This is a Unit Cost Sheet for a Stage II Invitation to Bid issued by the State of Utah Division of Facilities Construction and Management (DFCM) for pre-demolition abatement services at Southern Utah University's Ponderosa Terrace Apartment Building (Project #22309300). The project is limited to prequalified contractors who have completed Stage I Prequalification and appear on the DFCM Prequalified Contractors list as of the solicitation date. Bidders are required to submit a base bid along with unit prices for any unforeseen asbestos-containing building materials and hazardous substances encountered during abatement work. The unit cost sheet encompasses forty-two line items covering mobilizations, labor rates, building components (auto door closers, batteries, fire extinguishers, emergency exit signs), HVAC and refrigeration equipment, electrical materials (fluorescent ballasts and tubes, PCB ballasts, transformers), hazardous liquids (oils, chemicals, paints, glycol), waste streams (e-waste in various sizes, televisions, monitors), fire-rated materials, and roofing materials (membranes, shingles, tar, sealant, coatings, and vapor paper).
The construction cost estimate for the project is $350,000.00. Contractors must provide specific unit prices for each line item on the cost sheet, with units of measurement specified as each, hours, gallons, square feet, or trucks/trailers as applicable. The cost sheet was prepared as of July 17, 2026, and serves as the mechanism for pricing contingent work related to unforeseen hazardous materials and building components that may require removal or disposal during the abatement phase of the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTHERN UTAH UNIVERSITY
PONDEROSA TERRACE APARTMENT BUILDING
July 17, 2026 Company Name:
Unit Pricing: Bidding abatement contractors are to submit their base bid along with the following unit costs for any unforeseen asbestos-containing building materials using the Unit Pricing Cost Sheet which is posted separately.
Item No.
Description
Unit
Unit Price
1 Additional Mobilizations Each $ 2 Hourly Supervisor Rate Hr $ 3 Hourly Worker Rate Hr $ 4 Auto Door Closer Units Each $ 5 Batteries Each $ 6 Fire Extinguisher Each $ 7 Gas Cylinder Each $ 8 Fluorescent light ballast Each $ 9 Fluorescent light tubes 2’ to 8’ long Each $ 10 PCB Ballast Each $ 11 Radioactive Emergency Exit Signs Each $ 12 Transformer Oil gal $ 13 Chemicals gal $ 14 Fertilizer gal $ 15 Fuel gal $ 16 Glycol gal $ 17 Oil gal $ 18 Paints gal $ 19 Thermometers Each $ 20 Pipe fittings 0” to 12” total diameter Each $ 21 Refrigerant unit CFC evacuation Each $ 22 Refrigerant unit CFC evacuation (<50 lbs) Each $ 23 Refrigerant unit CFC evacuation (>300 lbs) Each $ 24 Refrigerant unit CFC evacuation (>50 to 300 lbs) Each $ 25 E-waste (Large) Each $ 26 E-waste (Med) Each $ 27 E-waste (Small) Each $ 28 TV/Monitor/Laptop Each $ 29 Fire Doors/Frames (Insulation) Each $ 30 Fire Rated Blanket Each $ 31 Fire Rated Safe Each $ 32 Fire Rated Curtains SF $ 33 Boiler Each $ 34 All-in Loaded Rate: Dump Trailer Wrapping Per Truck/
Trailer $
35 Roof Vapor Paper SF $ 36 Roof mastic/coating SF $ 37 Roof Plaster Coating SF $ 38 Roof sealant/caulk SF $ 39 Roofing Membrane SF $ 40 Roofing Shingle SF $ 41 Roofing Tar SF $ 42 Vermiculite in CMU Wall SF $