This is an approved construction plans document for the Perry Rest Area Landscape Improvements project in Perry, Utah, prepared by Design West Architects for the Utah Division of Facilities and Construction Management (DFCM). The project encompasses landscape upgrades including demolition, site work, landscape installation, and irrigation improvements at the northbound I-15 Perry Rest Area. The comprehensive bid set includes general specifications, site specifications, concrete paving details, synthetic grass surfacing requirements, and chain link fence specifications. Key submittal requirements include construction schedules prepared within seven days of contract award, shop drawings and product data for review, pre-construction meetings, and as-built documentation. The project specifications reference standards including ACI 301 for concrete work, ASTM standards for materials testing, and compliance with International Building Code and local ordinances. The document establishes detailed requirements for site clearing and grubbing, earthwork including fill and compaction specifications, concrete paving with specific tolerances and joint requirements, synthetic grass installation with eight-year warranty requirements, and chain link fencing with vinyl-coated fabric.
The specifications establish performance standards including 4,000 PSI concrete compressive strength at 28 days, synthetic grass infill requirements of 8.4 pounds per square foot, and comprehensive quality assurance testing protocols conducted by qualified independent testing agencies. Contractors must submit detailed cost proposals with specific qualifications: synthetic turf installers must have five years of business experience, be manufacturer-certified, employ supervisory personnel with minimum five years' experience, and maintain locations within a 100-mile project radius. The project requires proof of subgrade approval through proof-rolling and testing, field quality control testing for concrete in accordance with ASTM standards, and contractor responsibility for all importing or exporting of soil materials as part of the lump sum bid price. The document specifies significant submittal requirements including ten completed installations over five years for turf work, product samples, fiber supplier verification, and comprehensive warranty documentation covering complete replacement coverage without proration for eight years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-Attachment C Evaluator Score Sheet.xls | XLS spreadsheet | |
| 4-Attachment B Scope of Work.docx | DOCX document | |
| 2-B-Subcontractors List Form Instructions-7.1.2021.docx | DOCX document | |
| 2-Vendor Prerequisites - RFP Agency.pdf | ||
| 3-C-DFCM Health Insurance Statement of Compliance Form, Revised 7.28.25.docx | DOCX document | |
| 1-A-DFCM General Conditions August 2020-Clean rev 07122023.pdf | ||
| 3-Attachment A Terms and Conditions.docx | DOCX document | |
| 5-1-CS27006-27066900-Solicitation.pdf | ||
| 1-Claim of Business Confidentiality Updated.pdf.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© COPYRIGHT DESIGN WEST ARCHITECTS 2026
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUED:
B
ID
S E
T
DESIGN TEAM
PERRY REST AREA - LANDSCAPE IMPROVEMENTS
PERRY, UT
M
AR
K:
DA
TE
DE
SC
RI
PT
IO
N:
LOGAN, UTAH
(435) 752-7031
SALT LAKE CITY, UTAH
(801) 539-8221
824308
K. ALTHOUSE
B. WRIGHT
06.26.2026
OWNER
LANDSCAPE
UTAH DIVISION OF FACILITIES AND
CONSTRUCTION MANAGEMENT
450 STATE ST. SUITE 4110
SALT LAKE CITY, UT 84114
PHONE: 435.230.2086
EMAIL: jcfrancis@utah.gov
CONTACT: CARL FRANCIS, PROJECT MANAGER
DESIGN WEST ARCHITECTS
255 SOUTH 300 WEST
LOGAN, UT 84321
PHONE: 435.752.7031
EMAIL: kenia@designwestarchitects.com
CONTACT: KENI ALTHOUSE, LANDSCAPE ARCHITECT
SURVEY
FORESIGHT LAND SURVEYING
2005 N 600 W
LOGAN, UT 84321
PHONE: 435.753.1910
EMAIL: jeff@foresightsurvey.com
CONTACT: JEFF NIELSEN, PROFESSIONAL LAND SURVEYOR
PE
RR
Y
RE
ST
A
RE
A
- L
AN
DS
CA
PE
IM
PR
OV
EM
EN
TS
NO
RT
HB
OU
ND
I-
PE
RR
Y, U
TA
H
UT
AH
D
EP
AR
TM
EN
T
OF
T
RA
NS
PO
RT
AT
IO
N
DFCM APPROVAL
SHEET INDEX
105101-5301
OF UTAHSTATE
SED RA
C
LICEN
HI
TE
CT
AL N DSCAPE
BLAKE C. WRIGHT
06.26.2026
G-001
COVER SHEET
G-001 COVER SHEET
G-002 GENERAL SPECIFICATIONS
G-003 GENERAL SPECIFICATIONS
C-001 SITE SPECIFICATIONS
C-002 SITE SPECIFICATIONS
C-100 DEMOLITION PLAN
C-101 SITE PLAN
C-501 SITE DETAILS
C-601 ADD ALTERNATES
L-001 LANDSCAPE SPECIFICATIONS
L-002 LANDSCAPE SPECIFICATIONS
L-101 PLANTING PLAN
L-201 IRRIGATION PLAN
L-501 LANDSCAPE DETAILS
L-502 LANDSCAPE DETAILS
SHEET INDEX
ADD ALTERNATE 1: CURB REPAIR - SEE C-601
ADD ALTERNATE 2: SOUTH LANDSCAPE AREA - SEE C-601
ADD ALTERNATES
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
THOMAS PETERSON
07/09/2026
824308
K. ALTHOUSE
B. WRIGHT
06.26.2026
© COPYRIGHT DESIGN WEST ARCHITECTS 202654321
A
B
D
C
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUED:
LOGAN, UTAH
(435) 752-7031
SALT LAKE CITY, UTAH
(801) 539-8221
B
ID
S E
T
M
AR
K:
DA
TE
DE
SC
RI
PT
IO
N:
DFCM APPROVAL
PE
RR
Y
RE
ST
A
RE
A
- L
AN
DS
CA
PE
IM
PR
OV
EM
EN
TS
NO
RT
HB
OU
ND
I-
PE
RR
Y, U
TA
H
UT
AH
D
EP
AR
TM
EN
T
OF
T
RA
NS
PO
RT
AT
IO
N
105101-5301
OF UTAHSTATE
SED RA
C
LICEN
HI
TE
CT
AL N DSCAPE
BLAKE C. WRIGHT
06.26.2026
G-002
GENERAL
SPECIFICATIONS
SECTION 00 0102
PROJECT INFORMATION
PART 1 GENERAL
1.01 PROJECT IDENTIFICATION
PROJECT NAME: PERRY REST AREA - LANDSCAPE UPGRADES.
THE OWNER, HEREINAFTER REFERRED TO AS OWNER: UTAH DIVISION OF FACILITIES AND
CONSTRUCTION MANAGEMENT
1.02 NOTICE TO PROSPECTIVE BIDDERS
A. PART OF THE INVITATION TO BID LETTER SENT BY THE OWNER.
B. THE "STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A SMALL
PROJECT" A.I.A. DOCUMENT B155, LATEST EDITION ISSUED BY THE AMERICAN INSTITUTE OF
ARCHITECTS FOR USE IN SMALL CONSTRUCTION CONTRACTS WITH A STIPULATED SUM AS
THE SUGGESTED FOR OF CONTRACT AGREEMENT.
C. THESE DOCUMENTS CONSTITUTE AN INVITATION TO BID AND REQUEST FOR QUALIFICATIONS
FROM GENERAL CONTRACTORS FOR THE CONSTRUCTION OF THE PROJECT DESCRIBED
BELOW.
1.03 BID FORM
A. PART OF THE INVITATION TO BID LETTER SENT BY THE OWNER.
1.04 PROJECT DESCRIPTION
A. THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION OF A SMALL PROJECT"
A.I.A. FORM A205 LATEST EDITIONS ARE A PART AND CONDITION OF EACH DIVISION OF THESE
SPECIFICATIONS.
B. PROJECT CONSISTS OF LANDSCAPING AT THE PERRY AREA WITH THE FOLLOWING
AMENITIES: DEMOLITION, SITE, LANDSCAPE AND IRRIGATION.
1.05 PROCUREMENT TIMETABLE
A. THE OWNER RESERVES THE RIGHT TO CHANGE THE SCHEDULE OR TERMINATE THE ENTIRE
PROCUREMENT PROCESS AT ANY TIME.
1.06 PROCUREMENT DOCUMENTS
A. AVAILABILITY OF DOCUMENTS: COMPLETE SETS OF PROCUREMENT DOCUMENTS MAY BE
OBTAINED AT THE FOLLOWING ADDRESS:
DESIGN WEST ARCHITECTS
255 SOUTH 300 WEST
LOGAN, UTAH 84321
KENI ALTHOUSE, PLA
kenia@designwestarchitects.com
END OF SECTION
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 CONSTRUCTION SCHEDULE
A. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE ARCHITECT AND OWNER, A
BAR-CHART TYPE PROGRESS SCHEDULE FOR THE ENTIRE PROJECT, WITHIN SEVEN (7) DAYS
AFTER AWARD OF CONTRACT. PROVIDE A SEPARATE BAR FOR EACH WORK ITEM LISTED IN
THE SCHEDULE OF VALUES. INCLUDE APPROPRIATE TIME FOR PROJECT MOBILIZATION,
PROCUREMENT OF PRODUCTS, REVIEW AND RETURN OF SHOP DRAWINGS, INSTALLATION,
TESTING, FINAL CLEANUP AND INSTALLATION TIME FOR WORK UNDER SEPARATE
CONTRACTS. IDENTIFY EACH CALENDAR DAY THROUGHOUT THE SCHEDULE. HIGHLIGHT
CRITICAL PATH ELEMENTS OF THE SCHEDULE THAT ARE IMPORTANT TO COMPLETE THE
WORK ON TIME. CORRELATE THE ORGANIZATION OF THE SCHEDULE WITH THE DATE OF
SUBSTANTIAL COMPLETION INDICATED IN THE OWNER-CONTRACTOR AGREEMENT.
1.02 PROJECT COORDINATION & ADMINISTRATION
A. COORDINATE THE WORK OF THE COMPLETE PROJECT TO ASSURE AN EFFICIENT AND
ORDERLY SEQUENCE OF INSTALLATION OF CONSTRUCTION ELEMENTS, AND FOR
INSTALLATION OF ITEMS FURNISHED AND INSTALLED BY OTHERS, WITH PROVISIONS FOR
ACCOMMODATING OTHER ITEMS TO BE INSTALLED LATER. UTILIZE SPACE EFFICIENTLY TO
MAXIMIZE ACCESSIBILITY FOR OTHER INSTALLATIONS, AND FOR MAINTENANCE.
1.03 PRE-CONSTRUCTION MEETING
A. MEET WITH THE OWNER'S DESIGNATED CONSTRUCTION REPRESENTATIVE BEFORE STARTING
CONSTRUCTION. DISCUSS PROCEDURES AND REQUIREMENTS FOR SITE ACCESS, WORK
HOURS, PARKING, DELIVERIES AND RECEIVING, DEBRIS AND WASTE RECEPTACLES,
TEMPORARY BARRICADES, AND CONSTRUCTION OPERATIONS THAT MAY BE OFFENSIVE.
1.04 MAINTENANCE OF CONSTRUCTION DOCUMENTS
A. THE CONTRACTOR SHALL MAINTAIN AT THE PROJECT SITE, A RECORD SET OF
CONSTRUCTION DOCUMENTS AND THE FOLLOWING RELATED DRAWINGS OR DOCUMENTS
PREPARED BY OTHERS: SHOP DRAWINGS AND DATA SHEETS PREPARED BY THE
MANUFACTURERS, FABRICATORS, AND SUPPLIERS.
B. DO NOT CONSTRUCT ANY PORTION OF THE WORK RELATED TO THESE DRAWINGS AT ANY
TIME WITHOUT SUCH DRAWINGS BEING AVAILABLE AT THE PROJECT SITE.
C. "AS BUILT" DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR. DRAWINGS SHALL
INDICATE THE SIZE AND DIMENSIONS OF ALL CONCEALED AND UNDERGROUND WORK, AND
SHALL INDICATE DEPTH OF MAJOR CONDUIT AND PIPING.
1.05 PERMITS AND LOCAL CODES
A. THE LAWS IN FORCE AT THE BUILDING LOCATION SHALL GOVERN. THESE INCLUDE THE
LATEST EDITIONS OF THE INTERNATIONAL BUILDING CODE, INTERNATIONAL MECHANICAL
CODE, INTERNATIONAL PLUMBING CODE, NATIONAL ELECTRIC CODE, LIFE SAFETY CODE, ANSI
117.1 AND LOCAL ORDINANCES. THE CONTRACTOR SHALL PROCURE AND PAY FOR ALL
NECESSARY BUILDING PERMITS AND FOR INSPECTION SERVICES OF LOCAL AUTHORITIES AND
HIS OWN BUSINESS LICENSES. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS
SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF OCCUPATIONAL SAFETY AND HEALTH
STANDARDS, FEDERAL, STATE, COUNTY AND MUNICIPAL LAWS.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PROGRESS MEETINGS
A. SCHEDULE AND ADMINISTER MEETINGS THROUGHOUT PROGRESS OF THE WORK AT
MAXIMUM MONTHLY INTERVALS.
B. ATTENDANCE REQUIRED: JOB SUPERINTENDENT, MAJOR SUBCONTRACTORS AND
SUPPLIERS, OWNER, ARCHITECT, AS APPROPRIATE TO AGENDA TOPICS FOR EACH MEETING.
C. RECORD MINUTES AND DISTRIBUTE COPIES WITHIN TWO DAYS AFTER MEETING TO
PARTICIPANTS.
3.02 CONSTRUCTION PROGRESS SCHEDULE
A. IF PRELIMINARY SCHEDULE REQUIRES REVISION AFTER REVIEW, SUBMIT REVISED SCHEDULE
WITHIN 10 DAYS.
B. WITHIN 20 DAYS AFTER REVIEW OF PRELIMINARY SCHEDULE, SUBMIT DRAFT OF PROPOSED
COMPLETE SCHEDULE FOR REVIEW.
1. INCLUDE WRITTEN CERTIFICATION THAT MAJOR SUBCONTRACTORS HAVE REVIEWED AND
ACCEPTED PROPOSED SCHEDULE.
C. WITHIN 10 DAYS AFTER JOINT REVIEW, SUBMIT COMPLETE SCHEDULE.
D. SUBMIT UPDATED SCHEDULE WITH EACH APPLICATION FOR PAYMENT.
3.03 SUBMITTALS FOR REVIEW
A. WHEN THE FOLLOWING ARE SPECIFIED IN INDIVIDUAL SECTIONS, SUBMIT THEM FOR REVIEW:
1. PRODUCT DATA.
2. SHOP DRAWINGS.
3. SAMPLES FOR SELECTION.
4. SAMPLES FOR VERIFICATION.
B. SUBMIT TO ARCHITECT FOR REVIEW FOR THE LIMITED PURPOSE OF CHECKING FOR
CONFORMANCE WITH INFORMATION GIVEN AND THE DESIGN CONCEPT EXPRESSED IN THE
CONTRACT DOCUMENTS.
C. SAMPLES WILL BE REVIEWED ONLY FOR AESTHETIC, COLOR, OR FINISH SELECTION.
D. AFTER REVIEW, PROVIDE COPIES AND DISTRIBUTE IN ACCORDANCE WITH SUBMITTAL
PROCEDURES ARTICLE BELOW AND FOR RECORD DOCUMENTS PURPOSES DESCRIBED IN
SECTION 01 7800 - CLOSEOUT SUBMITTALS.
3.04 SUBMITTALS FOR INFORMATION
A. WHEN THE FOLLOWING ARE SPECIFIED IN INDIVIDUAL SECTIONS, SUBMIT THEM FOR
INFORMATION:
1. DESIGN DATA.
2. CERTIFICATES.
3. TEST REPORTS.
4. INSPECTION REPORTS.
5. MANUFACTURER'S INSTRUCTIONS.
6. MANUFACTURER'S FIELD REPORTS.
7. OTHER TYPES INDICATED.
B. SUBMIT FOR ARCHITECT'S KNOWLEDGE AND CONTRACT ADMINISTRATOR OR FOR OWNER.
NO ACTION WILL BE TAKEN.
3.05 SUBMITTALS FOR PROJECT CLOSEOUT
A. SUBMIT CORRECTION PUNCH LIST FOR SUBSTANTIAL COMPLETION.
B. SUBMIT FINAL CORRECTION PUNCH LIST FOR SUBSTANTIAL COMPLETION.
C. WHEN THE FOLLOWING ARE SPECIFIED IN INDIVIDUAL SECTIONS, SUBMIT THEM AT PROJECT
CLOSEOUT:
1. PROJECT RECORD DOCUMENTS.
2. OPERATION AND MAINTENANCE DATA.
3. WARRANTIES.
4. BONDS.
5. OTHER TYPES AS INDICATED.
D. SUBMIT FOR OWNER'S BENEFIT DURING AND AFTER PROJECT COMPLETION.
3.06 NUMBER OF COPIES OF SUBMITTALS
A. DOCUMENTS FOR REVIEW:
1. SMALL SIZE SHEETS, NOT LARGER THAN 8-1/2 X 11 INCHES: SUBMIT THE NUMBER OF
COPIES THAT CONTRACTOR REQUIRES, PLUS TWO COPIES THAT WILL BE RETAINED BY
ARCHITECT. ELECTRONIC COPIES ARE ACCEPTABLE AND ENCOURAGED.
B. DOCUMENTS FOR INFORMATION: SUBMIT TWO COPIES. ELECTRONIC COPIES ARE
ACCEPTABLE AND ENCOURAGED.
C. SAMPLES: SUBMIT THE NUMBER SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS; ONE OF
WHICH WILL BE RETAINED BY ARCHITECT.
1. AFTER REVIEW, PRODUCE DUPLICATES.
2. RETAINED SAMPLES WILL NOT BE RETURNED TO CONTRACTOR UNLESS SPECIFICALLY SO
STATED.
3.07 SUBMITTAL PROCEDURES
A. SHOP DRAWING PROCEDURES:
1. PREPARE ACCURATE, DRAWN-TO-SCALE, ORIGINAL SHOP DRAWING DOCUMENTATION BY
INTERPRETING THE CONTRACT DOCUMENTS AND COORDINATING RELATED WORK.
2. GENERIC, NON-PROJECT SPECIFIC INFORMATION SUBMITTED AS SHOP DRAWINGS DO
NOT MEET THE REQUIREMENTS FOR SHOP DRAWINGS.
B. SEQUENTIALLY NUMBER THE TRANSMITTAL FORM. REVISE SUBMITTALS WITH ORIGINAL
NUMBER AND A SEQUENTIAL ALPHABETIC SUFFIX.
C. IDENTIFY PROJECT, CONTRACTOR, SUBCONTRACTOR OR SUPPLIER; PERTINENT DRAWING
AND DETAIL NUMBER, AND SPECIFICATION SECTION NUMBER, AS APPROPRIATE ON EACH
COPY.
D. APPLY CONTRACTOR'S STAMP, SIGNED OR INITIALED CERTIFYING THAT REVIEW, APPROVAL, VERIFICATION OF PRODUCTS REQUIRED, FIELD DIMENSIONS, ADJACENT CONSTRUCTION
WORK, AND COORDINATION OF INFORMATION IS IN ACCORDANCE WITH THE REQUIREMENTS
OF THE WORK AND CONTRACT DOCUMENTS.
E. FOR EACH SUBMITTAL FOR REVIEW, ALLOW 15 DAYS EXCLUDING DELIVERY TIME TO AND
FROM THE CONTRACTOR.
F. IDENTIFY VARIATIONS FROM CONTRACT DOCUMENTS AND PRODUCT OR SYSTEM
LIMITATIONS THAT MAY BE DETRIMENTAL TO SUCCESSFUL PERFORMANCE OF THE
COMPLETED WORK.
G. PROVIDE SPACE FOR CONTRACTOR AND ARCHITECT REVIEW STAMPS.
H. WHEN REVISED FOR RESUBMISSION, IDENTIFY ALL CHANGES MADE SINCE PREVIOUS
SUBMISSION.
I. DISTRIBUTE REVIEWED SUBMITTALS AS APPROPRIATE. INSTRUCT PARTIES TO PROMPTLY
REPORT ANY INABILITY TO COMPLY WITH REQUIREMENTS.
J. SUBMITTALS NOT REQUESTED WILL NOT BE RECOGNIZED OR PROCESSED.
END OF SECTION
SECTION 01 4000
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SUBMITTALS
A. TESTING AGENCY QUALIFICATIONS:
1. PRIOR TO START OF WORK, SUBMIT AGENCY NAME, ADDRESS, AND TELEPHONE NUMBER,
AND NAMES OF FULL TIME REGISTERED ENGINEER AND RESPONSIBLE OFFICER.
