This document is a Proposal Response Form for the Performing Arts Addition & Remodel project at Pine View High School, issued by the Washington County School District in Utah. The form is used to capture pricing and cost information from Construction Manager/General Contractor (CM/GC) firms responding to the RFP. Bidders are required to submit detailed line-item pricing for preconstruction services, monthly supervision fees, bond premiums, and construction management fees. The preconstruction phase is proposed for six months with a monthly rate to be specified by the CM/GC. A mandatory pre-bid conference was scheduled for Wednesday, December 9, 2026, at 3:30 pm MST at Pine View High School (2850 East 750 North, St. George, UT 84790), with attendance required throughout the entirety of the meeting for bid eligibility. The RFP requires both in-person and electronic submission components, and award will be made to the responsive and responsible vendor with the highest score as justified by procurement code.
The proposal form requires CM/GC firms to provide pricing for all monthly supervision fees across multiple cost categories including project management, labor, equipment, insurance, and site conditions. Bond premiums are calculated based on a construction cost estimate of $10,000,000.00 for both Labor & Material Payment Bond and Performance Bond at 100% of construction costs. The construction manager fee is specified at 3.5% of the $10,000,000.00 construction cost estimate, equaling $350,000.00. All line items must be completed numerically, indicated as "not to exceed," or marked as "$0.00" or "Included in Bid"; no blank line items are permitted. The form includes acknowledgment sections for any addenda issued during the procurement process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal Response Form #1 Performing Arts Addition & Remodel at Pine View High School
PROPOSAL BREAKDOWN
THE PROPOSAL BREAKDOWN MUST BE PROVIDED IN A SEPARATE SEALED ENVELOPE
CM/GC Name:
Each line item must be filled out either numerically or indicate if item is to be bid with a not to exceed amount.
If a line item is included in the overall bid, then indicate on the line item “$0.00” or “Included in Bid.” No line items shall be left blank.
PRECONSTRUCTION WORK:
Design and Preconstruction Phase Services (Per Proposed Timeline Stated in RFP Paragraph L)
| Monthly Rate: $__ ________ Total Months: Six (6) Total: |
| $__________________________ |
| Other Preconstruction Costs: | _________ |
| $ |
| Grand TOTAL PRECONSTRUCTION WORK: |
| $ |
MONTHLY SUPERVISION FEES:
| Project Manager (1 Person, Part-Time Administrative) |
| $ |
| Project Superintendent(s) |
| $ |
| Office Staff |
| $ |
| Trailer and Supplies |
| $ |
Utilities:
Communication (Phones and Fax)
| Electricity (Temporary Power Installation) |
| $ |
| Electrical Panels (Temporary) |
| $ |
| Water (Temporary Water Installation) |
| $ |
| Portable Toilets |
| $ |
| Mobilization / Demobilization |
| $ |
| Construction Fencing & Barricades (Temporary) |
| $ |
| Project Sign (8' x 8') |
| $ |
Insurance:
General Liability
| Owners Protective Liability |
| $ |
| Automotive |
| $ |
| Workers’ Compensation |
| $ |
| Clean-up (Including Dumpster) |
| $ |
Soils Testing & Special Inspections
By Owner
| Fees and Permits |
| By Owner |
| Vehicle Costs |
| $ |
| Building Layout, Survey, and Engineering |
| $ |
| Construction Equipment |
| $ |
| Small Tools / Consumables |
| $ |
| Other Costs: |
| $ |
| TOTAL MONTHLY SUPERVISION FEES: |
| $ |
BOND PREMIUMS:
Labor & Material Payment Bond (100% of Construction Costs – $10,000,000.00)
Performance Bond (100% of Construction Costs – $10,000,000.00)
CONSTRUCTION MANAGER FEE:
(3.5% of Construction Costs – $10,000,000.00)
$350,000.00
TOTAL MONTHLY SUPERVISION FEES , BOND PREMIUMS, AND
CONSTRUCTION MANAGER FEE
Acknowledgement of Addenda, if any:
Addendum No. (Signature) Addendum No. (Signature) Addendum No. (Signature) Addendum No. (Signature) Addendum