This document is a Cost Sheet (Attachment C) for the Pilot Pond Exclosure Project, issued by the State of Utah Division of Purchasing and Department of Natural Resources. The project involves installing an exclosure fence with specific material requirements, including 110 steel pipe fenceline posts (9' length, 2 7/8" outside diameter), 45 steel pipe top rails (25' length), 135 steel sucker rod bottom rails, and two gates (one 16' and one 4', in green, brown, or gray). The contract must be completed by October 27, 2025, with vendors required to guarantee pricing through project completion.
The cost sheet instructs offerors to provide pricing for all yellow-highlighted line items, with the total overall cost (parts and labor) being the primary evaluation metric. Submissions must include all labor and travel expenses, and any alterations to the provided formulas will result in the bid being deemed unresponsive. The procurement aims to award a single contract to the lowest cost responsive and responsible vendor, with the expectation that the selected vendor will handle all mobilization, demobilization, equipment, and labor required for brush clearing and fence construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Vendor Prerequisites - IFB Agency.pdf | ||
| 2-AK26-5 Attachment A - Agency-Terms-and-Conditions-GS.docx | DOCX document | |
| 3-AK26-5 Attachment B - Scope of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Sheet Attachment C - Cost Sheet
AK26-5
Pilot Pond Exclosure Project
| 1 | Offeror must provide a cost in all line items in yellow to be considered responsive. | ||
| 2 | All cells in yellow require an input. Cost will be evaluated by total found in Cell E18 | ||
| 3 | Any submission that contains alterations to the formulas will deem the submission unresponsive | ||
| 4 | Submitted cost(s) should be inclusive of labor and travel expenses | ||
| 5 | If there are any questions or concerns regarding this cost sheet, please submit a question during the Q&A period. Any deviation from this format may result in disqualification of Offeror's bid. | ||
| Offeror Name: | |||
| Cost Proposal (Review Attachment B - Scope of Work) | |||
| Please provide your contract pricing to provide services found in Scope of Work for Installation. Installation includes all mobilization, demobilization, equipment,and all labor required to clear brush and constrct the exclosure fence. Materials include all materials described in the statement of work for the exclosure fence. | |||
| Materials Description | Estimated Quantity | Cost | |
| Steel Pipe (Fenceline Postss) - 9' (length) * 2 7/8" (outside diameter) | 110 | $ - 0 | |
| Steel Pipe (Top Rail) - 25' (length) * 2 7/8" (outside diameter) | 45 | $ - 0 | |
| Steel Sucker Rod - Three Bottom Rails - 25' (length) X3/4" | 135 | $ - 0 | |
| Gate (Powder River or equivalent) - 16'(6 rail gate) (Color - Green, Brown, or Gray) | 1 | $ - 0 | |
| Gate (Powder River or equivalent) - (4'(6 rail gate) (Color - Green, Brown, or Gray) | 1 | $ - 0 | |
| Total | $ - 0 |
| Total Overall Cost (Parts and labor) : | ||
| (Cost shall be evaluated by this amount) | $ - 0 |