4-26-07Part 4 Drawings Jefferson EF Wrestling Room HVAC.pdf
PDF 3 MB Posted
- Attached to
- IFB No. 26-07 Jefferson H. S. Exhaust Fans
- Solicitation number
- IFB No. 26-07
- Issued by
- Rock Island County, Illinois
About this file
This document is a comprehensive set of mechanical and electrical design and demolition plans for the RPS Jefferson Exhaust Fan Replacements & Wrestling Room HVAC project for Rockford Public Schools, located at 4145 Samuelson Rd, Rockford, IL 61109. The project is scheduled for bidding on 08/05/2025 and involves extensive HVAC system replacements, including demolishing existing exhaust fans, hot water unit heaters, and associated piping and controls. The project will replace multiple exhaust fans, install new blower coil units, outside air ductwork, hot water and chilled water piping, and integrate new building automation systems. The work spans multiple building levels, including lower level, first floor, gym mezzanine, and roof areas.
The project documents include detailed mechanical and electrical plans, schedules for exhaust fans, equipment specifications, and installation requirements. The design emphasizes maintaining continuous building operations during construction, with specific instructions for coordinating service interruptions and temporary systems. Electrical work includes removing and replacing existing electrical connections, installing new circuitry, and ensuring compatibility with existing electrical infrastructure. The project appears to be funded through the school district's capital improvement or maintenance budget, with a focus on upgrading aging HVAC and ventilation systems to improve building performance and energy efficiency. Contractors will be required to carefully coordinate work, minimize disruption to school operations, and follow strict installation and safety guidelines.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
REVISIONS:
LOCATION MAP
INDEX OF DRAWINGS
MEP/FP
707 NE Jefferson Ave.
Peoria, IL 61603 309.938.4005 www.KEDbluestone.com
KED
bluestone
707 NE Jefferson Ave.
Peoria, IL 61603 309.938.4005 www.KEDbluestone.com
KEDbluestone
8/5 /20
9:
:45
A M
G000
TITLE SHEET
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
RPS JEFFERSON EXHAUST FAN REPLACEMENTS &
WRESTLING ROOM HVAC
4145 SAMUELSON RD,
ROCKFORD, IL 61109
ROCKFORD PUBLIC SCHOOLS
ISSUED FOR BIDDING
ISSUE DATE: 08/05/2025
DATE SIGNED: 08/05/2025
Sheet No. Sheet Name
G000 TITLE SHEET
M000 MECHANICAL TITLE SHEET
MD100A MECHANICAL DEMOLITION - LOWER LEVEL AREA A
MD101A MECHANICAL DEMOLITION - FIRST FLOOR AREA A
MD103A MECHANICAL DEMOLITION - ROOF AREA A
MD103B MECHANICAL DEMOLITION - ROOF AREA B
M100A MECHANICAL NEW WORK - LOWER LEVEL AREA A
M101A MECHANICAL NEW WORK - FIRST FLOOR AREA A
M102A MECHANICAL NEW WORK - FIRST FLOOR MEZ. AREA A
M103A MECHANICAL NEW WORK - ROOF AREA A
M103B MECHANICAL NEW WORK - ROOF AREA B
M500 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES
E000 ELECTRICAL TITLE SHEET
ED100A ELECTRICAL DEMOLITION - LOWER LEVEL AREA A
ED103A ELECTRICAL DEMOLITION - ROOF AREA A
ED103B ELECTRICAL DEMOLITION - ROOF AREA B
E100A ELECTRICAL NEW WORK - LOWER LEVEL AREA A
E101A ELECTRICAL NEW WORK - FIRST FLOOR AREA A
E103A ELECTRICAL NEW WORK - ROOF AREA A
E103B ELECTRICAL NEW WORK - ROOF AREA B
E600 ELECTRICAL SCHEDULES
RPS PROJECT NUMBER: 2519
RPS IFB NUMBER: 26-07
NO. DESCRIPTION DATE
RPS PROJECT #: 2519
RPS IFB #: 26-07
M
B
C
F
S
F
P
T
S
H
TC
T
TH
CHWS
LPR
CWR
CWS
HWR
HWS
NG
LPS
CHWR
RL
2"
MECHANICAL PIPING SYMBOLS
KEYNOTE SYMBOL
SHEET NUMBER WHERE DETAIL IS PLACED
DETAIL NUMBER ON SHEET
PLAN REVISION NUMBER
GENERAL PLAN SYMBOLS
ROOM NAME / NUMBER
POINT WHERE NEW CONNECTS TO EXISTING
EXISTING PIPE TO REMAIN
AREA BEING DEMOLISHED
AREA NOT IN CONTRACT
PIPE TO BE DEMOLISHED
NOMINAL PIPE SIZE
X
* NOTE *
ALL GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL SUBSEQUENT SHEETS IN
SHEET LIST. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT
BE USED IN THIS SET OF DRAWINGS.
D
24/12
18Ø
RETURN AIR
SUPPLY AIR
EXISTING DUCT TO REMAIN
RECT. DUCT SIZE (WIDTH / HEIGHT)
DUCTWORK SYMBOLS
RECT. SUPPLY DUCT RISE / DROP
ROUND DUCT SIZE (DIAMETER)
DUCT TO BE DEMOLISHED
▲T TEMPREATURE DIFFERENCE
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
A/E ARCHITECT / ENGINEER
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BAS BUILDING AUTOMATION SYSTEM
BFF BELOW FINISHED FLOOR
BHP BRAKE HORSEPOWER
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CFH CUBIC FEET PER HOUR
CLG CEILING
C.M. CONSTRUCTION MANAGER
CO CLEAN OUT
CV CONTROL VALVE
CW COLD WATER
D DEGREE
DB DRY BULB
DDC DIRECT DIGITAL CONTROLS
DIA DIAMETER
DN DOWN
DW DEIONIZED WATER
EAT ENTERING AIR TEMPERATURE
E.C. ELECTRICAL CONTRACTOR
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EA EXHAUST AIR
EG EXHAUST GRILLE
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPC FIRE PROTECTION CONTRACTOR
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GF GAS-FIRED
G.C. GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIBB
HP HORSE POWER
HP HIGH PRESSURE
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT DRAIN
IN INCH
I.E. INVERT ELEVATION
K.E.C. KITCHEN EQUIPMENT CONTRACTOR
LAT LEAVING AIR TEMPERATURE
LB POUND
LB/HR POUNDS PER HOUR
LD LINEAR DIFFUSER
LP LOW PRESSURE
LP LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
M.C. MECHANICAL CONTRACTOR
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MP MEDIUM PRESSURE
MTR MOTOR
MUA MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NG NATURAL GAS
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
OA OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
RA RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLA RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SAN SANITARY
SD SMOKE DAMPER
SF SQUARE FOOT
SG SUPPLY GRILLE
SM SURFACE MOUNT
SP STATIC PRESSURE
SR SUPPLY REGISTER
STM STEAM
T THERMOSTAT
T.C. TEMP CONTROLS CONTRACTOR
TD TEMPERATURE DROP
TD TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
YCO YARD CLEANOUT
ABBREVIATIONS
PIPE ACCESSORIES
GLR
GLS
AC AIR CONDITIONING UNIT
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
BCU BLOWER COIL UNIT
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CHWP CHILLED WATER PUMP
CP CONDENSER PUMP
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
CP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
ERV ENERGY RECOVERY VENTILATOR
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HP HEAT PUMP
HWP HEATING WATER PUMP
HRU HEAT RECOVERY UNIT
P PUMP
PRV POWER ROOF VENTILATOR
RF RETURN FAN
RHC REHEAT COIL
RTU ROOFTOP UNIT
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
EQUIPMENT ABBREVIATIONS
DAMPER TYPES
SA
RA
ROUND SUPPLY DUCT RISE / DROP
RECT. RETURN DUCT RISE / DROP
ROUND RETURN DUCT RISE / DROP
RECT. EXHAUST DUCT RISE / DROP
ROUND EXHAUST DUCT RISE / DROP
SMOKE DAMPER
FIRE DAMPER
COMB. FIRE/ SMOKE DAMPER
MANUAL DAMPER
MOTORIZED DAMPER
BACKDRAFT DAMPER
BD
BFW
FOS
FOR
MPR
MPS
HPR
HPS
FLUE
CA
EA
OA
EXHAUST AIR
OUTSIDE AIR
FLUE GAS VENT
COMBUSTION AIR
MARK SCHEDULED EQUIPMENT (UNDERLINED)
18/12
2" CHWS
PIPE FITTINGS
FLOW SENSOR
2-WAY ELEC. CONTROL VALVE
EXISTING RELOCATED EQUIPMENT - (R) PREFIX
(E) MARK EXISTING EQUIPMENT - HALFTONE - (E) PREFIX
PIPE RISE / DROP
BALANCING VALVE
BALL VALVE
ELEC. CONTROL VALVE
GATE VALVE
PRESSURE REDUCING VALVE
PIPE ELBOW
PIPE TEE HORIZONTAL / RISER / DROP
PIPE CAP / CONTINUATION
STRAINER
ANGLE VALVE
BUTTERFLY VALVE
PLUG VALVEGENERIC ISOLATION VALVE
GAS METER
INLINE PUMP
HOSE BIBB/ HYDRANT
PRESSURE GAUGE
AIR VENT
PRESSURE RELIEF
3-WAY ELEC. CONTROL VALVE
PRESSURE SENSOR
TEMPERATURE SENSOR & WELL
STEAM TRAP
DATA DEVICES
THERMOSTAT
HUMIDISTAT
TEMPERATURE & HUMIDITY DETECTOR
GENERIC DETECTOR
DDC SENSOR. SEE ABBREVIATIONS LISTTS
TEMPERATURE & CO2 DETECTOR
(R) MARK
LP
SUPPLY GRILLE, REGISTER, DIFFUSER
RETURN GRILLE, REGISTER, DIFFUSER
EXHAUST GRILLE, REGISTER, DIFFUSER
DIFFUSER CALLOUT SYMBOL
MARK
NECK
CFM
CD
6"Ø
FLEXIBLE DUCTWORK
AIR TERMINALS
UNION
16/12
18/12Ø SUPPLY AIR OVAL DUCT SIZE (WIDTH / HEIGHT)
CD
XXX
MARK
CFM N/A
MARK NONSCHEDULED EQUIPMENT
DIFFUSER CALLOUT SYMBOL UNDEFINED CFM
BOILER BLOW DOWN
BOILER FEED-WATER
CHILLED-WATER SUPPLY
CHILLED-WATER RETURN
CONDESNER-WATER SUPPLY
CONDESNER-WATER RETURN
FUEL OIL SUPPLY
FUEL OIL RETURN
GEOTHERMAL LOOP SUPPLY
GEOTHERMAL LOOP RETURN
HOT-WATER SUPPLY
HOT-WATER RETURN
REFRIGERANT LINESET
LOW PRESSURE STEAM SUPPLY
LOW PRESSURE STEAM RETURN
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM RETURN
HIGH PRESSURE STEAM SUPPLY
HIGH PRESSURE STEAM SUPPLY
NATURAL GAS
LIQUID PROPANE
CONDENSATE DRAIN
Room
1.
2.
3.
4.
5.
a.
b.
c.
d.
e.
6.
7.
CONTRACTOR SHALL VISIT THE JOB SITE AND EXAMINE THE DRAWINGS OF OTHER TRADES PRIOR TO BIDDING TO THOROUGHLY FAMILIARIZE HIMSELF WITH EXISTING CONDITIONS AND THE SCOPE OF THE PROJECT. FAILURE TO DO SO DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY
TO UNDERSTAND THE SCOPE OR OF UNDERSTANDING ANY FIELD CONDITIONS WHICH COULD BE
REASONABLY EXPECTED TO BE KNOWN BY A THOROUGH INVESTIGATION.
AN ATTEMPT HAS BEEN MADE TO SHOW ALL HVAC EQUIPMENT, PIPING, DUCTWORK AND DIFFUSERS.
ALL CONTRACTORS SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS INDICATED FOR DEMOLITION NEED TO BE REMOVED AS NOTED
ON THE DRAWINGS.
IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND UNINTERRUPTED OPERATION DURING REPLACEMENT/UPGRADE OF THE HVAC SYSTEM. THE SPECIFIC AREAS UNDER CONSTRUCTION AT ANY SCHEDULED TIME ARE EXCLUSIVE OF THE STATEMENT. SERVICES TO THE
EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION INCLUDED DOMESTIC WATER;
SANITARY; STORM; STEAM; HEATING HOT WATER; HVAC SUPPLY, RETURN, AND EXHAUST
DUCTWORK. ANY ABSOLUTELY NECESSARY INTERRUPTION OF THESE SERVICES TO ACCOMPLISH
PROJECT CONSTRUCTION SHALL BE ARRANGED WITH THE OWNER, A MINIMUM OF TWO WEEKS IN
ADVANCE. TEMPORARY SERVICES SHALL BE FURNISHED AND INSTALLED WHERE NECESSARY TO
ACCOMPLISH THIS PURPOSE. TEMPORARY SERVICES SHALL BE REMOVED ONLY AFTER NEW
PERMANENT SERVICES ARE INSTALLED AND FULLY OPERATIONAL.
EACH CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING,
STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING
EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND REFINISHING
SHALL MATCH EXISTING SUBSTRATE AS NEARLY AS POSSIBLE, FINISH WORK BY OTHERS.
EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON THE DRAWINGS, ALL EXISTING EQUIPMENT AND
MATERIAL IN AREAS TO BE REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE
WITH PROPOSED NEW CONSTRUCTION AND/OR INTERFERE WITH PROPOSED USAGE OF SPACE BY
OWNER AS FOLLOWS:
REMOVE ANY PIPES PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL AND CAP AND
FINISH OVER WITH MATERIAL TO MATCH EXISTING.
REMOVE PIPING, DUCTWORK, EQUIPMENT, ETC. INCLUDING ABANDONED TO SOURCE OF
SUPPLY AND/OR MAIN LINES AS NOTED. CAP AT NEAREST ACTIVE MAIN. SUPPLY AND RETURN
MAINS TO BE CAPPED. REMOVE ALL ASSOCIATED CLAMPS, HANGERS, SUPPORTS, ETC.
ASSOCIATED WITH REMOVAL.
IN REMODELED/ALTERED AREAS ANY PIPING OR DUCTWORK PASSING THROUGH THE
REMODELED AREAS TO SERVE (OR BEING SERVED FROM EXISTING ADJACENT, REMOTE, OR
SURROUNDING AREA THAT ARE TO REMAIN) SHALL BE RETAINED AND KEPT OPERATIONAL AND
SHALL BE RE-ROUTED IN ALL CASES WHERE THEY INTERFERE WITH ANY NEW WORK OR USAGE
TO BE ACCOMPLISHED IN THE REMODELED AREA.
REPAIR ADJACENT CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION AND
EXTENSION WORK. MATCH ORIGINAL CONSTRUCTION. VERIFY ALTERNATIVE OR SPECIAL
REPAIR METHODS WITH A/E BEFORE PROCEEDING WITH DEMOLITION.
REPAIR ANY PIPING OR DUCT INSULATION THAT IS DAMAGED OR REMOVED DURING
CONSTRUCTION.
SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR PHASES OF DEMOLITION AND
CONSTRUCTION. COORDINATE WITH GENERAL CONTRACTOR\ CONSTRUCTION MANAGER AND ALL
OTHER TRADES.
ITEMS THAT ARE NOT IN THE REQUIRED SCOPE OF DEMOLITION, OR AS SPECIFICALLY NOTED, SHALL
REMAIN IN PLACE. SUCH ITEMS, INCLUDING ASSOCIATED EQUIPMENT, FIXTURES, DOMESTIC
PLUMBING, SANITARY AND STORM PIPING, SHALL BE MAINTAINED OPERATIONAL AND IN GOOD
CONDITION BY THIS CONTRACTOR.
GENERAL NOTES - MECHANICAL DEMOLITION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON DRAWINGS, AS SPECIFIED, AND AS
REQUIRED BY MOST CURRENT INTERNATIONAL MECHANICAL CODE AND ANY APPLICABLE LOCAL
CODES. PROVIDE CLEARANCE FOR INSPECTION, REPAIR, REPLACEMENT, AND SERVICE TO ALL
EQUIPMENT TO INCLUDE A MINIMUM OF 36 INCHES FROM ALL OBSTRUCTIONS (WALLS, STRUCTURE, DUCTWORK, PIPES, ETC.). CLEARANCE SHALL MAINTAIN ACCESS TO ALL ELECTRICAL PANELS, ACCESS DOORS, CONTROLLERS, VALVES, JUNCTION BOXES AND OPERATORS AND INCLUDE THE
AREA DIRECTLY IN FRONT OF AND ABOVE THE SYSTEM COMPONENTS. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, FLANGES, ACCESSORIES, AND OTHER APPARATUS REQUIRING ACCESS
ARE ACCESSIBLE.
MECHANICAL CONTRACTOR SHALL VISIT THE JOB SITE AND EXAMINE THE DRAWINGS OF OTHER
TRADES PRIOR TO BIDDING TO THOROUGHLY FAMILIARIZE HIMSELF WITH EXISTING CONDITIONS AND
THE SCOPE OF THE PROJECT. FAILURE TO DO SO DOES NOT RELIEVE THE MECHANICAL
CONTRACTOR OF THE RESPONSIBILITY TO UNDERSTAND THE SCOPE OR OF UNDERSTANDING ANY
FIELD CONDITIONS WHICH COULD BE REASONABLY EXPECTED TO BE KNOWN BY A THOROUGH
INVESTIGATION.
DRAWINGS ARE DIAGRAMMATICAL IN NATURE. IT IS NOT INTENDED THAT THE DRAWINGS SHOW
EVERY DUCT, FITTING, TRANSITION, DAMPER, ETC., AND IT IS UNDERSTOOD THAT WHILE THE
DRAWINGS MUST BE FOLLOWED AS CLOSELY AS CIRCUMSTANCES WILL PERMIT, THE PROPER
INSTALLATION ACCORDING TO THE TRUE INTENT AND MEANING OF THE DRAWINGS, LOCAL CODES
AND STANDARD PRACTICES SHALL BE PROVIDED. MECHANICAL CONTRACTOR TO PROVIDE ALL
DUCTWORK TRANSITIONS, FLEXIBLE CONNECTIONS, AND ACCESSORIES AS REQUIRED. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO INSTALLATION. REPORT ANY PROBLEMS OR CONFLICTS TO THE
OWNER OR ENGINEER.
ANY MINOR CHANGES IN THE LOCATION OF EQUIPMENT, DUCTS, PIPE CONTROL DEVICES, ETC., FROM THOSE LOCATIONS SHOWN ON THE DRAWINGS SHALL BE MADE WITHOUT EXTRA COST IF SO DIRECTED BY THE OWNERS REPRESENTATIVE OR ENGINEER BEFORE THE INSTALLATION IS MADE. A MINOR CHANGE IN LOCATION SHALL BE CONSIDERED TO BE WITHIN 6'-0 ” OF THE ORIGINALLY
INDICATED LOCATIONS.
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENTS. VERIFY FINAL LOCATIONS FOR ROUGH-INS WITH
FIELD MEASUREMENTS AND WITH THE REQUIREMENTS OF THE ACTUAL EQUIPMENT TO BE
CONNECTED.
WHERE MOUNTING HEIGHTS ARE NOT DETAILED OR DIMENSIONED, INSTALL SYSTEMS, MATERIALS, AND EQUIPMENT TO PROVIDE THE MAXIMUM HEADROOM POSSIBLE.
INSTALL SYSTEMS, MATERIALS AND EQUIPMENT LEVEL AND PLUMB, PARALLEL AND PERPENDICULAR TO OTHER BUILDING SYSTEMS AND COMPONENTS WHERE INSTALLED EXPOSED IN FINISHED SPACES AND GIVING RIGHT-OF-WAY PRIORITY TO SYSTEMS REQUIRED TO BE INSTALLED AT A SPECIFIED
SLOPE.
INSTALL ALL HVAC EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS,
CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
ALL OPENINGS IN FIRE-RATED AND SMOKE-RATED WALLS DUE TO DUCTWORK, PIPING AND CONTROL
CONDUIT SHALL BE FIRE-STOPPED WITH AN APPROVED FIRE STOP MATERIAL. COORDINATE
INSTALLATION WITH ARCHITECTURAL CODE PLANS.
PROVIDE ACCESS DOORS IN DUCTWORK OR WALLS/CEILING FOR OPERATION, ADJUSTMENT, AND
MAINTENANCE OF ALL FANS, VALVES, COILS, AND MECHANICAL EQUIPMENT. COILS LOCATED IN
DUCTWORK TO BE PROVIDED WITH ACCESS DOORS ON OUTLET SIDE OF COIL.
LOCATIONS AND SIZES OF ALL FLOOR, CEILING AND WALL OPENINGS SHALL BE COORDINATED WITH
ALL OTHER TRADES INVOLVED AND THE OWNER.
MECHANICAL CONTRACTOR SHALL COORDINATE CEILING DIFFUSER/GRILLE/REGISTER LOCATIONS
WITH LIGHTING, FIRE ALARM EQUIPMENT AND FIRE SUPPRESSION SYSTEMS.
WHERE NEW WORK OCCURS, MECHANICAL CONTRACTOR SHALL PATCH AND SEAL ALL WALLS,
FLOORS AND CEILINGS TO MATCH EXISTING. MECHANICAL CONTRACTOR SHALL VERIFY WITH
OWNER ALL PATCHING MATERIALS AND INSTALLATION METHODS.
MECHANICAL CONTRACTOR SHALL PROVIDE MANUAL BALANCE DAMPERS IN ALL BRANCH TAKE-OFFS TO SUPPLY DIFFUSERS. PROVIDE ADDITIONAL MANUAL BALANCE DAMPERS IN MAIN AND SUB-MAIN DUCTS AS REQUIRED TO ENSURE THE SUPPLY AND RETURN AIR SYSTEMS CAN BE BALANCED TO THE
SPECIFIED DESIGN AIRFLOW.
IN AREAS WHERE A CEILING GRID EXISTS, THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE
FOR REMOVAL AND REPLACEMENT OF EXISTING CEILING GRID AND TILES AS NECESSARY FOR
INSTALLATION OF VENTILATING WORK. ANY PORTION OF THE EXISTING TILES OR GRID WHICH
BECOME DAMAGED DURING REMOVAL SHALL BE REPLACED BY THE MECHANICAL CONTRACTOR.
DO NOT ROUTE DUCT OR PIPING ABOVE OR BELOW ELECTRICAL PANELS INCLUDING SERVICE
CLEARANCES.
ALL RECTANGULAR AND/OR ROUND SUPPLY AND RETURN DUCTWORK SHOWN ON THE PLANS MAY BE
CONVERTED TO EQUIVALENT ROUND/RECTANGULR DUCTWORK AT THE DISCRETION OF THE
MECHANICAL CONTRACTOR. ANY DUCT CONVERSIONS SHALL BE SUBMITTED AS PART OF THE
DUCTWORK SHOP DRAWINGS FOR APPROVAL BY THE ENGINEER.
MECHANICAL CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING METHODS OF BRINGING IN
MECHANICAL EQUIPMENT THROUGH BUILDING INTO MECHANICAL ROOMS.
PIPING SHALL NOT BE SUPPORTED FROM OTHER PIPING, CONDUIT, OR DUCTWORK.
PROVIDE CHAIN WHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS MOUNTED GREATER
THAN 7'-0" ABOVE FLOOR LEVEL. CHAIN SHALL EXTEND TO 7'-0" ABOVE FLOOR LEVEL.
COORDINATE PIPE ROUTING TO AVOID RUNNING PIPING BELOW ROOF HATCHES, SKYLIGHTS AND
ACCESS PANELS.
ALL CONTROL WIRING ROUTED EXPOSED IN SPACES SUCH AS MECHANICAL ROOMS OR ABOVE HARD CEILINGS SHALL BE ROUTED IN CONDUIT. CONTROL WIRING ROUTED ABOVE ACCESSIBLE CEILINGS IS NOT REQUIRED TO BE RUN IN CONDUIT, BUT SHOULD BE SECURELY STRAPPED TO PERMANENT
SUPPORTS FOR A CLEAN INSTALLATION.
GENERAL NOTES - MECHANICAL
PROJECT NOTES - MECHANICAL
1.
2.
NIGHT OR WEEKEND WORK IS REQUIRED FOR WORK ON THIS PROJECT. MECHANICAL CONTRACTOR SHALL INCLUDE ALL PREMIUM LABOR COSTS IN THEIR BID. COORDINATE REQUIREMENTS WITH GENERAL
CONTRACTOR/ CONSTRUCTION MANAGER AND OWNER.
THE MECHANICAL CONTRACTOR SHALL USE THE GRAPHIC PRODUCTS ANSI PIPE MARKERS | STANDARDS COMPLIANT PIPE LABELS | THE GRAPHIC PRODUCTS LINE OF ANSI PIPE MARKERS AND FOLLOW THE ANSI/ASME PIPE MARKER SIZE CHART AND PLACEMENT GUIDANCE FOR LABELING OF MECHANICAL PIPE, DUCTWORK, AND EQUIPMENT.
MECHANICAL SHEET INDEX
M000 MECHANICAL TITLE SHEET
MD100A MECHANICAL DEMOLITION - LOWER LEVEL AREA A
MD101A MECHANICAL DEMOLITION - FIRST FLOOR AREA A
MD103A MECHANICAL DEMOLITION - ROOF AREA A
MD103B MECHANICAL DEMOLITION - ROOF AREA B
M100A MECHANICAL NEW WORK - LOWER LEVEL AREA A
M101A MECHANICAL NEW WORK - FIRST FLOOR AREA A
M102A MECHANICAL NEW WORK - FIRST FLOOR MEZ. AREA A
M103A MECHANICAL NEW WORK - ROOF AREA A
M103B MECHANICAL NEW WORK - ROOF AREA B
M500 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
M000
MECHANICAL TITLE
SHEET
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
JJO AEC
DATE: 08/05/2025
NO. DESCRIPTION DATE
521 522520
Q
R
S
X
Y
176173
TOILET
VESTIBULE
2ND FLOOR OVERHANG ABOVE
ACCU
RETAINING
WALL
UH-XX
UH-XX
1" HWS
1" HWR
AREA A AREA B
LOWER LEVEL REGION
KEYED MECHANICAL NOTES (THIS SHEET):
1.
2.
DEMOLISH EXISTING SUSPENDED HOT WATER CABINET UNIT
HEATER AND ASSOCIATED BRANCH PIPING AND HANGERS.
DEMOLISH ALL ASSOCIATED CONTROLS, PNEUMATIC TUBING,
THERMOSTATS, AND WIRING ASSOCIATED WITH THE UNIT HEATERS.
DEMOLISH EXISTING HOT WATER PIPING AND CAP AT WALL.
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
MD100A
MECHANICAL
DEMOLITION - LOWER
LEVEL AREA A
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
JJO AEC
DATE: 08/05/2025
N
1/8" = 1'-0"1 LOWER LEVEL - MECHANICAL DEMOLITION PLAN
NO. DESCRIPTION DATE
521 522
C108
C10 8a
C10
6 51
118A118A
4a
4b
B16
4c
C10 8b
6A
6B
9A
165 163 159
162 157
154 148
4d
ST
U
V
LL
KK
JJ
EE
BB
AA
Q
R
S
V W
X
Y
EX
A/C
EXIST
LA
DDER
EXIST
LA
DDER
UP UP
UP UP
DN DN
DNDN
DN
DN
DN
DN
STORAGE
STAIR
C-S W
STORAGE
OFFIC
E
LK
RS
JA
N
TLT
ELE
CTRIC
AL &
MECHANIC
AL
AUDITORIU
M
STAGE
DRESSIN
G
OFFIC
E
TOILE
T
TOILE
T
DRESSIN
G
CORRID
OR
CORRID
OR
STAGECRAFT
BUILD
IN
G R
ECEIVIN
G
LE
CTURE A
LE
CTURE B
CONF.
MAIN OFF.
PRINC.
MAIL RM.
ASSOC.
PRIN.
141 143
NURSE
EXAM
KEEPER
EQUIP.
ASS'T
PRINC.
STUDENT OFF.
WOMEN
CHILD
DEVELOPEMENT
PROGRAM
DISTURBED
SELF-CONTAINED
D.D.
STOR. 113
111A
MEN
JAN.
WOMEN 115
DISH-
WASHING
LOUNGE/
DINING
SERVING
KITCHEN
DRY
STORAGE
FREEZER
COOLER
OFF.
RECEIV'G
LKR'S
JAN.
DINING
COMMONS
LOCKERS
EL.
WOMEN 169
MEN
BLDG.
ENG.
DRAFTING
EXISTING RAMP #1
EXISTING RAMP #2
CHORAL
MUSIC
MEN
D.D.
SELF-CONTAINED
DISCIPLINE
ALTERNATIVE
EMOTIONLY
SELF-CONTAINED SELF-CONTAINED
D.D.
FACULTY
ASS'T
PRINC.
POLICE
OFF.
ATTEN.
SPEC.
OFF.
MAN.
HEAD
BOOK- COMP.
D.D
SELF-CONTAINED
SNACK
BAR
OFFICE
STU.
H.C.
TOILET
ELEV
LOBBY
MECH
STORAGE
STORAGE
OFF.
RM. 424
SMALL ENGINES
STOR.
I.D. RM.
PRAC. 415
PRAC. 411
JAN. 109
STOR.
FT'G
MEN 166
CL.RM.
KILN
KILN W/HOOD
CL. RM. 451
TOOLS 453
TOOLS 450
PROJECTS
PROJECTS
METALS
SHOP 448
FINISH 446
TOOLS 445
PROJECTS
TECHNOLOGY LAB. 443
OFF. 447
TOOL STOR.
BLDG. ENG.
MUSIC 408
STOR. 409
RM. 105
STOR. 410OFF. 412
J-HAWK
SHOP 405
CONCESSION 404
PRAC. 416
PRAC. 403STORAGE
OFF. 417
OFFICE &
STOR. 418
STOR. 420
STOR. 414
ART 104
STOR. 102 OFF. 103
ART 100PRAC. 421
PRAC. 422
PRAC. 423
WOMEN 401
UPPER
LEVEL OF
NATATORIUM
MECH. 511
TOILET
TOILET
TOILET
STOR. STOR.
TOILET
LOCKERS
CORRIDOR
STAIRS
STAIRS
STAIRS
STAIRS
SPECTATORS 503
STAIR
C-SE
C103
C108
110A
CORRIDOR
OBSERV.
CORRID
OR
OFFICE
VESTIBULE
IDF
GYMNASIU
M
"N
EST"
STORAGE
POOL
VESTIBULE
STORAGE
STAIR
C-S E
TIC
KETS
P.E. S
TORAGE
ELE
V
TIC
KETS
SOUND C
LO
S
TRAIN
IN
G LOBBY
VESTIBULE
TRIANGLE
SECURITY
VESTIBULE
RAMP
LIFE SKILLS
LO
BBY #1
LO
BBY #2
LO
BBY #3
POOL
VESTIBULE
MEDIA
LAB
MEDIA
LAB STUDIO
MEDIA
STORAGE 1
CONTROL
ROOM STORAGE
SILK SCREENING
ACT
STORAGE
SCREEN
PREP
2ND FLOOR OVERHANG ABOVE
EL. +0'-0"
FIRST FLOOR
EL. -6'-0"
GYM FLOOR
FECr
FECr
FECr
FECr
D W
EL. -2'-0"EL. -4'-0"DN
DN
DN
DRANGE W
R
EFR
IG
ACCU
RETAINING
WALL
DN
FECr
FECr
DNDN
DN.DN.
R
AM
P
RAMP
521 522520
Q
R
S
X
Y
176173
TOILET
VESTIBULE
2ND FLOOR OVERHANG ABOVE
ACCU
RETAINING
WALL
5" HWR
5" HWS
2 1/2" HWS
2 1/2" HWR
2" HWR
2" HWS
2 1/2" HWR
2 1/2" HWS
1 1/4" HWR
1 1/4" HWS
3/4" HWR
3/4" HWS
3" HWR
3" HWS
2" HWS
2" HWR
3" CHWS
3" CHWR
1 1/4" HWR
1 1/4" HWS
AREA A AREA B
LOWER LEVEL REGION
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
MD101A
MECHANICAL
DEMOLITION - FIRST
FLOOR AREA A
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
Designer Checker
DATE: 08/05/2025
N
1/16" = 1'-0"1 FIRST FLOOR - MECHANICAL DEMOLITION PLAN - AREA A
KEYED NOTES:
1. SAW CUT NEW 18" X 24" FLOOR OPENING WITHIN THE EXISTING CONCRETE FLOOR.
NEW OPENING SHALL BE CUT CENTERED BETWEEN CONCRETE JOISTS. DO NOT CUT
INTO THE FLOOR JOISTS UNDER ANY CIRCUMSTANCES. ANY DAMAGE TO THE
CONCRETE FLOOR JOISTS WILL BE AT THE EXPENSE OF THE CONTRACTOR TO
PROVIDE ALL ENGINEERING / MATERIALS / EQUIPMENT / LABOR TO PROPERLY REPAIR
THEM. EXACT LOCATION SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR
TO WORK.
2. CONTRACTOR SHALL SAW CUT NEW ROUGH OPENING IN WALL SIZED TO INSTALL NEW
30X32 LOUVER AS NOTED ON SHEET M101A. TOP OF ROUGH OPENING SHALL BE A
MINIMUM OF 11'-0" ABOVE GRADE. EXACT LOCATION SHALL BE SUBMITTED TO THE
ENGINEER FOR REVIEW PRIOR TO WORK. FURNISH AND INSTALL STEEL LINTEL AS
NOTED ON SHEET M101.
NO. DESCRIPTION DATE
R
S
X
Y
176173
TOILET
VESTIBULE
2ND FLOOR OVERHANG ABOVE
ACCU
RETAINING
WALL
EF-19 (E)
EF-7 (E)
EF-20 (E)
EF-6 (E)
EF-35 (E)
EF-34 (E)
EF-21 (E)
EF-40 (E)
PRE-17 (E)
EF-18 (E)
EF-14 (E)
EF-15 (E)
EF-16 (E)
EF-10 (E)
PRE-2 (E)
PRE-6 (E)
EF-3 (E)
PRE-5 (E)
EF-11 (E)
EF-4 (E)
EF-13 (E)
AREA A AREA B
LOWER LEVEL REGION
KEYED MECHANICAL NOTES (THIS SHEET):
1.
2.
DEMOLISH EXISTING ROOF MOUNTED EXHAUST FAN AND
PRESERVE EXISTING ROOF CURB.
EXHAUST FAN EXISTING TO REMAIN.
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
MD103A
MECHANICAL
DEMOLITION - ROOF
AREA A
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
JJO AEC
DATE: 08/05/2025
N
1/16" = 1'-0"1 ROOF - MECHANICAL DEMOLITION PLAN - AREA A
PROJECT NOTES:
EACH CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ADEQUATE PROTRACTION ON THE EXISTING ROOF TO PREVENT DAMAGE AND ROOFING LEAKS FOR THE DURATION OF THE EXHAUST FAN REPLACEMENT. ANY ROOF LEAK AS A RESULT OF THE EXHAUST FAN REPLACEMENT IS THE RECONCILABILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIAL / EQUIPMENT / LABOR TO PATCH THE EXISTING ROOF. ROOFING CONTRACTOR
SHALL MEET ALL EXISTING ROOF WARRANTIES.
NO. DESCRIPTION DATE
R
S
X
Y
176173
TOILET
VESTIBULE
2ND FLOOR OVERHANG ABOVE
ACCU
RETAINING
WALL
EF-33 (E)
EF-30 (E)
EF-32 (E)
EF-31 (E)
EF-301 (E)
PRE-28 (E)
EF-29 (E) EF-26 (E)
EF-24 (E)
EF-22 (E)
EF-25 (E)
EF-28 (E)
EF-27 (E)
1 1
AREA A AREA B
LOWER LEVEL REGION
KEYED MECHANICAL NOTES (THIS SHEET):
1.
2.
DEMOLISH EXISTING ROOF MOUNTED EXHAUST FAN AND
PRESERVE EXISTING ROOF CURB.
EXHAUST FAN EXISTING TO REMAIN.
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
MD103B
MECHANICAL
DEMOLITION - ROOF
AREA B
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
JJO AEC
DATE: 08/05/2025
N
1/16" = 1'-0"1 ROOF - MECHANICAL DEMOLITION PLAN - AREA B
PROJECT NOTES:
EACH CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ADEQUATE PROTRACTION ON THE EXISTING ROOF TO PREVENT DAMAGE AND ROOFING LEAKS FOR THE DURATION OF THE EXHAUST FAN REPLACEMENT. ANY ROOF LEAK AS A RESULT OF THE EXHAUST FAN REPLACEMENT IS THE RECONCILABILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIAL / EQUIPMENT / LABOR TO PATCH THE EXISTING ROOF. ROOFING CONTRACTOR
SHALL MEET ALL EXISTING ROOF WARRANTIES.
NO. DESCRIPTION DATE
R
S
X
Y
176173
TOILET
VESTIBULE
2ND FLOOR OVERHANG ABOVE
ACCU
RETAINING
WALL
BCU-1
1 1/2" CHWS
1 1/2" CHWR
2" HWS
2" HWR
DL-1
DL-1
22Ø SA
DL-1
DL-1
DL-1
DL-1
DL-1
DL-1
DL-1
DL-1
18Ø SA
16Ø SA
12Ø SA
RG-1
1 1/2" CHWS/R UP
THROUGH FLOOR ABOVE
2" HWS/R UP
THROUGH FLOOR ABOVE
BAS DDC CONTROLLER
AREA A AREA B
LOWER LEVEL REGION
KEYED MECHANICAL NOTES (THIS SHEET):
1.
2.
3.
4.
5.
6.
7.
8.
9.
1.
FURNISH AND INSTALL NEW HOT WATER/CHILLED WATER BLOWER
COIL UNIT PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
UNIT TO BE INSTALLED AS HIGH AS POSSIBLE, SUSPENDED FROM
STRUCTURE ABOVE. PROVIDE CONDENSATE PUMP.
FURNISH AND INSTALL RETURN AIR DUCTWORK WITH ECONOMIZER
BOX AND OUTSIDE AIR DUCT CONNECTION. INSTALL ECONOMIZER
BOX PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
PROVIDE MOTORIZED DAMPERS AND BAS COMPATIBLE CONTROLS.
SEE DETAIL 4/M500.
FURNISH AND INSTALL NEW OUTSIDE AIR DUCTWORK DOWN
THROUGH FLOOR ABOVE AND CONNECT TO OUTSIDE AIR DAMPER
ON ECONOMIZER BOX AS SHOWN.
FURNISH AND INSTALL NEW SUPPLY AIR DUCTWORK AS SHOWN.
DUCTWORK SHALL BE HUNG AS TIGHT AS POSSIBLE TO AND
SUSPENDED FROM EXISTING STRUCTURE.
FURNISH AND INSTALL NEW HOT WATER SUPPLY AND RETURN
PIPING FROM FLOOR ABOVE, OVER TIGHT TO BOTTOM OF
STRUCTURE, AND CONNECT TO NEW BCU HOT WATER REHEAT
COIL.
FURNISH AND INSTALL NEW CHILLED WATER SUPPLY AND RETURN
PIPING FROM FLOOR ABOVE, OVER TIGHT TO BOTTOM OF
STRUCTURE, AND CONNECT TO NEW BCU CHILLED WATER COIL.
FURNISH AND INSTALL RA DUCTWORK OVER AND DOWN ALONG
WALL TO WITHIN 1'-0" OF FINISHED FLOOR. DUCTWORK WITHIN 10'
OF FLOOR SHALL BE CONSTRUCTED OF 16 GAUGE SHEETMETAL.
FURNISH AND INSTALL HEAVY DUTY BAR RETURN GRILLE ON SIDE
OF DUCTWORK WITH BOTTOM OF GRILLE 16" ABOVE FINISHED
FLOOR. ALL JOINTS AND SEAMS WITHIN 10' OF THE FINISHED FLOOR
SHALL BE SLIP AND DRIVE CONNECTIONS WITH HEMMED EDGES
AND BE FREE OF SHARP CORNERS. SECURE DUCTWORK TO WALL
WITH BRACKETS AND CONCRETE WALL ANCHORS.
FURNISH AND INSTALL NEW CONDENSATE RECEIVER PUMP WITH
STAINLESS STEEL MOTOR SHAFT, FULLY AUTOMATIC
START/STOP/SAFETY SWITCH OPERATIONS, ANTI SWEAT TANK
SLEEVE, AND MINIMUM 40 GPH AT 15' DYNAMIC HEAD (LITTLE GIANT
VCMA-20ULS-C-PRO OR EQUAL). FURNISH AND INSTALL
CONDENSATE PIPING UP THROUGH FLOOR ABOVE AND THROUGH
EXTERIOR WALL TO DISCHARGE AT GRADE. SEAL AROUND
EXTERIOR WALL PENETRATION WITH SEALANT MATCHING COLOR
OF EXISTING BRICK. SUSPEND UNIT FROM STRUCTURE.
COORDINATE 115V POWER REQUIREMENTS WITH ELECTRICAL
CONTRACTOR.
FURNISH AND INSTALL NEW BUILDING AUTOMATION SYSTEM
DIRECT DIGITAL CONTROLLER AS HIGH AS POSSIBLE ON WALL /
CONCRETE JOIST OR MOUNTED ON SIDE OF BLOWER COIL UNIT IF
ABLE WITH LOCKABLE CABINET.
GENERAL SHEET NOTE:
ALL HORIZONTAL DUCTWORK SHALL BE RAN AS HIGH AS POSSIBLE
TIGHT TO STRUCTURE.
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
M100A
MECHANICAL NEW WORK
- LOWER LEVEL AREA A
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
JJO AEC
DATE: 08/05/2025
N
1/8" = 1'-0"1 LOWER LEVEL - MECHANICAL PLAN
NO. DESCRIPTION DATE
521 522
C108
C10 8a
C10
6 51
118A118A
4a
4b
B16
4c
C10 8b
6A
6B
9A
165 163 159
162 157
154 148
4d
ST
U
V
LL
KK
JJ
EE
BB
AA
Q
R
S
V W
X
Y
EX
A/C
EXIST
LA
DDER
EXIST
LA
DDER
UP UP
UP UP
DN DN
DNDN
DN
DN
DN
DN
STORAGE
STAIR
C-S W
STORAGE
OFFIC
E
LK
RS
JA
N
TLT
ELE
CTRIC
AL &
MECHANIC
AL
AUDITORIU
M
STAGE
DRESSIN
G
OFFIC
E
TOILE
T
TOILE
T
DRESSIN
G
CORRID
OR
CORRID
OR
STAGECRAFT
BUILD
IN
G R
ECEIVIN
G
LE
CTURE A
LE
CTURE B
CONF.
MAIN OFF.
PRINC.
MAIL RM.
ASSOC.
PRIN.
141 143
NURSE
EXAM
KEEPER
EQUIP.
ASS'T
PRINC.
STUDENT OFF.
WOMEN
CHILD
DEVELOPEMENT
PROGRAM
DISTURBED
SELF-CONTAINED
D.D.
STOR. 113
111A
MEN
JAN.
WOMEN 115
DISH-
WASHING
LOUNGE/
DINING
SERVING
KITCHEN
DRY
STORAGE
FREEZER
COOLER
OFF.
RECEIV'G
LKR'S
JAN.
DINING
COMMONS
LOCKERS
EL.
WOMEN 169
MEN
BLDG.
ENG.
DRAFTING
EXISTING RAMP #1
EXISTING RAMP #2
CHORAL
MUSIC
MEN
D.D.
SELF-CONTAINED
DISCIPLINE
ALTERNATIVE
EMOTIONLY
SELF-CONTAINED SELF-CONTAINED
D.D.
FACULTY
ASS'T
PRINC.
POLICE
OFF.
ATTEN.
SPEC.
OFF.
MAN.
HEAD
BOOK- COMP.
D.D
SELF-CONTAINED
SNACK
BAR
OFFICE
STU.
H.C.
TOILET
ELEV
LOBBY
MECH
STORAGE
STORAGE
OFF.
RM. 424
SMALL ENGINES
STOR.
I.D. RM.
PRAC. 415
PRAC. 411
JAN. 109
STOR.
FT'G
MEN 166
CL.RM.
KILN
KILN W/HOOD
CL. RM. 451
TOOLS 453
TOOLS 450
PROJECTS
PROJECTS
METALS
SHOP 448
FINISH 446
TOOLS 445
PROJECTS
TECHNOLOGY LAB. 443
OFF. 447
TOOL STOR.
BLDG. ENG.
MUSIC 408
STOR. 409
RM. 105
STOR. 410OFF. 412
J-HAWK
SHOP 405
CONCESSION 404
PRAC. 416
PRAC. 403STORAGE
OFF. 417
OFFICE &
STOR. 418
STOR. 420
STOR. 414
ART 104
STOR. 102 OFF. 103
ART 100PRAC. 421
PRAC. 422
PRAC. 423
WOMEN 401
UPPER
LEVEL OF
NATATORIUM
MECH. 511
TOILET
TOILET
TOILET
STOR. STOR.
TOILET
LOCKERS
CORRIDOR
STAIRS
STAIRS
STAIRS
STAIRS
SPECTATORS 503
STAIR
C-SE
C103
C108
110A
CORRIDOR
OBSERV.
CORRID
OR
OFFICE
VESTIBULE
IDF
GYMNASIU
M
"N
EST"
STORAGE
POOL
VESTIBULE
STORAGE
STAIR
C-S E
TIC
KETS
P.E. S
TORAGE
ELE
V
TIC
KETS
SOUND C
LO
S
TRAIN
IN
G LOBBY
VESTIBULE
TRIANGLE
SECURITY
VESTIBULE
RAMP
LIFE SKILLS
LO
BBY #1
LO
BBY #2
LO
BBY #3
POOL
VESTIBULE
MEDIA
LAB
MEDIA
LAB STUDIO
MEDIA
STORAGE 1
CONTROL
ROOM STORAGE
SILK SCREENING
ACT
STORAGE
SCREEN
PREP
2ND FLOOR OVERHANG ABOVE
EL. +0'-0"
FIRST FLOOR
EL. -6'-0"
GYM FLOOR
FECr
FECr
FECr
FECr
D W
EL. -2'-0"EL. -4'-0"DN
DN
DN
DRANGE W
R
EFR
IG
ACCU
RETAINING
WALL
DN
FECr
FECr
DNDN
DN.DN.
R
AM
P
RAMP
521 522520
Q
R
S
X
Y
176173
TOILET
VESTIBULE
2ND FLOOR OVERHANG ABOVE
ACCU
RETAINING
WALL
23 24/18 OA
M
AREA A AREA B
LOWER LEVEL REGION
KEYED MECHANICAL NOTES (THIS SHEET):
1.
2.
3.
4.
5.
FURNISH AND INSTALL NEW HOT WATER/CHILLED WATER SUPPLY
AND RETURN PIPING UP FROM BELOW, OVER, AND TIE INTO
EXISTING MAINS LOCATED IN THE MECHANICAL MEZZANINE. ALL
PIPING SHALL BE SUSPENDED FROM STRUCTURE ABOVE.
CONTRACTOR SHALL COORDINATE EXACT LOCATION FOR PIPING
TO PENETRATE THE FLOOR AND CORE DRILL AS REQUIRED TO
INSTALL NEW PIPING.
FURNISH AND INSTALL NEW 18/24 OUTSIDE AIR DUCTWORK FROM
NEW OA INTAKE LOUVER / ISOLATION DAMPER, DOWN THOUGH NEW
FLOOR OPENING TO ECONOMIZER BOX BELOW.
FURNISH AND INSTALL NEW LINTEL AT TOP OF OPENING ONE FOR
THE FACE BRICK AND ONE FOR THE BLOCK. FACE BRICK LINTEL:
PROVIDE (1) L5 X 3-1/2 X 5/16" (LLV) ANGLE (GALVANIZED) PROVIDE A
MINIMUM OF 8" OF BEARING ON EACH END. CMU BLOCK LINTEL:
PROVIDE (2) L5 X 3-1/2 X 5/16" (LLV) ANGLE (GALVANIZED) PROVIDE A
MINIMUM OF 8" OF BEARING ON EACH END. GROUT CELL ON EACH
END BELOW LINTEL BEARING SOLID. LINTEL SHALL BE STITCH
WELDED TOGETHER TOP AND BOTTOM. PROVIDE A BUTT WELD 4"
LONG AT 12" O.C. WITH A MINIMUM OF 6" LONG AT EACH END.
FURNISH AND INSTALL NEW 30X36 ALUMINUM, STATIONARY,
DRAINABLE LOUVER IN NEW ROUGH OPENING IN WALL. USE
SEALANT TO SEAL NEW LOUVER WEATHER TIGHT. OWNER SHALL
SELECT CUSTOM COLOR/FINISH FOR NEW LOUVER. FURNISH AND
INSTALL THERMALLY BROKEN, INSULATED, TWO POSITION
(OCCUPIED - OPEN / UNOCCUPIED - CLOSED) DAMPER ON BACK
SIDE OF OUTSIDE AIR INTAKE LOUVER.
FURNISH AND INSTALL 3/4" CONDENSATE DRAIN PIPING UP FROM
CONDENSATE PUMP LOCATED ON FLOOR BELOW. ROUTE PIPING UP
AND GRAVITY DRAIN DOWN AND THEN THROUGH EXTERIOR WALL
AND DISCHARGE AT GRADE.
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
M101A
MECHANICAL NEW WORK
- FIRST FLOOR AREA A
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
JJO AEC
DATE: 08/05/2025
N
1/16" = 1'-0"1 FIRST FLOOR - MECHANICAL PLAN - AREA A
NO. DESCRIPTION DATE
Ca no py A4
B4
8- 8B
A4848
N
B4848-8B07
T120P
Canopy Canopy
B4848-8B07
N
A4848
B4848-8B07 N
A4
S144P B4848-8B07
N
A4848
B4848-8B07
N
A4848
T120P
B4
8- 8B
N
A4848
B4848-8B07
N
A4848
Ca no py
Canopy A4848
B4848-8B07
A4848
N
B4848-8B07
T120P
Ca no py Ca no py
B4848-8B07
N
A4848
B4
8- 8B
N
A4848
S1
P B4
8-
8B
N
A4
B4848-8B07
N
A4848
T120P
B4848-8B07 N
A4
B4848-8B07
N
A4848
Canopy
ART WORK DISPLAY
ART WORK DISPLAY
ART WORK DISPLAY
200 SHELVES @ 36"W
MAGAZINE AREA ALSO
"H
"H
RECEPTION
COUNTER
TOP
PRINTER
RECEPTION
RE
CE
PT
IO
N
RECEPTION
NEW LOCATION
OF PRINTER
COUNTER
TOP
PRINTER
COUNTER
TOP
PRINTER
COUNTER
TOP
PRINTER
EXISTING 3'-0' FIRE DR
PATH OF EGRESS IS 67'-0"
STAIR EGRESS
CORRIDOR
15.25" W X 82.25"H
15.25" W X 82.25"H
13" W X 82.25"H
15" W X 82.25"H
15.25" W X 82.25"H 13" W X 82.25"H
15.25" W X 64.25"H
17" W X 64.25"H
15.125" W X 64.25"H
15.125" W X 64.25"H
12" W X 64.25"H
12" W X 64.25"H
15.125" W X 82"H
13" W X 82"H
15.125" W X 82"H
15.25" W X 82"H
10.25"W X 77"H
WITH 13"D
X 10.25"
TOP CAP
13" W X 82"H
15.125" W X 82"H
13" W X 82"H
15.125" W X 82"H
15.25" W X 82"H
15.25" W X 82"H
12" W X 64.25"H
12" W X 64.25"H
12" W X 64.25"H
12" W X 64.25"H
12" W X 64.25"H
12" W X 64.25"H
12" W X 64.25"H
12" W X 64.25"H
SM
AR
TB
OA
RD
4'W
X 4'
H
MA
RK
ER
BO
AR
D 4'W
X 4'
H
TA
CK
BO
AR
D
4'W X
4' H
MA
RK
ER
BO
AR
D
4'W X
4' H
TA
CK
BO
AR
D
12' SLIDING
MARKERBOARD
12' SLIDING MARKERBOARDSHORT HT.
CABINET (4) 3H OPEN BOOKSHELF WITH LAMINATE TOP
TEACHER DESK
' S
LID
IN
G
MA
RK
ER
BO
AR
D
TEACHER DESK
SMARTBOARD
24" x 84" tables
DN.
DN. DN.
DN.
CL. RM.
CL. RM.
FACULTY
CL. RM.
CL. RM.
218 223 228
CL. RM.
SOC. STUDIES
CL. RM.
COMPUTER
LAB.
222221
EL.
MEN
WOMEN
BLD'G
ENG.
W. M.
TEACHERS
LOUNGE
ENGLISH
CL. RM.
ENGLISH
CL. RM.
ENGLISH
CL. RM.
SOC. STUDIES
CL. RM.
SOC. STUDIES
CL. RM.
ENGLISH
CL. RM.
MATH
CL. RM.
ART
CL. RM.
220 224
246 244
MEN
WOMEN
JAN.
CL. RM
CL. RM.
CL. RM.
CL. RM.
CL. RM.
CL. RM.
CL. RM.
CL. RM.
CLASSROOM
250a
A/V ROOM
CL. RM.
PERIODICALS
RM.
WORK
RM.
LIB.
OFF.
I.T.
CLOS.
LIBRARY
RESOURCE CENTER
READING READINGSTACKS
LAB.
COMPUTER
LAB.
COMPUTER CL. RM.
SOC. STUDIES
SOC. STUDIESENGLISH
ENGLISH ENGLISH
LANGUAGE LANGUAGE
LANGUAGELANGUAGE
SOC. STUDIES
SOC. STUDIES SOC. STUDIES
SOC. STUDIES
SPEC. ED.
CONFERENCE 232
CONFERENCE 240OFF.
LIBRARY
CL. RM.
216 217
MATH
CL. RM.
CLASSROOM
250b
CLASSROOM
243a
CLASSROOM
243b
COMPUTER LAB
251a
CL. RM.
ENGLISH
201B 201A
202A202B
205A
205B
201G 201H
310 SF
BAMIT
EMITT
356 SF
HPS
321 SF
HS
CONF
STORAGE
218 SF
OFFICE
201A
200 SF
OFFICE AP
201B
144 SF
OFFICE
202A
144 SF
OFFICE AP
202B
176 SF
OFFICE AP
205A
170 SF
OFFICE
205B 200 SF
OFFICE AP
206A
218 SF
OFFICE
206B
TD TD
TD TD
TD TD
3'-10 7/8"
3'-
3/ 4"
3'-
3/ 4"
3'- 9 3
/8"
5'-3"
'-4
1/ 8"
23'-6"
2'- 0"
3" HWR
3" HWS
2" HWR
2" HWS
3" CHWS
3" CHWR
1 1/4" HWS
1 1/4" HWR
2" HWS
2" HWR
1 1/2" CHWS
1 1/2" CHWR
KEYED MECHANICAL NOTES (THIS SHEET):
1.
2.
3.
FURNISH AND INSTALL NEW HOT WATER/CHILLED WATER SUPPLY
AND RETURN PIPING UP FROM BELOW, OVER, AND TIE INTO
EXISTING MAINS LOCATED IN THE MECHANICAL MEZZANINE. ALL
PIPING SHALL BE SUSPENDED FROM STRUCTURE ABOVE.
CONTRACTOR SHALL COORDINATE EXACT LOCATION FOR PIPING
TO PENETRATE THE FLOOR AND CORE DRILL AS REQUIRED TO
INSTALL NEW PIPING.
FURNISH AND INSTALL NEW CHILLED WATER 1-1/2" CHWS/R PIPING
AND TAP INTO EXISTING MAINS. FURNISH AND INSTALL MANUAL
ISOLATION VALVE IN NEW BRACH PIPING AT MAIN.
FURNISH AND INSTALL NEW HOT WATER 2" HWS/R PIPING OVER AND
TAP INTO EXISTING MAINS.FURNISH AND INSTALL MANUAL
ISOLATION VALVE IN NEW BRACH PIPING AT MAIN.
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
M102A
MECHANICAL NEW WORK
- FIRST FLOOR MEZ.
AREA A
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
JJO AEC
DATE: 08/05/2025
N
1/16" = 1'-0"1 GYM MEZZANINE MECHANICAL PLAN - AREA A
NO. DESCRIPTION DATE
R
S
X
Y
176173
TOILET
VESTIBULE
2ND FLOOR OVERHANG ABOVE
ACCU
RETAINING
WALL
PRE-2 (E)
PRE-6 (E)
PRE-5 (E)
EF-4 (E)
EF-19
EF-7
EF-20
EF-6
EF-35
EF-34
EF-21
EF-40
EF-17
EF-18
EF-14
EF-15
EF-16
EF-10
EF-3
EF-11
EF-13
AREA A AREA B
LOWER LEVEL REGION
KEYED MECHANICAL NOTES (THIS SHEET):
1.
2.
3.
FURNISH AND INSTALL INSULATED DOUBLE WALL CURB ADAPTER
ON EXISTING CURB TO ALLOW INSTALLATION OF NEW EXHAUST
FAN. CONTRACTOR SHALL MEASURE EACH EXISTING ROOF CURB
AND COORDINATE WITH EXHAUST FAN SUPPLIER FOR PROPER
CURB ADAPTOR SIZING PRIOR TO ORDER. THE EXISTING ROOF
CURB MAY BE UTILIZED IF THE EXISTING ROOF CURB SIZE
MATCHES THE REQUIREMENTS FOR INSTALLATION OF THE NEW
EXHAUST FAN.
EXHAUST FAN EXISTING TO REMAIN.
FURNISH AND INSTALL NEW ROOF MOUNTED EXHAUST FAN ON NEW
CURB ADAPTOR OR EXISTING ROOF CURB IF NEW FAN AND
EXISTING CURB PROPERLY MATE PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
M103A
MECHANICAL NEW WORK
- ROOF AREA A
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
JJO AEC
DATE: 08/05/2025
N
1/16" = 1'-0"1 ROOF - MECHANICAL PLAN - AREA A
PROJECT NOTES:
EACH CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ADEQUATE PROTRACTION ON THE EXISTING ROOF TO PREVENT DAMAGE AND ROOFING LEAKS FOR THE DURATION OF THE EXHAUST FAN REPLACEMENT. ANY ROOF LEAK AS A RESULT OF THE EXHAUST FAN REPLACEMENT IS THE RECONCILABILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIAL / EQUIPMENT / LABOR TO PATCH THE EXISTING ROOF. ROOFING CONTRACTOR
SHALL MEET ALL EXISTING ROOF WARRANTIES.
NO. DESCRIPTION DATE
R
S
X
Y
176173
TOILET
VESTIBULE
2ND FLOOR OVERHANG ABOVE
ACCU
RETAINING
WALL
PRE-28 (E)
EF-33
EF-30
EF-32
EF-31EF-301
EF-29 EF-26
EF-24
EF-22
EF-25
EF-28
EF-27
2 1
1 1
3 3
AREA A AREA B
LOWER LEVEL REGION
KEYED MECHANICAL NOTES (THIS SHEET):
1.
2.
3.
FURNISH AND INSTALL INSULATED DOUBLE WALL CURB ADAPTER
ON EXISTING CURB TO ALLOW INSTALLATION OF NEW EXHAUST
FAN. CONTRACTOR SHALL MEASURE EACH EXISTING ROOF CURB
AND COORDINATE WITH EXHAUST FAN SUPPLIER FOR PROPER
CURB ADAPTOR SIZING PRIOR TO ORDER. THE EXISTING ROOF
CURB MAY BE UTILIZED IF THE EXISTING ROOF CURB SIZE
MATCHES THE REQUIREMENTS FOR INSTALLATION OF THE NEW
EXHAUST FAN.
EXHAUST FAN EXISTING TO REMAIN.
FURNISH AND INSTALL NEW ROOF MOUNTED EXHAUST FAN ON NEW
CURB ADAPTOR OR EXISTING ROOF CURB IF NEW FAN AND
EXISTING CURB PROPERLY MATE PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
M103B
MECHANICAL NEW WORK
- ROOF AREA B
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
JJO AEC
DATE: 08/05/2025
N
1/16" = 1'-0"1 ROOF - MECHANICAL PLAN - AREA B
PROJECT NOTES:
EACH CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ADEQUATE PROTRACTION ON THE EXISTING ROOF TO PREVENT DAMAGE AND ROOFING LEAKS FOR THE DURATION OF THE EXHAUST FAN REPLACEMENT. ANY ROOF LEAK AS A RESULT OF THE EXHAUST FAN REPLACEMENT IS THE RECONCILABILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIAL / EQUIPMENT / LABOR TO PATCH THE EXISTING ROOF. ROOFING CONTRACTOR
SHALL MEET ALL EXISTING ROOF WARRANTIES.
NO. DESCRIPTION DATE
WOOD NAILING
STRIP
EXISTING ROOF CURB
SEE NOTE #2
RIGID CONDUIT TO
ACCOMMODATE ELECTRICAL
WIRES
NEW GRAVITY
BACKDRAFT DAMPER
CURB CAP
SEE NOTE #1
SEE NOTE #3
EXISTING ROOF STRUCTURE
TRANSITION DUCT TO SIZE OF
DAMPER SUPPLIED WITH ROOF
VENTILATOR
EXHAUST DUCT
1.
2.
3.
NOTE:
SECURE CURB CAP TO WOOD NAILING STRIP WITH 3/8" {10MM} CADIUM PLATED LAG BOLTS NOT OVER 12"
{305MM} ON CENTER
FURNISH AND INSTALL NEW DOUBLE WALL INSULATED CURB ADAPTOR AS REQUIRED IF NEW EXHAUST FAN IS NOT ABLE TO DIRECTLY MOUNT TO THE EXISTING ROOF CURB. CONTRACTOR IS REQUIRED TO MEASURE ALL EXISTING ROOF CURBS PRIOR TO ORDER OF EXHAUST FANS TO ENSURE A SEAMLESS REPLACEMENT.
CONTRACTOR SHALL REMOVE AND REPLACE EXISTING GRAVITY BACKDRAFT DAMPER. CONTRACTOR IS REQUIRED TO MEASURE ALL EXISTING ROOF CURBS PRIOR TO ORDER TO ENSURE PROPER FIT OF NEW
BACK DRAFT DAMPER.
NEW EXHAUST FAN
AUTOMATIC 3-WAY
MODULATING CONTROL
VALVE (TYP.)
BALANCE VALVE (TYP.)
PRESSURE/TEMPERATURE
TEST PORT (TYP.)
1/2" BALL VALVE
W/GOOSENECK DRAIN AT
HIGH POINT WITH CAP
ISOLATION
VALVE (TYP.)
UNION (TYP.)
DRAIN VALVE WITH HOSE
BIBB END AND CAP (TYP.)
EXTEND DRAIN PIPING
TO CONDENSATE PUMP
INLET (TYP.)
SIZE P-TRAP PER MANUFACTURER'S
REOMMANDED INSTRUCTIONS TO
ENSURE PROPER DRAINAGE. PROVIDE
CLEANOUT
CHILLED WATER
COILING COIL
DRAIN PAN
CHWS/R
AUTOMATIC 3-WAY
MODULATING CONTROL
VALVE (TYP.)
BALANCE VALVE (TYP.)
PRESSURE/TEMPERATURE
TEST PORT (TYP.)
1/2" BALL VALVE
W/GOOSENECK DRAIN AT
HIGH POINT WITH CAP.
ISOLATION
VALVE (TYP.)
UNION (TYP.)
DRAIN VALVE WITH HOSE
BIBB END & CAP (TYP.)
HOT WATER
HEATING COIL
H W
R
H W
S
RETURN AIR
MOTORIZED DAMPER (TYP.)
SHEETMETAL
ECONOMIZER BOX
TO BLOWER
COIL UNIT
M
M
A
A
B
MANUFACTURE MODEL
DIMINSIONS
A B
MICROMETL (OR EQUAL) MB-GP-2000 23.5" 18"
NOTE: COORDINATE SELECTION OF ECONOMIZER BOX WITH
MANUFACTURER AND WITH THE BLOWER COIL SELECTION.
ECONOMIZER BOX
OU
TS
ID
E
AI
R
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
KEDbluestone. © 2025 KEDbluestone
Peoria, IL 61603
(309) 938-4005 www.KEDbluestone.com
M500
MECHANICAL DETAILS
R
PS
J
EF
FE
R
SO
N
E X H
A U
ST
F
A N
R
EP
LA
C
EM
EN
T S
W
R
ES
T
LI
N G
R O
O M
H V
A C
S
A M
U
EL
SO
N
R D
R
O C
K
FO
R D
IL
325-073
08/05/2025
R O
C K
FO
R
D P
U B
LI
C S
C H
O O
LS
ISSUED FOR BIDDING
JJO AEC
DATE: 08/05/2025
N.T.S.N.T.S.1 EXHAUST FAN - DOWNDRAFT
N.T.S.N.T.S.2 CHILLED WATER COIL
N.T.S.N.T.S.3 HOT WATER PRE-HEAT COIL
N.T.S.N.T.S.4 BLOWER COIL ECONOMIZER
NO. DESCRIPTION DATE
EXHAUST FAN SCHEDULE
PERFORMANCE MOTOR
MARK DESIGN BASIS DESCRIPTION DRIVE AIRFLOW E.S.P. R.P.M. HP VOLTS PHASE REMARKS
MAKE MODEL (CFM) (IN. H2O)
EF-3 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 8,760 1.5 1726 7-1/2 460 3 SEE NOTES 1, 2, & 3
EF-6 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 400 0.5 1617 1/8 115 1 SEE NOTES 1, 2, & 3
EF-7 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 300 0.5 1438 1/8 115 1 SEE NOTES 1, 2, & 3
EF-10 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 7,700 0.5 1415 5 460 3 SEE NOTES 1, 2, & 3
EF-11 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 7,700 0.5 1415 5 460 3 SEE NOTES 1, 2, & 3
EF-13 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 7,700 0.5 1415 5 460 3 SEE NOTES 1, 2, & 3
EF-14 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 650 0.5 1712 1/4 208 1 SEE NOTES 1, 2, & 3
EF-15 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 7,700 0.5 1415 5 460 3 SEE NOTES 1, 2, & 3
EF-16 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 860 0.5 1845 1/3 208 1 SEE NOTES 1, 2, & 3
EF-17 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 300 0.5 1438 1/8 115 1 SEE NOTES 1, 2, & 3
EF-18 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 500 0.5 1668 1/6 208 1 SEE NOTES 1, 2, & 3
EF-19 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 460 0.5 1607 1/8 115 1 SEE NOTES 1, 2, & 3
EF-20 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 1,600 0.5 1722 1/2 115 1 SEE NOTES 1, 2, & 3
EF-21 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 1,800 0.5 1094 1/3 115 1 SEE NOTES 1, 2, & 3
EF-22 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3
EF-24 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3
EF-25 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 1,350 0.5 1522 1/3 115 1 SEE NOTES 1, 2, & 3
EF-26 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3
EF-27 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3
EF-28 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3
EF-29 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 750 0.5 1689 1/6 115 1 SEE NOTES 1, 2, & 3
EF-30 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3
EF-31 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3
EF-32 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 600 0.5 1648 1/6 115 1 SEE NOTES 1, 2, & 3
EF-33 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 800 0.5 1758 1/3 115 1 SEE NOTES 1, 2, & 3
EF-34 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 250 0.5 1328 1/8 115 1 SEE NOTES 1, 2, & 3
EF-35 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 250 0.5 1328 1/8 115 1 SEE NOTES 1, 2, & 3
EF-40 COOK ACE-D DOWNBLAST CENTRIFUGAL EXHAUST VENTILATOR DIRECT EC 650 0.5 1712 1/4 208 1 SEE NOTES 1, 2, & 3
NOTES:
1. PROVIDE FACTORY MOUNTED DISCONNECT SWITCH.
2. PROVIDE EC MOTOR.
3. PROVIDE BACKDRAFT DAMPER.
BLOWER COIL UNIT SCHEDULE
MARK
DESIGN BASIS
DESCRIPTION AIR FLOW (CFM)
COOLING COIL HEATING COIL MOTOR DATA
REMARKS
TOTAL CAPACITY (MBH) SENSIBLE CAPACITY (MBH)
ENTERING AIR LEAVING AIR
CHILLED WATER (GPM) WATER PD (FT) TOTAL CAPACITY (MBH) ENTERING AIR (°F) LEAVING AIR (°F) HOT WATER (GPM) WATER PD (FT) HP BHP FAN RPM VOLTS PHASE
DB (°F) WB (°F) DB (°F) WB (°F)MAKE MODEL
BCU-1 TRANE BCHE120 HORIZONTAL BLOWER COIL UNIT 3000 133.88 91.36 80.00 67.00 52.37 52.26 17.79 4.17 162.68 40 90 31.05 11.83 2.64 1.533 1124 208 3
NOTES:
1. PROVIDE EC MOTOR.
2. PROVIDE FACTORY MOUNTED DISCONNECT SWITCH.
GRILLE AND DIFFUSER SCHEDULE
MARK
DESIGN BASIS
DESCRIPTION MODULE SIZE NECK SIZE AIR PATTERN FRAME C.F.M. S.P. (WATER) NOISE LEVEL (NC) NOTES
MAKE MODEL / SERIES
SG-1 TITUS DL LONG THROW, HIGH CAPACITY SUPPLY GRILLE WITH ROTATING DRUM 12" X 8" 12" X 8" DIRECTIONAL THROW SEE NOTE 2 300 0.1 < 15 SEE NOTE 1
RG-1 TITUS 33RL HEAVY DUTY BAR RETURN GRILLE WITH SUPPORT BARS 6" 0.6. 48" X 18" 48" X 18" RETURN SEE NOTE 2 3000 0.07 30
NOTES:
1. ALL SUPPLY GRILLES AND DIFFUSERS SHALL BE CONSTRUCTED OF ALUMINUM UNLESS OTHERWISE NOTED.
2. COORDINATE DIFFUSER FRAME TYPE AND SIZE TO ENSURE COMPATIBILITY WITH CEILING/WALL/DUCT TYPE.
PROJECT NO:
SHEET (30X42):
ISSUE DATE:
ISSUANCE:
SHEET NAME:
DESIGNED BY: CHECKED BY:
REVISIONS:
707 NE Jefferson Ave.
KEDbluestone
KEDbluestone RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE
PROPERTY OF KEDbluestone AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .