This Design Narrative document prepared by architectural and engineering firms outlines the comprehensive design requirements for the Performing Arts Addition and Remodel project at Pine View High School in St. George, Utah, undertaken by the Washington County School District. The project encompasses an approximately 7,000-square-foot new addition structurally separated from the existing building, plus 4,400 square feet of renovations to existing spaces, designed to create and update performing arts facilities including new drama and choir classrooms, dressing rooms, a scene shop, storage areas, and a renovated band room. Additional work throughout the existing school building and on the site includes refinished faculty restrooms, upgraded door hardware, restrooms in the utility building, new landscaping, a new parking lot behind the vocational building, and a new press box with entry plaza. A mandatory pre-bid conference is scheduled for Wednesday, December 9, 2026, at 3:30 p.m. MST at Pine View High School (2850 East 750 North, St. George, UT 84790), with attendance required for all firms seeking to submit proposals. The procurement seeks a single Construction Manager/General Contractor (CM/GC) through competitive RFP with award to the responsive and responsible vendor with the highest justified score under the procurement code.

The design incorporates load-bearing concrete masonry unit construction for the new addition with steel roof joists and metal deck, following 2024 International Building Code standards and ASHRAE guidelines appropriate for Utah's high-desert climate. Mechanical systems feature high-efficiency gas-fired packaged rooftop units with demand-controlled ventilation integrated into an expanded Honeywell building management system, while plumbing utilizes copper and PEX distribution with low-flow fixtures and Schedule 40 PVC waste systems. Electrical systems include new interior and exterior lighting with occupancy sensors, power distribution via 480V feeder with step-down transformer, expanded fire alarm systems with smoke and carbon monoxide detectors, telecommunications infrastructure with dedicated data room, expanded intercom and sound systems, and security camera expansion. The project requires NFPA 13 compliant fire sprinkler system expansion, with analysis to determine if the existing system capacity is sufficient or if a new fire riser is necessary. The design documentation includes detailed mechanical, electrical, plumbing, and structural narratives; preliminary demolition plans; new floor plans; and site plans prepared by Naylor Wentworth Lund Architects, Resolut Group, and BHB Consulting Engineers. No specific funding source, budget amount, or pricing terms are stated in this design narrative document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SALT LAKE CITY OFFICE Design Excellence SOUTHERN UTAH OFFICE 723 Pacific Avenue, Suite 101 163 WEST 1600 SOUTH, SUITE 1

SALT LAKE CITY, UT 84104 ST. GEORGE, UTAH 84770

TEL 801-355-5959 FAX 801-355-5960 TEL 435-656-2883

September 30, 2026

Washington County School District Pine View High School Performing Arts Addition St. George, Utah

Re: Bryan Dyer

The following is an explanation of the expected design requirements for the proposed Performing Arts Addition at Pine View High School. See attached for the additional requirements for mechanical, electrical, plumbing, and structural. The preliminary demolition plan, new floorplans, and site plan are also attached for reference.

The proposed building is to be an addition structurally separated from the existing building with renovations of a small portion of the existing building near the southwest end of the property at Pine View High School. This addition and renovation are to create and update the performing art rooms to the school district standard. It is proposed to create new dressing rooms, choir and drama classrooms. Existing drama and choir classrooms are to be renovated into a scene shop and storage rooms. The existing band room will be renovated with new finishes and additional storage with the existing platform elevator removed to create new floor space. Additional support rooms will be included as needed. The structure of the building is planned to be concrete masonry units.

Along with the main addition and renovation in the Performing Arts wing, some additional work throughout the existing school building and on the site are planned. Inside the existing building, the specific additional work planned is to; refinish the faculty restrooms, replacing all wood doors and upgrading any door hardware that are not up to the district’s standards. Specific site upgrades include; putting in restrooms in the utility building across the tennis courts, new landscaping around this building block and the addition, new parking lot behind the vocational building in the southwest corner, new press box with new landscaping around it with a new entry plaza connecting the main school entrance to the press box.

Sincerely, Alicia Saunders Architectural Associate, Naylor Wentworth Lund Architects

WASHINGTON COUNTY SCHOOL

DISTRICT

Performing Arts Addition, Pine View High School St. George, Utah Mechanical, Electrical, Plumbing and Fire Design Narrative

230 North 1680 East. Bldg V, St. George, Utah 84765 801.530.31.48 www.resolutgroup.com

Submitted by: RESOLUT GROUP

September 30, 2026

Mechanical Design Narrative

Pine View High School Performing Arts Addition/Remodel

1. Project Overview

The proposed addition and modifications will provide improved functionality for the performing arts department at Pine View High School. The approximately 7,000-sf addition and 4,400-sf remodel includes the following program elements:

• Performing arts addition including a drama, choir, band room and auxiliary spaces

• Remodel area near the auditorium including a scene shop and dram storage room

• Faculty restroom remodel

• Tennis restrooms added to the utility building

• Press box at the playfield

The building will integrate with the existing campus while maintaining a simple, durable, and energy-efficient design appropriate for a high school environment in a high-desert climate characterized by cold winters, hot summers, and moderate daytime temperature swings. Mechanical systems are designed for reliability, ease of maintenance by school facilities staff, and compatibility with the existing Honeywell building management system (BMS) serving the main school building.

2. Mechanical (HVAC) Systems

The HVAC systems are designed to provide heating, ventilation, and cooling to maintain comfortable indoor conditions for athletic activities and occupied support spaces while promoting indoor air quality (IAQ) and energy efficiency.

Design Criteria

(Preliminary; to be finalized during detailed load calculations)

• Outdoor Design Conditions:

Based on ASHRAE or local climate data for St. George, Utah (approximately 110°F dry-bulb / 67°F wet-bulb cooling and winter extremes of 14°F or lower)

• Indoor Design Conditions:

o Clasrooms (Choir, Drama, Band):

Heating: 70–72°F

Cooling: 74–76°F o Office and restrooms:

Heating: 70–72°F

Cooling: 74–76°F

• Ventilation:

Ventilation rates comply with the 2024 IMC and ASHRAE Standard 62.1. Demand-controlled ventilation (DCV) is provided via CO₂ sensors integral with each rooftop unit.

• Energy Conservation:

All systems comply with the 2024 IECC (including Utah amendments), emphasizing high-efficiency gas-fired equipment and full BMS integration for scheduling, unoccupied setbacks, and energy optimization.

System Description

Primary Equipment

Multiple high-efficiency, gas-fired packaged rooftop units (RTUs) provide heating and cooling to the new addition of the building. It is also proposed to change the existing dual box units over the new drama storage and scene shop to new rooftop units. Units include:

• Direct-drive supply fans

• Modulating gas burners for precise temperature control

• Economizers for airside “free cooling” when outdoor conditions permit

• Demand-controlled ventilation

• Powered convenience outlets

• Phase-failure protection

• Factory-installed hail guards

Installation

RTUs are mounted on 14-inch-tall prefabricated curbs installed on the roof. This approach allows access and minimizes visibility of the units.

Air Distribution

Supply air is delivered via lined exposed rectangular ductwork transitioning to spiral round duct.

Limited ducted runs with drum louvers are used in the open exercise area for cost efficiency, while the office and restroom areas are served by fully ducted systems.

Return air is provided through dedicated return ducts or transfer paths, as required, with return locations positioned low along the building perimeter near the RTUs.

Zoning

Separate HVAC zones are provided for the following areas:

• Each classroom and associated connecting spaces including offices.

• Scene shop and drama storage area.

• Restrooms

This zoning strategy accommodates differing usage patterns and prevents over-conditioning of the high-volume athletic space.

Controls Integration

All RTUs are integrated with a new Honeywell direct digital control (DDC) system, which interfaces with and piggybacks onto the existing Honeywell BMS serving the main school building.

The integrated system provides:

• Centralized monitoring and control

• Scheduling and calendar-based operation

• Alarm notification and trend logging

• Optimal start/stop and night setback control

• Demand-response capability

The system is accessible from the main campus facilities office and supports long-term operational efficiency.

Filtration

Each RTU is equipped with MERV 13 filters or better, accessible within the unit, to support improved IAQ in an athletic environment.

3. Plumbing Systems

Plumbing systems serve the restrooms and associated fixtures in the band, choral and drama rooms as well as the supporting dressing rooms and are designed using durable, code-compliant materials suitable for a school environment.

Domestic Water System

• Insulated cold- and hot-water distribution piping utilizes:

o Type K copper piping for main runs and exposed risers (soldered joints) o PEX tubing for branch piping where flexibility and cost efficiency are advantageous

• Isolation valves are provided at major branches and at individual fixtures to facilitate maintenance

• Backflow prevention is provided at the building water service connection in accordance with code

Domestic Hot Water

Domestic hot water is supplied by tank-type, gas-fired water heaters with Type B venting. Water heaters are sized to meet peak demand conditions with adequate recovery capacity for intermittent high-use events. Units are located in a dedicated mechanical or utility space with clear service access and proper venting.

Sanitary Waste and Vent

• Sanitary waste and vent piping is constructed of Schedule 40 PVC, selected for durability, corrosion resistance, and constructability within a prefabricated structure

• Piping is routed below slab or within accessible chases.

• Floor drains with trap guards are provided in restroom and wet areas, with trap primers installed where required

• Roof drains are added to the addition areas. Existing roof drains are to be coordinated with the new construction to connect to storm drain piping below grade on site.

Plumbing Fixtures

Low-flow, water-conserving plumbing fixtures—including toilets, urinals, and lavatories—are specified in compliance with IECC requirements and applicable school district sustainability and maintenance standards.

4. Natural Gas Piping

Natural gas service supplies fuel to the RTUs and domestic water heaters.

• Piping:

Schedule 40 black steel piping with threaded, welded, or approved press-type connections, sized for total connected load with appropriate diversity

• Routing:

Piping is routed underground or aboveground from the campus gas service point to a dedicated meter and regulator assembly. Interior piping is routed through protected areas with shutoff valves provided at each appliance and at the point of building entry.

• Compliance:

Systems comply with the 2024 IFGC and NFPA 54, including pressure testing, sediment traps, venting, and seismic requirements

• Metering:

A dedicated gas meter is coordinated with the serving utility and located for accessibility and ease of maintenance by school facilities staff

5. Honeywell Temperature Controls (BMS)

The temperature control system consists of new Honeywell DDC controllers provided for all packaged RTUs and associated sensors.

Scope and Integration

The new control system integrates seamlessly with the existing Honeywell BMS serving the main school building through compatible networking (LONWorks or Honeywell proprietary protocol), enabling unified campus-wide monitoring and control.

System Capabilities

• Scheduling aligned with school calendars

• Alarm notifications for equipment faults, abnormal temperatures, and filter status

• Energy optimization, including economizer control and demand-controlled ventilation

• Graphical user interface accessible locally and remotely

• Trend logging and reporting for facilities management and diagnostics

The control system is coordinated with the fire alarm system for interlocks or shutdowns as required by code.

6. Electrical Systems

The electrical systems will consist of lighting, power distribution, fire alarm, telecommunications, intercom systems and security.

Lighting

There will be exterior building lights designed for building entrances and walkways. Additional exterior pole lighting will be provided in new parking lots and main courtyard. Exterior lights will be controlled with photocell or integral ambient/motion sensors.

Interior lighting will consist of a combination of recessed troffers, surface mounted wraparound and striplights providing the IESNA recommended light levels for each space included in the project

(classrooms, storage rooms, dressing rooms, restrooms, etc.). In addition the Drama classroom will have a suspended 2-wire track lighting system with dimmer switches. All lighting will be controlled with occupancy sensors with local control and dimming switches where required by IECC.

Power Distribution

The new addition will be fed from the building’s existing distribution equipment. A 480V feed will be installed in the new addition with a step down transformer sized for the additions 120/208V three phase power needs. The exact 480V feeder size will be determined after HVAC and equipment loads are provided.

All feeders and circuits will be in conduit (PVC if underground and EMT if above ground).

Specification grade receptacles will be specified.

In addition, some existing electrical gear will need to be relocated. Namely, there is a 750KVA transformer located outside (that serves the auditorium) that will need to be relocated to avoid obstruction with new building footprint.

Systems

• Fire Alarm:

Codes will require the expansion of the building’s existing automatic fire alarm system. The fire alarm system will consist of smoke and carbon monoxide detectors, strobes and horn/strobes to provide required notification. The fire alarm system will shut down fan units upon detector alarm. In addition, the fire alarm loop to the adjacent vocational building will need to be re-routed prior to demolition in order to maintain system functionality during construction.

• Telecommunications:

The new addition will consist of a dedicated Data Room. A new rack will be located in this room fed with 12-strand single mode fiber from the building MDP. This network rack will provide the capability for data drops and wireless access points.

• Intercom/Sound Systems:

The new addition will be equipped with intercom speakers and call switches and to receive bell tones for class changes. The intercom system will expand the existing

Rauland system. In addition, the intercom system connection to the adjacent vocational building will need to be re-routed prior to demolition in order to maintain system functionality during construction.

• The existing auditorium system will be expanded to provided “overflow” into the dressing rooms and drama classroom.

• The new Choir Room will have a dedicated sound system with recording and playback functionality.

• Security:

Security cameras will be provided on the exterior and interior as required for Utah code and as coordinated with the school district. All security cameras will connect to the network rack. The existing DW Spectrum video management system will be expanded to accommodate any new cameras.

7. Fire Protection Systems

Provide an NFPA 13 compliant fire sprinkler system for the addition. The preference of this addition would be to extend from the existing building system. Analysis is to be performed to understand the available capacity of the existing system. In the case that the system capacity is exceeded a new fire riser would be installed to serve the additional square footage.

Sprinklers throughout existing spaces are to be replaced and reworked as required to match the new occupancy types and floor and ceiling plans.

8. General Requirements

Codes and Standards

All mechanical, plumbing, gas and electrical systems comply with Utah-adopted 2024 I-Codes, applicable NFPA standards, ASHRAE guidelines, and local requirements of Washington County and

Pine View High School.

Sustainability

High-efficiency HVAC equipment, low-flow plumbing fixtures, LED lighting and optimized BMS control strategies support reduced energy and water consumption and long-term operational efficiency.

Coordination

The mechanical and electrical designs will be closely coordinated with the architect, prefab metal building manufacturer, and structural engineer to confirm equipment curbs, penetrations, structural support, power requirements, and equipment clearances. All equipment selections allow safe service access without disrupting athletic activities.

Testing and Commissioning

The project includes full functional performance testing, testing and balancing, and BMS commissioning. Training is provided to school facilities staff on proper system operation and maintenance.

Warranty

Equipment and systems include standard manufacturer warranties and a minimum one-year contractor labor warranty, unless otherwise specified.

BHB = RESPONSIVENESS + COORDINATION + CREATIVITY

BHB CONSULTING

ENGINEERS, INC

2766 South Main Street

Salt Lake City, UT 84115

p. 801 355 5656 bhbengineers.com

September 28, 2026

Naylor Wentworth Lund Architects

163 W 1600 S

St. George, UT 84770

RE: Structural Narrative for Pine View High School Performing Arts Remodel

Overview:

The structural design includes existing wall and framing modifications in the performing arts area of this existing high school as well as new structure for the performing arts addition and press box.

Codes and Loadings:

The structural design of this building must meet the following codes and standards:

• 2024 International Building Code (IBC)

• ASCE 7 Minimum Design Loads and Associated Criteria for Buildings and Other Structures

• American Institute of Steel Construction Steel Construction Manual (AISC)

• American Concrete Institute 318 Building Code Requirements for Reinforced Concrete (ACI)

The building structure shall meet the following minimum requirements of the 2024 IBC:

• Roof Live Load 20 psf + 5 psf for future solar array

• Minimum Roof Snow Load 35 psf

• Risk Category III

• Seismic Loads:

o Site Class C (Confirm with final soils report) o Seismic Design Category D o MCER Ground Motion (0.2 s period) SS = 0.55 g o MCER Ground Motion (1.0 s period) S1 = 0.16 g o 5% Damped Spectral Response SDS = 0.40 g

Accelerations at (0.2 s period) o 5% Damped Spectral Response SD1 = 0.153 g

Accelerations at (1.0 s period) o Seismic Importance Factor 1.25

• Wind Loads:

o Wind Velocity 106 mph o Exposure Type B

Dead Loads: Structure self-weight, all miscellaneous architectural and MEP components, including, but not limited to, lighting, ductwork, conduit, piping, fire detection system, ceiling fans, and hard lid ceiling over restroom area.

BHB = RESPONSIVENESS + COORDINATION + CREATIVITY

BHB CONSULTING

ENGINEERS, INC

2766 South Main Street

Salt Lake City, UT 84115

p. 801 355 5656 bhbengineers.com

Structural System:

Existing structure is single story load bearing masonry walls supporting steel joists and metal deck.

Modifications to existing structure include two new openings in walls, enlarging one existing opening, and removing walls in one area. There will be structural reinforcing to walls with new or enlarged openings. New steel framing will be required to support roof structure where existing walls are removed.

New performing arts addition structural system is single story and will consist of load bearing masonry walls supporting steel roof joists and metal deck. This addition will be seismically isolated from existing structure.

It is not anticipated that tennis restroom remodel in existing utility building will require any structural modifications.

New Press Box is expected to be Masonry structure with steel roof framing and an open front for maximum field visibility.

Footing, Foundation, and Geotechnical Criteria:

Based on previous geotechnical investigations at the school, BHB anticipates using conventionally reinforced concrete footings bearing on structural fill. The final allowable bearing pressure will be determined in updated geotechnical report. At interface between new and existing structures, helical piers or micropiles may be required so existing footings are not undermined to install structural fill and new foundations.

D D

C C

B B

2.5

2.5 2.5

2.6 2.6

2.5

2.6

2.5

2.21

2.6 2.6

2.21

2.52.5

2.7

2.16

2.16

2.10

2.11

2.10

2.10

2.10

2.11

2.15 2.14

2.12

2.12

2.12

2.12

2.17

2.18

2.5

2.5 2.6

2.5

2.10

2.10

2.20

2.11

2.10

2.202.5

2.19

2.9

6'

0"

2.8

2.8

2.8

2.8

2.8 2.8

2.8

2.8

2.8

2.82.8

2.8

2.82.8

2.8

2.8

2.8

2.6

2.8

2.8

2.8

2.8

2.7

2.13

2.12 2.12

2.8

2.8

2.8

E E

E100

BAND ROOM

E103

STORAGE

E102

STORAGE

E101

OFFICE

E104

PRACTICE

E105

PRACTICE

E110

DRAMA

E115

STORAGE

E116

PRACTICE

E111

OFFICE

E113

PRACTICE

E112

PRACTICE

E118

OFFICE

E114

OFFICE

E117

CHOIR

E119

PRACTICE

E120

PRACTICE

E121

PRACTICE

E109

SCENE SHOP

E108

WOMEN DRESSING

E106

CORRIDOR

E107

MEN DRESSING

E125

CLASSROOM

E124

WOMEN RESTROOM

E123

MEN RESTROOM

AREA 'A'

FACULTY RESTROOMS

E E

2.13 naylor wentworth lund architects

163 West 1600 South, Suite 1

St. George, UT 84770

Tel: 435 656-2883 fo r t h e B o a r d o f

E d u c a ti o n

CLIENT

LOGO

DRAWN BY:

ISSUE DATE:

CHECKED BY:

AD100

W A

S H

IN

G

T O

N C

O U

N T

Y S

C H

O O

L D

IS

T

R

IC

T

P

IN

E V

IE

W

H

IG

H S

C H

O O

L

P E

R F

O R

M

IN

G A

R T

S A

D D

IT

IO

N

A D

F

L O

O R

D E

M O

L

IT

IO

N

P L A

N

FLOOR

DEMOLITION

PLAN

GENERAL DEMOLITION NOTES

- LOCATION OF EXISTING ELEMENTS TO BE VERIFIED BY CONTRACTOR. FLOOR AND ROOF

ELEVATIONS ARE APPROXIMATE.

WHERE A BUILDING ELEMENT HAS NOT BEEN TAGGED OR OTHERWISE NOTED AS

DEMOLISHED, ASSUME ELEMENT IS TO REMAIN AND BE PROTECTED FROM DAMAGE. IN

THE EVENT IT IS DETERMINED THAT DEMOLITION IS REQUIRED, THE GC SHALL CONSULT

ARCHITECT AND/OR OWNER FOR DIRECTION PRIOR TO REMOVAL.

ANY PORTIONS OF THE BUILDING THAT ARE TO REMAIN ARE TO BE PROTECTED FROM

DAMAGE. ANY DAMAGE TO THESE AREAS IS THE RESPONSIBILITY OF THE CONTRACTOR

AND WILL BE REPAIRED WITH NO EXTRA EXPENSE TO THE OWNER.

THE OWNER RESERVES THE RIGHT TO REMOVE ANY EXISTING ITEMS FROM THE PORTIONS

OF BUILDING SCHEDULED FOR DEMOLITION BEFORE WORK BEGINS. ANY ITEMS

REMAINING IN THESE AREAS ONCE WORK BEGINS WILL BE DEALT WITH AS INDICATED IN

THE DEMOLITION NOTES.

THE SCOPE OF WORK, AS DEFINED BY NOTES AND DRAWINGS ON THIS SHEET, IS NOT

EXHAUSTIVE. THIS SHEET SERVES AS A GUIDE ONLY TO THE CONTRACTOR IN

DEMOLISHING REQUIRED PORTIONS OF EXISTING BUILDING. IT IS THE RESPONSIBILITY OF

THE CONTRACTOR TO TAKE ALL STEPS NECESSARY TO PERFORM DEMOLITION SUCH

THAT NEW CONSTRUCTION (INCLUDING BUT NOT LIMITED TO SHORING, SUPPORTING OF

EXISTING STRUCTURES, ETC.) CAN BE APPROPRIATELY EXECUTED.

SAWCUT MASONRY OPENINGS AT THE NEAREST MORTAR JOINT WHERE POSSIBLE. -

PROVIDE APPROPRIATE SOUND, DUST, AND DEBRIS PROTECTION BETWEEN PROJECT

AREAS AND OPERATIONAL SCHOOL FACILITIES AND CLASSROOMS. TYP.

CRITICAL WALLS, GLAZING, AND OTHER STRUCTURES AND FINISHES SHARED WITH LATER

PHASES TO REMAIN UNTIL THE LATER PHASE HAS BEGUN. IF WORK MUST EXTEND INTO A

LATER PHASE OR AN OCCUPIED SPACE WHILE CLASSES ARE IN SESSION, COORDINATE

WORK SCHEDULE WITH OWNER TO AVOID CONFLICTS.

SCALE:

DEMOLITION PLAN

1/8" = 1'-0"AD100

AREA 'A'

DEMOLITION NOTES

2.5 EXISTING WALL TO BE DEMOLISHED AND PROPERLY DISPOSED OF. (SHOWN

DASHED)

2.6 EXISTING DOOR AND FRAME TO BE REMOVED AND PROPERLY DISPOSED OF.

INFILL OPENING TO MATCH EXISTING

2.7 EXISTING DOOR AND FRAME TO BE REMOVED AND PROPERLY DISPOSED OF.

2.8 EXISTING DOOR TO BE REMOVED AND PROPERLY DISPOSED OF. FRAME TO

REMAIN AND BE PROTECTED FROM DAMAGE

2.9 EXISTING COLUMN TO BE REMOVED AND PROPERLY DISPOSED OF. REFER TO

STRUCTURAL DRAWINGS

2.10 EXISTING PLUMBING FIXTURE TO BE REMOVED AND PROPERLY DISPOSED OF

2.11 EXISTING RESTROOM ACCESSORIES TO BE REMOVED AND PROPERLY DISPOSED

OF

2.12 EXISTING CASEWORK TO BE REMOVED AND PROPERLY DISPOSED OF

2.13 EXISTING ELEVATOR TO BE REMOVED AND PROPERLY DISPOSED OF

2.14 EXISTING FLOOR TO BE DEMOLISHEDT AND PROPERLY DISPOSED OF

2.15 EXISTING STAIR TO BE DEMOLISHED AND PROPERLY DISPOSED OF

2.16 EXISTING WALL TILE TO BE REMOVED AND PROPERLY DISPOSED OF. TYPICAL OF

ALL WALLS IN RESTROOM

2.17 EXISTING STOREFRONT SYSTEM TO BE REMOVED AND PROPERLY DISPOSED OF.

2.18 EXISTING OHCD DOOR TO BE REMOVED AND PROPERLY DISPOSED OF

2.19 ENTIRE EXISTING SCENE SHOP AND DRESSING ROOM ADDITION TO BE

DEMOLISHED AND PROPERLY DISPOSED OF INCLUDING WALLS, CEILINGS, ROOF,

STRUCTURE, ETC.

2.20 EXISTING COUNTER TO BE REMOVED AND PROPERLY DISPOSED OF

2.21 EXISTING FRAMED STEPS TO BE REMOVED AND PROPERLY DISPOSED OF

R E V I S I O N S

NO DATE DESCRIPTION

SCALE: 1" = 160'-0"

KEY PLAN

SCALE:

DEMOLITION PLAN

1/4" = 1'-0"AD100

LOWER LEVEL AT ELEVATOR

AREA 'A'

D D

C C

B B

A A

6' - 8" 29' - 4" 6' - 8" 12' - 6" 8' - 0 3/8" 7' - 2"

48' - 2" 100' - 8" 14' - 4"

163' - 2"

2'

- 2

A100

BAND ROOM

A101

STORAGE

A104

STORAGE

A112

MEN DRESSING

A110

WOMEN DRESSING

A113

RESTROOM

A114

CORRIDOR

A119

ENSEMBLE

A118

STORAGE

A124

SCENE SHOP

A129

DRAMA STORAGE

A121

OFFICE

A105

STORAGE

A106

OFFICE

A108

STORAGE

A102

PRACTICE

A103

PRACTICE

A127

STORAGE

A125

STORAGE

A302

A300

A300

A111

RESTROOM

A133

CONCESSIONS

A134

STORAGE

A132

WOMEN

A131

MEN

A130

COSTUME STORAGE

A128

CUSTODIAL

G

P

O

P F

O

O

F

P

F

F

L

L

J

J

J

J

J

J

J

J

G

M

I

J

M

FM

M

J

N

II

L

L

L P

G G

P F

F

P

P

N

O

A120

DRAMA

A116

CHOIR

A122

ELECTRICAL

A123

CORRIDOR

A126

CORRIDOR

A107

STORAGE

A109

CORRIDOR

A115

DATA

A135

VESTIBULE

A300

A300

A300

A300

A300

A300

A300

A300

CE

A

U U

B

B

F

6' - 3 15/16" 12' - 10" 6' - 1 5/8" 29' - 10 3/8" 35' - 2"

5' - 5 3/8" 7' - 7 5/8" 4' - 0" 2' - 0"

8'

8"

6'

8"

5/

9 5/8"

5' - 4"

A300

A300

39' - 1 1/2"

6' - 8" 8' - 3" 4' - 0" 4' - 0" 4' - 0"

R 25' - 0"

R 32' - 11 21/64"

R 37' - 0"

R 29' - 0"

1'

/1 6"

7'

3/

3'

4"

' - 1

0 1 5/3

2"

7.58

22.3

22.2

22.2

/8

5'

4"

1" 8'

3/

3' - 4 7/8"

22.2

5' - 3 7/8"

5.7

5.7

5.7

2' - 0" 4' - 0" 3' - 4" 4' - 0" 3' - 4" 4' - 0" 3' - 4" 4' - 0" 1' - 10 3/8"

6'

0" 8'

0"

4'

0" 8'

0"

4'

0" 8'

0"

6'

A501

/8

8'

9/

4'

5/

8'

/4

1' - 3 1/8" 7' - 0 1/2"

/4

/4

2"

A303

A303

A305

A304

A303

A304

T

T

P

O

F

F

F

E E

2'

5/

8"

3/

8"

Q

B

A104

P R

K

R

A

A

A

A

A

A

A

A

A

A A

A A

A

A

A

A

A

A

A

A

A

A104

A104

A104

G

A

M

AT

CH

LI

NE

A

RE

A

'A

M

AT

CH

LI

NE

A

RE

A

'B

M

AT

CH

LI

NE

A

RE

A

'F

M

AT

CH

LI

NE

A

RE

A

'E

MATCHLINE AREA 'A'

MATCHLINE AREA 'F'

MATCHLINE AREA 'B'

MATCHLINE AREA 'E'

A150

AUDITORIUM

A144

STAGE

A303

SIM

A303 SIM

5' - 8"

3'

1/

2"

F.F.E.

0" F.F.E.

6"

F.F.E.

1' - 0" F.F.E.

1' - 6"

F.F.E.

2' - 0"

R 86' - 7 1/2"

R 90' - 7 1/2"

R 94' - 7 1/2"

R 98' - 7 1/2"

F.F.E.

0" F.F.E.

1' - 0"

F.F.E.

2' - 0"

F.F.E.

3' - 0"

A3054'

0"

48" MIN

M

IN

60" MIN

24" MIN BEYOND DOOR EDGE

EXTEND FLOOR 1' MIN

A

A

A

A

A

A A

AA

A A

A

A

A

V

A

J

J

4.9

8.38

8.20

8.22

4.9

8.1

8.2

9.14

7.92

9.1

D D

8.2 8.14.9

7.58

EXISTING WALLS

5/

8" 2"

2"

D D

9.81

9.15

7.92

4.9 4.9

7.58

5/

8" 2"

EXISTING

4.9

4.9

8.22

8.20

8.38 9.14

7.92

9.1

E E naylor wentworth lund architects

163 West 1600 South, Suite 1

St. George, UT 84770

Tel: 435 656-2883 fo r t h e B o a r d o f

E d u c a ti o n

CLIENT

LOGO

DRAWN BY:

ISSUE DATE:

CHECKED BY:

A104

W A

S H

IN

G

T O

N C

O U

N T

Y S

C H

O O

L D

IS

T

R

IC

T

P

IN

E V

IE

W

H

IG

H S

C H

O O

L

P E

R F

O R

M

IN

G A

R T

S A

D D

IT

IO

N

A

A

R E

A A

D

IM

E

N S

IO

N

P L A

N

AREA 'A'

DIMENSION PLAN

CONSTRUCTION NOTES

4 —— DIVISION 4 - MASONRY ——

4.9 04 2000 - CONCRETE MASONRY UNIT - REFER TO PLANS

5 —— DIVISION 5 - METALS ——

5.7 05 5000 - 6" DIA GALV STEEL PIPE BOLLARD FILLED WITH CONCRETE - REFER TO

SITE DEVELOPMENT DRAWINGS

7 —— DIVISION 7 - THERMAL AND MOISTURE PROTECTION ——

7.58 07 5400 - EXPANSION JOINT

7.92 07 2000 - FOAMED-IN-PLACE INSULATION

8 —— DIVISION 8 - OPENINGS ——

8.1 08 1000 - HOLLOW METAL DOOR OR WINDOW FRAME

8.2 08 1000 - HOLLOW METAL DOOR

8.20 08 4000 - 2 1/2" x 5 3/4" ALUMINUM CURTAIN WALL SYSTEM

8.22 08 4000 - CAULKING - CONTINUOUS BOTH SIDES OF FRAME (EXTERIOR SIDE TO BE

COLORED TO MATCH ADJACENT SURFACE)

8.38 08 8000 - GLAZING AS SCHEDULED

9 —— DIVISION 9 - FINISHES ——

9.1 09 2000 - 3 5/8" STEEL STUD FRAMING

9.14 09 2000 - 5/8" TYPE 'X' FIRE CODE GYPSUM WALLBOARD

9.15 09 2000 - 5/8" WATER RESISTANT (WR) FIRE CODE GYPSUM BOARD

9.81 09 3000 - THICK-SET TILE - SEE FINISH PLANS FOR TYPE

22 —— DIVISION 22 - PLUMBING ——

22.2 22 0000 - HANDWASH SINK - REFER TO PLUMBING DRAWINGS

22.3 22 0000 - DRINKING FOUNTAIN - REFER TO PLUMBING DRAWINGS

SCALE: 1" = 160'-0"

KEY PLAN

SHEET NOTES

SCALE:

FLOOR PLAN

1/8" = 1'-0"A104

AREA 'A' - DIMENSION

R E V I S I O N S

NO DATE DESCRIPTION

GENERAL ARCHITECTURAL NOTES

• DO NOT SCALE DRAWINGS.

• GC TO FIELD-VERIFY ALL DIMENSIONS. ANY ERRORS OR DISCREPANCIES SHALL BE BROUGHT

TO THE ATTENTION OF THE ARCHITECT.

• DIMENSIONS ARE TAKEN FROM FACE OF EXISTING FINISHES, FACE OF MASONRY OR

CONCRETE WALLS, & FACE OF STUDS IN NEW FRAMED WALLS UNLESS NOTED OTHERWISE.

• PATCH AND REPAIR ALL VISIBLE OR CRITICAL FINISHES THAT ARE DAMAGED DURING

DEMOLITION OR CONSTRUCTION.

• TOUCH-UP PAINT TO BE APPLIED AS REQUIRED IN ALL ROOMS IMPACTED BY CONSTRUCTION.

• FLOORING PRODUCTS ARE TO BE SUPPLIED BY OWNER, INSTALLED BY CONTRACTOR.

• PROVIDE BLOCKING AS REQUIRED BEHIND ALL HANGING CABINETS AND WALL-MOUNTED

FIXTURES.

• MAINTAIN CONSTRUCTION AREA, BROOM CLEAN DAILY. DO NOT ALLOW CONSTRUCTION

DEBRIS OR TRASH TO ACCUMULATE IN CONSTRUCTION OR TRAFFIC AREAS.

• REFER TO SPECIFICATIONS FOR PROJECT PHASING.

• FURNITURE IS SHOWN FOR REFERENCE ONLY.

• SLOPE FLOORS TO DRAIN WHERE OCCURS. SEE PLANS.

SCALE:

DETAIL

3/4" = 1'-0"A104

ENLARGED DETAIL - CORRIDOR A109

SCALE:

DETAIL

3/4" = 1'-0"A104

ENLARGED DETAIL - DRESSING ROOM A110

SCALE:

DETAIL

3/4" = 1'-0"A104

ENLARGED DETAIL - RESTROOM A111

SCALE:

DETAIL

3/4" = 1'-0"A104

ENLARGED DETAIL - VESTIBULE A135

SCALE:

FLOOR PLAN

1/4" = 1'-0"A104

LOWER LEVEL AT ELEVATOR - DIMENSION

7 8 11 12

SD104

PB101

ANNOUNCER

PB100

VISITOR

PB102

HOME

10 9

SD104

100' - 0"

GROUND LEVEL

102' - 0"

F.F.E.

116' - 0"

T.O.W.

PB100

VISITOR

PB101

ANNOUNCER

PB102

HOME 6

SD104

SD104

SD104

SD104

SD1049 SD10413 SD10417

PB100

VISITOR

PB101

ANNOUNCER

PB102

HOME

PB101

ANNOUNCER

PB102

HOME

PB100

VISITOR

EAST

6.50

NORTH

8.1

8.2

6.50

SOUTH

6.50

8.1

8.2

WEST EAST

6.50

NORTH

6.50

8.1

8.2

SOUTH

6.50

8.1

8.2

WEST

EAST

6.50

NORTH

8.1

8.2

6.50

SOUTH

8.1

8.2

6.50

WEST

PRESS BOX

SCALE:

BUILDING SECTION

1/4" = 1'-0"SD104

PRESS BOX - EW

SCALE:

REFLECTED CEILING PLAN

1/4" = 1'-0"SD104

PRESS BOX

SCALE:

BUILDING SECTION

1/4" = 1'-0"SD104

PRESS BOX - NS

SCALE:

FLOOR PLAN

1/4" = 1'-0"SD104

PRESS BOX

naylor wentworth lund architects

163 West 1600 South, Suite 1

St. George, UT 84770

Tel: 435 656-2883 fo r t h e B o a r d o f

E d u c a ti o n

CLIENT

LOGO

DRAWN BY:

ISSUE DATE:

CHECKED BY:

SD104

W A

S H

IN

G

T O

N C

O U

N T

Y S

C H

O O

L D

IS

T

R

IC

T

P

IN

E V

IE

W

H

IG

H S

C H

O O

L

P E

R F

O R

M

IN

G A

R T

S A

D D

IT

IO

N

S D

S

IT

E

B U

IL

D

IN

G

P

R E

S S

B O

X

SITE BUILDING -

PRESS BOX

CONSTRUCTION NOTES

6 —— DIVISION 6 - WOOD, PLASTICS & COMPOSITES ——

6.50 06 6116 - SOLID SURFACE COUNTERTOPS AND SPLASHES

8 —— DIVISION 8 - OPENINGS ——

8.1 08 1000 - HOLLOW METAL DOOR OR WINDOW FRAME

8.2 08 1000 - HOLLOW METAL DOOR

GENERAL ARCHITECTURAL NOTES

• DO NOT SCALE DRAWINGS.

• GC TO FIELD-VERIFY ALL DIMENSIONS. ANY ERRORS OR DISCREPANCIES SHALL BE BROUGHT

TO THE ATTENTION OF THE ARCHITECT.

• DIMENSIONS ARE TAKEN FROM FACE OF EXISTING FINISHES, FACE OF MASONRY OR

CONCRETE WALLS, & FACE OF STUDS IN NEW FRAMED WALLS UNLESS NOTED OTHERWISE.

• PATCH AND REPAIR ALL VISIBLE OR CRITICAL FINISHES THAT ARE DAMAGED DURING

DEMOLITION OR CONSTRUCTION.

• TOUCH-UP PAINT TO BE APPLIED AS REQUIRED IN ALL ROOMS IMPACTED BY CONSTRUCTION.

• FLOORING PRODUCTS ARE TO BE SUPPLIED BY OWNER, INSTALLED BY CONTRACTOR.

• PROVIDE BLOCKING AS REQUIRED BEHIND ALL HANGING CABINETS AND WALL-MOUNTED

FIXTURES.

• MAINTAIN CONSTRUCTION AREA, BROOM CLEAN DAILY. DO NOT ALLOW CONSTRUCTION

DEBRIS OR TRASH TO ACCUMULATE IN CONSTRUCTION OR TRAFFIC AREAS.

• REFER TO SPECIFICATIONS FOR PROJECT PHASING.

• FURNITURE IS SHOWN FOR REFERENCE ONLY.

• SLOPE FLOORS TO DRAIN WHERE OCCURS. SEE PLANS.

GENERAL ARCHITECTURAL NOTES

• DO NOT SCALE DRAWINGS.

• GC TO FIELD-VERIFY ALL DIMENSIONS. ANY ERRORS OR DISCREPANCIES SHALL BE BROUGHT

TO THE ATTENTION OF THE ARCHITECT.

• DIMENSIONS ARE TAKEN FROM FACE OF EXISTING FINISHES, FACE OF MASONRY OR

CONCRETE WALLS, & FACE OF STUDS IN NEW FRAMED WALLS UNLESS NOTED OTHERWISE.

• PATCH AND REPAIR ALL VISIBLE OR CRITICAL FINISHES THAT ARE DAMAGED DURING

DEMOLITION OR CONSTRUCTION.

• TOUCH-UP PAINT TO BE APPLIED AS REQUIRED IN ALL ROOMS IMPACTED BY CONSTRUCTION.

• FLOORING PRODUCTS ARE TO BE SUPPLIED BY OWNER, INSTALLED BY CONTRACTOR.

• PROVIDE BLOCKING AS REQUIRED BEHIND ALL HANGING CABINETS AND WALL-MOUNTED

FIXTURES.

• MAINTAIN CONSTRUCTION AREA, BROOM CLEAN DAILY. DO NOT ALLOW CONSTRUCTION

DEBRIS OR TRASH TO ACCUMULATE IN CONSTRUCTION OR TRAFFIC AREAS.

• REFER TO SPECIFICATIONS FOR PROJECT PHASING.

• FURNITURE IS SHOWN FOR REFERENCE ONLY.

• SLOPE FLOORS TO DRAIN WHERE OCCURS. SEE PLANS.

SCALE:

FINISH PLAN

1/4" = 1'-0"SD104

PRESS BOX

SCALE:

ROOF PLAN

1/4" = 1'-0"SD104

ENLARGED - PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

ANNOUNCER PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

ANNOUNCER PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

ANNOUNCER PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

ANNOUNCER PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

HOME PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

HOME PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

HOME PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

HOME PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

VISITOR PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

VISITOR PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

VISITOR PRESS BOX

SCALE:

INTERIOR ELEVATION

1/4" = 1'-0"SD104

VISITOR PRESS BOX

R E V I S I O N S

NO DATE DESCRIPTION

BASE FINISHES

SYM SECTION RMKSDESCRIPTION

NOTES:

1- PURCHASED AND INSTALLED BY OWNER

RB 1RUBBER BASEBY OWNER

CT CERAMIC TILE BASE09 3000 -

2- SECTION 09 9000 TO FINISH WALL SURFACE TO FLOOR WHERE REQ'D - PREFINISHED

ELEMENTS REQUIRE NO ADDITIONAL WORK

NR NO BASE REQUIRED09 9000 2

WALL FINISHES

SYM SECTION RMKSDESCRIPTION

NOTES:

2-

INTERIOR SURFACES ONLY- EXTERIOR USE TYPE 'GS' WALL FINISH

07 1900 -ANTI-GRAFFITI WALL SEALER- TYP @ ALL EXT WALLSGS

09 9000 1SEALED CONCRETE OR MASONRYWS

09 9000 -GLOSS EPOXY FINISH ON GYP BD, CONC, OR CMUWE

09 9000 -SEMI-GLOSS FINISH ON GYP BD, CONC, OR CMUWP

09 8420 -ACOUSTICAL TECTUM PANELSAT

09 3000 212 X 24 THICK-SET CERAMIC TILEWT

1-

THICK-SET TILE SYSTEM, COLORS AND PATTERNS BY ARCHITECT - SEE ELEVATIONS

X" - X"

A.F.F.

XX

2' x 4' LIGHT FIXTURE FIXTURE (DIV. 26)

1' x 4' SURFACE MOUNT LIGHT FIXTURE (DIV. 26)

SUSPENDED INDIRECT LIGHT FIXTURE (DIV. 26)

SUSPENDED HIGH BAY FIXTURE (DIV. 26)

RECESSED FIXTURE (DIV. 26)

WALL SCONCE (DIV. 26)

2' x 4' RADIANT HEAT PANEL

SUPPLY AIR CEILING DIFUSER (DIV. 23)

RETURN AIR GRILLE (DIV. 23)

EXHAUST FAN AIR GRILLE (DIV. 23)

ACCESS PANEL - SEE PLANS FOR SIZES (SECTION 08 3100)

CEILING MATERIAL REFERENCE MARKER - SEE FINISH SCHEDULE

CEILING HEIGHT MARKER

CEILING LEGEND

AUDIO ENHANCEMENT (DIV. 26)A/V

CEILING FINISHES

SYM SECTION RMKSDESCRIPTION

NOTES:

ROOM FINISH NOTE: IF ONLY ONE SYMBOL IS SHOWN IN A ROOM - ASSUME IT APPLIES TO

THE ENTIRE ROOM.

1 - DRY FALL PAINT - ALL ELEMENTS SHALL BE PAINTED - COLORS BY ARCHITECT

2 - TYP AT MECHANICAL / ELECTRICAL ROOMS ETC. (FACTORY PRIMED ELEMENTS)

09 9000 1PAINTED EXPOSED STRUCTURE, DUCTS, ETC. ES

09 9000 -EPOXY PAINT GYPSUM BOARDCE

09 9000 -PAINTED FLAT FINISH ON GYP BDCP

07 4210 -METAL PANELSMP

09 5100 -24 x 48 LAY-IN ACOUSTIC GRID CEILING ASSEMBLYAG4

NO ADDITIONAL FINISH REQUIREDNR

09 5100 -24 x 24 LAY-IN ACOUSTIC GRID CEILING ASSEMBLYAG2

EXISTING CEILING TO REMAIN AS ISEX - -

SHEET NOTES

SCALE: 1" = 160'-0"

KEY PLAN

THE ROOFING CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE

REQUIRED TAPERED INSULATION TO ENSURE THAT ROOF COMPLETELY

DRAINS. NO STANDING WATER SPOTS OR AREAS SHALL BE ALLOWED.

NO MECHANICAL EQUIPMENT SHALL BE MOUNTED ON ROOF WITHIN 10' - 0"

OF EDGE OF ROOF

750 NORTH ST.

M

M

N O

TI

TL

E

PR

O

JE

C

T

SHEET

SCALE

DATE

NAME

PROJECT #

OF

FILE

REVISIONS

D

AT

E

BY

D

ES

C R

IP

TI

O N

AS NOTED

S ou th

E as t, Su ite

St G eo rg e, U ta h

T:

.6

.6

• F

: 4

.6

.6

• a lp ha en gi ne er in g.

co m

PRELIM

IN

ARY

NOT FOR C

ONSTRUCTIO

N

O V

ER

A

LL

S

IT

E

PL

A

N

PI

N

E V

IE

W

H

IG

H S

CH

O

O L

PR

EF

O

RM

IN

G

A

RT

S A

D D

IT

IO

N

R

EN

O V

A

TI

O N

W A

SH

IN

G

TO

N C

O U

N

TY

S C

H O

O L

D

IS

TR

IC

T

032-286

WSS

FEBRUARY 05, 2026

1 3

032-286 MST.DWG

PARKING NOTES

P

W C S D

P in e

V ie w

H ig h

P e r fo r m in g

A r ts

A d d it io n

R e n o va ti o n D r a w in g s\ C o n st r u c ti o n

D r a w in g s\

M S T .d w g O V E R A

LL

IM

P R O V E M E N T S

:1 :3

P M w sl a c k

N O

TI

TL

E

PR

O

JE

C

T

SHEET

SCALE

DATE

NAME

PROJECT #

OF

FILE

REVISIONS

D

AT

E

BY

D

ES

C R

IP

TI

O N

AS NOTED

S ou th

E as t, Su ite

St G eo rg e, U ta h

T:

.6

.6

• F

: 4

.6

.6

• a lp ha en gi ne er in g.

co m

PRELIM

IN

ARY

NOT FOR C

ONSTRUCTIO

N

EV

EN

T

PL

A

ZA

EN

LA

R G

ED

S

IT

E

PL

A

N

PI

N E

V

IE

W H

IG

H

S

CH

O O

L

PR

EF

O

RM

IN

G A

RT

S

A D

D

IT

IO

N

R

EN

O

V A

TI

O

N W

A

SH

IN

G

TO

N

C O

U N

TY

S

C H

O O

L D

IS

TR

IC

T

032-286

WSS

FEBRUARY 05, 2026

2 3

032-286 MST.DWG

P

W C S D

P in e

V ie w

H ig h

P e r fo r m in g

A r ts

A d d it io n

R e n o va ti o n D r a w in g s\ C o n st r u c ti o n

D r a w in g s\

M S T .d w g E V E N T

P

LA

Z A

:2 :0

P M w sl a

VOCATIONAL BUILDING

N O

TI

TL

E

PR

O

JE

C

T

SHEET

SCALE

DATE

NAME

PROJECT #

OF

FILE

REVISIONS

D

AT

E

BY

D

ES

C R

IP

TI

O N

AS NOTED

S ou th

E as t, Su ite

St G eo rg e, U ta h

T:

.6

.6

• F

: 4

.6

.6

• a lp ha en gi ne er in g.

co m

PRELIM

IN

ARY

NOT FOR C

ONSTRUCTIO

N

SO

U

TH

P

A R

K

IN

G

EN

LA

R

G

ED

S

IT

E

PL

A N

PI

N

E V

IE

W

H

IG

H S

CH

O

O L

PR

EF

O

RM

IN

G

A

RT

S A

D D

IT

IO

N

R

EN

O V

A

TI

O N

W A

SH

IN

G

TO

N C

O U

N

TY

S C

H O

O L

D

IS

TR

IC

T

032-286

WSS

FEBRUARY 05, 2026

3 3

032-286 MST.DWG

P

W C S D

P in e

V ie w

H ig h

P e r fo r m in g

A r ts

A d d it io n

R e n o va ti o n D r a w in g s\ C o n st r u c ti o n

D r a w in g s\

M S T .d w g V O C P A R K

IN

G

LA

Y O U T

:2 :4

P M w sl a

COLWELL SHELOR LANDSCAPE ARCHITECTURE

OVERALL SITE PLAN

GREENHOUSE GARDEN

NEW PARKING LOT

ENTRANCE PLAZA

& CONNECTION TO

STADIUM

PERFORMING ARTS ADDITION

NEW HARDSCAPE & LANDSCAPE

NEW SIDEWALK CONNECTION

TO BASEBALL FIELD

NEW LANDSCAPE

SITE IMPROVEMENTS

NEW PRESS BOX AND

FIELD ENTRANCE

NEW LANDSCAPE

4PINE VIEW HIGH SCHOOL

File details come from the government source that posted it. Updated .