4-Addendum No. 1.pdf

PDF 94 KB Posted

Attached to
Contract No. 2026-439 Route 19 Waterline Replacement Project
Solicitation number
US.253294
Issued by
Butler County, Pennsylvania

About this file

This addendum to Contract No. 2026-439 - Route 19 Waterline Replacement Project issued by Cranberry Township's Engineering Department on October 6, 2026, modifies the Instructions to Bidders section of the contract documents. The addendum clarifies that the PennBid platform imposes no subscription or registration fees for bidders. Sealed electronic bids are due by 10:00 AM on Tuesday, November 10, 2026, via PennBid (www.pennbid.net), at which time bids will be opened with results made available on the platform. All bids must be accompanied by a certified check or bid bond in the amount of $1,000 payable to Cranberry Township. All bids shall remain irrevocable for 90 days following the actual bid opening date.

Only contractors awarded a contract will be assessed a PennBid fee capped at one-third of one percent (1/3 of 1%) of the contract value for fixed-fee contracts, with a minimum award fee of $150 and a maximum cap of $6,000 plus applicable tax. The Route 19 Waterline Replacement Project is estimated to cost greater than $25,000 and will be partially funded using EPA Grant monies, requiring Davis-Bacon Prevailing Wage compliance and contractor demonstration of adherence to Federal requirements associated with EPA funding. The Board of Supervisors reserves the right to reject any or all bids and to waive any defects or irregularities in the best interest of the Township.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

October 6, 2026 Page 1 of 1

TO ALL PLANHOLDERS OF RECORD

This addendum is issued in accordance with the requirements of the Contract Documents prepared by Cranberry Township’s Engineering Department titled 2026-439 – Route 19 Waterline Replacement Project and shall be considered part of said Contract Documents.

A. Where any part of the Contract Documents are modified or voided by this Addendum, the unaltered portions shall remain in effect.

CHANGES TO THE CONTRACT DOCUMENTS

A. Article 1 – Bidding Documents:

1. N/A

B. Article 2 – Instructions to Bidders

1. The PennBid platform has no subscription fees or registration fees for bidder. Only bidders awarded a contract will be assessed a capped fee of 1/3 of 1% of the contract value for a fixed fee contract. There is a minimum award fee of $150 and is capped at $6,000 (+tax). Please refer to https://pennbid.net/vendor-bidder-information/ for further information.

CHANGES TO THE TECHNICAL SPECIFICATIONS

A. N/A

CHANGES TO THE CONSTRUCTION DRAWINGS

A. N/A

END OF ADDENDUM NO. 1