4-Attachment B Scope of Work.docx
DOCX document 15 KB Posted
- Solicitation number
- AS27-114
- Issued by
- Utah
About this file
This Scope of Work is issued by the State of Utah Department of Natural Resources Division of Wildlife Resources in conjunction with the Division of Forestry, Fire, and State Lands for aerial herbicide application services. The project involves herbicide application to control cheatgrass across approximately 304 acres in the West Tintic Mountains (Juab County) following the Cherry wildfire, with elevations ranging from 5,700 to 6,800 feet. The contractor must apply Plateau herbicide at 6 ounces per acre mixed in a minimum of 8 gallons of water per acre plus 1 quart non-ionic surfactant per 100 gallons of spray mix. Application work must be completed by October 15, 2026, with spraying required to begin by 8:00 a.m. to minimize wind drift. The government reserves the right to postpone operations if wind speed exceeds 10 miles per hour. The nearest suitable airports for operations are Tooele Municipal or Provo Municipal Airport, with suitable dirt roads for landing available within 2 miles of project locations.
Bids must be submitted on a cost-per-acre basis, and the selected vendor must guarantee its pricing through project completion. The contractor is responsible for supplying all herbicide, surfactant, water, equipment, and personnel necessary for loading and mixing herbicide. The aircraft must be equipped with GPS technology to establish application lines ensuring 100 percent coverage. This is an Invitation for Bid anticipated to result in a single contract award to the lowest cost responsive and responsible vendor. No site visits, bidder conferences, or specific response deadlines are mentioned in the scope of work document.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B SCOPE OF WORK
#AS27-114
STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES
DIVISION OF WILDLIFE RESOURCES
REQUEST FOR QUOTE
AERIAL HERBICIDE APPLICATION SPECIFICATIONS
Project: FFSL and UDWR Aerial Herbicide Contract Cherry Fire
Description: The Division of Forestry, Fire, and State Lands and Utah Division of wildlife resources (DWR) are acquiring services for herbicide application to control cheatgrass following the Cherry wildfire.
Location: The project will occur in the West Tintic Mountains (Juab County). Elevations range from 5,700 to 6,800 feet. A vicinity map is attached showing the site.
Nearest Airport: The nearest airports to the project area are Tooele Municipal or Provo Municipal Airport. There are suitable dirt roads for landing near the project locations (within 2 miles).
Acreage: Approximately 304 acres.
Pricing: Bids are to be submitted on a cost per acre basis.
Herbicide Rate: Plateau herbicide (BASF corp.) will be applied at 6 oz/acre in a minimum of 8 gallons of water/acre + 1 quart non-ionic surfactant per 100 gallons of spray mix. The contractor is responsible for supplying all herbicide, surfactant, and water.
GPS Technology: The aircraft must be equipped with a global positioning system that is used to establish lines for 100% coverage.
Application Dates: Must be completed by October 15, 2026.
Timing: The contractor will be expected to begin spraying by 8:00 a.m. to avoid windy conditions and minimize drift. The government reserves the right to postpone the operation if wind speed exceeds 10 miles per hour.
DWR Assistance: The contractor will be responsible for providing necessary equipment and personnel to load and mix herbicide.