B. TEST REPORTS: AFTER EACH TEST/INSPECTION, PROMPTLY SUBMIT TWO COPIES OF REPORT
TO ARCHITECT AND TO CONTRACTOR.
C. CERTIFICATES: WHEN SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS, SUBMIT
CERTIFICATION BY THE MANUFACTURER AND CONTRACTOR OR INSTALLATION/APPLICATION
SUBCONTRACTOR TO ARCHITECT, IN QUANTITIES SPECIFIED FOR PRODUCT DATA.
1. INDICATE MATERIAL OR PRODUCT CONFORMS TO OR EXCEEDS SPECIFIED
REQUIREMENTS. SUBMIT SUPPORTING REFERENCE DATA, AFFIDAVITS, AND
CERTIFICATIONS AS APPROPRIATE.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 CONTROL OF INSTALLATION
A. MONITOR QUALITY CONTROL OVER SUPPLIERS, MANUFACTURERS, PRODUCTS, SERVICES,
SITE CONDITIONS, AND WORKMANSHIP, TO PRODUCE WORK OF SPECIFIED QUALITY.
B. COMPLY WITH MANUFACTURERS' INSTRUCTIONS, INCLUDING EACH STEP IN SEQUENCE.
C. SHOULD MANUFACTURERS' INSTRUCTIONS CONFLICT WITH CONTRACT DOCUMENTS,
REQUEST CLARIFICATION FROM ARCHITECT BEFORE PROCEEDING.
D. COMPLY WITH SPECIFIED STANDARDS AS MINIMUM QUALITY FOR THE WORK EXCEPT WHERE
MORE STRINGENT TOLERANCES, CODES, OR SPECIFIED REQUIREMENTS INDICATE HIGHER
STANDARDS OR MORE PRECISE WORKMANSHIP.
E. HAVE WORK PERFORMED BY PERSONS QUALIFIED TO PRODUCE REQUIRED AND SPECIFIED
QUALITY.
F. VERIFY THAT FIELD MEASUREMENTS ARE AS INDICATED ON SHOP DRAWINGS OR AS
INSTRUCTED BY THE MANUFACTURER.
G. SECURE PRODUCTS IN PLACE WITH POSITIVE ANCHORAGE DEVICES DESIGNED AND SIZED TO
WITHSTAND STRESSES, VIBRATION, PHYSICAL DISTORTION, AND DISFIGUREMENT.
3.02 DEFECT ASSESSMENT
A. REPLACE WORK OR PORTIONS OF THE WORK NOT CONFORMING TO SPECIFIED
REQUIREMENTS.
B. IF, IN THE OPINION OF THE ARCHITECT, IT IS NOT PRACTICAL TO REMOVE AND REPLACE THE
WORK, ARCHITECT WILL DIRECT AN APPROPRIATE REMEDY OR ADJUST PAYMENT.
END OF SECTION
SECTION 01 5639
TEMPORARY TREE AND PLANT PROTECTION
PART 1 GENERAL
1.01 SECTION INCLUDES
A. CONTRACTOR SHALL PROTECT AND AVOID DAMAGING EXISTING TREES, SHRUBS,
LANDSCAPE, AND ADJACENT VEGETATION.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 GENERAL
A. VEHICULAR AND PEDESTRIAN TRAFFIC SHALL BE LIMITED TO AREAS MARKED. THRU-TRAFFIC
AND STOCKPILING OF EQUIPMENT AND MATERIALS ARE NOT PERMITTED WITHIN MARKED
AREAS.
B. NO CONSTRUCTION ROADS ARE TO BE CREATED WITHIN THE DRIP LINES OF ANY TREES OR
OTHER VEGETATION DESIGNATED TO BE SAVED WITHOUT APPROVAL OF LANDSCAPE
ARCHITECT.
3.02 PROTECTED AREAS
A. PROTECTED AREAS ARE DESIGNATED BY THE TREE DRIPLINE. CONTRACTOR SHALL
ADEQUATELY MARK AREAS.
1. NO ACCESS OF CONSTRUCTION VEHICLES OR WORKERS ON FOOT IS PERMITTED
THROUGH PROTECTED AREAS.
2. NO MATERIAL SHALL BE STOCKPILED AND NO EQUIPMENT SHALL BE PARKED OR
REPAIRED WITHIN THESE AREAS.
3.03 TREES AND PLANTINGS
A. TREES DESIGNATED TO BE PRESERVED WITHIN THE LIMITS OF CONSTRUCTION, SHALL BE
PROTECTED FROM DAMAGE ASSOCIATED WITH CONSTRUCTION.
3.04 EXCAVATED AREAS
A. WHERE EXCAVATION FOR NEW CONSTRUCTION IS REQUIRED WITHIN DRIP LINE OF TREES,
HAND CLEAR AND EXCAVATE TO MINIMIZE DAMAGE TO ROOT SYSTEMS. USE NARROW-TINE
SPADING FORKS, COMB SOIL TO EXPOSE ROOTS, AND CLEANLY CUT ROOTS AS CLOSE TO
EXCAVATION AS POSSIBLE.
1. COVER EXPOSED ROOTS WITH BURLAP AND WATER REGULARLY TO PREVENT ROOTS
FROM DRYING OUT. BACKFILL WITH SOIL AS SOON AS POSSIBLE.
2. TEMPORARILY SUPPORT AND PROTECT ROOTS FROM DAMAGE UNTIL THEY ARE
PERMANENTLY RELOCATED AND COVERED WITH SOIL.
3. COAT CUT FACES OF ROOTS MORE THAN 1-1/2 INCHES IN DIAMETER WITH AN EMULSIFIED
ASPHALT OR OTHER APPROVED COATING FORMULATED FOR USE ON DAMAGED PLANT
TISSUES.
3.05 DAMAGE TO EXISTING VEGETATION
A. ANY TREES DAMAGED DURING CONSTRUCTION SHALL BE IMMEDIATELY REPAIRED BY A
CERTIFIED ARBORIST ACCEPTABLE TO THE LANDSCAPE ARCHITECT AT THE CONTRACTOR'S
EXPENSE.
B. ANY TREE JUDGED BY THE ACCEPTED CERTIFIED ARBORIST TO BE DAMAGED BEYOND REPAIR
SHALL BE REMOVED AT CONTRACTOR'S EXPENSE.
C. FOR EACH TREE ERRONEOUSLY REMOVED OR DAMAGED BEYOND REPAIR, AN ASSESSMENT
WILL BE IMMEDIATELY WITHHELD FROM CONTRACTOR'S PROGRESS PAYMENTS.
1. THIS ASSESSMENT WILL BE EQUAL TO THE VALUE OF THE TREE PRIOR TO DAMAGE.
2. THIS ASSESSMENT WILL BE DETERMINED BY A TREE APPRAISER, SELECTED BY
LANDSCAPE ARCHITECT AND PAID FOR BY CONTRACTOR.
3. THE COST FOR HIRING A TREE APPRAISER SHALL ALSO BE WITHHELD FROM
CONTRACTOR'S PROGRESS PAYMENTS.
D. CONTRACTOR SHALL REPLACE EACH DAMAGED TREE WITH NURSERY-GROWN MATERIAL OF
SIMILAR SIZE AND OF THE SAME OR APPROVED SPECIES.
1. REPLACEMENT TREES SHALL BE THE GREATER OF A TWO (2)-INCH CALIPER OR SIZE
EQUIVALENT TO THE SIZE OF THE DAMAGED TREE, BALLED AND BURLAPPED, AND
PLANTED IN ACCORDANCE WITH THE PROVISIONS OUTLINED IN THESE SPECIFICATIONS.
E. DAMAGED VEGETATION SHALL BE REPLACED BY CONTRACTOR WITH AN EQUAL VALUE PER
SQUARE FOOT OF DAMAGE.
END OF SECTION
SECTION 01 6000
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SUBMITTALS
A. PRODUCT DATA SUBMITTALS: SUBMIT MANUFACTURER'S STANDARD PUBLISHED DATA.
MARK EACH COPY TO IDENTIFY APPLICABLE PRODUCTS, MODELS, OPTIONS, AND OTHER
DATA. SUPPLEMENT MANUFACTURERS' STANDARD DATA TO PROVIDE INFORMATION
SPECIFIC TO THIS PROJECT.
B. SAMPLE SUBMITTALS: ILLUSTRATE FUNCTIONAL AND AESTHETIC CHARACTERISTICS OF THE
PRODUCT, WITH INTEGRAL PARTS AND ATTACHMENT DEVICES. COORDINATE SAMPLE
SUBMITTALS FOR INTERFACING WORK.
PART 2 PRODUCTS
2.01 NEW PRODUCTS
A. PROVIDE NEW PRODUCTS UNLESS SPECIFICALLY REQUIRED OR PERMITTED BY THE
CONTRACT DOCUMENTS.
2.02 PRODUCT OPTIONS
A. PRODUCTS SPECIFIED BY REFERENCE STANDARDS OR BY DESCRIPTION ONLY: USE ANY
PRODUCT MEETING THOSE STANDARDS OR DESCRIPTION.
B. PRODUCTS SPECIFIED BY NAMING ONE OR MORE MANUFACTURERS: USE A PRODUCT OF ONE
OF THE MANUFACTURERS NAMED AND MEETING SPECIFICATIONS, NO OPTIONS OR
SUBSTITUTIONS ALLOWED.
C. PRODUCTS SPECIFIED BY NAMING ONE OR MORE MANUFACTURERS WITH A PROVISION FOR
SUBSTITUTIONS: SUBMIT A REQUEST FOR SUBSTITUTION FOR ANY MANUFACTURER NOT
NAMED.
PART 3 EXECUTION
3.01 SUBSTITUTION PROCEDURES
A. SUBSTITUTION REQUESTS MUST BE SUBMITTED DURING THE BID PERIOD. BID QUESTIONS
AND SUBSTITUTION REQUESTS WILL BE ADDRESSED BY THE ARCHITECT AND APPROVED BY
DFCM UNTIL 72 HOURS PRIOR TO THE BID DATE PUBLISHED BY THE CONSTRUCTION
MANAGER.
B. DOCUMENT EACH REQUEST WITH COMPLETE DATA SUBSTANTIATING COMPLIANCE OF
PROPOSED SUBSTITUTION WITH CONTRACT DOCUMENTS.
C. A REQUEST FOR SUBSTITUTION CONSTITUTES A REPRESENTATION THAT THE SUBMITTER:
1. HAS INVESTIGATED PROPOSED PRODUCT AND DETERMINED THAT IT MEETS OR EXCEEDS
THE QUALITY LEVEL OF THE SPECIFIED PRODUCT.
2. WILL PROVIDE THE SAME WARRANTY FOR THE SUBSTITUTION AS FOR THE SPECIFIED
PRODUCT.
3. WILL COORDINATE INSTALLATION AND MAKE CHANGES TO OTHER WORK THAT MAY BE
REQUIRED FOR THE WORK TO BE COMPLETE WITH NO ADDITIONAL COST TO OWNER.
4. WAIVES CLAIMS FOR ADDITIONAL COSTS OR TIME EXTENSION THAT MAY SUBSEQUENTLY
BECOME APPARENT.
D. SUBSTITUTION SUBMITTAL PROCEDURE:
1. SUBMIT THREE COPIES OF REQUEST FOR SUBSTITUTION FOR CONSIDERATION. LIMIT EACH
REQUEST TO ONE PROPOSED SUBSTITUTION.
2. SUBMIT SHOP DRAWINGS, PRODUCT DATA, AND CERTIFIED TEST RESULTS ATTESTING TO
THE PROPOSED PRODUCT EQUIVALENCE. BURDEN OF PROOF IS ON PROPOSER.
3. THE ARCHITECT WILL NOTIFY CONTRACTOR BY ADDENDUM OF DECISION TO ACCEPT.
END OF SECTION
SECTION 01 7000
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 1 GENERAL
1.01 PROJECT CONDITIONS
A. GRADE SITE TO DRAIN. MAINTAIN EXCAVATIONS FREE OF WATER. PROVIDE, OPERATE, AND
MAINTAIN PUMPING EQUIPMENT.
B. DUST CONTROL: EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS. PROVIDE POSITIVE MEANS TO PREVENT AIR-BORNE DUST
FROM DISPERSING INTO ATMOSPHERE AND OVER ADJACENT PROPERTY.
C. EROSION AND SEDIMENT CONTROL: PLAN AND EXECUTE WORK BY METHODS TO CONTROL
SURFACE DRAINAGE FROM CUTS AND FILLS, FROM BORROW AND WASTE DISPOSAL AREAS.
PREVENT EROSION AND SEDIMENTATION.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 GENERAL INSTALLATION REQUIREMENTS
A. INSTALL PRODUCTS AS SPECIFIED IN INDIVIDUAL SECTIONS, IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS, AND SO AS TO AVOID WASTE
DUE TO NECESSITY FOR REPLACEMENT.
B. MAKE VERTICAL ELEMENTS PLUMB AND HORIZONTAL ELEMENTS LEVEL, UNLESS
OTHERWISE INDICATED.
C. INSTALL EQUIPMENT AND FITTINGS PLUMB AND LEVEL, NEATLY ALIGNED WITH ADJACENT
VERTICAL AND HORIZONTAL LINES, UNLESS OTHERWISE INDICATED.
D. MAKE CONSISTENT TEXTURE ON SURFACES, WITH SEAMLESS TRANSITIONS, UNLESS
OTHERWISE INDICATED.
E. MAKE NEAT TRANSITIONS BETWEEN DIFFERENT SURFACES, MAINTAINING TEXTURE AND
APPEARANCE.
3.02 PROGRESS CLEANING
A. MAINTAIN AREAS FREE OF WASTE MATERIALS, DEBRIS, AND RUBBISH. MAINTAIN SITE IN A
CLEAN AND ORDERLY CONDITION.
3.03 PROTECTION OF INSTALLED WORK
A. PROTECT INSTALLED WORK FROM DAMAGE BY CONSTRUCTION OPERATIONS.
B. PROVIDE SPECIAL PROTECTION WHERE SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS.
C. REMOVE PROTECTIVE COVERINGS WHEN NO LONGER NEEDED; REUSE OR RECYCLE PLASTIC
COVERINGS IF POSSIBLE.
3.04 FINAL CLEANING
A. USE CLEANING MATERIALS THAT ARE NON-HAZARDOUS.
B. CLEAN INTERIOR AND EXTERIOR GLASS, SURFACES EXPOSED TO VIEW; REMOVE
TEMPORARY LABELS, STAINS AND FOREIGN SUBSTANCES, POLISH TRANSPARENT AND
GLOSSY SURFACES, VACUUM CARPETED AND SOFT SURFACES.
C. REMOVE ALL LABELS THAT ARE NOT PERMANENT. DO NOT PAINT OR OTHERWISE COVER FIRE
TEST LABELS OR NAMEPLATES ON MECHANICAL AND ELECTRICAL EQUIPMENT.
D. CLEAN EQUIPMENT AND FIXTURES TO A SANITARY CONDITION WITH CLEANING MATERIALS
APPROPRIATE TO THE SURFACE AND MATERIAL BEING CLEANED.
3.05 CLOSEOUT PROCEDURES
A. MAKE SUBMITTALS THAT ARE REQUIRED BY GOVERNING OR OTHER AUTHORITIES.
B. NOTIFY ARCHITECT WHEN WORK IS CONSIDERED READY FOR SUBSTANTIAL COMPLETION.
C. SUBMIT WRITTEN CERTIFICATION CONTAINING CONTRACTOR'S CORRECTION PUNCH LIST,
THAT CONTRACT DOCUMENTS HAVE BEEN REVIEWED, WORK HAS BEEN INSPECTED, AND
THAT WORK IS COMPLETE IN ACCORDANCE WITH CONTRACT DOCUMENTS AND READY FOR
ARCHITECT'S SUBSTANTIAL COMPLETION INSPECTION.
D. NOTIFY ARCHITECT WHEN WORK IS CONSIDERED FINALLY COMPLETE AND READY FOR
ARCHITECT'S SUBSTANTIAL COMPLETION FINAL INSPECTION.
E. COMPLETE ITEMS OF WORK DETERMINED BY ARCHITECT LISTED IN EXECUTED CERTIFICATE
OF SUBSTANTIAL COMPLETION.
END OF SECTION
SECTION 01 7800
CLOSEOUT SUBMITTALS
PART 1 GENERAL
1.01 SUBMITTALS
A. PROJECT RECORD DOCUMENTS: SUBMIT DOCUMENTS TO ARCHITECT FOR FINAL
IMPLEMENTATION OF CHANGES DURING THE CONSTRUCTION PROCESS TO CREATE "RECORD"
OR "AS-BUILT" DOCUMENTS AS THEY ARE COMMONLY KNOWN.
B. OPERATION AND MAINTENANCE DATA
C. WARRANTIES AND BONDS: FOR EQUIPMENT OR COMPONENT PARTS OF EQUIPMENT PUT
INTO SERVICE DURING CONSTRUCTION WITH OWNER'S PERMISSION, SUBMIT DOCUMENTS
WITHIN 10 DAYS AFTER ACCEPTANCE.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.01 PROJECT RECORD DOCUMENTS
A. MAINTAIN ON SITE ONE SET OF THE FOLLOWING RECORD DOCUMENTS; RECORD ACTUAL
REVISIONS TO THE WORK:
1. DRAWINGS.
2. ADDENDA.
3. CHANGE ORDERS AND OTHER MODIFICATIONS TO THE CONTRACT.
3.02 OPERATION AND MAINTENANCE DATA
A. SOURCE DATA: FOR EACH PRODUCT OR SYSTEM, LIST NAMES, ADDRESSES AND TELEPHONE
NUMBERS OF SUBCONTRACTORS AND SUPPLIERS, INCLUDING LOCAL SOURCE OF SUPPLIES
AND REPLACEMENT PARTS.
B. PRODUCT DATA: MARK EACH SHEET TO CLEARLY IDENTIFY SPECIFIC PRODUCTS AND
COMPONENT PARTS, AND DATA APPLICABLE TO INSTALLATION. DELETE INAPPLICABLE
INFORMATION.
C. DRAWINGS: SUPPLEMENT PRODUCT DATA TO ILLUSTRATE RELATIONS OF COMPONENT
PARTS OF EQUIPMENT AND SYSTEMS, TO SHOW CONTROL AND FLOW DIAGRAMS. DO NOT
USE PROJECT RECORD DOCUMENTS AS MAINTENANCE DRAWINGS.
3.03 WARRANTIES AND BONDS
A. OBTAIN WARRANTIES AND BONDS, EXECUTED IN DUPLICATE BY RESPONSIBLE
SUBCONTRACTORS, SUPPLIERS, AND MANUFACTURERS, WITHIN 10 DAYS AFTER
COMPLETION OF THE APPLICABLE ITEM OF WORK. EXCEPT FOR ITEMS PUT INTO USE WITH
OWNER'S PERMISSION, LEAVE DATE OF BEGINNING OF TIME OF WARRANTY UNTIL THE DATE
OF SUBSTANTIAL COMPLETION IS DETERMINED.
END OF SECTION
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
B. WRIGHT
06.26.2026
© COPYRIGHT DESIGN WEST ARCHITECTS 202654321
A
B
D
C
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUED:
LOGAN, UTAH
(435) 752-7031
SALT LAKE CITY, UTAH
(801) 539-8221
B
ID
S E
T
M
AR
K:
DA
TE
DE
SC
RI
PT
IO
N:
DFCM APPROVAL
PE
RR
Y
RE
ST
A
RE
A
- L
AN
DS
CA
PE
IM
PR
OV
EM
EN
TS
NO
RT
HB
OU
ND
I-
PE
RR
Y, U
TA
H
UT
AH
D
EP
AR
TM
EN
T
OF
T
RA
NS
PO
RT
AT
IO
N
105101-5301
OF UTAHSTATE
SED RA
C
LICEN
HI
TE
CT
AL N DSCAPE
BLAKE C. WRIGHT
06.26.2026
G-003
GENERAL
SPECIFICATIONS
SECTION 02 4119
SELECTIVE SITE DEMOLITION
PART 1 GENERAL
1.01 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND
SUPPLEMENTARY CONDITIONS AND OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO
THIS SECTION.
1.02 SECTION INCLUDES
A. DEMOLITION AND REMOVAL OF SELECTED SITE ELEMENTS.
B. SALVAGE OF EXISTING ITEMS TO BE REUSED OR RECYCLED.
1.03 RELATED SECTIONS
A. DIVISION 31 2300 "EARTHWORK" FOR SITE CLEARING AND REMOVAL OF ABOVE- AND
BELOW-GRADE IMPROVEMENTS.
1.04 DEFINITIONS
A. REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM
OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND
REINSTALLED.
B. REMOVE AND SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM
TO OWNER READY FOR REUSE.
C. REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM
FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
D. EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED
AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR
REMOVED AND REINSTALLED.
1.05 SUBMITTALS
A. QUALIFICATION DATA: FOR DEMOLITION FIRM.
B. SCHEDULE OF SELECTIVE DEMOLITION ACTIVITIES: INDICATE THE FOLLOWING:
1. DETAILED SEQUENCE OF SELECTIVE DEMOLITION AND REMOVAL WORK, WITH STARTING
AND ENDING DATES FOR EACH ACTIVITY. ENSURE OWNER'S OTHER TENANTS' ON-SITE
OPERATIONS ARE UNINTERRUPTED.
2. INTERRUPTION OF UTILITY SERVICES. INDICATE HOW LONG UTILITY SERVICES WILL BE
INTERRUPTED.
3. COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES.
4. LOCATIONS OF PROPOSED DUST AND NOISE CONTROL, TEMPORARY PARTITIONS AND
MEANS OF EGRESS, INCLUDING FOR OTHER TENANTS AFFECTED BY SELECTIVE
DEMOLITION OPERATIONS.
5. COORDINATION OF OWNER'S CONTINUING OCCUPANCY OF PORTIONS OF EXISTING SITE
AND OF OWNER'S PARTIAL OCCUPANCY OF COMPLETED WORK.
6. MEANS OF PROTECTION FOR ITEMS TO REMAIN AND ITEMS IN PATH OF WASTE REMOVAL
FROM SITE.
C. INVENTORY: AFTER SELECTIVE DEMOLITION IS COMPLETE, SUBMIT A LIST OF ITEMS THAT
HAVE BEEN REMOVED AND SALVAGED.
D. PREDEMOLITION PHOTOGRAPHS OR VIDEOTAPES: SHOW EXISTING CONDITIONS OF
ADJOINING CONSTRUCTION AND SITE IMPROVEMENTS, INCLUDING FINISH SURFACES, THAT
MIGHT BE MISCONSTRUED AS DAMAGE CAUSED BY SELECTIVE DEMOLITION OPERATIONS.
E. LANDFILL RECORDS: INDICATE RECEIPT AND ACCEPTANCE OF HAZARDOUS WASTES BY A
LANDFILL FACILITY LICENSED TO ACCEPT HAZARDOUS WASTES.
1.06 QUALITY ASSURANCE
A. DEMOLITION FIRM QUALIFICATIONS: AN EXPERIENCED FIRM THAT HAS SPECIALIZED IN
DEMOLITION WORK SIMILAR IN MATERIAL AND EXTENT TO THAT INDICATED FOR THIS
PROJECT.
B. REGULATORY REQUIREMENTS: COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS
BEFORE BEGINNING SELECTIVE DEMOLITION. COMPLY WITH HAULING AND DISPOSAL
REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
C. STANDARDS: COMPLY WITH ANSI A10.6 AND NFPA 241
D. PREDEMOLITION CONFERENCE: CONDUCT CONFERENCE AT PROJECT SITE. REVIEW METHODS
AND PROCEDURES RELATED TO SELECTIVE DEMOLITION INCLUDING, BUT NOT LIMITED TO,
THE FOLLOWING:
1. INSPECT AND DISCUSS CONDITION OF CONSTRUCTION TO BE SELECTIVELY DEMOLISHED.
2. REVIEW AND FINALIZE SELECTIVE DEMOLITION AND VERIFY AVAILABILITY OF MATERIALS, DEMOLITION PERSONNEL, EQUIPMENT, AND FACILITIES NEEDED TO MAKE PROGRESS AND
AVOID DELAYS.
3. REVIEW REQUIREMENTS OF WORK PERFORMED BY OTHER TRADES THAT RELY ON
SUBSTRATES EXPOSED BY SELECTIVE DEMOLITION OPERATIONS.
4. REVIEW AREAS WHERE EXISTING CONSTRUCTION IS TO REMAIN AND REQUIRES
PROTECTION.
1.07 PROJECT CONDITIONS
A. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSE WILL BE MAINTAINED
BY OWNER AS FAR AS PRACTICAL.
1. BEFORE SELECTIVE DEMOLITION, OWNER WILL REMOVE THE ITEMS TO BE SALVAGED BY
THE OWNER. COORDINATE OTHER ITEMS WITH THE ARCHITECT.
B. NOTIFY ARCHITECT OF DISCREPANCIES BETWEEN EXISTING CONDITIONS AND DRAWINGS
BEFORE PROCEEDING WITH SELECTIVE DEMOLITION.
C. HAZARDOUS MATERIALS: IT IS NOT EXPECTED THAT HAZARDOUS MATERIALS WILL BE
ENCOUNTERED IN THE WORK.
1. HAZARDOUS MATERIALS WILL BE REMOVED BY OWNER BEFORE START OF THE WORK OR
HAVE BEEN REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
2. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED,
DO NOT DISTURB; IMMEDIATELY NOTIFY ARCHITECT AND OWNER. OWNER WILL REMOVE
HAZARDOUS MATERIALS UNDER A SEPARATE CONTRACT.
D. STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON-SITE IS NOT PERMITTED.
E. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND
PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS.
1. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING SELECTIVE DEMOLITION
OPERATIONS.
1.08 WARRANTY
A. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES
CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO
AS NOT TO VOID EXISTING WARRANTIES.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 EXAMINATION
A. VERIFY THAT UTILITIES HAVE BEEN SHUT OFF AND READY TO BE CAPPED.
B. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO
DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED.
C. INVENTORY AND RECORD THE CONDITION OF ITEMS TO BE REMOVED AND REINSTALLED AND
ITEMS TO BE REMOVED AND SALVAGED.
D. SURVEY OF EXISTING CONDITIONS: RECORD EXISTING CONDITIONS BY USE OF MEASURED
DRAWINGS, PRECONSTRUCTION PHOTOGRAPHS, PRECONSTRUCTION VIDEO, AND
TEMPLATES.
E. PERFORM SURVEYS AS THE WORK PROGRESSES TO DETECT HAZARDS RESULTING FROM
SELECTIVE DEMOLITION ACTIVITIES.
3.02 UTILITY SERVICES
A. EXISTING SERVICES/SYSTEMS: MAINTAIN SERVICES/SYSTEMS INDICATED TO REMAIN AND
PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS.
A. SERVICE/SYSTEM REQUIREMENTS: LOCATE, IDENTIFY, DISCONNECT, AND SEAL OR CAP OFF
INDICATED UTILITY SERVICES AND OTHER SYSTEMS SERVING AREAS TO BE SELECTIVELY
DEMOLISHED.
1. OWNER WILL ARRANGE TO SHUT OFF INDICATED SERVICES/SYSTEMS WHEN REQUESTED
BY CONTRACTOR.
2. ARRANGE TO SHUT OFF INDICATED UTILITIES WITH THE OWNER.
3. IF SERVICES/SYSTEMS ARE REQUIRED TO BE REMOVED, RELOCATED, OR ABANDONED,
BEFORE PROCEEDING WITH SELECTIVE DEMOLITION PROVIDE TEMPORARY
SERVICES/SYSTEMS THAT BYPASS AREA OF SELECTIVE DEMOLITION AND THAT MAINTAIN
CONTINUITY OF SERVICES/SYSTEMS.
3.03 PREPARATION
A. SITE ACCESS AND TEMPORARY CONTROLS: CONDUCT SELECTIVE DEMOLITION AND
DEBRIS-REMOVAL OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS,
WALKS, WALKWAYS, AND OTHER ADJACENT OCCUPIED AND USED FACILITIES.
B. TEMPORARY FACILITIES: PROVIDE TEMPORARY BARRICADES AND OTHER PROTECTION
REQUIRED TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT BUILDINGS AND
FACILITIES TO REMAIN.
1. PROVIDE PROTECTION TO ENSURE SAFE PASSAGE OF PEOPLE AROUND SELECTIVE
DEMOLITION AREA AND TO AND FROM OCCUPIED PORTIONS OF THE SITE.
2. PROVIDE TEMPORARY WEATHER PROTECTION, DURING INTERVAL BETWEEN SELECTIVE
DEMOLITION OF EXISTING CONSTRUCTION ON EXTERIOR SURFACES, TO PREVENT WATER
DAMAGE TO CRITICAL AREAS.
C. TEMPORARY SHORING: PROVIDE AND MAINTAIN SHORING, BRACING, AND STRUCTURAL
SUPPORTS AS REQUIRED TO PRESERVE STABILITY AND PREVENT MOVEMENT, SETTLEMENT,
OR COLLAPSE OF CONSTRUCTION AND ITEMS TO REMAIN, AND TO PREVENT UNEXPECTED OR
UNCONTROLLED MOVEMENT OR COLLAPSE OF CONSTRUCTION BEING DEMOLISHED.
1. STRENGTHEN OR ADD NEW SUPPORTS WHEN REQUIRED DURING PROGRESS OF
SELECTIVE DEMOLITION.
D. NO CLEARING, DEMOLITION, OR REMOVAL OF ANY KIND SHALL PROCEED UNTIL ALL EXISTING
TREES, IMPROVEMENTS, ETC. TO BE REMOVED HAVE BEEN ESTABLISHED AND ARE
INSPECTED AND DOCUMENTED BY THE OWNER.
E. ESTABLISH NECESSARY CLEARING LIMITS WITHIN THE CONSTRUCTION LIMITS. MARK ALL
TREES, SHRUBS, STRUCTURES, FENCES, CONCRETE, AND OTHER IMPROVEMENTS TO BE
REMOVED.
F. WITHIN 10 FEET OF CLEARING LIMITS, INSPECT, PHOTOGRAPH WITH VIDEO, AND RECORD
CONDITION OF CONCRETE SLABS, STRUCTURES, LANDSCAPING AND OTHER FEATURES TO
REMAIN WHICH MIGHT BE AFFECTED BY WORK. ALLOW OWNER TO VIEW TAPE AND
APPROVE PRIOR TO PROCEEDING WITH THE WORK.
G. TREES, SHRUBS AND LAWN, AREAS TO RECEIVE PLANTING, FENCES, SPRINKLERS AND
OTHER IMPROVEMENTS THAT ARE NOT TO BE REMOVED SHALL BE PROTECTED FROM
DAMAGE OR INJURY. IF DAMAGED OR REMOVED, THEY SHALL BE RESTORED OR REPLACED IN
AS NEARLY THE ORIGINAL CONDITION AND LOCATION AS IS REASONABLY POSSIBLE. TREES,
SHRUBS, AND IMPROVEMENTS NOT TO BE REMOVED SHALL BE MARKED IN FIELD BY OWNER
AND/OR SHOWN ON THE DRAWINGS.
H. GIVE REASONABLE NOTICE TO OWNER TO PERMIT HIM TO SALVAGE PLANTS, TREES, FENCES, SPRINKLERS AND OTHER IMPROVEMENTS WITHIN THE CONSTRUCTION LIMITS THAT MAY BE
DESTROYED BECAUSE OF THE WORK.
I. NOTIFY INTERESTED UTILITY COMPANIES TO BE PRESENT IF DISTURBING GROUND IN THE
VICINITY OF UTILITIES.
J. PROTECT ACTIVE UTILITY SYSTEMS ADJACENT TO OR UNCOVERED BY ANY EXCAVATION
DURING SITE PREPARATION.
K. MAINTAIN BENCHMARKS, MONUMENTS AND OTHER REFERENCE POINTS AND CONSTRUCTION
STAKES.
L. PROTECT ALL IMPROVEMENTS TO REMAIN OR OUTSIDE OF CONSTRUCTION FROM TREE
REMOVAL AND/OR PRUNING WORK.
3.04 CLEARING AND GRUBBING
A. PRIOR TO ANY CONSTRUCTION, REMOVE UNSUITABLE SOILS AND VEGETATION FROM BELOW
FOUNDATIONS, FLOOR SLABS, EXTERIOR CONCRETE FLATWORK, AND ASPHALT CONCRETE
PAVEMENTS AND ROADS.
3.05 SELECTIVE DEMOLITION, GENERAL
A. GENERAL: DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT
REQUIRED BY NEW CONSTRUCTION AND AS INDICATED. USE METHODS REQUIRED TO
COMPLETE THE WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS AND AS FOLLOWS:
1. PROCEED WITH SELECTIVE DEMOLITION SYSTEMATICALLY.
2. NEATLY CUT OPENINGS AND HOLES PLUMB, SQUARE, AND TRUE TO DIMENSIONS
REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE CONSTRUCTION TO
REMAIN OR ADJOINING CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS
DESIGNED FOR SAWING OR GRINDING, NOT HAMMERING AND CHOPPING, TO MINIMIZE
DISTURBANCE OF ADJACENT SURFACES. TEMPORARILY COVER OPENINGS TO REMAIN.
3. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES TO
AVOID MARRING EXISTING FINISHED SURFACES.
4. DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF FLAMMABLE
MATERIALS. MAINTAIN FIRE WATCH AND PORTABLE FIRE-SUPPRESSION DEVICES DURING
FLAME-CUTTING OPERATIONS.
5. REMOVE STRUCTURAL FRAMING MEMBERS AND LOWER TO GROUND BY METHOD
SUITABLE TO AVOID FREE FALL AND TO PREVENT GROUND IMPACT OR DUST
GENERATION.
6. DISPOSE OF DEMOLISHED ITEMS AND MATERIALS PROMPTLY.
B. REMOVED AND SALVAGED ITEMS:
1. CLEAN SALVAGED ITEMS.
2. PACK OR CRATE ITEMS AFTER CLEANING. IDENTIFY CONTENTS OF CONTAINERS.
3. STORE ITEMS IN A SECURE AREA UNTIL DELIVERY TO OWNER.
4. TRANSPORT ITEMS TO OWNER'S STORAGE AREA ON-SITE.
5. PROTECT ITEMS FROM DAMAGE DURING TRANSPORT AND STORAGE.
C. EXISTING ITEMS TO REMAIN: PROTECT CONSTRUCTION INDICATED TO REMAIN AGAINST
DAMAGE AND SOILING DURING SELECTIVE DEMOLITION. WHEN PERMITTED BY ARCHITECT,
ITEMS MAY BE REMOVED TO A SUITABLE, PROTECTED STORAGE LOCATION DURING
SELECTIVE DEMOLITION AND CLEANED AND REINSTALLED IN THEIR ORIGINAL LOCATIONS
AFTER SELECTIVE DEMOLITION OPERATIONS ARE COMPLETE.
3.06 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. TOPSOIL:
1. BEFORE ANY CONSTRUCTION ACTIVITY BEGINS, REMOVE TOPSOIL AND STOCKPILE FOR
RE-USE.
2. TOPSOIL SHALL BE PROTECTED FROM CONTAMINATION BY WEEDS, DEBRIS, ETC. AND
SHALL BE REPLACED, GRADED AND LIGHTLY COMPACTED BY CONTRACTOR AT
COMPLETION OF PROJECT.
B. CONCRETE:
1. DEMOLISH IN SECTIONS. CUT CONCRETE FULL DEPTH AT JUNCTURES WITH
CONSTRUCTION TO REMAIN AND AT REGULAR INTERVALS, USING POWER-DRIVEN SAW,
THEN REMOVE CONCRETE BETWEEN SAW CUTS.
2. CONCRETE SLABS-ON-GRADE: SAW-CUT PERIMETER OF AREA TO BE DEMOLISHED, THEN
BREAK UP AND REMOVE.
3. CONCRETE SHALL BE REMOVED TO NEATLY SAWED EDGES WITH SAW CUTS MADE TO A
MINIMUM DEPTH OF 4 INCHES.
4. CONCRETE SIDEWALK OR DRIVEWAY TO BE REMOVED SHALL BE NEATLY SAWED IN
STRAIGHT LINES EITHER PARALLEL TO THE CURB OR AT RIGHT ANGLES TO THE
ALIGNMENT OF THE SIDEWALK. NO SECTION TO BE REPLACED SHALL BE SMALLER THAN
30 INCHES IN EITHER LENGTH OR WIDTH.
5. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, IF THE SAWCUT WOULD FALL WITHIN 30
INCHES OF A CONSTRUCTION JOINT, EXPANSION JOINT, OR EDGE, THE CONCRETE SHALL
BE REMOVED TO THE JOINT OR EDGE, EXCEPT THAT WHERE THE SAW CUT WOULD FALL
WITHIN 12 INCHES OF A SCORE MARK, THE SAW CUT SHALL BE MADE IN AND ALONG THE
SCORE MARK.
6. CURB AND GUTTER TO BE REMOVED SHALL BE SAWED TO A DEPTH OF 1-1/2 INCHES ON A
NEAT LINE AT RIGHT ANGLES TO THE CURB FACE.
C. ASPHALTIC CONCRETE PAVEMENT:
1. SAWING SHALL BE USED TO ENSURE THE BREAKAGE OF PAVEMENT ALONG STRAIGHT
LINES.
2. DISPOSE OF ASPHALT PAVEMENT TO BE REMOVED AT A SUITABLE OFFSITE LOCATION IN
ACCORDANCE WITH APPLICABLE LAWS AND ORDINANCES.
D. FENCES AND MISCELLANEOUS OBSTRUCTIONS
1. NO DEMOLITION OR REMOVAL OF FENCES OR MISCELLANEOUS OBSTRUCTIONS SHALL
PROCEED UNTIL CLEARANCE IS OBTAINED FROM THE OWNER.
3.07 DISPOSAL OF DEMOLISHED MATERIALS
A. GENERAL: EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE RECYCLED, REUSED,
SALVAGED, REINSTALLED, OR OTHERWISE INDICATED TO REMAIN OWNER'S PROPERTY,
REMOVE DEMOLISHED MATERIALS FROM PROJECT SITE AND LEGALLY DISPOSE OF THEM IN
AN EPA-APPROVED LANDFILL.
1. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.
2. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON
ADJACENT SURFACES AND AREAS.
B. BURNING: DO NOT BURN DEMOLISHED MATERIALS.
C. DISPOSAL: TRANSPORT DEMOLISHED MATERIALS OFF OWNER'S PROPERTY AND LEGALLY
DISPOSE OF THEM.
3.08 CLEANING
A. CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST, DIRT, AND DEBRIS CAUSED
BY SELECTIVE DEMOLITION OPERATIONS. RETURN ADJACENT AREAS TO CONDITION EXISTING
BEFORE SELECTIVE DEMOLITION OPERATIONS BEGAN.
END OF SECTION
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
B. WRIGHT
06.26.2026
© COPYRIGHT DESIGN WEST ARCHITECTS 202654321
A
B
D
C
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUED:
LOGAN, UTAH
(435) 752-7031
SALT LAKE CITY, UTAH
(801) 539-8221
B
ID
S E
T
M
AR
K:
DA
TE
DE
SC
RI
PT
IO
N:
DFCM APPROVAL
PE
RR
Y
RE
ST
A
RE
A
- L
AN
DS
CA
PE
IM
PR
OV
EM
EN
TS
NO
RT
HB
OU
ND
I-
PE
RR
Y, U
TA
H
UT
AH
D
EP
AR
TM
EN
T
OF
T
RA
NS
PO
RT
AT
IO
N
105101-5301
OF UTAHSTATE
SED RA
C
LICEN
HI
TE
CT
AL N DSCAPE
BLAKE C. WRIGHT
06.26.2026
C-001
SITE
SPECIFICATIONS
SECTION 31 1000
SITE CLEARING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. CLEARING AND PROTECTION OF VEGETATION.
B. CLEARING AND GRUBBING.
C. STRIPPING AND STOCKPILING TOPSOIL.
D. REMOVING ABOVE- AND BELOW- GRADE SITE IMPROVEMENTS.
E. TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES.
F. REMOVAL OF EXISTING DEBRIS.
1.02 DEFINITIONS
A. TOPSOIL: NATURAL OR CULTIVATED SURFACE-SOIL LAYER CONTAINING ORGANIC MATTER
AND SAND, SILT, AND CLAY PARTICLES; FRIABLE, PERVIOUS, AND BLACK OR A DARKER
SHADE OF BROWN, GRAY, OR RED THAN UNDERLYING SUBSOIL; REASONABLY FREE OF
SUBSOIL, CLAY LUMPS, GRAVEL, AND OTHER OBJECTS MORE THAN 2 INCHES IN DIAMETER;
AND FREE OF SUBSOIL AND WEEDS, ROOTS, TOXIC MATERIALS, OR OTHER NON-SOIL
MATERIALS.
1.03 MATERIAL OWNERSHIP
A. EXCEPT FOR STRIPPED TOPSOIL OR OTHER MATERIALS INDICATED TO REMAIN OWNER'S
PROPERTY, CLEARED MATERIALS SHALL BECOME CONTRACTOR'S PROPERTY AND SHALL BE
REMOVED FROM PROJECT SITE.
1.04 SUBMITTALS
A. PHOTOGRAPHS OR VIDEOTAPE, SUFFICIENTLY DETAILED, OF EXISTING CONDITIONS OF TREES
AND PLANTINGS, ADJOINING CONSTRUCTION, AND SITE IMPROVEMENTS THAT MIGHT BE
MISCONSTRUED AS DAMAGE CAUSED BY SITE CLEARING.
C. RECORD DRAWINGS, IDENTIFYING AND ACCURATELY LOCATING CAPPED UTILITIES AND
OTHER SUBSURFACE STRUCTURAL, ELECTRICAL, AND MECHANICAL CONDITIONS.
1.05 QUALITY ASSURANCE
A. PRE-INSTALLATION CONFERENCE: CONDUCT CONFERENCE AT PROJECT SITE FOR PROJECT
MANAGEMENT AND COORDINATION.
1.06 PROJECT CONDITIONS
A. TRAFFIC: MINIMIZE INTERFERENCE WITH ADJOINING ROADS, STREETS, WALKS, AND OTHER
ADJACENT OCCUPIED OR USED FACILITIES DURING SITE-CLEARING OPERATIONS.
1. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER ADJACENT OCCUPIED OR
USED FACILITIES WITHOUT PERMISSION FROM OWNER AND AUTHORITIES HAVING
JURISDICTION.
2. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF
REQUIRED BY AUTHORITIES HAVING JURISDICTION.
B. SALVABLE IMPROVEMENTS: CAREFULLY REMOVE ITEMS INDICATED TO BE SALVAGED AND
STORE ON OWNER'S PREMISES WHERE APPROVED.
C. UTILITY LOCATOR SERVICE: NOTIFY UTILITY LOCATOR SERVICE FOR AREA WHERE PROJECT
IS LOCATED BEFORE SITE CLEARING.
D. DO NOT COMMENCE SITE CLEARING OPERATIONS UNTIL TEMPORARY EROSION AND
SEDIMENTATION CONTROL MEASURES ARE IN PLACE.
PART 2 PRODUCTS
2.01 SOIL MATERIALS
A. SATISFACTORY SOIL MATERIAL: AS SPECIFIED IN SOIL PREPARATION SECTION.
1. OBTAIN APPROVED BORROW SOIL MATERIALS OFF-SITE WHEN SATISFACTORY SOIL
MATERIALS ARE NOT AVAILABLE ON-SITE.
PART 3 EXECUTION
3.01 PREPARATION
A. PROTECT AND MAINTAIN BENCHMARKS AND SURVEY CONTROL POINTS FROM DISTURBANCE
DURING CONSTRUCTION.
B. PROTECT EXISTING SITE IMPROVEMENTS TO REMAIN FROM DAMAGE DURING
CONSTRUCTION.
1. RESTORE DAMAGED IMPROVEMENTS TO THEIR ORIGINAL CONDITION, AS ACCEPTABLE TO
OWNER.
3.02 TEMPORARY EROSION AND SEDIMENTATION CONTROL
A. PROVIDE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES TO PREVENT
SOIL EROSION AND DISCHARGE OF SOIL-BEARING WATER RUNOFF OR AIRBORNE DUST TO
ADJACENT PROPERTIES AND WALKWAYS, ACCORDING TO REQUIREMENTS OF AUTHORITIES
HAVING JURISDICTION, SEDIMENT AND EROSION CONTROL DRAWINGS, A SEDIMENT AND
EROSION CONTROL PLAN, SPECIFIC TO THE SITE, THAT COMPLIES WITH EPA 832/R-92-005
OR REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION, WHICHEVER IS MORE
STRINGENT.
B. INSPECT, REPAIR, AND MAINTAIN EROSION AND SEDIMENTATION CONTROL MEASURES
DURING CONSTRUCTION UNTIL PERMANENT VEGETATION HAS BEEN ESTABLISHED.
C. REMOVE EROSION AND SEDIMENTATION CONTROLS AND RESTORE AND STABILIZE AREAS
DISTURBED DURING REMOVAL.
3.03 SITE CLEARING AND GRUBBING
A. COMPLY WITH OTHER REQUIREMENTS SPECIFIED IN SECTION 01 7000.
B. REMOVE OBSTRUCTIONS, GRASS, AND OTHER VEGETATION TO PERMIT INSTALLATION OF
NEW CONSTRUCTION.
C. FILL DEPRESSIONS CAUSED BY CLEARING AND GRUBBING OPERATIONS WITH SATISFACTORY
SOIL MATERIAL UNLESS FURTHER EXCAVATION OR EARTHWORK IS INDICATED.
1. PLACE FILL MATERIAL IN HORIZONTAL LAYERS NOT EXCEEDING A LOOSE DEPTH OF 8
INCHES AND COMPACT EACH LAYER TO A DENSITY EQUAL TO ADJACENT ORIGINAL
GROUND.
3.04 EXISTING UTILITIES AND BUILT ELEMENTS
A. COORDINATE WORK WITH UTILITY COMPANIES; NOTIFY BEFORE STARTING WORK AND
COMPLY WITH THEIR REQUIREMENTS; OBTAIN REQUIRED PERMITS.
1. OWNER WILL ARRANGE TO SHUT OFF INDICATED UTILITIES WHEN REQUESTED BY
CONTRACTOR.
B. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE.
C. DO NOT DISRUPT PUBLIC UTILITIES WITHOUT PERMIT FROM AUTHORITY HAVING
JURISDICTION.
1. NOTIFY ARCHITECT NOT LESS THAN TWO DAYS IN ADVANCE OF PROPOSED UTILITY
INTERRUPTIONS.
2. DO NOT PROCEED WITH UTILITY INTERRUPTIONS WITHOUT ARCHITECT'S WRITTEN
PERMISSION.
D. PROTECT EXISTING STRUCTURES AND OTHER ELEMENTS THAT ARE NOT TO BE REMOVED.
3.05 TOPSOIL STRIPPING
A. REMOVE SOD AND GRASS BEFORE STRIPPING TOPSOIL.
B. STRIP TOPSOIL TO WHATEVER DEPTHS ARE ENCOUNTERED IN A MANNER TO PREVENT
INTERMINGLING WITH UNDERLYING SUBSOIL OR OTHER WASTE MATERIALS.
1. REMOVE SUBSOIL AND NON-SOIL MATERIALS FROM TOPSOIL, INCLUDING TRASH, DEBRIS,
WEEDS, ROOTS, AND OTHER WASTE MATERIALS.
C. STOCKPILE TOPSOIL MATERIALS AWAY FROM EDGE OF EXCAVATIONS WITHOUT INTERMIXING
WITH SUBSOIL. GRADE AND SHAPE STOCKPILES TO DRAIN SURFACE WATER. COVER TO
PREVENT WINDBLOWN DUST.
1. LIMIT HEIGHT OF TOPSOIL STOCKPILES TO 120 INCHES.
2. DISPOSE OF EXCESS TOPSOIL AS SPECIFIED FOR WASTE MATERIAL DISPOSAL.
3. STOCKPILE SURPLUS TOPSOIL TO ALLOW FOR RE-SPREADING DEEPER TOPSOIL.
3.06 VEGETATION
A. DO NOT REMOVE OR DAMAGE VEGETATION BEYOND THE LIMITS INDICATED ON DRAWINGS.
B. IN AREAS WHERE VEGETATION MUST BE REMOVED BUT NO CONSTRUCTION WILL OCCUR
OTHER THAN PERVIOUS PAVING, REMOVE VEGETATION WITH MINIMUM DISTURBANCE OF THE
SUBSOIL.
C. VEGETATION REMOVED: DO NOT BURN, BURY, LANDFILL, OR LEAVE ON SITE, EXCEPT AS
INDICATED.
1. TREES: TREAT AS SPECIFIED FOR OTHER VEGETATION REMOVED; REMOVE STUMPS AND
ROOTS TO DEPTH OF 18 INCHES (450 MM).
D. RESTORATION: IF VEGETATION OUTSIDE REMOVAL LIMITS OR WITHIN SPECIFIED PROTECTIVE
FENCES IS DAMAGED OR DESTROYED DUE TO SUBSEQUENT CONSTRUCTION OPERATIONS,
REPLACE AT NO COST TO OWNER.
3.07 SITE IMPROVEMENTS
A. REMOVE EXISTING ABOVE-GRADE AND BELOW-GRADE IMPROVEMENTS AS INDICATED AND AS
NECESSARY TO FACILITATE NEW CONSTRUCTION. REFER TO PROJECT PLANS FOR
IMPROVEMENTS TO BE ABANDONED IN PLACE.
B. REMOVE SLABS, PAVING, CURBS, GUTTERS, AND AGGREGATE BASE AS INDICATED.
1. UNLESS EXISTING FULL-DEPTH JOINTS COINCIDE WITH LINE OF DEMOLITION, NEATLY
SAW-CUT LENGTH OF EXISTING PAVEMENT TO REMAIN BEFORE REMOVING EXISTING
PAVEMENT. SAW-CUT FACES VERTICALLY.
2. PAINT CUT ENDS OF STEEL REINFORCEMENT IN CONCRETE TO REMAIN TO PREVENT
CORROSION.
3.08 DEBRIS
A. REMOVE DEBRIS, JUNK, AND TRASH FROM SITE.
B. LEAVE SITE IN CLEAN CONDITION, READY FOR SUBSEQUENT WORK.
C. CLEAN UP SPILLAGE AND WIND-BLOWN DEBRIS FROM PUBLIC AND PRIVATE LANDS.
3.09 DISPOSAL
A. REMOVE SURPLUS SOIL MATERIAL, UNSUITABLE TOPSOIL, OBSTRUCTIONS, DEMOLISHED
MATERIALS, AND WASTE MATERIALS INCLUDING TRASH AND DEBRIS, AND LEGALLY DISPOSE
OF THEM OFF OWNER'S PROPERTY.
1. SEPARATE RECYCLABLE MATERIALS PRODUCED DURING SITE CLEARING FROM OTHER
NON-RECYCLABLE MATERIALS. STORE OR STOCKPILE WITHOUT INTERMIXING WITH
OTHER MATERIALS AND TRANSPORT THEM TO RECYCLING FACILITIES.
END OF SECTION
SECTION 31 2300
EARTHWORK
PART 1 GENERAL
1.01 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND
SUPPLEMENTARY CONDITIONS AND DIVISION 1 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.02 SUMMARY
A. THIS SECTION INCLUDES THE FOLLOWING:
1. PREPARING SUBGRADES FOR SLABS-ON-GRADE, WALKS, PAVEMENTS, LAWNS, AND
PLANTINGS.
2. EXCAVATING AND BACKFILLING FOR BUILDINGS AND STRUCTURES.
3. DRAINAGE COURSE FOR SLABS-ON-GRADE.
4. SUBBASE COURSE FOR CONCRETE WALKS AND PAVEMENTS.
5. BASE COURSE FOR ASPHALT PAVING.
6. SUBSURFACE DRAINAGE BACKFILL FOR WALLS AND TRENCHES.
B. RELATED SECTIONS INCLUDE THE FOLLOWING:
1. DIVISION 2 SECTION 02 4119 "SELECTIVE SITE DEMOLITION" FOR TEMPORARY CONTROLS
AND SITE STRIPPING, GRUBBING, REMOVING TOPSOIL, AND PROTECTING TREES TO
REMAIN.
1.03 DEFINITIONS
A. BACKFILL: SOIL MATERIALS USED TO FILL AN EXCAVATION.
1. INITIAL BACKFILL: BACKFILL PLACED BESIDE AND OVER PIPE IN A TRENCH, INCLUDING
HAUNCHES TO SUPPORT SIDES OF PIPE.
2. FINAL BACKFILL: BACKFILL PLACED OVER INITIAL BACKFILL TO FILL A TRENCH.
B. BASE COURSE: LAYER PLACED BETWEEN THE SUBBASE COURSE AND ASPHALT PAVING.
C. BEDDING COURSE: LAYER PLACED OVER THE EXCAVATED SUBGRADE IN A TRENCH BEFORE
LAYING PIPE.
D. BORROW: SATISFACTORY SOIL IMPORTED FROM OFF-SITE FOR USE AS FILL OR BACKFILL.
E. EXCAVATION: REMOVAL OF MATERIAL ENCOUNTERED ABOVE SUBGRADE ELEVATIONS.
1. BULK EXCAVATION: EXCAVATIONS MORE THAN 10 FEET (3 M) IN WIDTH AND PITS MORE
THAN 30 FEET (9 M) IN EITHER LENGTH OR WIDTH.
2. UNAUTHORIZED EXCAVATION: EXCAVATION BELOW SUBGRADE ELEVATIONS OR BEYOND
INDICATED DIMENSIONS WITHOUT DIRECTION BY ARCHITECT. UNAUTHORIZED
EXCAVATION, AS WELL AS REMEDIAL WORK DIRECTED BY ARCHITECT, SHALL BE
WITHOUT ADDITIONAL COMPENSATION.
F. FILL: SOIL MATERIALS USED TO RAISE EXISTING GRADES.
G. STRUCTURES: BUILDINGS, FOOTINGS, FOUNDATIONS, RETAINING WALLS, SLABS, TANKS,
CURBS, MECHANICAL AND ELECTRICAL APPURTENANCES, OR OTHER MAN-MADE
STATIONARY FEATURES CONSTRUCTED ABOVE OR BELOW THE GROUND SURFACE.
H. SUBBASE COURSE: LAYER PLACED BETWEEN THE SUBGRADE AND BASE COURSE FOR
ASPHALT PAVING, OR LAYER PLACED BETWEEN THE SUBGRADE AND A CONCRETE
PAVEMENT OR WALK.
I. SUBGRADE: SURFACE OR ELEVATION REMAINING AFTER COMPLETING EXCAVATION, OR TOP
SURFACE OF A FILL OR BACKFILL IMMEDIATELY BELOW SUBBASE, DRAINAGE FILL, OR
TOPSOIL MATERIALS.
J. UTILITIES: UTILITIES INCLUDE ON-SITE UNDERGROUND PIPES, CONDUITS, DUCTS, AND
CABLES, AS WELL AS UNDERGROUND SERVICES WITHIN BUILDINGS.
1.04 SUBMITTALS
A. MATERIAL TEST REPORTS: FROM A QUALIFIED TESTING AGENCY INDICATING AND
INTERPRETING TEST RESULTS FOR COMPLIANCE OF THE FOLLOWING WITH REQUIREMENTS
INDICATED:
1. CLASSIFICATION ACCORDING TO ASTM D 2487 OF EACH ON-SITE OR BORROW SOIL
MATERIAL PROPOSED FOR FILL AND BACKFILL.
2. LABORATORY COMPACTION CURVE ACCORDING TO ASTM D 1557 FOR EACH ON-SITE OR
BORROW SOIL MATERIAL PROPOSED FOR FILL AND BACKFILL.
1.05 PROJECT CONDITIONS
A. NO ADDITIONAL MONIES FOR EXPORTING OR IMPORTING OF SOIL.
1. AS PART OF THE CONSTRUCTION DOCUMENTS, OWNER MAY HAVE PROVIDED
CONTRACTOR WITH A TOPOGRAPHIC SURVEY PERFORMED BY MANUAL OR AERIAL
MEANS. SUCH SURVEY WAS PREPARED FOR PROJECT DESIGN PURPOSES AND IS
PROVIDED TO THE CONTRACTOR AS A COURTESY. IT IS EXPRESSLY UNDERSTOOD THAT
SUCH SURVEY MAY NOT ACCURATELY REFLECT EXISTING TOPOGRAPHICAL CONDITIONS
AND TYPICALLY WILL VARY FROM ACTUAL CONDITIONS BY A SIGNIFICANT DEGREE. IT IS
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ACTUAL EXISTING CONDITIONS BY
WHATEVER MEANS THE CONTRACTOR DEEMS APPROPRIATE. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR DETERMINING THEIR OWN EARTHWORK QUANTITIES AND NOT RELY
ON ANY ESTIMATE PREPARED BY THE OWNER, ITS AGENTS OR OUTSIDE PARTIES. THE
CONTRACTOR IS RESPONSIBLE AS PART OF ITS LUMP SUM BID PRICE FOR THE PROJECT,
FOR IMPORTING OR EXPORTING SOILS TO ACHIEVE FINAL SUB-GRADES WITH SUITABLE
SOILS PER THE PLANS AND SPECIFICATIONS. NO ADDITIONAL MONIES WILL BE ALLOWED
BEYOND THE CONTRACTOR'S LUMP SUM BID PRICE FOR THE PROJECT, FOR THE
EXPORTING OR IMPORTING OF SOILS.
B. EXISTING UTILITIES: LOCATE EXISTING UNDERGROUND UTILITIES IN AREAS OF WORK. IF
UTILITIES ARE TO REMAIN IN PLACE, PROVIDE ADEQUATE MEANS OF SUPPORT AND
PROTECTION DURING EARTHWORK OPERATIONS.
1. SHOULD UNCHARTED, OR INCORRECTLY CHARTED, PIPING OR OTHER UTILITIES BE
ENCOUNTERED DURING EXCAVATION, CONSULT UTILITY OWNER IMMEDIATELY FOR
DIRECTIONS. COOPERATE WITH OWNER AND UTILITY COMPANIES IN KEEPING
RESPECTIVE SERVICES AND FACILITIES IN OPERATION. REPAIR DAMAGED UTILITIES TO
SATISFACTION OF UTILITY OWNER.
2. DO NOT INTERRUPT UTILITIES SERVING FACILITIES OCCUPIED BY OWNER OR OTHERS
UNLESS PERMITTED IN WRITING BY ARCHITECT AND THEN ONLY AFTER ARRANGING TO
PROVIDE TEMPORARY UTILITY SERVICES ACCORDING TO REQUIREMENTS INDICATED:
3. NOTIFY ARCHITECT NOT LESS THAN SEVEN (7) DAYS IN ADVANCE OF PROPOSED UTILITY
INTERRUPTIONS.
4. DO NOT PROCEED WITH UTILITY INTERRUPTIONS WITHOUT ARCHITECT'S WRITTEN
PERMISSION.
5. CONTACT UTILITY-LOCATOR SERVICE FOR AREA WHERE PROJECT IS LOCATED BEFORE
EXCAVATING.
C. PROTECTION OF PERSONS AND PROPERTY: BARRICADE OPEN EXCAVATIONS OCCURRING AS
PART OF THIS WORK AND POST WITH WARNING LIGHTS.
1. OPERATE WARNING LIGHTS AS RECOMMENDED BY AUTHORITIES HAVING JURISDICTION.
PART 2 PRODUCTS
2.01 SOIL MATERIALS
A. GENERAL: PROVIDE BORROW SOIL MATERIALS WHEN SUFFICIENT SATISFACTORY SOIL
MATERIALS ARE NOT AVAILABLE FROM EXCAVATIONS.
B. SATISFACTORY SOILS: ASTM D 2487 SOIL CLASSIFICATION GROUPS GW, GP, GM, SW, SP, AND SM, OR A COMBINATION OF THESE GROUP SYMBOLS; FREE OF ROCK OR GRAVEL
LARGER THAN 4 INCHES (100 MM) IN ANY DIMENSION, DEBRIS, WASTE, FROZEN MATERIALS,
VEGETATION, AND OTHER DELETERIOUS MATTER.
C. UNSATISFACTORY SOILS: ASTM D 2487 SOIL CLASSIFICATION GROUPS GC, SC, ML, MH, CL, CH, OL, OH, AND PT, OR A COMBINATION OF THESE GROUP SYMBOLS.
1. UNSATISFACTORY SOILS ALSO INCLUDE SATISFACTORY SOILS NOT MAINTAINED WITHIN 2
PERCENT OF OPTIMUM MOISTURE CONTENT AT TIME OF COMPACTION.
D. BACKFILL AND FILL: SATISFACTORY SOIL MATERIALS.
E. SUBBASE: NATURALLY OR ARTIFICIALLY WELL GRADED MIXTURE OF NATURAL OR CRUSHED
GRAVEL, CRUSHED STONE, AND NATURAL OR CRUSHED SAND; ASTM D 2940; WITH AT LEAST
70 PERCENT PASSING A 3/4- INCH (18-MM) SIEVE AND NOT MORE THAN 25 PERCENT
PASSING A NO. 200 (0.075-MM) SIEVE.
F. BASE COURSE: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR CRUSHED
GRAVEL, CRUSHED STONE, AND NATURAL OR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .