4-26-07Part 4 Drawings Jefferson EF Wrestling Room HVAC.pdf

PDF 3 MB Posted

Attached to
IFB No. 26-07 Jefferson H. S. Exhaust Fans
Solicitation number
IFB No. 26-07
Issued by
Rock Island County, Illinois

About this file

This document is a comprehensive set of mechanical and electrical design and demolition plans for the RPS Jefferson Exhaust Fan Replacements & Wrestling Room HVAC project for Rockford Public Schools, located at 4145 Samuelson Rd, Rockford, IL 61109. The project is scheduled for bidding on 08/05/2025 and involves extensive HVAC system replacements, including demolishing existing exhaust fans, hot water unit heaters, and associated piping and controls. The project will replace multiple exhaust fans, install new blower coil units, outside air ductwork, hot water and chilled water piping, and integrate new building automation systems. The work spans multiple building levels, including lower level, first floor, gym mezzanine, and roof areas.

The project documents include detailed mechanical and electrical plans, schedules for exhaust fans, equipment specifications, and installation requirements. The design emphasizes maintaining continuous building operations during construction, with specific instructions for coordinating service interruptions and temporary systems. Electrical work includes removing and replacing existing electrical connections, installing new circuitry, and ensuring compatibility with existing electrical infrastructure. The project appears to be funded through the school district's capital improvement or maintenance budget, with a focus on upgrading aging HVAC and ventilation systems to improve building performance and energy efficiency. Contractors will be required to carefully coordinate work, minimize disruption to school operations, and follow strict installation and safety guidelines.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

REVISIONS:

LOCATION MAP

INDEX OF DRAWINGS

MEP/FP

707 NE Jefferson Ave.

Peoria, IL 61603 309.938.4005 www.KEDbluestone.com

KED

bluestone

707 NE Jefferson Ave.

Peoria, IL 61603 309.938.4005 www.KEDbluestone.com

KEDbluestone

8/5 /20

9:

:45

A M

G000

TITLE SHEET

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

RPS JEFFERSON EXHAUST FAN REPLACEMENTS &

WRESTLING ROOM HVAC

4145 SAMUELSON RD,

ROCKFORD, IL 61109

ROCKFORD PUBLIC SCHOOLS

ISSUED FOR BIDDING

ISSUE DATE: 08/05/2025

DATE SIGNED: 08/05/2025

Sheet No. Sheet Name

G000 TITLE SHEET

M000 MECHANICAL TITLE SHEET

MD100A MECHANICAL DEMOLITION - LOWER LEVEL AREA A

MD101A MECHANICAL DEMOLITION - FIRST FLOOR AREA A

MD103A MECHANICAL DEMOLITION - ROOF AREA A

MD103B MECHANICAL DEMOLITION - ROOF AREA B

M100A MECHANICAL NEW WORK - LOWER LEVEL AREA A

M101A MECHANICAL NEW WORK - FIRST FLOOR AREA A

M102A MECHANICAL NEW WORK - FIRST FLOOR MEZ. AREA A

M103A MECHANICAL NEW WORK - ROOF AREA A

M103B MECHANICAL NEW WORK - ROOF AREA B

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

E000 ELECTRICAL TITLE SHEET

ED100A ELECTRICAL DEMOLITION - LOWER LEVEL AREA A

ED103A ELECTRICAL DEMOLITION - ROOF AREA A

ED103B ELECTRICAL DEMOLITION - ROOF AREA B

E100A ELECTRICAL NEW WORK - LOWER LEVEL AREA A

E101A ELECTRICAL NEW WORK - FIRST FLOOR AREA A

E103A ELECTRICAL NEW WORK - ROOF AREA A

E103B ELECTRICAL NEW WORK - ROOF AREA B

E600 ELECTRICAL SCHEDULES

RPS PROJECT NUMBER: 2519

RPS IFB NUMBER: 26-07

NO. DESCRIPTION DATE

RPS PROJECT #: 2519

RPS IFB #: 26-07

M

B

C

F

S

F

P

T

S

H

TC

T

TH

CHWS

LPR

CWR

CWS

HWR

HWS

NG

LPS

CHWR

RL

2"

MECHANICAL PIPING SYMBOLS

KEYNOTE SYMBOL

SHEET NUMBER WHERE DETAIL IS PLACED

DETAIL NUMBER ON SHEET

PLAN REVISION NUMBER

GENERAL PLAN SYMBOLS

ROOM NAME / NUMBER

POINT WHERE NEW CONNECTS TO EXISTING

EXISTING PIPE TO REMAIN

AREA BEING DEMOLISHED

AREA NOT IN CONTRACT

PIPE TO BE DEMOLISHED

NOMINAL PIPE SIZE

X

* NOTE *

ALL GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL SUBSEQUENT SHEETS IN

SHEET LIST. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT

BE USED IN THIS SET OF DRAWINGS.

D

24/12

18Ø

RETURN AIR

SUPPLY AIR

EXISTING DUCT TO REMAIN

RECT. DUCT SIZE (WIDTH / HEIGHT)

DUCTWORK SYMBOLS

RECT. SUPPLY DUCT RISE / DROP

ROUND DUCT SIZE (DIAMETER)

DUCT TO BE DEMOLISHED

▲T TEMPREATURE DIFFERENCE

Ø ROUND

ABV ABOVE

AC AIR CONDITIONING

AD AREA DRAIN

ADD ADDENDUM

A/E ARCHITECT / ENGINEER

AFF ABOVE FINISHED FLOOR

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

ALT ALTERNATE

AP ACCESS PANEL

ARCH ARCHITECT/ARCHITECTURAL

BAS BUILDING AUTOMATION SYSTEM

BFF BELOW FINISHED FLOOR

BHP BRAKE HORSEPOWER

BLW BELOW

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

CAP CAPACITY

CB CATCH BASIN

CD CEILING DIFFUSER

CFM CUBIC FEET PER MINUTE

CFH CUBIC FEET PER HOUR

CLG CEILING

C.M. CONSTRUCTION MANAGER

CO CLEAN OUT

CV CONTROL VALVE

CW COLD WATER

D DEGREE

DB DRY BULB

DDC DIRECT DIGITAL CONTROLS

DIA DIAMETER

DN DOWN

DW DEIONIZED WATER

EAT ENTERING AIR TEMPERATURE

E.C. ELECTRICAL CONTRACTOR

ELEC ELECTRICAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EA EXHAUST AIR

EG EXHAUST GRILLE

EXIST EXISTING

F DEGREES FAHRENHEIT

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FL FLOOR

FO FUEL OIL

FOV FUEL OIL VENT

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPC FIRE PROTECTION CONTRACTOR

FPM FEET PER MINUTE

FS FLOOR SINK

FT FOOT/FEET

FTR FIN TUBE RADIATION

GAL GALLON

GF GAS-FIRED

G.C. GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GW GREASE WASTE

HB HOSE BIBB

HP HORSE POWER

HP HIGH PRESSURE

HTG HEATING

HTR HEATER

HW HOT WATER

HYD HYDRANT

ID INDIRECT DRAIN

IN INCH

I.E. INVERT ELEVATION

K.E.C. KITCHEN EQUIPMENT CONTRACTOR

LAT LEAVING AIR TEMPERATURE

LB POUND

LB/HR POUNDS PER HOUR

LD LINEAR DIFFUSER

LP LOW PRESSURE

LP LIQUEFIED PETROLEUM GAS

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

MA MIXED AIR

MAX MAXIMUM

MBH ONE THOUSAND BTU PER HOUR

M.C. MECHANICAL CONTRACTOR

MD MOTORIZED DAMPER

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MP MEDIUM PRESSURE

MTR MOTOR

MUA MAKE-UP/AIR

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NG NATURAL GAS

NO NUMBER

NO NORMALLY OPEN

NTS NOT TO SCALE

O OXYGEN

OA OUTSIDE AIR

ORD OVERFLOW ROOF DRAIN

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PWR POWER

R DUCT RISER

RA RETURN AIR

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REC RECESSED

RED REDUCER

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RLA RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SAN SANITARY

SD SMOKE DAMPER

SF SQUARE FOOT

SG SUPPLY GRILLE

SM SURFACE MOUNT

SP STATIC PRESSURE

SR SUPPLY REGISTER

STM STEAM

T THERMOSTAT

T.C. TEMP CONTROLS CONTRACTOR

TD TEMPERATURE DROP

TD TRENCH DRAIN

TEMP TEMPERATURE

TYP TYPICAL

UG UNDERGROUND

VAC VACUUM

V VENT

VAV VARIABLE AIR VOLUME

VENT VENTILATION

VTR VENT THROUGH ROOF

W WASTE

WB WET BULB

WCO WALL CLEAN OUT

WH WALL HYDRANT

YCO YARD CLEANOUT

ABBREVIATIONS

PIPE ACCESSORIES

GLR

GLS

AC AIR CONDITIONING UNIT

ACCU AIR COOLING CONDENSING UNIT

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

BCU BLOWER COIL UNIT

CH CHILLER

CT COOLING TOWER

CUH CABINET UNIT HEATER

CHWP CHILLED WATER PUMP

CP CONDENSER PUMP

DBP DOMESTIC WATER BOOSTER PUMP

DC DUCT MOUNTED COIL

CP DOMESTIC WATER CIRCULATING PUMP

EF EXHAUST FAN

EDC ELECTRIC DUCT COIL

ET EXPANSION TANK

ERV ENERGY RECOVERY VENTILATOR

EWH ELECTRIC WATER HEATER

FCU FAN COIL UNIT

FP FIRE PUMP

GI GREASE INTERCEPTOR

GRV GRAVITY ROOF VENTILATOR

HP HEAT PUMP

HWP HEATING WATER PUMP

HRU HEAT RECOVERY UNIT

P PUMP

PRV POWER ROOF VENTILATOR

RF RETURN FAN

RHC REHEAT COIL

RTU ROOFTOP UNIT

SP SUMP PUMP

UH UNIT HEATER

WH WATER HEATER

EQUIPMENT ABBREVIATIONS

DAMPER TYPES

SA

RA

ROUND SUPPLY DUCT RISE / DROP

RECT. RETURN DUCT RISE / DROP

ROUND RETURN DUCT RISE / DROP

RECT. EXHAUST DUCT RISE / DROP

ROUND EXHAUST DUCT RISE / DROP

SMOKE DAMPER

FIRE DAMPER

COMB. FIRE/ SMOKE DAMPER

MANUAL DAMPER

MOTORIZED DAMPER

BACKDRAFT DAMPER

BD

BFW

FOS

FOR

MPR

MPS

HPR

HPS

FLUE

CA

EA

OA

EXHAUST AIR

OUTSIDE AIR

FLUE GAS VENT

COMBUSTION AIR

MARK SCHEDULED EQUIPMENT (UNDERLINED)

18/12

2" CHWS

PIPE FITTINGS

FLOW SENSOR

2-WAY ELEC. CONTROL VALVE

EXISTING RELOCATED EQUIPMENT - (R) PREFIX

(E) MARK EXISTING EQUIPMENT - HALFTONE - (E) PREFIX

PIPE RISE / DROP

BALANCING VALVE

BALL VALVE

ELEC. CONTROL VALVE

GATE VALVE

PRESSURE REDUCING VALVE

PIPE ELBOW

PIPE TEE HORIZONTAL / RISER / DROP

PIPE CAP / CONTINUATION

STRAINER

ANGLE VALVE

BUTTERFLY VALVE

PLUG VALVEGENERIC ISOLATION VALVE

GAS METER

INLINE PUMP

HOSE BIBB/ HYDRANT

PRESSURE GAUGE

AIR VENT

PRESSURE RELIEF

3-WAY ELEC. CONTROL VALVE

PRESSURE SENSOR

TEMPERATURE SENSOR & WELL

STEAM TRAP

DATA DEVICES

THERMOSTAT

HUMIDISTAT

TEMPERATURE & HUMIDITY DETECTOR

GENERIC DETECTOR

DDC SENSOR. SEE ABBREVIATIONS LISTTS

TEMPERATURE & CO2 DETECTOR

(R) MARK

LP

SUPPLY GRILLE, REGISTER, DIFFUSER

RETURN GRILLE, REGISTER, DIFFUSER

EXHAUST GRILLE, REGISTER, DIFFUSER

DIFFUSER CALLOUT SYMBOL

MARK

NECK

CFM

CD

6"Ø

FLEXIBLE DUCTWORK

AIR TERMINALS

UNION

16/12

18/12Ø SUPPLY AIR OVAL DUCT SIZE (WIDTH / HEIGHT)

CD

XXX

MARK

CFM N/A

MARK NONSCHEDULED EQUIPMENT

DIFFUSER CALLOUT SYMBOL UNDEFINED CFM

BOILER BLOW DOWN

BOILER FEED-WATER

CHILLED-WATER SUPPLY

CHILLED-WATER RETURN

CONDESNER-WATER SUPPLY

CONDESNER-WATER RETURN

FUEL OIL SUPPLY

FUEL OIL RETURN

GEOTHERMAL LOOP SUPPLY

GEOTHERMAL LOOP RETURN

HOT-WATER SUPPLY

HOT-WATER RETURN

REFRIGERANT LINESET

LOW PRESSURE STEAM SUPPLY

LOW PRESSURE STEAM RETURN

MEDIUM PRESSURE STEAM SUPPLY

MEDIUM PRESSURE STEAM RETURN

HIGH PRESSURE STEAM SUPPLY

HIGH PRESSURE STEAM SUPPLY

NATURAL GAS

LIQUID PROPANE

CONDENSATE DRAIN

Room

1.

2.

3.

4.

5.

a.

b.

c.

d.

e.

6.

7.

CONTRACTOR SHALL VISIT THE JOB SITE AND EXAMINE THE DRAWINGS OF OTHER TRADES PRIOR TO BIDDING TO THOROUGHLY FAMILIARIZE HIMSELF WITH EXISTING CONDITIONS AND THE SCOPE OF THE PROJECT. FAILURE TO DO SO DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY

TO UNDERSTAND THE SCOPE OR OF UNDERSTANDING ANY FIELD CONDITIONS WHICH COULD BE

REASONABLY EXPECTED TO BE KNOWN BY A THOROUGH INVESTIGATION.

AN ATTEMPT HAS BEEN MADE TO SHOW ALL HVAC EQUIPMENT, PIPING, DUCTWORK AND DIFFUSERS.

ALL CONTRACTORS SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS INDICATED FOR DEMOLITION NEED TO BE REMOVED AS NOTED

ON THE DRAWINGS.

IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND UNINTERRUPTED OPERATION DURING REPLACEMENT/UPGRADE OF THE HVAC SYSTEM. THE SPECIFIC AREAS UNDER CONSTRUCTION AT ANY SCHEDULED TIME ARE EXCLUSIVE OF THE STATEMENT. SERVICES TO THE

EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION INCLUDED DOMESTIC WATER;

SANITARY; STORM; STEAM; HEATING HOT WATER; HVAC SUPPLY, RETURN, AND EXHAUST

DUCTWORK. ANY ABSOLUTELY NECESSARY INTERRUPTION OF THESE SERVICES TO ACCOMPLISH

PROJECT CONSTRUCTION SHALL BE ARRANGED WITH THE OWNER, A MINIMUM OF TWO WEEKS IN

ADVANCE. TEMPORARY SERVICES SHALL BE FURNISHED AND INSTALLED WHERE NECESSARY TO

ACCOMPLISH THIS PURPOSE. TEMPORARY SERVICES SHALL BE REMOVED ONLY AFTER NEW

PERMANENT SERVICES ARE INSTALLED AND FULLY OPERATIONAL.

EACH CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING,

STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING

EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND REFINISHING

SHALL MATCH EXISTING SUBSTRATE AS NEARLY AS POSSIBLE, FINISH WORK BY OTHERS.

EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON THE DRAWINGS, ALL EXISTING EQUIPMENT AND

MATERIAL IN AREAS TO BE REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE

WITH PROPOSED NEW CONSTRUCTION AND/OR INTERFERE WITH PROPOSED USAGE OF SPACE BY

OWNER AS FOLLOWS:

REMOVE ANY PIPES PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL AND CAP AND

FINISH OVER WITH MATERIAL TO MATCH EXISTING.

REMOVE PIPING, DUCTWORK, EQUIPMENT, ETC. INCLUDING ABANDONED TO SOURCE OF

SUPPLY AND/OR MAIN LINES AS NOTED. CAP AT NEAREST ACTIVE MAIN. SUPPLY AND RETURN

MAINS TO BE CAPPED. REMOVE ALL ASSOCIATED CLAMPS, HANGERS, SUPPORTS, ETC.

ASSOCIATED WITH REMOVAL.

IN REMODELED/ALTERED AREAS ANY PIPING OR DUCTWORK PASSING THROUGH THE

REMODELED AREAS TO SERVE (OR BEING SERVED FROM EXISTING ADJACENT, REMOTE, OR

SURROUNDING AREA THAT ARE TO REMAIN) SHALL BE RETAINED AND KEPT OPERATIONAL AND

SHALL BE RE-ROUTED IN ALL CASES WHERE THEY INTERFERE WITH ANY NEW WORK OR USAGE

TO BE ACCOMPLISHED IN THE REMODELED AREA.

REPAIR ADJACENT CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION AND

EXTENSION WORK. MATCH ORIGINAL CONSTRUCTION. VERIFY ALTERNATIVE OR SPECIAL

REPAIR METHODS WITH A/E BEFORE PROCEEDING WITH DEMOLITION.

REPAIR ANY PIPING OR DUCT INSULATION THAT IS DAMAGED OR REMOVED DURING

CONSTRUCTION.

SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR PHASES OF DEMOLITION AND

CONSTRUCTION. COORDINATE WITH GENERAL CONTRACTOR\ CONSTRUCTION MANAGER AND ALL

OTHER TRADES.

ITEMS THAT ARE NOT IN THE REQUIRED SCOPE OF DEMOLITION, OR AS SPECIFICALLY NOTED, SHALL

REMAIN IN PLACE. SUCH ITEMS, INCLUDING ASSOCIATED EQUIPMENT, FIXTURES, DOMESTIC

PLUMBING, SANITARY AND STORM PIPING, SHALL BE MAINTAINED OPERATIONAL AND IN GOOD

CONDITION BY THIS CONTRACTOR.

GENERAL NOTES - MECHANICAL DEMOLITION

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL

COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON DRAWINGS, AS SPECIFIED, AND AS

REQUIRED BY MOST CURRENT INTERNATIONAL MECHANICAL CODE AND ANY APPLICABLE LOCAL

CODES. PROVIDE CLEARANCE FOR INSPECTION, REPAIR, REPLACEMENT, AND SERVICE TO ALL

EQUIPMENT TO INCLUDE A MINIMUM OF 36 INCHES FROM ALL OBSTRUCTIONS (WALLS, STRUCTURE, DUCTWORK, PIPES, ETC.). CLEARANCE SHALL MAINTAIN ACCESS TO ALL ELECTRICAL PANELS, ACCESS DOORS, CONTROLLERS, VALVES, JUNCTION BOXES AND OPERATORS AND INCLUDE THE

AREA DIRECTLY IN FRONT OF AND ABOVE THE SYSTEM COMPONENTS. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, FLANGES, ACCESSORIES, AND OTHER APPARATUS REQUIRING ACCESS

ARE ACCESSIBLE.

MECHANICAL CONTRACTOR SHALL VISIT THE JOB SITE AND EXAMINE THE DRAWINGS OF OTHER

TRADES PRIOR TO BIDDING TO THOROUGHLY FAMILIARIZE HIMSELF WITH EXISTING CONDITIONS AND

THE SCOPE OF THE PROJECT. FAILURE TO DO SO DOES NOT RELIEVE THE MECHANICAL

CONTRACTOR OF THE RESPONSIBILITY TO UNDERSTAND THE SCOPE OR OF UNDERSTANDING ANY

FIELD CONDITIONS WHICH COULD BE REASONABLY EXPECTED TO BE KNOWN BY A THOROUGH

INVESTIGATION.

DRAWINGS ARE DIAGRAMMATICAL IN NATURE. IT IS NOT INTENDED THAT THE DRAWINGS SHOW

EVERY DUCT, FITTING, TRANSITION, DAMPER, ETC., AND IT IS UNDERSTOOD THAT WHILE THE

DRAWINGS MUST BE FOLLOWED AS CLOSELY AS CIRCUMSTANCES WILL PERMIT, THE PROPER

INSTALLATION ACCORDING TO THE TRUE INTENT AND MEANING OF THE DRAWINGS, LOCAL CODES

AND STANDARD PRACTICES SHALL BE PROVIDED. MECHANICAL CONTRACTOR TO PROVIDE ALL

DUCTWORK TRANSITIONS, FLEXIBLE CONNECTIONS, AND ACCESSORIES AS REQUIRED. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO INSTALLATION. REPORT ANY PROBLEMS OR CONFLICTS TO THE

OWNER OR ENGINEER.

ANY MINOR CHANGES IN THE LOCATION OF EQUIPMENT, DUCTS, PIPE CONTROL DEVICES, ETC., FROM THOSE LOCATIONS SHOWN ON THE DRAWINGS SHALL BE MADE WITHOUT EXTRA COST IF SO DIRECTED BY THE OWNERS REPRESENTATIVE OR ENGINEER BEFORE THE INSTALLATION IS MADE. A MINOR CHANGE IN LOCATION SHALL BE CONSIDERED TO BE WITHIN 6'-0 ” OF THE ORIGINALLY

INDICATED LOCATIONS.

VERIFY ALL DIMENSIONS BY FIELD MEASUREMENTS. VERIFY FINAL LOCATIONS FOR ROUGH-INS WITH

FIELD MEASUREMENTS AND WITH THE REQUIREMENTS OF THE ACTUAL EQUIPMENT TO BE

CONNECTED.

WHERE MOUNTING HEIGHTS ARE NOT DETAILED OR DIMENSIONED, INSTALL SYSTEMS, MATERIALS, AND EQUIPMENT TO PROVIDE THE MAXIMUM HEADROOM POSSIBLE.

INSTALL SYSTEMS, MATERIALS AND EQUIPMENT LEVEL AND PLUMB, PARALLEL AND PERPENDICULAR TO OTHER BUILDING SYSTEMS AND COMPONENTS WHERE INSTALLED EXPOSED IN FINISHED SPACES AND GIVING RIGHT-OF-WAY PRIORITY TO SYSTEMS REQUIRED TO BE INSTALLED AT A SPECIFIED

SLOPE.

INSTALL ALL HVAC EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS,

CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.

ALL OPENINGS IN FIRE-RATED AND SMOKE-RATED WALLS DUE TO DUCTWORK, PIPING AND CONTROL

CONDUIT SHALL BE FIRE-STOPPED WITH AN APPROVED FIRE STOP MATERIAL. COORDINATE

INSTALLATION WITH ARCHITECTURAL CODE PLANS.

PROVIDE ACCESS DOORS IN DUCTWORK OR WALLS/CEILING FOR OPERATION, ADJUSTMENT, AND

MAINTENANCE OF ALL FANS, VALVES, COILS, AND MECHANICAL EQUIPMENT. COILS LOCATED IN

DUCTWORK TO BE PROVIDED WITH ACCESS DOORS ON OUTLET SIDE OF COIL.

LOCATIONS AND SIZES OF ALL FLOOR, CEILING AND WALL OPENINGS SHALL BE COORDINATED WITH

ALL OTHER TRADES INVOLVED AND THE OWNER.

MECHANICAL CONTRACTOR SHALL COORDINATE CEILING DIFFUSER/GRILLE/REGISTER LOCATIONS

WITH LIGHTING, FIRE ALARM EQUIPMENT AND FIRE SUPPRESSION SYSTEMS.

WHERE NEW WORK OCCURS, MECHANICAL CONTRACTOR SHALL PATCH AND SEAL ALL WALLS,

FLOORS AND CEILINGS TO MATCH EXISTING. MECHANICAL CONTRACTOR SHALL VERIFY WITH

OWNER ALL PATCHING MATERIALS AND INSTALLATION METHODS.

MECHANICAL CONTRACTOR SHALL PROVIDE MANUAL BALANCE DAMPERS IN ALL BRANCH TAKE-OFFS TO SUPPLY DIFFUSERS. PROVIDE ADDITIONAL MANUAL BALANCE DAMPERS IN MAIN AND SUB-MAIN DUCTS AS REQUIRED TO ENSURE THE SUPPLY AND RETURN AIR SYSTEMS CAN BE BALANCED TO THE

SPECIFIED DESIGN AIRFLOW.

IN AREAS WHERE A CEILING GRID EXISTS, THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE

FOR REMOVAL AND REPLACEMENT OF EXISTING CEILING GRID AND TILES AS NECESSARY FOR

INSTALLATION OF VENTILATING WORK. ANY PORTION OF THE EXISTING TILES OR GRID WHICH

BECOME DAMAGED DURING REMOVAL SHALL BE REPLACED BY THE MECHANICAL CONTRACTOR.

DO NOT ROUTE DUCT OR PIPING ABOVE OR BELOW ELECTRICAL PANELS INCLUDING SERVICE

CLEARANCES.

ALL RECTANGULAR AND/OR ROUND SUPPLY AND RETURN DUCTWORK SHOWN ON THE PLANS MAY BE

CONVERTED TO EQUIVALENT ROUND/RECTANGULR DUCTWORK AT THE DISCRETION OF THE

MECHANICAL CONTRACTOR. ANY DUCT CONVERSIONS SHALL BE SUBMITTED AS PART OF THE

DUCTWORK SHOP DRAWINGS FOR APPROVAL BY THE ENGINEER.

MECHANICAL CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING METHODS OF BRINGING IN

MECHANICAL EQUIPMENT THROUGH BUILDING INTO MECHANICAL ROOMS.

PIPING SHALL NOT BE SUPPORTED FROM OTHER PIPING, CONDUIT, OR DUCTWORK.

PROVIDE CHAIN WHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS MOUNTED GREATER

THAN 7'-0" ABOVE FLOOR LEVEL. CHAIN SHALL EXTEND TO 7'-0" ABOVE FLOOR LEVEL.

COORDINATE PIPE ROUTING TO AVOID RUNNING PIPING BELOW ROOF HATCHES, SKYLIGHTS AND

ACCESS PANELS.

ALL CONTROL WIRING ROUTED EXPOSED IN SPACES SUCH AS MECHANICAL ROOMS OR ABOVE HARD CEILINGS SHALL BE ROUTED IN CONDUIT. CONTROL WIRING ROUTED ABOVE ACCESSIBLE CEILINGS IS NOT REQUIRED TO BE RUN IN CONDUIT, BUT SHOULD BE SECURELY STRAPPED TO PERMANENT

SUPPORTS FOR A CLEAN INSTALLATION.

GENERAL NOTES - MECHANICAL

PROJECT NOTES - MECHANICAL

1.

2.

NIGHT OR WEEKEND WORK IS REQUIRED FOR WORK ON THIS PROJECT. MECHANICAL CONTRACTOR SHALL INCLUDE ALL PREMIUM LABOR COSTS IN THEIR BID. COORDINATE REQUIREMENTS WITH GENERAL

CONTRACTOR/ CONSTRUCTION MANAGER AND OWNER.

THE MECHANICAL CONTRACTOR SHALL USE THE GRAPHIC PRODUCTS ANSI PIPE MARKERS | STANDARDS COMPLIANT PIPE LABELS | THE GRAPHIC PRODUCTS LINE OF ANSI PIPE MARKERS AND FOLLOW THE ANSI/ASME PIPE MARKER SIZE CHART AND PLACEMENT GUIDANCE FOR LABELING OF MECHANICAL PIPE, DUCTWORK, AND EQUIPMENT.

MECHANICAL SHEET INDEX

M000 MECHANICAL TITLE SHEET

MD100A MECHANICAL DEMOLITION - LOWER LEVEL AREA A

MD101A MECHANICAL DEMOLITION - FIRST FLOOR AREA A

MD103A MECHANICAL DEMOLITION - ROOF AREA A

MD103B MECHANICAL DEMOLITION - ROOF AREA B

M100A MECHANICAL NEW WORK - LOWER LEVEL AREA A

M101A MECHANICAL NEW WORK - FIRST FLOOR AREA A

M102A MECHANICAL NEW WORK - FIRST FLOOR MEZ. AREA A

M103A MECHANICAL NEW WORK - ROOF AREA A

M103B MECHANICAL NEW WORK - ROOF AREA B

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

M000

MECHANICAL TITLE

SHEET

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

JJO AEC

DATE: 08/05/2025

NO. DESCRIPTION DATE

521 522520

Q

R

S

X

Y

176173

TOILET

VESTIBULE

2ND FLOOR OVERHANG ABOVE

ACCU

RETAINING

WALL

UH-XX

UH-XX

1" HWS

1" HWR

AREA A AREA B

LOWER LEVEL REGION

KEYED MECHANICAL NOTES (THIS SHEET):

1.

2.

DEMOLISH EXISTING SUSPENDED HOT WATER CABINET UNIT

HEATER AND ASSOCIATED BRANCH PIPING AND HANGERS.

DEMOLISH ALL ASSOCIATED CONTROLS, PNEUMATIC TUBING,

THERMOSTATS, AND WIRING ASSOCIATED WITH THE UNIT HEATERS.

DEMOLISH EXISTING HOT WATER PIPING AND CAP AT WALL.

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

MD100A

MECHANICAL

DEMOLITION - LOWER

LEVEL AREA A

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

JJO AEC

DATE: 08/05/2025

N

1/8" = 1'-0"1 LOWER LEVEL - MECHANICAL DEMOLITION PLAN

NO. DESCRIPTION DATE

521 522

C108

C10 8a

C10

6 51

118A118A

4a

4b

B16

4c

C10 8b

6A

6B

9A

165 163 159

162 157

154 148

4d

ST

U

V

LL

KK

JJ

EE

BB

AA

Q

R

S

V W

X

Y

EX

A/C

EXIST

LA

DDER

EXIST

LA

DDER

UP UP

UP UP

DN DN

DNDN

DN

DN

DN

DN

STORAGE

STAIR

C-S W

STORAGE

OFFIC

E

LK

RS

JA

N

TLT

ELE

CTRIC

AL &

MECHANIC

AL

AUDITORIU

M

STAGE

DRESSIN

G

OFFIC

E

TOILE

T

TOILE

T

DRESSIN

G

CORRID

OR

CORRID

OR

STAGECRAFT

BUILD

IN

G R

ECEIVIN

G

LE

CTURE A

LE

CTURE B

CONF.

MAIN OFF.

PRINC.

MAIL RM.

ASSOC.

PRIN.

141 143

NURSE

EXAM

KEEPER

EQUIP.

ASS'T

PRINC.

STUDENT OFF.

WOMEN

CHILD

DEVELOPEMENT

PROGRAM

DISTURBED

SELF-CONTAINED

D.D.

STOR. 113

111A

MEN

JAN.

WOMEN 115

DISH-

WASHING

LOUNGE/

DINING

SERVING

KITCHEN

DRY

STORAGE

FREEZER

COOLER

OFF.

RECEIV'G

LKR'S

JAN.

DINING

COMMONS

LOCKERS

EL.

WOMEN 169

MEN

BLDG.

ENG.

DRAFTING

EXISTING RAMP #1

EXISTING RAMP #2

CHORAL

MUSIC

MEN

D.D.

SELF-CONTAINED

DISCIPLINE

ALTERNATIVE

EMOTIONLY

SELF-CONTAINED SELF-CONTAINED

D.D.

FACULTY

ASS'T

PRINC.

POLICE

OFF.

ATTEN.

SPEC.

OFF.

MAN.

HEAD

BOOK- COMP.

D.D

SELF-CONTAINED

SNACK

BAR

OFFICE

STU.

H.C.

TOILET

ELEV

LOBBY

MECH

STORAGE

STORAGE

OFF.

RM. 424

SMALL ENGINES

STOR.

I.D. RM.

PRAC. 415

PRAC. 411

JAN. 109

STOR.

FT'G

MEN 166

CL.RM.

KILN

KILN W/HOOD

CL. RM. 451

TOOLS 453

TOOLS 450

PROJECTS

PROJECTS

METALS

SHOP 448

FINISH 446

TOOLS 445

PROJECTS

TECHNOLOGY LAB. 443

OFF. 447

TOOL STOR.

BLDG. ENG.

MUSIC 408

STOR. 409

RM. 105

STOR. 410OFF. 412

J-HAWK

SHOP 405

CONCESSION 404

PRAC. 416

PRAC. 403STORAGE

OFF. 417

OFFICE &

STOR. 418

STOR. 420

STOR. 414

ART 104

STOR. 102 OFF. 103

ART 100PRAC. 421

PRAC. 422

PRAC. 423

WOMEN 401

UPPER

LEVEL OF

NATATORIUM

MECH. 511

TOILET

TOILET

TOILET

STOR. STOR.

TOILET

LOCKERS

CORRIDOR

STAIRS

STAIRS

STAIRS

STAIRS

SPECTATORS 503

STAIR

C-SE

C103

C108

110A

CORRIDOR

OBSERV.

CORRID

OR

OFFICE

VESTIBULE

IDF

GYMNASIU

M

"N

EST"

STORAGE

POOL

VESTIBULE

STORAGE

STAIR

C-S E

TIC

KETS

P.E. S

TORAGE

ELE

V

TIC

KETS

SOUND C

LO

S

TRAIN

IN

G LOBBY

VESTIBULE

TRIANGLE

SECURITY

VESTIBULE

RAMP

LIFE SKILLS

LO

BBY #1

LO

BBY #2

LO

BBY #3

POOL

VESTIBULE

MEDIA

LAB

MEDIA

LAB STUDIO

MEDIA

STORAGE 1

CONTROL

ROOM STORAGE

SILK SCREENING

ACT

STORAGE

SCREEN

PREP

2ND FLOOR OVERHANG ABOVE

EL. +0'-0"

FIRST FLOOR

EL. -6'-0"

GYM FLOOR

FECr

FECr

FECr

FECr

D W

EL. -2'-0"EL. -4'-0"DN

DN

DN

DRANGE W

R

EFR

IG

ACCU

RETAINING

WALL

DN

FECr

FECr

DNDN

DN.DN.

R

AM

P

RAMP

521 522520

Q

R

S

X

Y

176173

TOILET

VESTIBULE

2ND FLOOR OVERHANG ABOVE

ACCU

RETAINING

WALL

5" HWR

5" HWS

2 1/2" HWS

2 1/2" HWR

2" HWR

2" HWS

2 1/2" HWR

2 1/2" HWS

1 1/4" HWR

1 1/4" HWS

3/4" HWR

3/4" HWS

3" HWR

3" HWS

2" HWS

2" HWR

3" CHWS

3" CHWR

1 1/4" HWR

1 1/4" HWS

AREA A AREA B

LOWER LEVEL REGION

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

MD101A

MECHANICAL

DEMOLITION - FIRST

FLOOR AREA A

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

Designer Checker

DATE: 08/05/2025

N

1/16" = 1'-0"1 FIRST FLOOR - MECHANICAL DEMOLITION PLAN - AREA A

KEYED NOTES:

1. SAW CUT NEW 18" X 24" FLOOR OPENING WITHIN THE EXISTING CONCRETE FLOOR.

NEW OPENING SHALL BE CUT CENTERED BETWEEN CONCRETE JOISTS. DO NOT CUT

INTO THE FLOOR JOISTS UNDER ANY CIRCUMSTANCES. ANY DAMAGE TO THE

CONCRETE FLOOR JOISTS WILL BE AT THE EXPENSE OF THE CONTRACTOR TO

PROVIDE ALL ENGINEERING / MATERIALS / EQUIPMENT / LABOR TO PROPERLY REPAIR

THEM. EXACT LOCATION SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR

TO WORK.

2. CONTRACTOR SHALL SAW CUT NEW ROUGH OPENING IN WALL SIZED TO INSTALL NEW

30X32 LOUVER AS NOTED ON SHEET M101A. TOP OF ROUGH OPENING SHALL BE A

MINIMUM OF 11'-0" ABOVE GRADE. EXACT LOCATION SHALL BE SUBMITTED TO THE

ENGINEER FOR REVIEW PRIOR TO WORK. FURNISH AND INSTALL STEEL LINTEL AS

NOTED ON SHEET M101.

NO. DESCRIPTION DATE

R

S

X

Y

176173

TOILET

VESTIBULE

2ND FLOOR OVERHANG ABOVE

ACCU

RETAINING

WALL

EF-19 (E)

EF-7 (E)

EF-20 (E)

EF-6 (E)

EF-35 (E)

EF-34 (E)

EF-21 (E)

EF-40 (E)

PRE-17 (E)

EF-18 (E)

EF-14 (E)

EF-15 (E)

EF-16 (E)

EF-10 (E)

PRE-2 (E)

PRE-6 (E)

EF-3 (E)

PRE-5 (E)

EF-11 (E)

EF-4 (E)

EF-13 (E)

AREA A AREA B

LOWER LEVEL REGION

KEYED MECHANICAL NOTES (THIS SHEET):

1.

2.

DEMOLISH EXISTING ROOF MOUNTED EXHAUST FAN AND

PRESERVE EXISTING ROOF CURB.

EXHAUST FAN EXISTING TO REMAIN.

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

MD103A

MECHANICAL

DEMOLITION - ROOF

AREA A

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

JJO AEC

DATE: 08/05/2025

N

1/16" = 1'-0"1 ROOF - MECHANICAL DEMOLITION PLAN - AREA A

PROJECT NOTES:

EACH CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ADEQUATE PROTRACTION ON THE EXISTING ROOF TO PREVENT DAMAGE AND ROOFING LEAKS FOR THE DURATION OF THE EXHAUST FAN REPLACEMENT. ANY ROOF LEAK AS A RESULT OF THE EXHAUST FAN REPLACEMENT IS THE RECONCILABILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIAL / EQUIPMENT / LABOR TO PATCH THE EXISTING ROOF. ROOFING CONTRACTOR

SHALL MEET ALL EXISTING ROOF WARRANTIES.

NO. DESCRIPTION DATE

R

S

X

Y

176173

TOILET

VESTIBULE

2ND FLOOR OVERHANG ABOVE

ACCU

RETAINING

WALL

EF-33 (E)

EF-30 (E)

EF-32 (E)

EF-31 (E)

EF-301 (E)

PRE-28 (E)

EF-29 (E) EF-26 (E)

EF-24 (E)

EF-22 (E)

EF-25 (E)

EF-28 (E)

EF-27 (E)

1 1

AREA A AREA B

LOWER LEVEL REGION

KEYED MECHANICAL NOTES (THIS SHEET):

1.

2.

DEMOLISH EXISTING ROOF MOUNTED EXHAUST FAN AND

PRESERVE EXISTING ROOF CURB.

EXHAUST FAN EXISTING TO REMAIN.

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

MD103B

MECHANICAL

DEMOLITION - ROOF

AREA B

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

JJO AEC

DATE: 08/05/2025

N

1/16" = 1'-0"1 ROOF - MECHANICAL DEMOLITION PLAN - AREA B

PROJECT NOTES:

EACH CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ADEQUATE PROTRACTION ON THE EXISTING ROOF TO PREVENT DAMAGE AND ROOFING LEAKS FOR THE DURATION OF THE EXHAUST FAN REPLACEMENT. ANY ROOF LEAK AS A RESULT OF THE EXHAUST FAN REPLACEMENT IS THE RECONCILABILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIAL / EQUIPMENT / LABOR TO PATCH THE EXISTING ROOF. ROOFING CONTRACTOR

SHALL MEET ALL EXISTING ROOF WARRANTIES.

NO. DESCRIPTION DATE

R

S

X

Y

176173

TOILET

VESTIBULE

2ND FLOOR OVERHANG ABOVE

ACCU

RETAINING

WALL

BCU-1

1 1/2" CHWS

1 1/2" CHWR

2" HWS

2" HWR

DL-1

DL-1

22Ø SA

DL-1

DL-1

DL-1

DL-1

DL-1

DL-1

DL-1

DL-1

18Ø SA

16Ø SA

12Ø SA

RG-1

1 1/2" CHWS/R UP

THROUGH FLOOR ABOVE

2" HWS/R UP

THROUGH FLOOR ABOVE

BAS DDC CONTROLLER

AREA A AREA B

LOWER LEVEL REGION

KEYED MECHANICAL NOTES (THIS SHEET):

1.

2.

3.

4.

5.

6.

7.

8.

9.

1.

FURNISH AND INSTALL NEW HOT WATER/CHILLED WATER BLOWER

COIL UNIT PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.

UNIT TO BE INSTALLED AS HIGH AS POSSIBLE, SUSPENDED FROM

STRUCTURE ABOVE. PROVIDE CONDENSATE PUMP.

FURNISH AND INSTALL RETURN AIR DUCTWORK WITH ECONOMIZER

BOX AND OUTSIDE AIR DUCT CONNECTION. INSTALL ECONOMIZER

BOX PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.

PROVIDE MOTORIZED DAMPERS AND BAS COMPATIBLE CONTROLS.

SEE DETAIL 4/M500.

FURNISH AND INSTALL NEW OUTSIDE AIR DUCTWORK DOWN

THROUGH FLOOR ABOVE AND CONNECT TO OUTSIDE AIR DAMPER

ON ECONOMIZER BOX AS SHOWN.

FURNISH AND INSTALL NEW SUPPLY AIR DUCTWORK AS SHOWN.

DUCTWORK SHALL BE HUNG AS TIGHT AS POSSIBLE TO AND

SUSPENDED FROM EXISTING STRUCTURE.

FURNISH AND INSTALL NEW HOT WATER SUPPLY AND RETURN

PIPING FROM FLOOR ABOVE, OVER TIGHT TO BOTTOM OF

STRUCTURE, AND CONNECT TO NEW BCU HOT WATER REHEAT

COIL.

FURNISH AND INSTALL NEW CHILLED WATER SUPPLY AND RETURN

PIPING FROM FLOOR ABOVE, OVER TIGHT TO BOTTOM OF

STRUCTURE, AND CONNECT TO NEW BCU CHILLED WATER COIL.

FURNISH AND INSTALL RA DUCTWORK OVER AND DOWN ALONG

WALL TO WITHIN 1'-0" OF FINISHED FLOOR. DUCTWORK WITHIN 10'

OF FLOOR SHALL BE CONSTRUCTED OF 16 GAUGE SHEETMETAL.

FURNISH AND INSTALL HEAVY DUTY BAR RETURN GRILLE ON SIDE

OF DUCTWORK WITH BOTTOM OF GRILLE 16" ABOVE FINISHED

FLOOR. ALL JOINTS AND SEAMS WITHIN 10' OF THE FINISHED FLOOR

SHALL BE SLIP AND DRIVE CONNECTIONS WITH HEMMED EDGES

AND BE FREE OF SHARP CORNERS. SECURE DUCTWORK TO WALL

WITH BRACKETS AND CONCRETE WALL ANCHORS.

FURNISH AND INSTALL NEW CONDENSATE RECEIVER PUMP WITH

STAINLESS STEEL MOTOR SHAFT, FULLY AUTOMATIC

START/STOP/SAFETY SWITCH OPERATIONS, ANTI SWEAT TANK

SLEEVE, AND MINIMUM 40 GPH AT 15' DYNAMIC HEAD (LITTLE GIANT

VCMA-20ULS-C-PRO OR EQUAL). FURNISH AND INSTALL

CONDENSATE PIPING UP THROUGH FLOOR ABOVE AND THROUGH

EXTERIOR WALL TO DISCHARGE AT GRADE. SEAL AROUND

EXTERIOR WALL PENETRATION WITH SEALANT MATCHING COLOR

OF EXISTING BRICK. SUSPEND UNIT FROM STRUCTURE.

COORDINATE 115V POWER REQUIREMENTS WITH ELECTRICAL

CONTRACTOR.

FURNISH AND INSTALL NEW BUILDING AUTOMATION SYSTEM

DIRECT DIGITAL CONTROLLER AS HIGH AS POSSIBLE ON WALL /

CONCRETE JOIST OR MOUNTED ON SIDE OF BLOWER COIL UNIT IF

ABLE WITH LOCKABLE CABINET.

GENERAL SHEET NOTE:

ALL HORIZONTAL DUCTWORK SHALL BE RAN AS HIGH AS POSSIBLE

TIGHT TO STRUCTURE.

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

M100A

MECHANICAL NEW WORK

- LOWER LEVEL AREA A

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

JJO AEC

DATE: 08/05/2025

N

1/8" = 1'-0"1 LOWER LEVEL - MECHANICAL PLAN

NO. DESCRIPTION DATE

521 522

C108

C10 8a

C10

6 51

118A118A

4a

4b

B16

4c

C10 8b

6A

6B

9A

165 163 159

162 157

154 148

4d

ST

U

V

LL

KK

JJ

EE

BB

AA

Q

R

S

V W

X

Y

EX

A/C

EXIST

LA

DDER

EXIST

LA

DDER

UP UP

UP UP

DN DN

DNDN

DN

DN

DN

DN

STORAGE

STAIR

C-S W

STORAGE

OFFIC

E

LK

RS

JA

N

TLT

ELE

CTRIC

AL &

MECHANIC

AL

AUDITORIU

M

STAGE

DRESSIN

G

OFFIC

E

TOILE

T

TOILE

T

DRESSIN

G

CORRID

OR

CORRID

OR

STAGECRAFT

BUILD

IN

G R

ECEIVIN

G

LE

CTURE A

LE

CTURE B

CONF.

MAIN OFF.

PRINC.

MAIL RM.

ASSOC.

PRIN.

141 143

NURSE

EXAM

KEEPER

EQUIP.

ASS'T

PRINC.

STUDENT OFF.

WOMEN

CHILD

DEVELOPEMENT

PROGRAM

DISTURBED

SELF-CONTAINED

D.D.

STOR. 113

111A

MEN

JAN.

WOMEN 115

DISH-

WASHING

LOUNGE/

DINING

SERVING

KITCHEN

DRY

STORAGE

FREEZER

COOLER

OFF.

RECEIV'G

LKR'S

JAN.

DINING

COMMONS

LOCKERS

EL.

WOMEN 169

MEN

BLDG.

ENG.

DRAFTING

EXISTING RAMP #1

EXISTING RAMP #2

CHORAL

MUSIC

MEN

D.D.

SELF-CONTAINED

DISCIPLINE

ALTERNATIVE

EMOTIONLY

SELF-CONTAINED SELF-CONTAINED

D.D.

FACULTY

ASS'T

PRINC.

POLICE

OFF.

ATTEN.

SPEC.

OFF.

MAN.

HEAD

BOOK- COMP.

D.D

SELF-CONTAINED

SNACK

BAR

OFFICE

STU.

H.C.

TOILET

ELEV

LOBBY

MECH

STORAGE

STORAGE

OFF.

RM. 424

SMALL ENGINES

STOR.

I.D. RM.

PRAC. 415

PRAC. 411

JAN. 109

STOR.

FT'G

MEN 166

CL.RM.

KILN

KILN W/HOOD

CL. RM. 451

TOOLS 453

TOOLS 450

PROJECTS

PROJECTS

METALS

SHOP 448

FINISH 446

TOOLS 445

PROJECTS

TECHNOLOGY LAB. 443

OFF. 447

TOOL STOR.

BLDG. ENG.

MUSIC 408

STOR. 409

RM. 105

STOR. 410OFF. 412

J-HAWK

SHOP 405

CONCESSION 404

PRAC. 416

PRAC. 403STORAGE

OFF. 417

OFFICE &

STOR. 418

STOR. 420

STOR. 414

ART 104

STOR. 102 OFF. 103

ART 100PRAC. 421

PRAC. 422

PRAC. 423

WOMEN 401

UPPER

LEVEL OF

NATATORIUM

MECH. 511

TOILET

TOILET

TOILET

STOR. STOR.

TOILET

LOCKERS

CORRIDOR

STAIRS

STAIRS

STAIRS

STAIRS

SPECTATORS 503

STAIR

C-SE

C103

C108

110A

CORRIDOR

OBSERV.

CORRID

OR

OFFICE

VESTIBULE

IDF

GYMNASIU

M

"N

EST"

STORAGE

POOL

VESTIBULE

STORAGE

STAIR

C-S E

TIC

KETS

P.E. S

TORAGE

ELE

V

TIC

KETS

SOUND C

LO

S

TRAIN

IN

G LOBBY

VESTIBULE

TRIANGLE

SECURITY

VESTIBULE

RAMP

LIFE SKILLS

LO

BBY #1

LO

BBY #2

LO

BBY #3

POOL

VESTIBULE

MEDIA

LAB

MEDIA

LAB STUDIO

MEDIA

STORAGE 1

CONTROL

ROOM STORAGE

SILK SCREENING

ACT

STORAGE

SCREEN

PREP

2ND FLOOR OVERHANG ABOVE

EL. +0'-0"

FIRST FLOOR

EL. -6'-0"

GYM FLOOR

FECr

FECr

FECr

FECr

D W

EL. -2'-0"EL. -4'-0"DN

DN

DN

DRANGE W

R

EFR

IG

ACCU

RETAINING

WALL

DN

FECr

FECr

DNDN

DN.DN.

R

AM

P

RAMP

521 522520

Q

R

S

X

Y

176173

TOILET

VESTIBULE

2ND FLOOR OVERHANG ABOVE

ACCU

RETAINING

WALL

23 24/18 OA

M

AREA A AREA B

LOWER LEVEL REGION

KEYED MECHANICAL NOTES (THIS SHEET):

1.

2.

3.

4.

5.

FURNISH AND INSTALL NEW HOT WATER/CHILLED WATER SUPPLY

AND RETURN PIPING UP FROM BELOW, OVER, AND TIE INTO

EXISTING MAINS LOCATED IN THE MECHANICAL MEZZANINE. ALL

PIPING SHALL BE SUSPENDED FROM STRUCTURE ABOVE.

CONTRACTOR SHALL COORDINATE EXACT LOCATION FOR PIPING

TO PENETRATE THE FLOOR AND CORE DRILL AS REQUIRED TO

INSTALL NEW PIPING.

FURNISH AND INSTALL NEW 18/24 OUTSIDE AIR DUCTWORK FROM

NEW OA INTAKE LOUVER / ISOLATION DAMPER, DOWN THOUGH NEW

FLOOR OPENING TO ECONOMIZER BOX BELOW.

FURNISH AND INSTALL NEW LINTEL AT TOP OF OPENING ONE FOR

THE FACE BRICK AND ONE FOR THE BLOCK. FACE BRICK LINTEL:

PROVIDE (1) L5 X 3-1/2 X 5/16" (LLV) ANGLE (GALVANIZED) PROVIDE A

MINIMUM OF 8" OF BEARING ON EACH END. CMU BLOCK LINTEL:

PROVIDE (2) L5 X 3-1/2 X 5/16" (LLV) ANGLE (GALVANIZED) PROVIDE A

MINIMUM OF 8" OF BEARING ON EACH END. GROUT CELL ON EACH

END BELOW LINTEL BEARING SOLID. LINTEL SHALL BE STITCH

WELDED TOGETHER TOP AND BOTTOM. PROVIDE A BUTT WELD 4"

LONG AT 12" O.C. WITH A MINIMUM OF 6" LONG AT EACH END.

FURNISH AND INSTALL NEW 30X36 ALUMINUM, STATIONARY,

DRAINABLE LOUVER IN NEW ROUGH OPENING IN WALL. USE

SEALANT TO SEAL NEW LOUVER WEATHER TIGHT. OWNER SHALL

SELECT CUSTOM COLOR/FINISH FOR NEW LOUVER. FURNISH AND

INSTALL THERMALLY BROKEN, INSULATED, TWO POSITION

(OCCUPIED - OPEN / UNOCCUPIED - CLOSED) DAMPER ON BACK

SIDE OF OUTSIDE AIR INTAKE LOUVER.

FURNISH AND INSTALL 3/4" CONDENSATE DRAIN PIPING UP FROM

CONDENSATE PUMP LOCATED ON FLOOR BELOW. ROUTE PIPING UP

AND GRAVITY DRAIN DOWN AND THEN THROUGH EXTERIOR WALL

AND DISCHARGE AT GRADE.

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

M101A

MECHANICAL NEW WORK

- FIRST FLOOR AREA A

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

JJO AEC

DATE: 08/05/2025

N

1/16" = 1'-0"1 FIRST FLOOR - MECHANICAL PLAN - AREA A

NO. DESCRIPTION DATE

Ca no py A4

B4

8- 8B

A4848

N

B4848-8B07

T120P

Canopy Canopy

B4848-8B07

N

A4848

B4848-8B07 N

A4

S144P B4848-8B07

N

A4848

B4848-8B07

N

A4848

T120P

B4

8- 8B

N

A4848

B4848-8B07

N

A4848

Ca no py

Canopy A4848

B4848-8B07

A4848

N

B4848-8B07

T120P

Ca no py Ca no py

B4848-8B07

N

A4848

B4

8- 8B

N

A4848

S1

P B4

8-

8B

N

A4

B4848-8B07

N

A4848

T120P

B4848-8B07 N

A4

B4848-8B07

N

A4848

Canopy

ART WORK DISPLAY

ART WORK DISPLAY

ART WORK DISPLAY

200 SHELVES @ 36"W

MAGAZINE AREA ALSO

"H

"H

RECEPTION

COUNTER

TOP

PRINTER

RECEPTION

RE

CE

PT

IO

N

RECEPTION

NEW LOCATION

OF PRINTER

COUNTER

TOP

PRINTER

COUNTER

TOP

PRINTER

COUNTER

TOP

PRINTER

EXISTING 3'-0' FIRE DR

PATH OF EGRESS IS 67'-0"

STAIR EGRESS

CORRIDOR

15.25" W X 82.25"H

15.25" W X 82.25"H

13" W X 82.25"H

15" W X 82.25"H

15.25" W X 82.25"H 13" W X 82.25"H

15.25" W X 64.25"H

17" W X 64.25"H

15.125" W X 64.25"H

15.125" W X 64.25"H

12" W X 64.25"H

12" W X 64.25"H

15.125" W X 82"H

13" W X 82"H

15.125" W X 82"H

15.25" W X 82"H

10.25"W X 77"H

WITH 13"D

X 10.25"

TOP CAP

13" W X 82"H

15.125" W X 82"H

13" W X 82"H

15.125" W X 82"H

15.25" W X 82"H

15.25" W X 82"H

12" W X 64.25"H

12" W X 64.25"H

12" W X 64.25"H

12" W X 64.25"H

12" W X 64.25"H

12" W X 64.25"H

12" W X 64.25"H

12" W X 64.25"H

SM

AR

TB

OA

RD

4'W

X 4'

H

MA

RK

ER

BO

AR

D 4'W

X 4'

H

TA

CK

BO

AR

D

4'W X

4' H

MA

RK

ER

BO

AR

D

4'W X

4' H

TA

CK

BO

AR

D

12' SLIDING

MARKERBOARD

12' SLIDING MARKERBOARDSHORT HT.

CABINET (4) 3H OPEN BOOKSHELF WITH LAMINATE TOP

TEACHER DESK

' S

LID

IN

G

MA

RK

ER

BO

AR

D

TEACHER DESK

SMARTBOARD

24" x 84" tables

DN.

DN. DN.

DN.

CL. RM.

CL. RM.

FACULTY

CL. RM.

CL. RM.

218 223 228

CL. RM.

SOC. STUDIES

CL. RM.

COMPUTER

LAB.

222221

EL.

MEN

WOMEN

BLD'G

ENG.

W. M.

TEACHERS

LOUNGE

ENGLISH

CL. RM.

ENGLISH

CL. RM.

ENGLISH

CL. RM.

SOC. STUDIES

CL. RM.

SOC. STUDIES

CL. RM.

ENGLISH

CL. RM.

MATH

CL. RM.

ART

CL. RM.

220 224

246 244

MEN

WOMEN

JAN.

CL. RM

CL. RM.

CL. RM.

CL. RM.

CL. RM.

CL. RM.

CL. RM.

CL. RM.

CLASSROOM

250a

A/V ROOM

CL. RM.

PERIODICALS

RM.

WORK

RM.

LIB.

OFF.

I.T.

CLOS.

LIBRARY

RESOURCE CENTER

READING READINGSTACKS

LAB.

COMPUTER

LAB.

COMPUTER CL. RM.

SOC. STUDIES

SOC. STUDIESENGLISH

ENGLISH ENGLISH

LANGUAGE LANGUAGE

LANGUAGELANGUAGE

SOC. STUDIES

SOC. STUDIES SOC. STUDIES

SOC. STUDIES

SPEC. ED.

CONFERENCE 232

CONFERENCE 240OFF.

LIBRARY

CL. RM.

216 217

MATH

CL. RM.

CLASSROOM

250b

CLASSROOM

243a

CLASSROOM

243b

COMPUTER LAB

251a

CL. RM.

ENGLISH

201B 201A

202A202B

205A

205B

201G 201H

310 SF

BAMIT

EMITT

356 SF

HPS

321 SF

HS

CONF

STORAGE

218 SF

OFFICE

201A

200 SF

OFFICE AP

201B

144 SF

OFFICE

202A

144 SF

OFFICE AP

202B

176 SF

OFFICE AP

205A

170 SF

OFFICE

205B 200 SF

OFFICE AP

206A

218 SF

OFFICE

206B

TD TD

TD TD

TD TD

3'-10 7/8"

3'-

3/ 4"

3'-

3/ 4"

3'- 9 3

/8"

5'-3"

'-4

1/ 8"

23'-6"

2'- 0"

3" HWR

3" HWS

2" HWR

2" HWS

3" CHWS

3" CHWR

1 1/4" HWS

1 1/4" HWR

2" HWS

2" HWR

1 1/2" CHWS

1 1/2" CHWR

KEYED MECHANICAL NOTES (THIS SHEET):

1.

2.

3.

FURNISH AND INSTALL NEW HOT WATER/CHILLED WATER SUPPLY

AND RETURN PIPING UP FROM BELOW, OVER, AND TIE INTO

EXISTING MAINS LOCATED IN THE MECHANICAL MEZZANINE. ALL

PIPING SHALL BE SUSPENDED FROM STRUCTURE ABOVE.

CONTRACTOR SHALL COORDINATE EXACT LOCATION FOR PIPING

TO PENETRATE THE FLOOR AND CORE DRILL AS REQUIRED TO

INSTALL NEW PIPING.

FURNISH AND INSTALL NEW CHILLED WATER 1-1/2" CHWS/R PIPING

AND TAP INTO EXISTING MAINS. FURNISH AND INSTALL MANUAL

ISOLATION VALVE IN NEW BRACH PIPING AT MAIN.

FURNISH AND INSTALL NEW HOT WATER 2" HWS/R PIPING OVER AND

TAP INTO EXISTING MAINS.FURNISH AND INSTALL MANUAL

ISOLATION VALVE IN NEW BRACH PIPING AT MAIN.

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

M102A

MECHANICAL NEW WORK

- FIRST FLOOR MEZ.

AREA A

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

JJO AEC

DATE: 08/05/2025

N

1/16" = 1'-0"1 GYM MEZZANINE MECHANICAL PLAN - AREA A

NO. DESCRIPTION DATE

R

S

X

Y

176173

TOILET

VESTIBULE

2ND FLOOR OVERHANG ABOVE

ACCU

RETAINING

WALL

PRE-2 (E)

PRE-6 (E)

PRE-5 (E)

EF-4 (E)

EF-19

EF-7

EF-20

EF-6

EF-35

EF-34

EF-21

EF-40

EF-17

EF-18

EF-14

EF-15

EF-16

EF-10

EF-3

EF-11

EF-13

AREA A AREA B

LOWER LEVEL REGION

KEYED MECHANICAL NOTES (THIS SHEET):

1.

2.

3.

FURNISH AND INSTALL INSULATED DOUBLE WALL CURB ADAPTER

ON EXISTING CURB TO ALLOW INSTALLATION OF NEW EXHAUST

FAN. CONTRACTOR SHALL MEASURE EACH EXISTING ROOF CURB

AND COORDINATE WITH EXHAUST FAN SUPPLIER FOR PROPER

CURB ADAPTOR SIZING PRIOR TO ORDER. THE EXISTING ROOF

CURB MAY BE UTILIZED IF THE EXISTING ROOF CURB SIZE

MATCHES THE REQUIREMENTS FOR INSTALLATION OF THE NEW

EXHAUST FAN.

EXHAUST FAN EXISTING TO REMAIN.

FURNISH AND INSTALL NEW ROOF MOUNTED EXHAUST FAN ON NEW

CURB ADAPTOR OR EXISTING ROOF CURB IF NEW FAN AND

EXISTING CURB PROPERLY MATE PER MANUFACTURER'S

INSTALLATION INSTRUCTIONS.

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

M103A

MECHANICAL NEW WORK

- ROOF AREA A

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

JJO AEC

DATE: 08/05/2025

N

1/16" = 1'-0"1 ROOF - MECHANICAL PLAN - AREA A

PROJECT NOTES:

EACH CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ADEQUATE PROTRACTION ON THE EXISTING ROOF TO PREVENT DAMAGE AND ROOFING LEAKS FOR THE DURATION OF THE EXHAUST FAN REPLACEMENT. ANY ROOF LEAK AS A RESULT OF THE EXHAUST FAN REPLACEMENT IS THE RECONCILABILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIAL / EQUIPMENT / LABOR TO PATCH THE EXISTING ROOF. ROOFING CONTRACTOR

SHALL MEET ALL EXISTING ROOF WARRANTIES.

NO. DESCRIPTION DATE

R

S

X

Y

176173

TOILET

VESTIBULE

2ND FLOOR OVERHANG ABOVE

ACCU

RETAINING

WALL

PRE-28 (E)

EF-33

EF-30

EF-32

EF-31EF-301

EF-29 EF-26

EF-24

EF-22

EF-25

EF-28

EF-27

2 1

1 1

3 3

AREA A AREA B

LOWER LEVEL REGION

KEYED MECHANICAL NOTES (THIS SHEET):

1.

2.

3.

FURNISH AND INSTALL INSULATED DOUBLE WALL CURB ADAPTER

ON EXISTING CURB TO ALLOW INSTALLATION OF NEW EXHAUST

FAN. CONTRACTOR SHALL MEASURE EACH EXISTING ROOF CURB

AND COORDINATE WITH EXHAUST FAN SUPPLIER FOR PROPER

CURB ADAPTOR SIZING PRIOR TO ORDER. THE EXISTING ROOF

CURB MAY BE UTILIZED IF THE EXISTING ROOF CURB SIZE

MATCHES THE REQUIREMENTS FOR INSTALLATION OF THE NEW

EXHAUST FAN.

EXHAUST FAN EXISTING TO REMAIN.

FURNISH AND INSTALL NEW ROOF MOUNTED EXHAUST FAN ON NEW

CURB ADAPTOR OR EXISTING ROOF CURB IF NEW FAN AND

EXISTING CURB PROPERLY MATE PER MANUFACTURER'S

INSTALLATION INSTRUCTIONS.

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

M103B

MECHANICAL NEW WORK

- ROOF AREA B

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

JJO AEC

DATE: 08/05/2025

N

1/16" = 1'-0"1 ROOF - MECHANICAL PLAN - AREA B

PROJECT NOTES:

EACH CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ADEQUATE PROTRACTION ON THE EXISTING ROOF TO PREVENT DAMAGE AND ROOFING LEAKS FOR THE DURATION OF THE EXHAUST FAN REPLACEMENT. ANY ROOF LEAK AS A RESULT OF THE EXHAUST FAN REPLACEMENT IS THE RECONCILABILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIAL / EQUIPMENT / LABOR TO PATCH THE EXISTING ROOF. ROOFING CONTRACTOR

SHALL MEET ALL EXISTING ROOF WARRANTIES.

NO. DESCRIPTION DATE

WOOD NAILING

STRIP

EXISTING ROOF CURB

SEE NOTE #2

RIGID CONDUIT TO

ACCOMMODATE ELECTRICAL

WIRES

NEW GRAVITY

BACKDRAFT DAMPER

CURB CAP

SEE NOTE #1

SEE NOTE #3

EXISTING ROOF STRUCTURE

TRANSITION DUCT TO SIZE OF

DAMPER SUPPLIED WITH ROOF

VENTILATOR

EXHAUST DUCT

1.

2.

3.

NOTE:

SECURE CURB CAP TO WOOD NAILING STRIP WITH 3/8" {10MM} CADIUM PLATED LAG BOLTS NOT OVER 12"

{305MM} ON CENTER

FURNISH AND INSTALL NEW DOUBLE WALL INSULATED CURB ADAPTOR AS REQUIRED IF NEW EXHAUST FAN IS NOT ABLE TO DIRECTLY MOUNT TO THE EXISTING ROOF CURB. CONTRACTOR IS REQUIRED TO MEASURE ALL EXISTING ROOF CURBS PRIOR TO ORDER OF EXHAUST FANS TO ENSURE A SEAMLESS REPLACEMENT.

CONTRACTOR SHALL REMOVE AND REPLACE EXISTING GRAVITY BACKDRAFT DAMPER. CONTRACTOR IS REQUIRED TO MEASURE ALL EXISTING ROOF CURBS PRIOR TO ORDER TO ENSURE PROPER FIT OF NEW

BACK DRAFT DAMPER.

NEW EXHAUST FAN

AUTOMATIC 3-WAY

MODULATING CONTROL

VALVE (TYP.)

BALANCE VALVE (TYP.)

PRESSURE/TEMPERATURE

TEST PORT (TYP.)

1/2" BALL VALVE

W/GOOSENECK DRAIN AT

HIGH POINT WITH CAP

ISOLATION

VALVE (TYP.)

UNION (TYP.)

DRAIN VALVE WITH HOSE

BIBB END AND CAP (TYP.)

EXTEND DRAIN PIPING

TO CONDENSATE PUMP

INLET (TYP.)

SIZE P-TRAP PER MANUFACTURER'S

REOMMANDED INSTRUCTIONS TO

ENSURE PROPER DRAINAGE. PROVIDE

CLEANOUT

CHILLED WATER

COILING COIL

DRAIN PAN

CHWS/R

AUTOMATIC 3-WAY

MODULATING CONTROL

VALVE (TYP.)

BALANCE VALVE (TYP.)

PRESSURE/TEMPERATURE

TEST PORT (TYP.)

1/2" BALL VALVE

W/GOOSENECK DRAIN AT

HIGH POINT WITH CAP.

ISOLATION

VALVE (TYP.)

UNION (TYP.)

DRAIN VALVE WITH HOSE

BIBB END & CAP (TYP.)

HOT WATER

HEATING COIL

H W

R

H W

S

RETURN AIR

MOTORIZED DAMPER (TYP.)

SHEETMETAL

ECONOMIZER BOX

TO BLOWER

COIL UNIT

M

M

A

A

B

MANUFACTURE MODEL

DIMINSIONS

A B

MICROMETL (OR EQUAL) MB-GP-2000 23.5" 18"

NOTE: COORDINATE SELECTION OF ECONOMIZER BOX WITH

MANUFACTURER AND WITH THE BLOWER COIL SELECTION.

ECONOMIZER BOX

OU

TS

ID

E

AI

R

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

KEDbluestone. © 2025 KEDbluestone

Peoria, IL 61603

(309) 938-4005 www.KEDbluestone.com

M500

MECHANICAL DETAILS

R

PS

J

EF

FE

R

SO

N

E X H

A U

ST

F

A N

R

EP

LA

C

EM

EN

T S

W

R

ES

T

LI

N G

R O

O M

H V

A C

S

A M

U

EL

SO

N

R D

R

O C

K

FO

R D

IL

325-073

08/05/2025

R O

C K

FO

R

D P

U B

LI

C S

C H

O O

LS

ISSUED FOR BIDDING

JJO AEC

DATE: 08/05/2025

N.T.S.N.T.S.1 EXHAUST FAN - DOWNDRAFT

N.T.S.N.T.S.2 CHILLED WATER COIL

N.T.S.N.T.S.3 HOT WATER PRE-HEAT COIL

N.T.S.N.T.S.4 BLOWER COIL ECONOMIZER

NO. DESCRIPTION DATE

EXHAUST FAN SCHEDULE

PERFORMANCE MOTOR

MARK DESIGN BASIS DESCRIPTION DRIVE AIRFLOW E.S.P. R.P.M. HP VOLTS PHASE REMARKS

MAKE MODEL (CFM) (IN. H2O)

EF-3 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 8,760 1.5 1726 7-1/2 460 3 SEE NOTES 1, 2, & 3

EF-6 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 400 0.5 1617 1/8 115 1 SEE NOTES 1, 2, & 3

EF-7 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 300 0.5 1438 1/8 115 1 SEE NOTES 1, 2, & 3

EF-10 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 7,700 0.5 1415 5 460 3 SEE NOTES 1, 2, & 3

EF-11 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 7,700 0.5 1415 5 460 3 SEE NOTES 1, 2, & 3

EF-13 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 7,700 0.5 1415 5 460 3 SEE NOTES 1, 2, & 3

EF-14 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 650 0.5 1712 1/4 208 1 SEE NOTES 1, 2, & 3

EF-15 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 7,700 0.5 1415 5 460 3 SEE NOTES 1, 2, & 3

EF-16 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 860 0.5 1845 1/3 208 1 SEE NOTES 1, 2, & 3

EF-17 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 300 0.5 1438 1/8 115 1 SEE NOTES 1, 2, & 3

EF-18 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 500 0.5 1668 1/6 208 1 SEE NOTES 1, 2, & 3

EF-19 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 460 0.5 1607 1/8 115 1 SEE NOTES 1, 2, & 3

EF-20 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 1,600 0.5 1722 1/2 115 1 SEE NOTES 1, 2, & 3

EF-21 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 1,800 0.5 1094 1/3 115 1 SEE NOTES 1, 2, & 3

EF-22 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3

EF-24 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3

EF-25 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 1,350 0.5 1522 1/3 115 1 SEE NOTES 1, 2, & 3

EF-26 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3

EF-27 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3

EF-28 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3

EF-29 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 750 0.5 1689 1/6 115 1 SEE NOTES 1, 2, & 3

EF-30 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3

EF-31 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3

EF-32 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3

EF-33 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 800 0.5 1758 1/3 115 1 SEE NOTES 1, 2, & 3

EF-34 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 250 0.5 1328 1/8 115 1 SEE NOTES 1, 2, & 3

EF-35 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 250 0.5 1328 1/8 115 1 SEE NOTES 1, 2, & 3

EF-40 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 650 0.5 1712 1/4 208 1 SEE NOTES 1, 2, & 3

NOTES:

1. PROVIDE FACTORY MOUNTED DISCONNECT SWITCH.

2. PROVIDE EC MOTOR.

3. PROVIDE BACKDRAFT DAMPER.

BLOWER COIL UNIT SCHEDULE

MARK

DESIGN BASIS

DESCRIPTION AIR FLOW (CFM)

COOLING COIL HEATING COIL MOTOR DATA

REMARKS

TOTAL CAPACITY (MBH) SENSIBLE CAPACITY (MBH)

ENTERING AIR LEAVING AIR

CHILLED WATER (GPM) WATER PD (FT) TOTAL CAPACITY (MBH) ENTERING AIR (°F) LEAVING AIR (°F) HOT WATER (GPM) WATER PD (FT) HP BHP FAN RPM VOLTS PHASE

DB (°F) WB (°F) DB (°F) WB (°F)MAKE MODEL

BCU-1 TRANE BCHE120 HORIZONTAL BLOWER COIL UNIT 3000 133.88 91.36 80.00 67.00 52.37 52.26 17.79 4.17 162.68 40 90 31.05 11.83 2.64 1.533 1124 208 3

NOTES:

1. PROVIDE EC MOTOR.

2. PROVIDE FACTORY MOUNTED DISCONNECT SWITCH.

GRILLE AND DIFFUSER SCHEDULE

MARK

DESIGN BASIS

DESCRIPTION MODULE SIZE NECK SIZE AIR PATTERN FRAME C.F.M. S.P. (WATER) NOISE LEVEL (NC) NOTES

MAKE MODEL / SERIES

SG-1 TITUS DL LONG THROW, HIGH CAPACITY SUPPLY GRILLE WITH ROTATING DRUM 12" X 8" 12" X 8" DIRECTIONAL THROW SEE NOTE 2 300 0.1 < 15 SEE NOTE 1

RG-1 TITUS 33RL HEAVY DUTY BAR RETURN GRILLE WITH SUPPORT BARS 6" 0.6. 48" X 18" 48" X 18" RETURN SEE NOTE 2 3000 0.07 30

NOTES:

1. ALL SUPPLY GRILLES AND DIFFUSERS SHALL BE CONSTRUCTED OF ALUMINUM UNLESS OTHERWISE NOTED.

2. COORDINATE DIFFUSER FRAME TYPE AND SIZE TO ENSURE COMPATIBILITY WITH CEILING/WALL/DUCT TYPE.

PROJECT NO:

SHEET (30X42):

ISSUE DATE:

ISSUANCE:

SHEET NAME:

DESIGNED BY: CHECKED BY:

REVISIONS:

707 NE Jefferson Ave.

KEDbluestone

KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING

COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN

THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE

PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE

EXPRESS WRITTEN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .