This is a Schedule of Values document for Salt Lake Valley Transfer Station PT Deck-Pit Repair project (SW132061) submitted to Salt Lake County, Utah. The project involves repair of the post-tension concrete deck surface and replacement and repair of pit surrounds with metal treatment. The document provides a template for bidders to itemize costs across multiple work divisions, including Payment and Performance Bond, Insurance and Builder's Risk, and Division 01-General Conditions, with columns for a base bid and three alternates (Alternate 1/B and Alternate 2/C).
The Schedule of Values requires bidders to enter the total base bid amount and each alternate amount, with a notation that these totals must match the amounts submitted in the Online Solicitation System (OSS). The document is structured to accommodate various divisions of work with specific line items for pricing, though the template shown contains placeholder values of $0. Bidders must complete this form with their company name and provide cost breakdowns that align with their formal bids entered into the OSS system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section 2 - Document 3.0 | ||||||||
| Schedule Of Values | ||||||||
| Project: SW132061 Salt Lake Valley Transfer Station PT Deck-Pit Repair | ||||||||
| Divisions of Work | Base Bid | Alternate 1 | Alternate 2 | Alternate 3 | ||||
| (Specify entire work scope; examples are listed below) | Alternate 1 | Alternate B | Alternate C | Total | ||||
| Payment & Performance Bond | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Insurance & Builder's Risk | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Division 01-General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Totals (Enter in OSS) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS). |
| The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS) |
| Name of Company Bidding ________________________________ |