R
O J E
C T
N U
M B
E R
P R
O J E
C T
:4
S D a v e n p o rt
-O
C T
-2
D G
N F il e
G
S h a re d d ri v e s \u ta h
.n e p a -p ro je c ts
\2
S
R -1
B ri d g e s \M ic ro
S ta ti o n f il e s \1
S
R -1
B R
ID
G
E S
A
N D
C
U L
V E
R T
S
R E
P L
A C
E M
E N
T \E n v ir o n m e n ta l\
W M
D T
-0
G R
A D
IN
G
P L
A N
N O
R T
H .d g n
R E
G
IO
N
S R
-1
B R
ID
G
E S
P R
O F
E S
S
IO
N A
L E
N G
IN
E
E R
C U
L V
E R
T S
R E
P L
A C
E M
E N
T
F -0
(1
)7
S E
E S
H E
E T
W M
D T
-0
M A
T C
H L
WMDT-03
W E
T L
A N
D M
IT
IG
A T
IO
N
D E
T A
IL
N
Saleratus Creek
WETLAND MITIGATION GRADING PLAN (NORTH)
WETLAND RESTORATION
WETL
AND R
ES
TORAT
ION
EXISTING WETLAND
EXISTING WETLAND
EXISTING WETLAND
FIBER ROLL BARRIER REQ'D
BANK STABILIZATION SOIL LIFT REQ'D
NOTES:
GROUNDWATER MONITORING PIT.
APPROXIMATEY 6303'.
THE ORDINARY HIGH WATER MARK (OHWM) IS
WETLAND RESTORATION
LEGEND
WETLAND EXCAVATION (PLAN QUANTITY) REQ'D
CLEARING AND GRUBBING REQ'D
SPREAD SALVAGED TOPSOIL (PLAN QUANTITY) REQ'D
STRIP AND STOCKPILE TOPSOIL (PLAN QUANTITY) REQ'D
FLOW
FIBER ROLL BARRIER REQ'D
LP 6302 LP 6301
LP 6302.50
OHWM
OHWM
MITIGATION SITE BOUNDARY
UDOT R
OW
0510 10 20 30 40
Scale In Feet
STABILIZED CONSTRUCTION ACCESS REQ'D
X
X
X
/1 7/
D R
A W
N B
Y
A P
P R
O V
E D
B Y
A P
P R
O V
E D
SHEET NO.
U T
A H
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N
D A
T E
R E
V
IS
IO
N
S
R E
M A
R K
S D
A T
E N
O
C H
E C
K E
D B
Y
Q C
P R
O J E
C T
N U
M B
E R
P R
O J E
C T
:5
S D a v e n p o rt
-O
C T
-2
D G
N F il e
G
S h a re d d ri v e s \u ta h .n e p a -p ro je c ts
\2 S
R -1
B ri d g e s \M ic ro
S ta ti o n f il e s \1
S
R -1
B
R
ID
G E
S A
N D
C
U L
V E
R T
S R
E P
L A
C E
M E
N T
\E n v ir o n m e n ta l\ W
M D
T -0
P
L A
N T
IN
G
P L
A N
S O
U T
H .d g n
R E
G
IO
N
S R
-1
B R
ID
G
E S
P R
O F
E S
S
IO
N A
L E
N G
IN
E
E R
C U
L V
E R
T S
R E
P L
A C
E M
E N
T
F -0
(1
)7
S E
E S
H E
E T
W M
D T
-0
M A
T C
H L
A
M
S D
WMDT-04
W E
T L
A N
D M
IT
IG
A T
IO
N
D E
T A
IL
US (5)
NC-P (7)
NC-P (3)
PW-P (10)
S a le ra tu s C re e k
N
WETLAND MITIGATION PLANTING PLAN (SOUTH)
NC (3)
SB (10)
RD (10)
PW-P (8)
EC (5)
TS (7)
FC-P (5)
GC (5)
TS (3)SB (10)
EXISTING WETLAND
WETLAND RESTORATION
US (5)
CK (5)
WR (5)
LEGEND SEED MIX REQ'D
CK (5)
RD (5)
US (10)
FC-P (5)
FC-P (10)
FC-P (10)
GC (5)WR (5)
GC (5)
CK (5)
US (5)
BROADCAST SEED ROADWAY SLOPE AREAS >3:1.
WETLAND AREAS. DRILL SEED ROADWAY SLOPE AREAS <3:1.
