About this file

This is a Unit Cost Sheet submitted by a bidding contractor for the Utah Department of Alcoholic Beverage Services' pre-demolition abatement project at the 2100 South Properties facility. The project, identified as Stage II Invitation to Bid under DFCM Construction and Project #23413030, involves the pre-demolition abatement of 7 buildings with an estimated construction cost of $200,000. Only contractors prequalified under Stage I Prequalification and currently listed on the DFCM Prequalified Contractors list are eligible to bid on this solicitation. The Unit Cost Sheet was submitted on June 10, 2026, and requires bidders to provide unit pricing for potential unforeseen asbestos-containing building materials and other hazardous materials that may be encountered during abatement operations.

The Unit Cost Sheet contains 59 line items requesting unit prices across multiple categories of materials and labor, including hourly rates for supervisors and workers, hazardous materials removal (asbestos-containing products, fluorescent ballasts, PCB materials, and refrigerants), electronic waste disposal, roofing materials, insulation, floor coverings, and various building components containing regulated substances. Bidders are required to submit their base bid along with these unit costs to account for any unforeseen materials requiring abatement. The pricing structure enables flexible cost management for potential variations discovered during the pre-demolition phase, ensuring comprehensive budgeting for the hazmat abatement scope before building demolition commences.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTAH DEPARTMENT OF ALCOHOLIC BEVERAGE SERVICES-2100 SOUTH

PROPERTIES

June 10, 2026

Company Name:

Unit Pricing: Bidding abatement contractors are to submit their base bid along with the following unit costs for any unforeseen asbestos-containing building materials using the Unit Pricing Cost Sheet which is posted separately.

Item

No.

Description

Unit

Unit Price

1 Additional Mobilizations Each $ 2 Hourly Supervisor Rate Hr $ 3 Hourly Worker Rate Hr $ 4 Fluorescent Light Ballast Each $ 5 Fluorescent Light Tubes 2’ To 8’ Long Each $ 6 Pcb Ballast Each $ 7 Batteries Each $ 8 Auto Door Closer Units Each $ 9 Thermometers Each $ 10 Chemicals Gal $ 11 Paints Gal $ 12 Glycol Gal $ 13 Fertilizer Gal $ 14 Oil Gal $ 15 Fuel Gal $ 16 Exit Signs Each $ 17 Fire Extinguisher Each $ 18 Gas Cylinder Each $ 19 Radioactive Emergency Exit Signs Each $ 20 Refrigerant Unit Cfc Evacuation Each $ 21 Refrigerant Unit Cfc Evacuation (<50 lbs) Each $ 22 Refrigerant Unit Cfc Evacuation (>50 To 300 lbs) Each $ 23 Refrigerant Unit Cfc Evacuation (>300 lbs) Each $ 24 E-Waste (Small) Each $ 25 E-Waste (Med) Each $ 26 E-Waste (Large) Each $ 27 Tv/Monitor/Laptop Each $ 28 Vehicle Each $ 29 Fire Doors/Frames (Insulation) Each $ 30 Roof Mastic/Coating SF $ 31 Roof Sealant/Caulk SF $ 32 Roofing Membrane SF $ 33 Roofing Shingle SF $ 34 Roofing Tar SF $ 35 Vermiculite In CMU Wall SF $ 36 Wall Texture SF $ 37 Ceiling Texture SF $ 38 Wallboard And Joint Compound (Wall System) SF $ 39 HVAC Paper Tape SF $ 40 Tile & Glass Adhesive SF $ 41 Window Glaze SF $ 42 Insulation SF $ 43 Insulation & Debris SF $ 44 Window Caulk SF $ 45 Caulk SF $ 46 Door Caulk SF $

47 Asbestos Cement Board (Transite) SF $ 48 Concrete Surfacing SF $ 49 Plaster Demo SF $ 50 TSI-Mudded Fittings SF $ 51 Sheet Vinyl Tile on Wood SF $ 52 Sheet Vinyl Tile on Concrete SF $ 53 Sheet Vinyl Tile on Concrete Under Carpet SF $ 54 Vinyl Floor Tile and Mastic on Concrete SF $ 55 Vinyl Floor Tile and Mastic on Concrete Under Carpet SF $ 56 Vinyl Floor Tile on Concrete SF $ 57 Vinyl Floor Tile on Concrete Under Carpet SF $ 58 Mastic on Concrete SF $ 59 Mastic on Concrete Under Carpet SF $