2-Rt 19 Phase 1 Tech Specs.pdf

PDF 3 MB Posted

Attached to
Contract No. 2026-439 Route 19 Waterline Replacement Project
Solicitation number
US.253294
Issued by
Butler County, Pennsylvania

About this file

This file contains technical specifications for the Route 19 Waterline Replacement Project (Contract No. 2026-439) managed by the Cranberry Township Board of Supervisors in Butler County, Pennsylvania. The project requires all labor, materials, supervision, and equipment necessary for the replacement of the Route 19 waterline as detailed in the specifications document. Sealed bids were to be submitted electronically via the PennBid program (www.pennbid.net) by 10:00 AM on Tuesday, November 10, 2026, at which time bids would be opened and results made available on PennBid. All bids were required to remain irrevocable for 90 days following the bid opening date. No site visits, bidders' meetings, or conferences are mentioned in the opportunity documentation.

The estimated project cost exceeds Twenty-five Thousand Dollars ($1,000), and all bids must be accompanied by a certified check or bid bond in that amount payable to Cranberry Township. The project will be partially funded using EPA Grant monies, which triggers Davis-Bacon Prevailing Wage requirements and mandates contractor compliance with associated federal requirements. Contractors must demonstrate their ability to meet these federal compliance obligations. The Board of Supervisors reserves the right to reject any or all bids and to waive any defects or irregularities in the best interest of the Township.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATON

ROUTE 19 WATERLINE REPLACEMENT PROJECT

CONTRACT NO. 2026-439

CRANBERRY TOWNSHIP

2525 ROCHESTER ROAD, SUITE 400

CRANBERRY TOWNSHIP, PA 16066-6499

PREPARED BY:

PENN E&R

ENVIRONMENTAL & REMEDIATION, INC.

100 RYAN COURT, STE. 20

PITTSBURGH, PA 15205

ARTICLE 5 – SPECIFICATIONS

5.1.1 GENERAL INFORMATION – BASE BID

5.1.2 GENERAL INFORMATION – ALTERNATE BID

5.2 TECHNICAL SPECIFICTIONS

5.3 BID DRAWINGS

5.1.1 GENERAL INFORMATION – BASE BID

For the Base Bid: Provide all labor, material, equipment, and supervision necessary for the installation of approximately 2,200 linear feet of 12-inch and approximately 2,300 linear feet of 8-inch waterline and 20 linear feet of 6-inch waterline along PA State Route 19, & Brandt Drive, as specified more clearly in the Contract Documents.

It is the intent of these specifications to provide a new complete and workable potable water line system.

Any item not specifically called for in the specifications, but which are normally required to conform with the intent, is to be considered as part of the contract.

Provide any additional items not specifically mentioned herein but necessary for the proper performance and function of the system, without claim for additional payment.

Submit four (4) sets of detailed shop drawings/catalog cut sheets for as-specified material for approval.

Shop drawings shall include and clearly indicate the addition of any items not detailed herein, but necessary to provide a properly functioning and complete system.

1. The Unit Cost for Mobilization/Demobilization shall include all equipment, fuel, tools, labor, etc. to enter, prepare at, and leave the job site.

2. The Unit Cost for the Erosion & Sedimentation Controls shall include all labor, materials, and equipment necessary to install Compost Filter Socks, Inlet Protection, Pumped

Water Filter Bags, E&S Blankets, and any other required erosion and sedimentation controls and maintain them, in good working order, over the life of the construction project. Installation and maintenance shall be in accordance with the PADEP E&S

Manual.

3. The Unit Cost for Connect to 8" Waterline with Tapping Sleeve & Valve shall include all labor, excavation, backfill, equipment, bedding, and related items to connect the existing waterline to the proposed waterline with a tapping sleeve, including but not limited to installing resilient wedge gate valves, a reducer, blocking and Megalugs (or approved equal), as detailed and directed, complete and in place.

4. The Unit Cost for Connect to 12" Waterline with Tapping Sleeve & Valve shall include all labor, excavation, backfill, equipment, bedding, and related items to connect the existing waterline to the proposed waterline with a tapping sleeve, including but not limited to installing proposed resilient wedge gate valves, a reducer, blocking and Megalugs (or approved equal), as detailed and directed, complete and in place.

5. The Unit Cost for Remove Existing Fire Hydrant and Deliver to Township shall include all labor, excavation, backfill, equipment, plugging, and related items to remove hydrant from deactivated waterline and properly seal and deliver hydrant to Township as directed, complete and in place.

6. The Unit Cost for the Fire Hydrant Installation shall be in accordance with The Township's Public and Private Improvements Code - Detail SW-23 and shall include excavation, backfill, compaction, labor, fuel, bedding, material (including but not limited to: hydrant anchor tee, valve, 6” waterline, restraint glands / Megalugs (or approved equal), fire hydrant (Mueller Super Centurion 250, A-423), concrete blocking, activation and connection to main, bury depth 4.5 feet as detailed and directed, complete & in place.

7. The Unit Cost for 1” Service Connection shall include all labor, fuel, excavation, equipment, and material necessary for installing a corporation stop, curb box, curb stop, and bushing and connection to the existing water service line as detailed and directed, complete and in-place.

8. The Unit Cost for 1” HDPE SDR-9 Service Line shall include all labor, excavation, fuel, equipment, and material necessary for installing service line and tracer wire and detection tape as called out, detailed and directed, complete and in-place.

