4-26-16 - Bid Specs - Lacrosse Field Fence.pdf
PDF 223 KB Posted
- Attached to
- Lacrosse Field Fence
- Solicitation number
- 26-16
- Issued by
- Brazoria County, Missouri
About this file
This is a Request for Bid (RFB) issued by Parkway School District for the purchase and installation of a galvanized chain link fence for a Lacrosse Field. The bid (Proposal Number 26-16) was published on July 15, 2025, with a bid opening scheduled for July 29, 2025, at 1:00 PM CST. A mandatory pre-bid site visit is required on July 18, 2025, at 9:00 AM, located at Central High School in Chesterfield, Missouri. The contract is a one-time purchase, with vendors expected to submit their proposals through the Parkway School District's Bonfire Portal. The anticipated award date is tentatively set for August 5, 2025.
The bid requires vendors to provide comprehensive documentation, including a company W-9, vendor signature page, federal work authorization form, references, specification sheets/manuals, an affidavit of non-collusion, and a pricing sheet. Pricing must be F.O.B. destination with all associated charges included, and equipment must be new. The successful vendor will be required to provide extensive insurance coverage, including worker's compensation, general liability, and auto liability, with Parkway School District named as an additional insured. The district reserves the right to award the bid based on the lowest or best bid and may order similar items under the same terms and conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BID
BID SPECIFICATIONS (THIS IS A FORMAL BID)
PROPOSAL
NUMBER:
26-16
DATE PUBLISHED:
July 15, 2025
GOODS / SERVICE AREA:
Lacrosse Field Fence
BID OPENING:
Date: July 29, 2025 Time: 1:00 PM CST
CONTRACT PERIOD:
One Time Purchase
ADDRESS INQUIRIES ON:
The Parkway School District Bonfire Portal at https://parkwayschools.bonfirehub.com/
RETURN BID ON:
The Parkway School District Bonfire Portal at
SB-1 GENERAL INFORMATION:
Parkway School District (District) is seeking quotes from qualified vendors for the purchase and installation of galvanized chain link fence.
SB-2 BID AWARD METHOD:
It is the District's policy to award a bid based on the lowest or best bid. However, the District retains the right to award in whatever manner serves the best interests of the District.
SB-3 CONTACT PERSON
Any bidder with questions must submit in writing via the bidding platform, Bonfire. Questions are to be submitted through the Opportunity Q&A via the Messages panel. All questions must be submitted by the Bid’s Question Due Date. Every attempt shall be made to ensure that the bidder receives a prompt response if such questions are received in a timely manner. Any questions submitted outside the Bonfire platform shall not be answered.
SB-4 PROPOSAL FORMAT AND CONTENTS
The vendor’s proposal package shall contain a signed RFP cover sheet created by the vendor and the following items in the order listed below and utilize the forms provided. The Vendor is urged to be concise yet thorough in its presentations. Pertinent supplemental information should be referenced and included as attachments. All proposals must be organized and tabbed to comply with the following sections. Where there are no provided bid forms, the vendor is to use company letterhead to address the components of the RFP. Where a discrepancy exists between an amount submitted as figures and words, the amount expressed in words shall govern. Any interlineations, alterations or erasures must be initialed by the signer of the Proposal.
https://parkwayschools.bonfirehub.com/
1. PROPOSAL ON COMPANY LETTERHEAD
The vendor shall submit a quote on company letterhead.
2. COMPANY W-9
The vendor shall provide a current signed and dated W-9
3. VENDOR SIGNATURE PAGE
This cover sheet identifies the vendor’s legal name, mailing address, telephone, fax, email address and contact persons. An officer of the vendor’s company must sign the Vendor Signature Page. The vendor must be registered to do business in the state of Missouri.
4. FEDERAL WORK AUTHORIZATION (E-VERIFY) PROGRAM
The vendor shall complete the form.
5. REFERENCES (minimum of 3) On company letterhead provide three references to include the following information:
● company name
● representative’s contact name
● email address
● phone number
6. SPECIFICATION SHEET/MANUALS
The vendor must provide a complete set of comprehensive and easy to understand manuals (as applicable) for service, operation, parts, and repair. All manuals must be written in American English.
7. AFFIDAVIT OF NON-COLLUSION
The vendor shall complete the form.
8. PRICING SHEET
The vendor shall complete the Bonfire 26-16 pricing sheet.
SB-5 SITE VISIT:
Contractors are required to attend a MANDATORY pre-bid site visit which will be held on Friday, July 15, 2025, starting at 9:00 a.m. The pre-bid site visit will be held at Central High School located at 369 Woods Mill Rd, Chesterfield MO 63017. For questions pertaining directions to the mandatory pre-bid site visit, contact Pat Gutting at 314-220-3452 (cell).
SB-6 INSURANCE REQUIREMENTS:
The vendor must indicate that they agree to the insurance requirements as indicated in the terms and conditions document - IB-21, indicating its ability to comply with minimum insurance requirements. The vendor shall assume all responsibility for its actions and those of anyone else working for it while engaged in any activity connected with this proposal. The vendor shall carry sufficient insurance to protect it and the district from any property damage or bodily injury claims arising out of the contracted work. Evidence of current insurance coverage shall be provided with the district named as an additional insured. This proof of insurance shall be submitted no later than ten (10) days after receipt of notice of intent to award the contract. If the vendor fails to maintain and keep the insurance coverage in force, as herein provided, the district shall have the right to cancel and terminate the established contract forthwith and without notice. The vendor shall bear full responsibility for all risk of loss from equipment damage, and money or product loss resulting from vandalism or theft. The vendor shall not in any manner penalize the district for any such losses.
Minimum Insurance Requirements
The successful vendor will be required to provide to the district at the time of contract award, a certificate of insurance indicating that the contractor has, and will keep in effect for the term of the contract, the following types of insurance:
1. Worker's Compensation:
a. State: Missouri Statutory
b. Employer's Liability:
$100,000 per accident $500,000 Disease, policy limit $100,000 Disease, each employee
2. Comprehensive or Commercial General Liability (including premises-operations;
independent contractors protective, products and completed operations; broad form property damage).
a. Bodily injury: $1,000,000 combined single limit
b. Property damage: $1,000,000 combined single limit
c. Products and completed operations to be maintained for one (1) year after final payment: $1,000,000 combined single limit
d. Property damage liability insurance shall provide X, C and U coverage.
e. Broad form property damage coverage shall include completed operations.
3. Contractual Liability:
a. Bodily injury: $1,000,000 combined single limit
b. Property damage: $1,000,000 combined single limit
4. Personal injury, with employment exclusion deleted: $1,000,000 combined single limit
5. Business auto liability (including owned, non-owned and hired vehicles):
a. Bodily injury: $1,000,000 combined single limit
b. Property damage: $1,000,000 combined single limit
6. If the General Liability coverages are provided by a commercial liability policy, the:
a. General aggregate shall be not less than $1,000,000 and shall apply, in total, to this project only. This shall be confirmed by a Certificate of Insurance.
b. Fire damage limit shall be not less than $50,000 on any one fire.
c. Medical expense limit shall be not less than $5,000 on any one person.
7. Parkway School District to be named as "Additional Insured".
SB-7 PRICING:
Prices quoted are to be F.O.B., destination, freight allowed, Parkway School District, 363 North Woods Mill Road, Chesterfield, Missouri 63017. Prices MUST include all handling, freight, assembly, setup, warranty, and any other charges. Equipment must be new. Used, reconditioned, or demonstrator equipment will not be accepted.
SB-8 DELIVERY:
All bids MUST be F.O.B. to the Parkway Warehouse, located at 363 North Woods Mill Road, Chesterfield, Missouri 63017. Deliveries shall be made to Parkway School District Receiving Warehouse, 363 North Woods Mill Road, Chesterfield, Missouri 63017. Deliveries shall be accepted Monday through Friday between 7:00 a.m. and 2:00 p.m., excluding holidays and during inclement weather events the district is closed.
SB-9 WARRANTY:
The contractor must provide the standard manufacturer’s warranty. The warranty will commence upon written acceptance of the equipment by the Parkway School District or payment of such, whichever occurs first.
SB-10 SUBSTITUTIONS:
No substitution shall be made on any item ordered without authorization from the ordering or purchasing department. No exceptions may be drawn to this clause. All unacceptable material will be returned with no expense to the District.
SB-11 RELATED AND/OR SIMILAR ITEMS:
Parkway School District reserves the right to order similar and/or related items under the same terms and conditions stated herein.
SB-12 CONTACT METHOD:
Any bidder with questions must submit in writing via the bidding platform, Bonfire. Questions are to be submitted through the Opportunity Q&A via the Messages panel. All questions must be submitted by the Bid’s Question Due Date. Every attempt shall be made to ensure that the bidder receives a prompt response if such questions are received in a timely manner. Any questions submitted outside the Bonfire platform shall not be answered.
SB-13 SPECIFICATIONS:
Lacrosse Field Fence – Galvanized Chain Link Fence
Prebid Mandatory Meeting Scheduled – SEE BELOW
SB-14 PROCUREMENT TIMELINE:
*all times are CST
Action Date* Bid Published July 15, 2025 11:00 AM Mandatory Pre-Bid Meeting July 18, 2025 9:00 AM Q&A End July 22, 2025 2:00 PM Intent to bid July 29, 2025 12:30 PM Bid Close July 29, 2025 1:00 PM Vendor Notified of Award (Tentative) August 5, 2025 4:00 PM https://parkwayschools.bonfirehub.com/
| SB-11 RELATED AND/OR SIMILAR ITEMS: |
| Parkway School District reserves the right to order similar and/or related items under the same terms and conditions stated herein. |
File details come from the government source that posted it. Updated .