AREAS OUTSIDE OF WETLAND RESTORATION AND EXISTING
ROADSIDE SEED (MIX A): 3,700 SY. INSTALL IN ALL UPLAND
EXISTING WETLAND AND WETLAND RESTORATION
280 SY. INSTALL IN ADDITION TO MIX A.
SHRUB SEED (BROADCAST SEED MIX B):
EMERGENT MARSH SEED (BROADCAST SEED MIX C): 1,100 SY
Subtotal =
Willow Wattle
Diameter
Overall an 10 Inch combined into
Live Cuttings
Salix lutea, Yellow Willow
Salix exigua, Coyote Willow
Salix bebbiana, Bebb's WillowWW
LFSIZECombination of the following Willow shrub types:KEY
WILLOW WATTLES
Subtotal =
Pole Plantings
Length x 3 to 4 Feet
Diameter
3/4 to 1-1/2 Inch Peachleaf WillowSalix amygdaloidesPW-P
Length x 4 to 6 Feet
Diameter
1-1/2 to 3 Inch Eastern Cottonwood Populus deltoidesFC-P
Length x 4 to 6 Feet
Diameter
1-1/2 to 3 Inch Narrowleaf Cottonwood Populus angustifoliaNC-P
QTYSIZECOMMON NAMEBOTANICAL NAMEKEY
POLE PLANTINGS
Shrub Subtotal
Deciduous
20No. 1Silver BuffaloberryShepherdia argenteaSB
10No. 1Wood's RoseRosa woodsiiWR
15No. 1Golden CurrentRibes aureumGC
10No. 1Skunkbush sumacRhus trilobataTS
15No. 1ChokecherryPrunus virginianaCK
15No. 1Redosier dogwoodCornus sericeaRD
30No. 1Utah serviceberryAmelanchier utahensisUS
QTYSIZECOMMON NAMEBOTANICAL NAMEKEY
DECIDUOUS SHRUBS
Trees Subtotal =
Deciduous
5No. 5Eastern Cottonwood Populus deltoidesEC
3No. 5Narrowleaf Cottonwood Populus angustifoliaNC
QTYSIZECOMMON NAMEBOTANICAL NAMEKEY
DECIDUOUS TREES
SR-16 LANDSCAPE PLANTS SCHEDULE WMDT-04
OHW
M
O H
W M
S a le ra tu s C re e k
F L O
W
NC-P (10)
PW-P (12)
WET MEADOW SEED (BROADCAST SEED MIX D): 10,600 SY
0510 10 20 30 40
Scale In Feet
/1 7/
A W
N B
Y
A P
P R
O V
E D
B Y
A P
P R
O V
E D
SHEET NO.
U T
A H
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N
D A
T E
R E
V
IS
IO
N
S
R E
M A
R K
S D
A T
E N
O
C H
E C
K E
D B
Y
Q C
P R
O J E
C T
N U
M B
E R
P R
O J E
C T
:3
S D a v e n p o rt
-N
O V
-2
D G
N F il e
G
S h a re d d ri v e s \u ta h .n e p a -p ro je c ts
\2 S
R -1
B ri d g e s \M ic ro
S ta ti o n f il e s \1
S
R -1
B
R
ID
G E
S A
N D
C
U L
V E
R T
S R
E P
L A
C E
M E
N T
\E n v ir o n m e n ta l\ W
M D
T -0
P
L A
N T
IN
G
P L
A N
N O
R T
H .d g n
R E
G
IO
N
S R
-1
B R
ID
G
E S
P R
O F
E S
S
IO
N A
L E
N G
IN
E
E R
C U
L V
E R
T S
R E
P L
A C
E M
E N
T
F -0
(1
)7
S E
E S
H E
E T
W M
D T
-0
M A
T C
H L
WMDT-05
E
T L
A N
D M
IT
IG
A T
IO
N
N
Saleratus Creek
RD (5)
WETLAND MITIGATION PLANTING PLAN (NORTH)
CK (5)
TS (4)
GC (5)
CK (5)
US (5) PW-P (10)
NC-P (7)
SB (5)
US (5)
NC-P (5)
PW-P (10)
NC (2)
PW-P (8)
FC-P (5)
NC-P (5)
PW-P (7)
EC (4)
NC-P (3)
NC (5)
WR (5)
EC (1)
EXISTING WETLAND
EXISTING WETLAND
RD (5)
RD (5)
RD (5)
RD (5)
TS (5)
FC-P (5)
WR (5)
CK (5)
SB (5)
TS (3)
Subtotal =
Willow Wattle
Diameter
10 Inch Overall combined into an
Live Cuttings
Salix lutea, Yellow Willow
Salix exigua, Coyote Willow
Salix bebbiana, Bebb's WillowWW
LFSIZECombination of the following Willow shrub types:KEY
WILLOW WATTLES
Subtotal =
Pole Plantings
Length x 3 to 4 Feet
Diameter
3/4 to 1-1/2 Inch Peachleaf WillowSalix amygdaloidesPW-P
Length x 4 to 6 Feet
Diameter
1-1/2 to 3 Inch Eastern Cottonwood Populus deltoidesFC-P
Length x 4 to 6 Feet
Diameter
1-1/2 to 3 Inch Narrowleaf Cottonwood Populus angustifoliaNC-P
QTYSIZECOMMON NAMEBOTANICAL NAMEKEY
POLE PLANTINGS
Shrub Subtotal =
Deciduous
10No. 1Silver BuffaloberryShepherdia argenteaSB
10No. 1Wood's RoseRosa woodsiiWR
5No. 1Golden CurrentRibes aureumGC
10No. 1Skunkbush sumacRhus trilobataTS
15No. 1ChokecherryPrunus virginianaCK
25No. 1Redosier dogwoodCornus sericeaRD
10No. 1Utah serviceberryAmelanchier utahensisUS
QTYSIZECOMMON NAMEBOTANICAL NAMEKEY
DECIDUOUS SHRUBS
Subtotal =
Deciduous Trees
5No. 5Eastern Cottonwood Populus deltoidesEC
7No. 5Narrowleaf Cottonwood Populus angustifoliaNC
QTYSIZECOMMON NAMEBOTANICAL NAMEKEY
DECIDUOUS TREES
SR-16 LANDSCAPE PLANTS SCHEDULE WMDT-05
PW-P (5)
NC-P (5) NC-P (5)
FC-P (7)
FC-P (3)
OHWM
FLOW
OHWM
0510 10 20 30 40
Scale In Feet
LEGEND SEED MIX REQ'D
BROADCAST SEED ROADWAY SLOPE AREAS >3:1.
WETLAND AREAS. DRILL SEED ROADWAY SLOPE AREAS <3:1.
AREAS OUTSIDE OF WETLAND RESTORATION AND EXISTING
ROADSIDE SEED (MIX A): 3,700 SY. INSTALL IN ALL UPLAND
EXISTING WETLAND AND WETLAND RESTORATION
280 SY. INSTALL IN ADDITION TO MIX A.
SHRUB SEED (BROADCAST SEED MIX B):
EMERGENT MARSH SEED (BROADCAST SEED MIX C): 1,100 SY
WET MEADOW SEED (BROADCAST SEED MIX D): 10,600 SY
32" PRECAST JERSEY
42" CAST-IN-PLACE
/1 7/
A W
N B
Y
A P
P R
O V
E D
B Y
A P
P R
O V
E D
SHEET NO.
U T
A H
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N
D A
T E
R E
V
IS
IO
N
S
R E
M A
R K
S D
A T
E N
O
C H
E C
K E
D B
Y
Q C
P R
O J E
C T
N U
M B
E R
P R
O J E
C T
:3
S D a v e n p o rt
-N
O V
-2
D G
N F il e
G
S h a re d d ri v e s \u ta h
.n e p a -p ro je c ts
\2
S
R -1
B ri d g e s \M ic ro
S ta ti o n f il e s \1
S
R -1
B R
ID
G
E S
A
N D
C
U L
V E
R T
S
R E
P L
A C
E M
E N
T \E n v ir o n m e n ta l\
W M
D T
-0
S U
M M
A R
Y .d g n
R E
G
IO
N
S R
-1
B R
ID
G
E S
P R
O F
E S
S
IO
N A
L E
N G
IN
E
E R
C U
L V
E R
T S
R E
P L
A C
E M
E N
T
F -0
(1
)7
WMDT-06
E
T L
A N
D M
IT
IG
A T
IO
N
D E
T A
IL
110100.00%27.7573100.00%18.50
2220.35%7.051520.35%4.70
54.71%0.4534.71%0.30500,000Munro globemallowSphaeralcea munroana
1210.67%3.00810.67%2.00170,000Lewis flaxLinum lewsii
54.97%3.6044.97%2.4065,900Rocky Mountain BeeplantCleome serrulata
Forb Species
8779.65%20.705879.65%13.80
1211.04%0.30811.04%0.201,758,000Alkali sacatonSporobolus airoides
119.86%0.4579.86%0.301,047,000Sandberg bluegrassPoa secunda ssp. sandbergii
1110.36%4.50810.36%3.00110,000Western wheatgrassPascopyrum smithii
1413.19%5.251013.19%3.50120,000Snake River wheatgrassElymus wawawaiensis
1917.47%5.251317.47%3.50159,000Slender wheatgrassElymus trachycaulus ssp. trachycaulus
76.66%1.2056.66%0.80265,250Ephraim Crested wheatgrassAgropyron cristatum'Ephraim'
1211.07%3.75811.07%2.50141,000Indian ricegrassAchnatherum hymenoides
Grass Species
(PLS/Sq. Foot) Number of Seeds
Seed mixture Percentage of
Live Seed (PLS)/Acre Pounds (LBS) of Pure
(PLS/Sq. Foot) Number of Seeds
Seed mixture Percentage of
Live Seed (PLS)/Acre Pounds (LBS) of Pure COMMON NAMEBOTANICAL NAME
BROADCAST SEEDDRILL SEED
per Pound (LBS) Number of Seeds
SPECIES NAME
ROADSIDE SEED (DRILL SEED MIX A) (BROADCAST SEED MIX A)
10100.00%9.50
326.95%2.5045,300Woods' roseRosa woodsii
441.65%0.50350,000Golden currantRibes aureum
331.40%6.5020,300Skunkbush sumacRhus trilobata
(PLS/Sq. Foot) Number of Seeds
Seed mixture Percentage of
Live Seed (PLS)/Acre Pounds (LBS) of Pure COMMON NAMEBOTANICAL NAME
BROADCAST SEED
per Pound (LBS) Number of Seeds
SPECIES NAME
SHRUB SEED (BROADCAST SEED MIX B)
123100.00%19.2382100.00%12.82
22.03%3.1522.03%2.10
11.15%0.9011.15%0.6068,100Swamp milkweedAsclepias incarnata
10.88%2.2510.88%1.5021,000Rocky Mountain irisIris missouriensis
Forb Species
12097.97%16.088097.97%10.72
2016.67%4.131416.67%2.75216,000Common threesquareSchoenoplectus pungens
2015.90%2.251315.90%1.50377,600Hardstem bulrushSchoenoplectus acutus
64.49%0.0344.49%0.028,000,000Baltic rushJuncus balticus
1310.44%0.90910.44%0.60620,000Common spikerushEleocharis palustris
76.00%0.6056.00%0.40534,100Nebraska sedgeCarex nebrascencis
2117.02%1.881417.02%1.25485,000Water sedgeCarex aquatilis
2117.34%5.701417.34%3.80162,600Cosmopolitan bulrushBolboschoenus maritimus
1210.11%0.60810.11%0.40900,000American SloughgrassBeckmannia syzigachne
Grass Species
(PLS/Sq. Foot) Number of Seeds
Seed mixture Percentage of
Live Seed (PLS)/Acre Pounds (LBS) of Pure
(PLS/Sq. Foot) Number of Seeds
Seed mixture Percentage of
Live Seed (PLS)/Acre Pounds (LBS) of Pure COMMON NAMEBOTANICAL NAME
BROADCAST SEEDDRILL SEED
per Pound (LBS) Number of Seeds
SPECIES NAME
EMERGENT MARSH SEED (BROADCAST SEED MIX C)
486100.00%18.21361100.00%12.14
101.96%2.4661.76%1.64
61.30%0.0641.17%0.044,586,000Marsh Indian paintbrushCastilleja minor
30.66%2.4020.59%1.6058,000Showy milkweedAsclepias speciosa
Forb Species
47698.04%15.7535498.24%10.50
5912.05%1.503910.82%1.001,700,000Alkali sacatonSporobolus airoides
6212.76%1.804111.46%1.201,500,000Fowl bluegrassPoa palustris
12726.16%0.458523.49%0.3012,300,000Torrey's rushJuncus torreyi
449.07%1.50298.15%1.001,280,000American mannagrassGlyceria grandis
5310.99%3.75369.87%2.50620,000Common spikerushEleocharis palustris
5411.06%4.50369.93%3.00520,000Inland saltgrassDistichlis spicata
7715.95%2.255214.32%1.501,500,000Tufted hairgrassDeschampsia cespitosa
5511.36%4.503710.20%3.00534,100Nebraska sedgeCarex nebrascencis
Grass Species
Foot) Seeds (PLS/Sq.
Number of
Seed mixture Percentage of
Live Seed (PLS)/Acre Pounds (LBS) of Pure
(PLS/Sq. Foot) Number of Seeds
Seed mixture Percentage of
Live Seed (PLS)/Acre Pounds (LBS) of Pure COMMON NAMEBOTANICAL NAME
BROADCAST SEEDDRILL SEED
per Pound (LBS) Number of Seeds
SPECIES NAME
WET MEADOW SEED (BROADCAST SEED MIX D)
* 1260 Inch Overall Diameter Live Cuttings combined into an 10
Salix lutea, Yellow Willow Salix exigua, Coyote Willow Salix bebbiana, Bebb's WillowWW
LFSIZECombination of the following Willow shrub types:KEY
WILLOW WATTLES
170Pole Plantings Subtotal = x 4 to 6 Feet Length 1-1/2 to 3 Inch DiameterPeachleaf WillowSalix amygdaloidesPW-P x 4 to 6 Feet Length 1-1/2 to 3 Inch DiameterEastern Cottonwood Populus deltoidesFC-P x 4 to 6 Feet Length 1-1/2 to 3 Inch DiameterNarrowleaf Cottonwood Populus angustifoliaNC-P
QTYSIZECOMMON NAMEBOTANICAL NAMEKEY
POLE PLANTINGS
200Deciduous Shrub Subtotal =
30No. 1Silver BuffaloberryShepherdia argenteaSB
20No. 1Wood's RoseRosa woodsiiWR
20No. 1Golden CurrentRibes aureumGC
20No. 1Skunkbush sumacRhus trilobataTS
30No. 1ChokecherryPrunus virginianaCK
40No. 1Redosier dogwoodCornus sericeaRD
40No. 1Utah serviceberryAmelanchier utahensisUS
QTYSIZECOMMON NAMEBOTANICAL NAMEKEY
DECIDUOUS SHRUBS
20Deciduous Tree Subtotal =
10No. 5Eastern Cottonwood Populus deltoidesEC
10No. 5Narrowleaf Cottonwood Populus angustifoliaNC
QTYSIZECOMMON NAMEBOTANICAL NAMEKEY
DECIDUOUS TREES
SR-16 LANDSCAPE PLANT SCHEDULE
* Willow Wattle total is "For Information Only" as payment will be included as part of BANK STABILIZTION SOIL LIFT.
INCLUDES COIR WOVEN FIBER GEOTEXTILE, RECP TYPE 4 GEOTEXTILE, BACKFILL MATERIAL, WOOD STAKES, AND WILLOW WATTLE.1,260FEETBANK STABILIZATION SOIL LIFT6
1,230 CU YD TO BE USED FOR TOPSOIL 4" THICK.11,500SQ YDSPREAD SALVAGED TOPSOIL (PLAN QUANTITY)5
1,230 CU YD TO BE USED FOR TOPSOIL 4" THICK.11,500SQ YDSTRIP AND STOCKPILE SALVAGED TOPSOIL (PLAN QUANTITY)4
INCLUDES SPREAD TOPSOIL (4"). THE GRADES SHOWN ON PLANS ARE FINISH GRADE AND INCLUDES TOPSOIL.5,600CU YDWETLAND EXCAVATION (PLAN QUANTITY)3
780FEETFIBER ROLL BARRIER2
2EACHSTABILIZED CONSTRUCTION ENTRANCE1
REMARKSQUANITYUNITITEM DESCRIPTIONITEM
SUMMARY OF ITEMS: WETLAND MITIGATION GRADING
"For Information Only" as payment is part of BANK STABILIZATION SOIL LIFT.1260FEETWILLOW WATTLE10
See Plant Schedule170EACHPOLE PLANTING9
See Plant Schedule200EACHPLANT - NO. 1 CONTAINER (DECIDUOUS SHRUB8
See Plant Schedule20EACHPLANT - NO. 5 CONTAINER (DECIDUOUS TREE)7
Broadcast Seed10,600SQ YDWET MEADOW SEED (BROADCAST SEED MIX D)6
Broadcast Seed 1,700SQ YDEMERGENT MARSH SEED (BROADCAST SEED MIX C)5
Broadcast Seed280SQ YDSHRUB SEED (BROADCAST SEED MIX B)4
Drill or Broadcast Seed, Coordinate with UDOT. 3,700SQ YDROADSIDE SEED (DRILL SEED/ BROADCAST SEED MIX A)3
Install in areas of seed (MIX A), (MIX C), and (MIX D).14,500SQ YDVEGETATIVE GROWN MEDIUM (PLAN QUANTITY)2
Install in areas of seed (MIX A), (MIX C), and (MIX D).14,500SQ YDHECP TYPE 2 (PLAN QUANTITY)1
REMARKSQUANITYUNITITEM DESCRIPTIONITEM
SUMMARY OF ITEMS: WETLAND MITIGATION LANDSCAPE
/1 7/
A W
N B
Y
A P
P R
O V
E D
B Y
A P
P R
O V
E D
SHEET NO.
U T
A H
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N
D A
T E
R E
V
IS
IO
N
S
R E
M A
R K
S D
A T
E N
O
C H
E C
K E
D B
Y
Q C
P R
O J E
C T
N U
M B
E R
P R
O J E
C T
:2
S D a v e n p o rt
-N
O V
-2
D G
N F il e
G
S h a re d d ri v e s \u ta h
.n e p a -p ro je c ts
\2
S
R -1
B ri d g e s \M ic ro
S ta ti o n f il e s \1
S
R -1
B R
ID
G
E S
A
N D
C
U L
V E
R T
S
R E
P L
A C
E M
E N
T \E n v ir o n m e n ta l\
W M
D T
-0
C R
O S
S S
E C
T
IO
N .d g n
R E
G
IO
N
S R
-1
B R
ID
G
E S
P R
O F
E S
S
IO
N A
L E
N G
IN
E
E R
C U
L V
E R
T S
R E
P L
A C
E M
E N
T
F -0
(1
WMDT-07
E
T L
A N
D M
IT
IG
A T
IO
N
D E
T A
IL
E le v a ti o n 6310
CROSS SECTION A - A'
POLE PLANTING REQ'D
BANK STABILIZATION SOIL LIFT
EXISTING GRADE
OHWM
FINISH GRADE ELEVATION 3
POLE PLANTING REQ'D
HECP TYPE 1 REQ'D
(PLAN QUANTITY) REQD
SPREAD SALVAGED TOPSOIL
(PLAN QUANTITY) REQ'D
STRIP AND STOCKPILE TOPSOIL
3:
M
AX
REFER TO WETLAND EXCAVATION SECTION 02311S. 3
FOR ADDITIONAL INFORMATION.
SEE LANDSCAPE PLAN SHEET AND LANDSCAPE DETAIL SHEET WMDT-08 2
CONSTRUCTION INFORMATION.
SEE GRADE SHEETS AND ROADWAY SHEETS FOR ADDITIONAL GRADING 1
NOTES:
WETLAND EXCAVATION & FINISH GRADE ELEVATION DETAIL
6300E le v a ti o n
FINISH GRADE ELEVATION
(PLAN QUANTITY) REQ'D
STRIP AND STOCKPILE TOPSOIL
REFER TO WETLAND EXCAVATION SECTION 02311S. 1
NOTES:
EXISTING GRADE
OHWM
ROUGH GRADE ELEVATION
UNDISTURBED GROUND
(4 INCH THICK)
(PLAN QUANTITY) REQD
SPREAD SALVAGED TOPSOIL
/1
/2
S D
A M
/1 7/
A W
N B
Y
A P
P R
O V
E D
B Y
A P
P R
O V
E D
SHEET NO.
U T
A H
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N
D A
T E
R E
V
IS
IO
N
S
R E
M A
R K
S D
A T
E N
O
C H
E C
K E
D B
Y
Q C
P R
O J E
C T
N U
M B
E R
P R
O J E
C T
:5
S D a v e n p o rt
-N
O V
-2
D G
N F il e
G
S h a re d d ri v e s \u ta h
.n e p a -p ro je c ts
\2
S
R -1
B ri d g e s \M ic ro
S ta ti o n f il e s \1
S
R -1
B R
ID
G
E S
A
N D
C
U L
V E
R T
S
R E
P L
A C
E M
E N
T \E n v ir o n m e n ta l\
W M
D T
-0
D E
T A
IL
S
.d g n R
E G
IO
N
S R
-1
B R
ID
G
E S
P R
O F
E S
S
IO
N A
L E
N G
IN
E
E R
C U
L V
E R
T S
R E
P L
A C
E M
E N
T
F -0
(1
S
WMDT-08
W E
T L
A N
D M
IT
IG
A T
IO
N
D E
T A
IL
WILLOW WATTLE
(OUTSIDE LAYER)
COIR WOVEN GEOTEXTILE
CHANNEL BANKPLACE TOPSOIL 4 INCH THICK
LENGTH OF THE BANK.
SPACE EVERY 4 FEET ALONG THE
WOOD STAKES, 2-FEET LONG, TYP.
BANK STABILIZATION SOIL LIFT
REFER TO BANK STABILIZTION SOIL LIFT SECTION 02942S.4.
WATTLE TO EXTEND BACK TOWARD BANK.
WRAP BOTH RECP TYPE 4 AND COIR WOVEN GEOTEXTILE AROUND WILLOW 3.
RECP TYPE 4 AND COIR WOVEN GEOTEXTILE AND ANCHOR IT.
MATERIAL AND SALVAGED TOPSOIL. COVER THE FILL MATERIAL WITH BOTH
ANCHOR THE BOTTOM FABRIC AND FILL WITH 10 INCHES OF EXCAVETED 2.
WATTLE.
STAKE BOTH FABRICS EVERY 4 FEET. PLACE STAKES ON BOTH SIDES OF THE 1.
NOTES:
PLANT WITH ROOT COLLAR AT OR ABOVE ADJACENT SOIL ELEVATION
UNDISTURBED EARTH
NATIVE SOIL BACKFILL
EXISTING SLOPE
4-INCH DEEP SAUCER BERM
KEEP AWAY FROM PLANT TRUNK OR STEM.
3-INCH DEEP MULCH LAYER.
CONTAINER PLANT
CHANNEL BOTTOM
TRANSITION
2:1 SLOPE
EXISTING SLOPE
OF ROOTBALL
DIG HOLE 2 X THE DIA.
SECTION VIEW
EXISTING WETLAND
5 FEET DEEP X 10 INCH THICK.
BANK MATERIAL AND SALVAGED TOPSOIL,
BACKFILL WITH PREVIOUSLY EXCAVATED
POLE PLANTING
POLE PLANTING
RECP TYPE 4 (INSIDE LAYER)
MIN. BELOW WATER TABLE.
PLANT TO EXTEND 6-INCHES
/1
/2
A M
ORDINARY HIGH WATER MARK (OHWM)
LOWER HALF OF WATTLE IS BELOW THE
10 INCH DIA. MIN. INSTALL SO THAT
CHANNEL BANK
WOOD STAKES, 2-FEET LONG, TYP.
REFER TO WILLOW WATTLES SECTION 02942S.3.
WATTLE TO EXTEND BACK TOWARD BANK.
WRAP BOTH RECP TYPE 4 AND COIR WOVEN GEOTEXTILE AROUND WILLOW 2.
WATTLE.
STAKE WILLOW WATTLES EVERY 4 FEET. PLACE STAKES ON BOTH SIDES OF THE 1.
NOTES:
5'
SALERATUS CREEK OHWM
SALERATUS CREEK OHWM
/1 7/
APPENDIX B
Saleratus Creek Mitigation Site – Contractor Bid Cost Sheet
Item # Item Name Cost Unit
7.1 A.1 Target Plant Species (TPS) Control -$ Annual Lump Sum
7.2 B (Low-Bid Estimate and Contract Award) = -$ Annual Lump Sum
7.1 B.1 Tractor Mowing -$ per Acre
7.1 B.2 Walk-Behind Brush Mower -$ per Acre
7.1 B.3 Trimmer -$ per Acre
Item # Item Name Cost Unit
7.3 A.1 Re-seed Roadside/Upland (Mix A)Habitat Areas -$ per 1/10th Acre
7.3 A.2 Re-seed Wet Meadow (Mix D) Habitat Areas -$ per 1/10th Acre
7.3 A.3 Re-seed Emergent Marsh (Mix C) Habitat Areas -$ per 1/10th Acre
7.3 B.1 Utah Serviceberry (Amelanchier utahensis), #1 container size -$ per Each
7.3 B.2 Red-osier Dogwood (Cornus sercia), #1 container size -$ per Each
7.3 B.3 Chokecherry (Prunus virginiana), #1 container size -$ per Each
7.3 B.4 Three-leaf Sumac (Rhus trilobata), #1 container size -$ per Each
7.3 B.5 Golden Currant (Ribes aureum), #1 container size -$ per Each
7.3 B.6 Wood’s Rose (Rosa woodsii), #1 container size -$ per Each
7.3 B.7 Silver Buffaloberry (Shepherdia argentea), #1 container size -$ per Each
7.3 B.8 Coyote Willow (Salix exigua), Live Cutting -$ per Each
7.3 B.9 Bebb’s Willow (Salix bebbiana), Live Cutting -$ per Each
7.3 B.10 Yellow Willow (Salix lutea), Live Cutting -$ per Each
7.3 B.11 Peachleaf Willow (Salix amygdaloides), Pole Planting -$ per Each
7.3 B.12 Fremont Cottonwood (Populus fremontii ), Pole Planting -$ per Each
7.3 B.13 Fremont Cottonwood (Populus fremontii ), #5 container -$ per Each
7.3 B.14 Narrowleaf Cottonwood (P. angustifolia ), Pole Planting -$ per Each
7.3 B.15 Narrowleaf Cottonwood (P. angustifolia ), #5 container -$ per Each
Notes regarding Costs and UDOT Award Total (i.e., Low-Bid Total)
3. Contract work will be paid based amount of each work item completed and bid prices provided in Contractor Bid Cost Sheet.
1. See Part 7.2 for UDOT Contract Award procedures
2. Bid Prices in 7.3 will not be use to calculate the Low-Bid Estimate or contract award.
2027 Scope of Work
Saleratus Creek Mitigation Site - Vegetation Control Contract
CONTRACTOR BID COST SHEET
7.1 Scope of Work Bid Prices & 7.2 Low-Bid Estimate
7.3 Additional Work Items (only as requested by UDOT, see Part 5)
APPENDIX C
Applicable Seed Schedule & 2026 UDOT Applicable Standard
Specifications:
Section 02922 (Seed, Turf Seed, and Turf Sod) Section 02924 (Noxious Weed Control)
Section 02932 (Landscape Plants)
Seed, Turf Seed, And Turf Sod 02922 – Page 1 of 7
2027 Standard Specifications Latest Revision: June 8, 2023
SECTION 02922
SEED, TURF SEED, AND TURF SOD
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Seed, turf seed, and turf sod requirements and application.
B. Surface preparation.
1.2 RELATED SECTIONS Not Used
1.3 REFERENCES
A. Utah Fertilizer Act, Utah Code, Title 4, Chapter 13
B. Utah Seed Act, Utah Code, Title 4, Chapter 16
1.4 DEFINITIONS Not Used
1.5 SUBMITTALS
A. Manufacturer’s directions on drill calibration seven calendar days before seeding, for information. Refer to this Section, Article 3.3.
B. Seed substitution request, for review, if required. Refer to this Section, Article 2.1
C. Quantity of seed required, for review. Include at least the following:
1. Description of the measuring technique of the area to receive seed.
2. Calculated area to receive drill seed, broadcast seed, turf seed, or turf sod.
3. Calculation of total quantity of seed, turf seed or turf sod to be purchased.
D. The following documentation from seed supplier, for information:
1. Letter of Certification documenting the purchase and mixing of project seed schedule, including any authorized seed substitutions.
Include at least the following:
a. Common name of each seed.
b. Lot number of each seed
c. Purity percent of each seed
02922 – Page 2 of 7
2027 Standard Specifications Latest Revision: June 8, 2023
d. Germination percent of each seed
e. Dormant or hard seed percent of each seed
f. Bulk lb and percent of each seed.
g. Pure Live Seed (PLS) lb of each seed.
h. Total combined bulk lb of project seed schedule.
i. Total combined PLS lb of project seed schedule.
j. Total number of bags and bulk lb per bag delivered.
2. Certified Copy of Seed Analysis for each seed, including any authorized seed substitutions. Include at least the following on seed certification reports and labels:
a. Botanical name and common name, including variety.
b. Name of seed testing laboratory
c. Origin and Lot number
d. Purity percent
e. Inert matter percent
f. Other crop percent
g. Weed seed percent
h. Noxious Weed percent
i. Germination percent
j. Dormant or hard seed percent
k. Total Viability percent
l. PLS percent
m. Last seed germination test date (month and year)
E. Certification that turf sod is nursery grown and contains grass species shown, for review.
F. Documentation indicating the date and time turf sod was cut at the nursery, for information.
G. Fertilizer labels, for information.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Notify Engineer seven calendar days before purchasing and mixing project seed schedule shown or as modified by authorized seed substitution request.
B. Deliver seed or turf seed to project in original seed supplier bags showing analysis of seed mixture, net…