IFB No. 6176-26B Bees Ferry Class Three Landfill Cells 3 & 6 Construction
Solicitation number
6176-26B
Issued by
Charleston County, South Carolina

About this file

This file consists of engineering drawings for the Bees Ferry Class Three Landfill Cells 3 & 6 Construction project in South Carolina, prepared by Howard Engineering. The drawings document the decommissioning and construction of an approximate 22-acre Municipal Solid Waste landfill expansion at the Bees Ferry Landfill. The project scope includes abandonment of the existing Ash Monofill within the Cell 3 footprint, installation of a class three landfill base liner system, approximately 300,000 cubic yards of structural fill soil materials, geosynthetic clay liner, geomembrane liner, geocomposite drainage net, leachate collection piping, a 2-foot minimum soil protective drainage cover layer, raincover system, and associated appurtenances. The drawing set comprises 12 sheets organized sequentially, including a cover sheet, site layout, existing conditions, excavation plans, subgrade specifications, final and lining system details, protective cover specifications, rain berms, and comprehensive construction details with cross-sections. The drawings reference the project as A25129 and indicate an electrical component prepared by Bees Ferry Electrical dated 12-16-25.

The drawings serve as the technical basis for IFB No. 6176-26B and establish the design and construction standards that contractors must follow during execution of the project work. The detailed plans and specifications illustrated across the 12-sheet set provide contractors with the necessary engineering documentation to accurately estimate costs, procure materials, schedule work sequences, and execute construction in three distinct phases as shown in the site plan sequence sheets.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H O W A R D

E N G

IN

E E R

IN

G

W A R D

E N G

IN

E E R

W A R D

E N G

IN

E E R

01 COVER
02 SITE LAYOUT
03 EX COND
04 EXCAVATION
05 SUBGRADE
06 FML AND LCS
07 PROT COVER
08 RAIN BERMS
09 DETAILS
10 DETAILS
11 DETAILS
12 DETAILS
11 REF C1 ASH LF ASBUILT
A25129 Bees Ferry Electrical 12-16-25
A25129 E1
E1
A25129 E2
E2
A25129 E3
E3
ASH LANDFILL DECOMMISSION DRAWINGS
COVER SHEET
SITE PLAN
SEQUENCE 1
SEQUENCE 2
SEQUENCE 3
CROSS SECTIONS