9. The Unit Cost for 2” Service Connection shall include but not be limited to all labor, fuel, excavation, equipment, and material necessary for installing 2” saddle, corporation stop, curb stop, curb box, and bushing for connecting to the existing 2” water service line as called out, as detailed and directed, complete and in-place.

10. The Unit Cost for 2” HDPE SDR-9 Service Line shall include all labor, excavation, fuel, equipment, and material necessary for installing 2” service line and tracer wire and detection tape as called out, detailed and directed, complete and in-place.

11. The Unit Cost for 1.5” Service Connection shall include all labor, fuel, excavation, equipment, and material necessary for installing corporation stop, curb box and curb stop, bushing and connection to existing water service line as called out, detailed and directed, complete and in-place.

12. The Unit Cost for 1.5” HDPE SDR-9 Service Line shall include all labor, excavation, fuel, equipment, and material necessary for installing service line and tracer wire and detection tape as called out, detailed and directed, and complete and in-place.

13. The Unit Cost for 6" Service Connection shall include all labor, fuel, equipment, and material necessary for installing tee, 6” waterline, blocking, resilient wedge gate valve, curb box, and connect to existing 6” service line as called out, detailed and directed, complete and in-place.

14. The Unit Cost for Cut and Cap Existing 12” Waterline shall include all labor, excavation, fuel, equipment, and material necessary for cutting and capping existing 12” waterline, as detailed and directed, complete and in-place.

15. The Unit Cost for Cut and Cap Existing 8” Waterline shall include all labor, excavation, fuel, equipment, and material necessary for cutting and capping existing 8” waterline, as detailed and directed, complete and in-place.

16. The Unit Cost for Cut and Cap Existing 6” Waterline shall include all labor, excavation, fuel, equipment, and material necessary for cutting and capping existing 6” waterline, as detailed and directed, complete and in-place.

17. The Unit Cost for 2” Combination Valve shall include all labor, excavation, equipment, grading, and related items to install a precast, four-foot diameter manhole flush to existing grade, containing an 8”X8”X 2” tee, 2” shutoff valve, and 2” ARI D046PN16-T2 combination air valve or approved equal, as detailed and directed, complete and in place.

18. The Unit Cost for 6” Resilient Wedge Gate Valve shall include all labor, excavation, fuel, equipment, and material necessary for the installation of a 6” resilient wedge gate valve, blocking, and three-piece valve box as detailed and directed, complete and in-place.

19. The Unit Cost for 8” Resilient Wedge Gate Valve shall include all labor, excavation, fuel, equipment, and material necessary for the installation of a 8” resilient wedge gate valve, blocking and three-piece valve box as detailed and directed, complete and in-place.

20. The Unit Cost for 12” Resilient Wedge Gate Valve shall include all labor, excavation, fuel, equipment, and material necessary for the installation of a 12” resilient wedge gate valve, blocking and three-piece valve box as detailed and directed, complete and in-place.

21. The Unit Cost for 8x6x8 Tee and 6” Valve shall include all labor, fuel, equipment, and material necessary for installing an 8x6x8 tee and blocking and resilient wedge gate valve and three-piece valve box as called out, detailed and directed, complete and in-place.

22. The Unit Cost for 12x12x6 Tee shall include all labor, fuel, equipment, and material necessary for installing an 12x12x6 tee and blocking, as detailed and directed, complete and in-place.

23. The Unit Cost for 12x12x12 Tee shall include all labor, fuel, equipment, and material necessary for installing an 12x12x12 tee and blocking, as detailed and directed, complete and in-place.

24. The Unit Cost for 8x8x8 Tee shall include all labor, fuel, equipment, and material necessary for installing an 8x8x8 tee and blocking, detailed and directed, complete and in-place.

25. The Unit Cost for 8x8x8 Tee and Three Valves shall include all labor, fuel, equipment, and material necessary for installing an 8x8x8 tee and blocking and 8”resilient wedge gate valves and three-piece valve boxes as called out, detailed and directed, complete and in-place.

26. The Unit Cost for 8x8x8 Tee and Two Valves shall include all labor, fuel, equipment, and material necessary for installing an 8x8x8 tee and blocking and 8” resilient wedge gate valves and three-piece valve boxes as called out, detailed and directed, complete and in-place.

27. The Unit Cost for 12x8 Reducer shall include all labor, fuel, equipment, and material necessary for installing an 12x8 reducer, detailed and directed, complete and in-place.

28. The Unit Cost for the 12” PVC C-900 DR-14 PVC Waterline shall include and not be limited to all excavation, bedding, labor, equipment, fuel, tools, Megalug mechanical joint glands, miscellaneous fittings, elbows, bends, gaskets, concrete blocking, restraining joints, tracer wire installation, detection tape, and flushing as specified, as detailed and directed, complete and in place to install waterline.

29. The Unit Cost for the 8” PVC C-900 DR-14 PVC Waterline shall include and not be limited to all excavation, bedding, labor, equipment, fuel, tools, Megalug mechanical joint glands, miscellaneous fittings, elbows, bends, gaskets, concrete blocking, restraining joints, tracer wire installation, detection tape, and flushing as specified, as detailed and directed, complete and in place to install waterline.

30. The Unit Cost for the 6” PVC C-900 DR-14 PVC Waterline shall include and not be limited to all excavation, bedding, labor, equipment, fuel, tools, Megalug mechanical joint glands, miscellaneous fittings, elbows, bends, gaskets, concrete blocking, restraining joints, tracer wire installation, detection tape, and flushing as specified, as detailed and directed, complete and in place to install waterline.

31. The Unit Costs for Concrete Encasement shall include all labor, excavation, equipment, and material necessary to provide a 1’ thick, 3,500 psi concrete encasement surrounding the installed waterline for separation from existing utilities, as directed and detailed, complete and in place.

32. The Unit Cost for 2A Limestone Select Backfill shall include all labor, material, equipment, tools, fuel, and transportation for installing 100% PennDOT-approved 2A limestone backfill at the top of the pipe bedding in the waterline trench, where the waterline is within three feet of the edge of a road and will be repaved, as directed and detailed, complete and in place.

33. The Unit Cost for AASHTO #57 Limestone Select Backfill shall include all labor, material, equipment, tools, fuel, and transportation for installing AASHTO #57 limestone backfill above the pipe bedding in the waterline trench where the waterline is under or within three feet of the edge of a road, as directed and detailed, complete and in place.

34. The Unit Cost for Plain Cement Concrete Pavement, 9” Depth (PennDOT ROW) shall include all labor, material, equipment, tools, fuel, and transportation for installing nine-inch-thick plain cement concrete pavement in trench, all edge and surface cleaning, sealing, keyways, power brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 Standards and Details, including the re-establishment of subsurface drains that may be affected during the construction project as directed in the field, complete and in-place.

35. The Unit Cost for 19mm Binder Course, 4.5” Depth (PennDOT ROW) shall include all labor, material, equipment, tools, fuel, and transportation for installing four and a half-inch compacted thickness SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64E-22, 3 to < 10 MILLION ESALS, 19MM MIX,, WMA binder course in trench and including but not limited to one-foot cutbacks, all edge and surface cleaning, sealing, tack coat, keyways, wedge curb restoration, brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 Standards and Details, including the re-establishment of subsurface drains and driveway aprons that may be affected during the construction project as directed in the field, complete and in-place.

36. The Unit Cost for 9.5mm Leveling Course, 1” Depth (PennDOT ROW) shall include all labor, material, equipment, tools, fuel, and transportation for installing SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING (LEVELING) COURSE, PG 64E-22, 3 to < 10 MILLION ESALS, 9.5MM MIX, 1 INCH DEPTH, SRL-L, WMA leveling course 1” compacted thickness leveling course in trench and including but not limited to one-foot cutbacks, all edge and surface cleaning, sealing, tack coat, keyways, wedge curb, brooming, compaction, temporary and permanent paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 and Township Standards and Details, including re-establishment of bituminous wedge curbs, driveway aprons, and subsurface drains that may be affected during the construction project as directed in the field, complete and in-place.

37. The Unit Cost for 9.5mm Wearing Course, 1.5” Depth shall include all labor, material, equipment, tools, fuel, and transportation for installing PG 64E-22, 3 to < 10 MILLION ESALS, 9.5MM MIX, 1.5 INCHES DEPTH, SRL-H, WMA wearing course 1.5” compacted thickness wearing course in trench and including but not limited to one-foot cutbacks, all edge and surface cleaning, sealing, tack coat, keyways, wedge curb, brooming, compaction, temporary and permanent paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 and Township Standards and Details, including re-establishment of bituminous wedge curbs, driveway aprons, valve covers and subsurface drains that may be affected during the construction project as directed in the field, complete and in-place.

38. The Unit Cost for Saw Cut Asphalt Road shall include all power brooming, saw cutting, and joint sealing. All work shall be performed as per the Township Standards and Details, as detailed and directed, complete and in place.

39. The Unit Cost for Remove and Replace Guiderail shall include all removal and replacement of undamaged guide rail. All work shall be performed as per the PennDOT 408 Standards and Details, as detailed and directed, complete and in place.

40. The Unit Cost for Remove and Replace Road Sign shall include all removal and replacement of undamaged road/ directional sign. All work shall be performed as per the most recent Edition of the MUTCD and per PennDOT 408 Standards and Details, as detailed and directed, complete and in place.

41. The Unit Cost for ADA Ramp Replacement shall include all excavation, removal and disposal of existing ramps and sidewalks to complete and install PennDOT-compliant ADA ramps and disturbed curb in kind. All ramps shall have cast iron truncated dome warning strips installed and follow the specified ramp installation type. All work shall be performed as per the PennDOT 408 Standards and Details, as detailed and directed, complete and in place.

42. The Unit Cost for Crosswalk, Lane Lines & Stop Bar Painting Restoration shall include all labor and equipment to place and match the existing epoxy pavement markings, and any new ADA crossings, as per section 964 of PennDOT Pub 408 and all 408 standards, as detailed and directed, complete and in place.

43. The Unit Cost for Exploratory Excavation/ Potholing shall include all labor and equipment to conduct exploratory excavation, backfill, and restoration as directed in the field by the Owner or Owner’s representative.

44. The Unit Cost for Seeding & Restoration shall include all labor, fuel, equipment, and material necessary for reseeding, mulching and re-establishing 80% vegetative cover, for all non-impervious, vegetated, lawn restoration areas impacted by construction. Screened topsoil shall be used in the restoration of lawn areas and seeding shall be conducted per project plans and Township Standards and Details. The removal of all temporary E&S controls after the work areas have been stabilized and 80% healthy vegetation re-established shall be included in this line item.

45. The Unit Cost for Traffic Control shall include all labor, equipment, fuel, tools, approved apparatus for site preparation and installation of any PennDOT-approved traffic control measures, including temporary detours, safety barriers and driveway closures, per the project’s details and approved PennDOT Highway Occupancy Permit (HOP). The HOP shall remain on site and followed at all times, including Contractor coordination with PennDOT and the Township. All traffic controls shall remain in place and be adjusted as work progresses as needed each day both when construction activities are occurring and after hours. It is the responsibility of the Contractor to adhere to and maintain property site safety at all times.

46. The Unit Cost for As Built Survey shall include all labor, material, equipment, fuel, tools and transportation necessary to survey the completed project limits and document final conditions of the entire project area. A final plan with all pertinent grades, elevations, features, fixtures and surface information shall be provided, in PDF and DWG formats, to the Township.

47. The Unit Cost for Sidewalk Replacement shall include all labor, material, excavation, backfill, equipment, fuel, tools, and transportation necessary to replace existing disturbed sidewalk to match existing sidewalk with a minimum of 4” of AA Concrete. Work to include, removal and disposal of existing disturbed sidewalk, as specified, called out, as detailed and directed, complete and in-place.

48. The Unit Cost for Concrete Curb Replacement shall include all labor, material, excavation, backfill, and equipment, to remove and replace plain cement concrete curb in kind, as per section 630 of the Penn DOT PUB 408, as detailed and directed, complete and in-place.

49. The Unit Cost for Waterline Testing shall include all materials and equipment necessary for testing all installed waterline and associated items, including but not limited to, pipe, tees, fittings and valves. Testing includes but is not limited to pressure and bacteria testing and shall be conducted per Township’s Standards and Details and Public and Private Improvements Code, as directed and detailed complete and in place. This item shall include proof of bacteria test results, witness and approval from Township, and activating the waterline for testing and for final use.

50. The Unit Cost for the Hauling of Spoil Materials shall include all labor, material, equipment, fuel, tools, transportation and proper disposal of excess fill or demolished pavement materials, at a Township-approved permitted disposal site. All required items and efforts to ensure proper disposal are covered in this item and approval must be received from the Township prior to starting any work. This item includes but is not limited to excess fill removed from trenches which will be replaced with stone as called out, detailed and directed, complete and in-place.

51. The Unit Cost for the Remove Abandoned Water Valve and Curb Box shall include all labor, material, equipment, fuel, tools, lid removal, filling to grade with concrete, and proper disposal of existing abandoned curb boxes and water valves as called out, detailed and directed, complete and in-place.

5.1.2 GENERAL INFORMATION – ALTERNATE BID

For the Alternate Bid: Provide all labor, material, equipment, and supervision necessary for the installation of approximately 1,915 linear feet of 8-inch and approximately 100 linear feet of 6-inch waterline along Smith Drive and Wisconsin Avenue, as specified more clearly in the Contract

Documents.

It is the intent of these specifications to provide a new complete and workable potable water line system.

Any item not specifically called for in the specifications, but which are normally required to conform with the intent, is to be considered as part of the contract.

Provide any additional items not specifically mentioned herein but necessary for the proper performance and function of the system, without claim for additional payment.

Submit four (4) sets of detailed shop drawings/catalog cut sheets for as-specified material for approval.

Shop drawings shall include and clearly indicate the addition of any items not detailed herein, but necessary to provide a properly functioning and complete system.

1. The Unit Cost for the Erosion & Sedimentation Controls shall include all labor, materials, and equipment necessary to install Compost Filter Socks, Inlet Protection, Pumped Water Filter Bags, E&S Blankets, and any other required erosion and sedimentation controls and maintain them, in good working order, over the life of the construction project. Installation and maintenance shall be in accordance with the PADEP E&S Manual.

2. The Unit Cost for Connect to 6" Waterline with Tapping Sleeve & Valve shall include all labor, excavation, backfill, equipment, bedding, and related items to connect the existing waterline to the proposed waterline with a tapping sleeve, including but not limited to installing proposed resilient wedge gate valves, a reducer, blocking and Megalugs (or approved equal), as detailed and directed, complete and in place.

3. The Unit Cost for Connect to 8" Waterline with Tapping Sleeve & Valve shall include all labor, excavation, backfill, equipment, bedding, and related items to connect the existing waterline to the proposed waterline with a tapping sleeve, including but not limited to installing resilient wedge gate valves, a reducer, blocking and Megalugs (or approved equal), as detailed and directed, complete and in place.

4. The Unit Cost for Remove Existing Fire Hydrant and Deliver to Township shall include all labor, excavation, backfill, equipment, plugging, and related items to remove hydrant from deactivated waterline and properly seal and deliver hydrant to Township as directed, complete and in place.

5. The Unit Cost for the Fire Hydrant Installation shall be in accordance with The Township's Public and Private Improvements Code - Detail SW-23 and shall include excavation, backfill, compaction, labor, fuel, bedding, material (including but not limited to: hydrant anchor tee, valve, 6” waterline, restraint glands / Megalugs (or approved equal), fire hydrant (Mueller Super Centurion 250, A-423), concrete blocking, activation and connection to main, bury depth 4.5 feet as detailed and directed, complete & in place.

6. The Unit Cost for 1” Service Connection shall include all labor, fuel, excavation, equipment, and material necessary for installing a corporation stop, curb box, curb stop, and bushing and connection to the existing water service line as detailed and directed, complete and in-place.

7. The Unit Cost for 1” HDPE SDR-9 Service Line shall include all labor, excavation, fuel, equipment, and material necessary for installing service line and tracer wire and detection tape as called out, detailed and directed, complete and in-place.

8. The Unit Cost for 6" Service Connection shall include all labor, fuel, equipment, and material necessary for installing tee, 6” waterline, blocking, resilient wedge gate valve, curb box, and connect to existing 6” service line as called out, detailed and directed, complete and in-place.

9. The Unit Cost for Cut and Cap Existing 6” Waterline shall include all labor, excavation, fuel, equipment, and material necessary for cutting and capping existing 6” waterline, as detailed and directed, complete and in-place.

10. The Unit Cost for 6” Resilient Wedge Gate Valve shall include all labor, excavation, fuel, equipment, and material necessary for the installation of a 6” resilient wedge gate valve, blocking, and three-piece valve box as detailed and directed, complete and in-place.

11. The Unit Cost for 8” Resilient Wedge Gate Valve shall include all labor, excavation, fuel, equipment, and material necessary for the installation of a 8” resilient wedge gate valve, blocking and three-piece valve box as detailed and directed, complete and in-place.

12. The Unit Cost for 8x8x6 Tee and 6” Valve shall include all labor, fuel, equipment, and material necessary for installing an 8x8x6 tee and blocking and resilient wedge gate valve and three-piece valve box as called out, detailed and directed, complete and in-place.

13. The Unit Cost for 8x6x8 Tee shall include all labor, fuel, equipment, and material necessary for installing an 8x6x8 tee and blocking, as detailed and directed, complete and in-place.

14. The Unit Cost for 6x6x6 Tee shall include all labor, fuel, equipment, and material necessary for installing an 6x6x6 tee and blocking, as detailed and directed, complete and in-place.

15. The Unit Cost for 8x6 Reducer shall include all labor, fuel, equipment, and material necessary for installing an 8x6 reducer, detailed and directed, complete and in-place.

16. The Unit Cost for the 8” PVC C-900 DR-14 PVC Waterline shall include and not be limited to all excavation, bedding, labor, equipment, fuel, tools, Megalug mechanical joint glands, miscellaneous fittings, elbows, bends, gaskets, concrete blocking, restraining joints, tracer wire installation, detection tape, and flushing as specified, as detailed and directed, complete and in place to install waterline.

17. The Unit Cost for the 6” PVC C-900 DR-14 PVC Waterline shall include and not be limited to all excavation, bedding, labor, equipment, fuel, tools, Megalug mechanical joint glands, miscellaneous fittings, elbows, bends, gaskets, concrete blocking, restraining joints, tracer wire installation, detection tape, and flushing as specified, as detailed and directed, complete and in place to install waterline.

18. The Unit Cost for the Cap and Concrete Block Proposed Waterline shall include and not be limited to all excavation, labor, equipment, fuel, tools, Megalug mechanical joint gland, concrete blocking, and restraining joints, as detailed and directed complete and in place.

19. The Unit Costs for Concrete Encasement shall include all labor, excavation, equipment, and material necessary to provide a 1’ thick, 3,500 psi concrete encasement surrounding the installed waterline for separation from existing utilities, as directed and detailed, complete and in place.

20. The Unit Cost for 2A Limestone Select Backfill shall include all labor, material, equipment, tools, fuel, and transportation for installing 100% PennDOT-approved 2A limestone backfill at the top of the pipe bedding in the waterline trench, where the waterline is within three feet of the edge of a road and will be repaved, as directed and detailed, complete and in place.

21. The Unit Cost for AASHTO #57 Limestone Select Backfill shall include all labor, material, equipment, tools, fuel, and transportation for installing AASHTO #57 limestone backfill above the pipe bedding in the waterline trench where the waterline is under or within three feet of the edge of a road, as directed and detailed, complete and in place.

22. The Unit Costs for 25mm Base Course, 8” Depth (Township ROW) shall include (two four-inch compacted thickness lifts in trench), 25mm base course as per PennDOT 408, as directed in the field, complete and in-place, all edge and surface cleaning, sealing, tack coat, keyways, wedge curb restoration, power brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 Standards and Details, including the re-establishment of any subsurface drains that may be affected during the construction project.

23. The Unit Costs for 19mm Binder Course, 1.5” Depth (Township ROW) shall include all labor, material, equipment, tools, fuel, and transportation for installing 1.5-inch compacted thickness SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64E- 22, 3 to < 10 MILLION ESALS, 19MM MIX, WMA binder course in trench and including but not limited to one-foot cutbacks, all edge and surface cleaning, sealing, tack coat, keyways, wedge curb restoration, power brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per Township Standards and Details, including the re-establishment of subsurface drains, wedge curb, and driveway aprons that may be affected during the construction project as directed in the field, complete and in-place.

24. The Unit Cost for 9.5mm Wearing Course, 1.5” Depth (Township ROW) shall include all labor, material, equipment, tools, fuel, and transportation for installing PG 64E-22, 3 to < 10 MILLION ESALS, 9.5MM MIX, 1.5 INCHES DEPTH, SRL-H, WMA wearing course 1.5” compacted thickness wearing course in trench and including but not limited to one-foot cutbacks, all edge and surface cleaning, sealing, tack coat, keyways, wedge curb, brooming, compaction, temporary and permanent paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 and Township Standards and Details, including re-establishment of bituminous wedge curbs, driveway aprons, valve covers and subsurface drains that may be affected during the construction project as directed in the field, complete and in-place.

25. The Unit Cost for Saw Cut Asphalt Road shall include all power brooming, saw cutting, and joint sealing. All work shall be performed as per the Township Standards and Details, as detailed and directed, complete and in place.

26. The Unit Cost for Remove and Replace Road Sign shall include all removal and replacement of undamaged road/ directional sign. All work shall be performed as per the most recent Edition of the MUTCD and per PennDOT 408 Standards and Details, as detailed and directed, complete and in place.

27. The Unit Cost for Remove and Replace Trees shall include all trimming, cutting, excavation, disposal and replanting of new trees for any Township shade trees that were removed for the construction of the new water line. All work shall be performed per the Township Standards and Details, and the Contractor shall verify tree type, size and location with the Township prior to installation, as detailed and directed, complete and in place.

28. The Unit Cost for ADA Ramp Replacement shall include all excavation, removal and disposal of existing ramps and sidewalks to complete and install PennDOT-compliant ADA ramps and disturbed curb in kind. All ramps shall have cast iron truncated dome warning strips installed and follow the specified ramp installation type. All work shall be performed as per the PennDOT 408 Standards and Details, as detailed and directed, complete and in place.

29. The Unit Cost for Crosswalk, Lane Lines & Stop Bar Painting Restoration shall include all labor and equipment to place and match the existing epoxy pavement markings, and any new ADA crossings, as per section 964 of PennDOT Pub 408 and all 408 standards, as detailed and directed, complete and in place.

30. The unit cost for Brick Crosswalk Restoration shall include all labor and equipment to replace disturbed brick crosswalk in kind to match existing as per Penn DOT’s PUB 408, restoration as directed in the field by the Owner or Owner’s representative, complete and in place.

31. The Unit Cost for Exploratory Excavation/ Potholing shall include all labor and equipment to conduct exploratory excavation, backfill, and restoration as directed in the field by the Owner or Owner’s representative.

32. The Unit Cost for Seeding & Restoration shall include all labor, fuel, equipment, and material necessary for reseeding, mulching and re-establishing 80% vegetative cover, for all non-impervious, vegetated, lawn restoration areas impacted by construction. Screened topsoil shall be used in the restoration of lawn areas and seeding shall be conducted per project plans and Township Standards and Details. The removal of all temporary E&S controls after the work areas have been stabilized and 80% healthy vegetation re-established shall be included in this line item.

33. The Unit Cost for Traffic Control shall include all labor, equipment, fuel, tools, approved apparatus for site preparation and installation of any PennDOT-approved traffic control measures, including temporary detours, safety barriers and driveway closures, per the project’s details and approved PennDOT Highway Occupancy Permit (HOP). The HOP shall remain on site and followed at all times, including Contractor coordination with PennDOT and the Township. All traffic controls shall remain in place and be adjusted as work progresses as needed each day both when construction activities are occurring and after hours. It is the responsibility of the Contractor to adhere to and maintain property site safety at all times.

34. The Unit Cost for As Built Survey shall include all labor, material, equipment, fuel, tools and transportation necessary to survey the completed project limits and document final conditions of the entire project area. A final plan with all pertinent grades, elevations, features, fixtures and surface information shall be provided, in PDF and DWG formats, to the Township.

35. The Unit Cost for Sidewalk Replacement shall include all labor, material, excavation, backfill, equipment, fuel, tools, and transportation necessary to replace existing disturbed sidewalk to match existing sidewalk with a minimum of 4” of AA Concrete. Work to include, removal and disposal of existing disturbed sidewalk, as specified, called out, as detailed and directed, complete and in-place.

36. The Unit Cost for Concrete Curb Replacement shall include all labor, material, excavation, backfill, and equipment, to remove and replace plain cement concrete curb in kind, as per section 630 of the Penn DOT PUB 408, as detailed and directed, complete and in-place.

37. The Unit Cost for Waterline Testing shall include all materials and equipment necessary for testing all installed waterline and associated items, including but not limited to, pipe, tees, fittings and valves. Testing includes but is not limited to pressure and bacteria testing and shall be conducted per Township’s Standards and Details and Public and Private Improvements Code, as directed and detailed complete and in place. This item shall include proof of bacteria test results, witness and approval from Township, and activating the waterline for testing and for final use.

38. The Unit Cost for the Hauling of Spoil Materials shall include all labor, material, equipment, fuel, tools, transportation and proper disposal of excess fill or demolished pavement materials, at a Township-approved permitted disposal site. All required items and efforts to ensure proper disposal are covered in this item and approval must be received from the Township prior to starting any work. This item includes but is not limited to excess fill removed from trenches which will be replaced with stone as called out, detailed and directed, complete and in-place.

5.2 TECHNICAL SPECIFICTIONS

CRANBERRY TOWNSHIP PPIC

§17-403 - SANITARY SEWER AND PUBLIC WATER

SYSTEMS

§ 17-403. Sanitary Sewer and Public Water Systems. [Ord. 96-273, 9/5/1996; as amended by Ord. 2003-339, 4/1/2003, § 4; and by Ord. 2005-362, 12/15/2005]

1. General Requirements.

A. Introduction.

(1) These specifications cover the requirements construction of all of the Township's water and sewer line facilities. These specifications are intended for and apply to all such projects whether directly constructed by (a) contractor(s) under contract the Township, or constructed by a land developer who in turn employs a construction contractor(s).

(2) Where the term "Township" is used herein, it shall mean the Municipal Sewer and Water Authority of Cranberry Township, its employees, management, or Board, as is appropriate for each occurrence of use of the term. When necessary or the Township may call upon its engineering and/or legal consultants for advice and direction.

B. Inspection of Construction Work.

(1) All work performed in connection with the extension modification or improvement of public water or wastewater facilities within the Township shall be required to conform with all Township rules and regulations and shall be inspected during construction by an authorized representative of the Township.

(2) All completed work shall be required to meet the approval of the Township and shall be changed, modified, replaced, removed or otherwise corrected by the contractor to such extent as directed by the Township.

(3) The work will be periodically or continuously inspected during its progress and when completed, shall be in inspected jointly, by the Township and the contractor.

(4) The contractor shall keep on site, and make available upon request by the Township, a surveyor's rod and level for the purpose of spot checking elevations as the work progresses.

(5) The contractor shall also keep and make available a 300 feet surveyors tape for the purpose of spot checking distances and for the purpose of the contractor providing off-set measurements as the work progresses.

C. Rights-of-Way.

(1) The alignments and locations of the proposed pipe lines and appurtenances are shown on the plans on which street, highway and/or other acquired rights-of-way limits have also been superimposed. No pipe line shall be relocated outside of the street or other right-of-way within which it is shown without obtaining the formal written approval for such

:1 chance from the Township.

(2) Where a special pipe line right-of-way is obtained through private property, the minimum permanent width for operation and maintenance purposes shall be 20 feet; the width of the temporary right-of-way obtained through such private properties for initial pipe line installation and construction purposes shall be 40 feet, 10 feet of which shall be located adjacent to and on the outside of both limits of the permanent right-of-way. The minimum distance between the center of any longitudinal pipe line and the right-of-way limit line shall be five feet. All construction activities shall be confined within the 40 feet wide construction right-of-way as much as possible.

(3) The contractor shall, however, make his own arrangements for office space, materials storage yards, change trailers, sanitary facilities, utility services, debris disposal sites, and for ingress and egress to any location along the pipe line project for which the contractor desires or requires use and, for which the Township has been granted no such right-of-way.

(4) Proposed pipe lines and appurtenances may also encroach upon, right-of-way occupied by pipelines or other facilities owned, operated and/or maintained by other utility companies and/or governmental agencies. It shall be the responsibility of the contractor to notify the appropriate representatives of those agencies in advance of performing any work therein and, to conduct all construction activities in accordance with the respective regulations appertaining thereto. The contractor shall utilize the PA One Call System as required by law. The PA One Call telephone number is 1-800-242-1776.

(5) The position of water and sewer lines proposed to be constructed in connection with land development projects shall be such that, regardless of the sequencing of various utility line construction gas, power, telephone, water, storm sewer, sanitary sewers, etc. no pipe line shall be aligned longitudinally, along either the water or sanitary sewer lines, any closer than three feet. It is imperative that such minimum distance be maintained along all sanitary sewer and water lines to provide space required for future maintenance and/or repairs.

(6) The separation between sanitary sewer and waterline pipe(s) shall be in accordance with the regulations of the Pennsylvania Department of Protection, in accordance with Detail Drawing SW-5.

D. Control of Pipe Line Elevations and Alignments.

(1) The contractor shall confirm the elevation of all existing facilities to which proposed facilities will connect, as well as the profile of the existing and/or finished (in the case of land development projects) ground lines, prior to commencement of construction, to confirm compatibility.

§ 17-403 § 17-403

:2

(2) All sewer lines shall be required to be constructed and the elevations and alignment shall be controlled by the use of laser equipment. Sewer line construction shall begin at the manhole with the lowest invert elevation unless prior approval is granted by the Township. Water lines shall be installed on uniform slopes as indicated on the profiles to assure that the air release valves (where indicated) will function effectively. Similarly, such grade controls of waterlines shall also be implemented to assure that blow-off assemblies are properly located.

(3) The contractor shall employ competent field survey personnel as may be required to control grades and/or alignment of proposed facilities and to assist the Township by obtaining information during construction progress, and for purposes of preparing as-built record drawings.

E. Traffic Warning Signs, Barricades, Lights and Control.

(1) Where pipe lines and/or other facilities are constructed along State Highways and/or Township Streets, and where construction activities may otherwise impede normal vehicular traffic patterns on said highways or streets, the control of traffic shall be accomplished in accordance with the details set forth in Publication 203 of the Pennsylvania Department of Transportation, the title of which is "Work Zone Traffic Control."

(2) The position of work zone signs, erection of signs, sizes of signs, details and configuration of signs, traffic channelizing, tapered lengths/spacing, cones, drums, vertical panels, lighting devices, arrow boards and all flagging conduct and activities shall conform to the details described therein. The location and configuration of traffic control methods shall conform to those graphically illustrated on the appertaining Table 5 and Figures 5 through 23 shown in the publication. The contractor shall submit a traffic control plan and procedure (conforming to the above referenced Publication 203) to the Township for approval, prior to commencing with field construction.

F. Exploratory Excavations.

(1) Some of the proposed pipe lines and appurtenant structures are somewhat flexible with respect to alignment. Therefore, in those existing streets, roadways, berms or other areas expected to have a number of underground utility lines, where there are large trees which may be saved by realignment, and where the Township so directs, the contractor shall make appropriate exploratory excavations for the purpose of locating said lines.

(2) In all instances, the costs associated with exploratory excavations shall be the responsibility of the contractor, and any realignment of pipelines shall be approved by the Township.

G. Existing Utility Lines — Location, Protection and Hazards.

:3

(1) The plans show those underground water lines, gas lines, electric lines, cable TV lines, telephone lines, sanitary sewers, storm drains, conduits and other similar utility lines and appurtenances for which said location information was either made available to the designer, or was observed in the field. Neither the number of such underground facilities nor their respective types, sizes and/or locations can be assured or guaranteed and it is therefore, the responsibility of the contractor to obtain such additional information; as is required to properly complete the work in compliance with the specifications, and to contact the owners of the various utilities in the area prior to starting and during performance of the work accordance with 73 P.S. § 180.

(2) The approximate location of any power and telephone poles and guy poles along the route of the work is shown on the drawings and the overhead lines supported by all such poles shall be observed and located by the contractor prior to commencement of the work.

(3) The contractor shall be completely and solely responsible for any and all property damages, bodily injuries financial losses and interruption of service that results from or are attributable to his construction activities and, which affect water lines, gas lines, electric lines, telephone lines, drain lines, sanitary and storm sewer lines and all appurtenances and service facilities connected thereto. Restoration of all such disturbed facilities shall be accomplished immediately after incurrence thereto.

(4) Water, sewer, gas, power and telephone service to dwellings or places of business shall be maintained with a minimum of interruption throughout the construction of the contract work. No such service shall be intentionally interrupted without the approval of the respective utility company concerned, and without first giving due warning to the occupants of said dwelling or business establishment. At least three working days notice of an interruption in service shall be given to the Township so that the Township may notify its customers.

(5) In some areas, it may be found that existing pipe lines are in a location where construction of the proposed work cannot reasonably proceed until the utility has been relocated. The contractor shall make all necessary subsurfaces investigations and shall locate such utility mains far enough in advance of the trenching work so that work progress is not unnecessarily interrupted.

(6) Attention is directed to the fact that the proposed work could be in close proximity to overhead power lines which transmit electric current at high voltages and which, if disturbed or contacted during construction, would be hazardous to construction personnel and/or other persons. The contractor shall, therefore, properly protect such wires, pole supports or other power line appurtenances to avoid disturbance to those facilities, and shall operate all machinery and conduct all other construction

:4 activities in a manner which will assure protection of all construction personnel and other persons against said hazards.

(7) Work in the vicinity of the existing underground gas lines and appurtenances is also hazardous because under certain conditions, such materials are flammable and/or explosive and, the contractor shall avoid all temporary and permanent supports and other required protection to prevent exposure of the same to construction personnel and/or other persons. Where such lines are exposed during construction and leakage is detected, construction work in those areas shall be immediately suspended, the owner of the pipe lines shall be immediately advised of the condition and the construction work shall not resume until all repairs have been properly completed.

(8) The construction activities required to be performed in the conduct of the work may necessitate the interconnection, interception, surveying, inspection, removal, replacement and repair of certain existing manholes, sewer pipes and appurtenances. Said items are conveying all wastes and runoff discharged to and infiltrating into the public sewer system within the area served, which wastes may contain and/or generate toxic, noxious oxygen depleting or other liquid or gaseous substances harmful to human beings.

(9) The contractor shall also provide all personnel with all tools, clothing and other devices necessary for such safe practice, including appropriate waterproof clothing, respirators, protective glasses, mechanical air blowing equipment to pre-ventilate manholes and other chambers, explosive atmosphere detectors, ladders, safety harnesses, etc. No work shall be performed under any unsafe conditions and if same is detected at any time, the contractor shall, therefore, thoroughly instruct all personnel involved in such work so that appropriate and complete safety practices are observed at all times.

2. General Notes.

A. Shop Drawings.

(1) Prior to delivery to the job site, the contractor shall supply to the Township four copies of shop drawing details of all pipe and appurtenances including, but not limited to: pipe, valves, fittings, hydrants, brass, boxes, manholes, frames and castings, steps, coatings, etc.

(2) Each shop drawing shall be stamped by the contractor and the supplier.

The supplier shall be an approved distributor of the manufactured product and shall state as such on the submittal.

(3) No materials shall be incorporated in any sewer or water lines or appurtenances which have not received prior approval.

:5

(4) The Township will review, make corrections on, reject and/or approve submitted shop drawings and will return two copies to the contractor.

Resubmittal shall be made by the contractor as required to obtain approval prior to installation of the material.

B. Preconstruction Photos. Prior to any mobilization, one set of photos of all proposed off-site construction shall be submitted to the Township. The photos shall be indexed with a date and location and in binder format.

C. Restoration.

(1) The contractor shall have no more than 1,000 lineal feet of disturbed trench at one time.

(2) All areas which are disturbed by construction operations, including equipment and materials storage, and which are not occupied by pavement or permanent structures shall be seeded with grass seed or crown vetch, when slopes are…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .