4-6176.Bid Information Questionaire.pdf

PDF 202 KB Posted

Attached to
IFB No. 6176-26B Bees Ferry Class Three Landfill Cells 3 & 6 Construction
Solicitation number
6176-26B
Issued by
Charleston County, South Carolina

About this file

This is a Bid Information Questionnaire for the South Carolina municipality overseeing the Bees Ferry Landfill Class Three Landfill Cells 3 & 6 Construction project (IFB No. 6176-26B). The questionnaire requires bidders to provide detailed information about proposed sources for three categories of soil materials: backfill soil material, compacted soil liner material, and protective cover soil material. For each source, bidders must submit one form per source location and provide precise off-site source locations, source size in acres, and available quantity in cubic yards. Bidders are required to document whether borrow source materials have been tested, confirm approval from source owners with supporting letters, and verify professional engineer certification that materials comply with project specifications. Additionally, bidders must identify all applicable permits and zoning approvals, including erosion control permits, zoning approvals, and mining permits, and provide the names of firms or contractors responsible for installation of each material type.

The questionnaire imposes significant documentation and verification requirements on bidders to ensure material quality and regulatory compliance for the approximately 22-acre landfill construction project. Bidders must demonstrate that proposed sources meet project specifications through professional engineer verification and that all necessary approvals and permits are in place prior to bid submission. This comprehensive pre-bid material sourcing documentation ensures that selected contractors can execute the project without delays related to material sourcing, testing, or permitting issues once the contract is awarded.

View the file

Other files

File Type Posted
2-6176.Project Manual.pdf PDF
3-6176.Drawings.pdf PDF
1-IFB No. 6176 Landfill Cell Construction.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

December 2025

00415 - 1

SECTION 00415

BID INFORMATION QUESTIONNAIRE - STRUCTURAL BACKFILL, AND

PROTECTIVE COVER LAYERS

(Submit with necessary attachments along with your bid documents)

(Please Type or Print)

00415 - 2

BACKFILL SOIL MATERIAL

(SUBMIT ONE FORM FOR EACH SOURCE)

1. FOR PROPOSED OFF-SITE BACKFILL, PLEASE PROVIDE THE

FOLLOWING INFORMATION.

1A OFF-SITE SOURCE LOCATION (be precise)

1B HAS THE BORROW SOURCE MATERIAL BEEN TESTED?

_____ Yes _____ No (Please check one)

1C SOURCE SIZE:___________________________________ACRES

1D QUANTITY AVAILABLE:_______________________CUBIC YARDS

1E HAS THE USE OF THE SOURCE BEEN APPROVED BY THE SOURCE

OWNER?

(IF YES, PLEASE INCLUDE A LETTER INDICATING APPROVAL)

1F HAS SOURCE BEEN VERIFIED BY A PROFESSIONAL ENGINEER TO

COMPLY WITH PROJECT SPECIFICATIONS?

1G DOES SOURCE HAVE ALL APPLICABLE PERMITS AND ZONING

APPROVALS? (Please check one)

EROSION CONTROL PERMIT _____ Yes _____ No _____ NA

ZONING APPROVAL _____ Yes _____ No _____ NA

MINING PERMIT _____ Yes _____ No _____ NA

1H. NAME OF FIRM/CONTRACTOR RESPONSIBLE FOR INSTALLATION OF

BACKFILL:

00415 - 3

COMPACTED SOIL LINER MATERIAL

1. FOR PROPOSED OFF-SITE BACKFILL, PLEASE PROVIDE THE

FOLLOWING INFORMATION.

1A OFF-SITE SOURCE LOCATION (be precise)

1B HAS THE BORROW SOURCE MATERIAL BEEN TESTED?

1C SOURCE SIZE:___________________________________ACRES

1D QUANTITY AVAILABLE:_______________________CUBIC YARDS

1E HAS THE USE OF THE SOURCE BEEN APPROVED BY THE SOURCE

1F HAS SOURCE BEEN VERIFIED BY A PROFESSIONAL ENGINEER TO

1G DOES SOURCE HAVE ALL APPLICABLE PERMITS AND ZONING

1H. NAME OF FIRM/CONTRACTOR RESPONSIBLE FOR INSTALLATION OF

BACKFILL:

00415 - 4

PROTECTIVE COVER SOIL MATERIAL

3. FOR PROPOSED OFF-SITE PROTECTIVE COVER, PLEASE PROVIDE

THE FOLLOWING INFORMATION.

3A PRIMARY OFF-SITE SOURCE LOCATION (be precise)

3B HAS THE BORROW SOURCE MATERIAL BEEN TESTED?

3C SOURCE SIZE:____________________________________ACRES

3D QUANTITY AVAILABLE:_______________________CUBIC YARDS

3E HAS THE USE OF THE SOURCE BEEN APPROVED BY THE SOURCE

3F HAS SOURCE BEEN VERIFIED BY A PROFESSIONAL ENGINEER TO

3G DOES SOURCE HAVE ALL APPLICABLE PERMITS AND ZONING

3H. NAME OF FIRM RESPONSIBLE FOR INSTALLATION OF PROTECTIVE

COVER LAYER:

END OF SECTION