4-2-CS27002-27079310-Approved Plans.pdf
PDF 10 MB Posted
- Solicitation number
- CS27002
- Issued by
- Utah
About this file
This is an Approved Plans document for the State of Utah Division of Facilities Construction and Management (DFCM) related to a Stage II Invitation to Bid for the Ogden Regional Center Sewer Ejection Pump replacement project. The project involves replacing the sewer ejection pumps at the facility, with a construction cost estimate of $95,000.00. This is a prequalified contractor solicitation, meaning only contractors who have successfully completed Stage I Prequalification for Contractors and appear on the current DFCM Prequalified Contractors list as of the solicitation date are eligible to submit bids. The approved plans document serves as the technical specification reference for bidders preparing their proposals and cost estimates for the mechanical work required.
The plans provide the detailed design and construction specifications necessary for contractors to accurately bid on the sewer ejection pump replacement work. As a Stage II solicitation restricted to prequalified contractors, this project limits competition to those who have already demonstrated qualifications and financial stability through the DFCM prequalification process. The approved plans ensure all eligible bidders are working from the same technical standards and specifications, promoting fair and competitive bidding among qualified mechanical contractors capable of executing the scope of work within the estimated budget.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
North: ______ South: ______ East: ______ West: ______
d) Unlimited Area Building: Yes ______ No ______ Code Section: ______ a a
3) Three Story: A (3)______
2) Two Story: A (2)______
1) One Story: ______
c) Total Allowable Area for:
1_< Allowable Area
Actual Area
b) Sum of the Ratio Calculations for Mixed Occupancies:
a) 0.25I = 100f
F
P 30
WstA I
100100 fIA t taA = A + +
Official for Complex Buildings. Including, but not limited to:
g) Fire Stopping, Including Tested Design Number.
f) Exterior and Interior Accessibility Route.
e) Fire Assembly Locator Sheet.
a) High Rise Requirements.
b) Atriums.
c) Performance Based Criteria.
d) Means or Egress Analysis.
2) Additional Code Information shall be provided at the discretion of the Building
Code Accessibility Chapters, the more restrictive requirement shall govern.
through - ADA Guidelines and specific reference to the International Building
1) In case of conflict with the U.S. Department of Justice Federal Registers Parts
FOOTNOTES:
d) Drinking Fountains: ______ Service Sinks: ______
c) Bath Tubs or Showers: ______
b) Lavatories - Required (m) ______ (f) ______ Provided (m) ______ (f) ______
a) Water Closets - Required (m) ______ (f) ______ Provided (m) ______ (f) _____
M. Minimum Number of Required Plumbing Facilities:
Exit Width Required: ______ Exit Width Provided: ______
Element Hours Assembly
ListingListing Element
Assembly Hours
Smoke Partitions
Fire Partitions
Exterior Bearing Walls
Interior Bearing Walls
Exterior Non-Bearing Walls
Structural Frame
Partitions - Permanent
Fire Barriers
Floors - Ceiling Floors
Roofs - Ceiling Roofs
Exterior Doors and Windows
Shaft Enclosures
Fire Walls
BAHTBABABA
L. Design Occupant Load: ______
K. Fire Resistance Rating Requirements for Building Elements (hours).
Area Modifications:J:
____________________________________________Tabular Area:I:
per Floor (square feet): __________________________Actual AreaH:
Number of Stories: ______ Building Height: ______G:
Required: ______ Provided: ______ Type of Sprinkler System: ____________
Sprinklers:F:
Mixed Occupancies: ______ Nonseparated Uses: ______E.
separation distance (in hours):
Requirements for the Exterior Walls based on the fireFire Resistance RatingD.
Special Use and Occupancy (e.g. High Rise, Covered Mall): __________________
Design Wind Speed: ______ mphB. Seismic Design Category: ______
C. Type of Construction (circle one):
Change in Use: Yes ______ No ______ Mixed Occupancy: Yes ______ No ______
A. Occupancy and Group: ________ ________ ________ ________ ________
CODE ANALYSIS
Guidelines
ADA Accessibility
Building Conservation
Uniform Code for
National Electrical Code
Conservation Code
International Energy
International Fire Code
International Plumbing Code
International Mechanical Code
International Building Code
YearYear
APPLICABLE CODES
IND
USTRY
OGDEN REGIONAL CENTER -
SEWER EJECTION PUMP
REPLACEMENT
DFCM# 27079310
2532 WASHINGTON BLVD,
OGDEN, UT 84401
DESIGN CRITERIA:
THESE DOCUMENTS - DRAWINGS AND SPECIFICATIONS
COMPLY WITH ALL THE REQUIREMENTS OF THE DFCM
STANDARDS FOR MECHANICAL UPGRADES OF EXISTING
BUILDING.
CODE INSPECTION REQUIREMENTS:
1. BEFORE A FINAL ACCEPTANCE CAN BE ISSUED, THE
STATE APPOINTED CODE INSPECTOR SHALL PROVIDE A
FINAL REPORT RECOMMENDING THAT THE NEW
MECHANICAL WORK IS IN COMPLIANCE WITH THE
DRAWINGS, SPECIFICATIONS AND APPLICABLE CODES
ESPECIALLY FOR THE FOLLOWING ITEMS.
2. SEE ALSO SHEET G002.
CODE REVIEW STAMP
SCOPE:
• REMOVE AND REPLACE EXISTING
SEWER EJECTION PUMPS.
• REMOVE AND REPLACE STARTER AND
DISCONNECTS FOR EACH PUMP.
GENERAL:
G001 - TITLE SHEET
G002 - SPECIAL INSTRUCTIONS AND TESTING
MECHANICAL:
MG001 - MECHANICAL LEGEND AND GENERAL NOTES
ME101 - BASEMENT LEVEL - MECHANICAL FLOOR PLANS
ME501 - MECHANICAL DETAILS AND SCHEDULES
DRAWING INDEX:
DEFERRED SUBMITTALS : SEISMIC
SPECIAL INSPECTIONS:
1. SEE SHEET DRAWING G002.
N/A
N/A
N/A
X X
N/A N/A
N/A N/A N/A N/A
N/A N/A
N/A N/A
7 111'
107,326
B
G001
20232021
T H E
G R E A T
S E
A L
OF THE
S
T A T E
O F
U T A H
State of Utah-Department of Administrative Services
DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT
4315 South 2700 West, Floor 3/Taylorsville, Utah 84129-2128
WORK SITE
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
06/24/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
THOMAS PETERSON
07/02/2026
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
H W
N G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A D
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
06/24/2026DD
CL
06/24/2026
26060
CL
SPECIAL
INSPECTIONS AND
TESTING FORM
G002
OGDEN REGIONAL
CENTER SEWER
EJECTION PUMP
REPLACEMENT
DFCM#27079310
2532 Washington Blvd, Ogden, UT 84401
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
M
M
P
T
S
PS
F
MECHANICAL LEGEND
SYMBOL ABR, DESCRIPTION
GENERAL TERMINOLOGY
A
ME101
SECTION LETTER DESIGNATION
SECTION DRAWN ON THIS SHEET
A2
AH
DETAIL NUMBER DESIGNATION
CORRESPONDING WITH GRID
LOCATION
MECHANICAL EQUIPMENT DESIGNATION
EQUIPMENT ITEM DESIGNATION
REGISTER, GRILLE OR DIFFUSER
DESIGNATION WITH BALANCING CFM
LISTED BELOW
D-1
CFM
GRILLE OR LOUVER DESIGNATION
WHERE BALANCING NOT REQUIREDR-1
REVISION DESIGNATOR AND NUMBER
KEY NOTE DESIGNATOR AND NUMBER
POINT OF CONNECTION
POINT OF REMOVAL
ABOVE FINISHED FLOOR
ACCESS PANEL
CENTERLINE ELEVATION
GENERAL CONTRACTOR
AFF
AP
POC
POR
C EL.
GC
MECHANICAL CONTRACTORMC
CONTROLS CONTRACTORATC
ELECTRICAL CONTRACTOREC
FIRE PROTECTION CONTRACTORFPC
NOT IN CONTRACTNIC
NOT TO SCALENTS
VITRIFIED CLAY PIPEVCP
NORMALLY CLOSEDNC
COMMONC
NORMALLY OPENNO
SYMBOL ABR, DESCRIPTION
WET SIDE
PUMP
REGULATOR
UNION
MANUAL ACTUATOR
PNUEMATIC DIAPHRAM ACTUATOR
ELECTRIC MOTOR ACTUATOR
SOLENOID ACTUATOR
BUTTERFLY VALVE
GATE VALVE
GLOBE VALVE - STRAIGHT PATTERN
GLOBE VALVE - ANGLE PATTERN
MOTORIZED 2-WAY CONTROL VALVE
MOTORIZED 3-WAY CONTROL VALVE
CHECK VALVE
CIRCUIT BALANCING VALVE
BALL VALVE
PRESSURE RELIEF VALVE
THERMAL RELIEF VALVE
SAFETY RELIEF VALVE
PLUG VALVE
NEEDLE VALVE
TRIPLE DUTY VALVE
AUTOMATIC AIR VENT
MANUAL AIR VENT
STRAINER
STRAINER W/ PLUG BLOW OFF
VENTURI
PRESSURE GAUGE W/ COCK - WATER
PRESSURE GAUGE W/ COCK - STEAM
THERMOMETER & THERMOWELL
WATER TEMP SENSOR & THERMOWELL
FLOW SWITCH
PRESSURE SWITCH
THERMOWELL
PRESSURE & TEMP TAP
DIRECTION OF FLOW
BACKFLOW PREVENTING VALVE
SYMBOL ABR, DESCRIPTION
WET SIDE
PITCH DOWN
ELBOW UP/DN
TEE UP/DN
EXISTING PIPING TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
PIPE CAP OR PLUG
REDUCER - CONCENTRIC / ECCENTRIC
EXPANSION JOINT
FLEXIBLE CONNECTION
ANCHOR POINT
CONDENSATE DRAIN
NATURAL GAS PIPING
CHEMICAL FEED LINE
MAKE-UP WATER LINE
CULINARY COLD WATER
CULINARY HOT WATER
CULINARY HOT WATER RECIRC
CD
G
CF
MU
CW
HW
HWREC
GLYCOL FILL LINEGF
R
M
S
PRESSURE REDUCING VALVEPRV
S
VENT LINEV
SANITARY SEWERSS
GENERAL NOTES
G-1 - MECHANICAL INFORMATION IS NOT LIMITED TO THE MECHANICAL
DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMATION OF THE
EXISTING BUILDING AND SITE CONDITIONS, EXISTING PIPING, EXISTING
ELECTRICAL, AND EXISTING SUPPORTS.
A - EACH DRAWING SHEET AND THE SPECIFICATIONS HAVE BEEN PREPARED TO
SUPPLEMENT EACH OTHER AND THEY SHALL BE INTERPRETED AS AN INTEGRAL
UNIT WITH ITEMS SHOWN AND NOTED ON ONE AND NOT THE OTHER BEING
FURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLED OUT IN ALL
PLACES. ITEMS IN SPECIFICATIONS OR DRAWINGS LISTED WHICH ARE DIFFERING
IN EFFICIENCY OR QUALITY SHALL BE HELD TO THE GREATEST OF: EFFICIENCY,
QUALITY OR GOVERNING CODE.
B - THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE INSTALLATION OF
THE SYSTEMS ACCORDING TO THE TRUE INTENT AND MEANING OF THE
CONTRACT DOCUMENTS.
C - THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT WITH PROPER SERVICE
ACCESS AND CLEARANCES ACCORDING TO MANUFACTURERS
RECOMMENDATIONS. THE CONTRACTOR SHALL REVIEW SUPPLIERS BID
PACKAGES FOR COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS,
SCHEDULES, AND DESIGN INTENT (ALL EQUIPMENT AND METHODS). THE
CONTRACTOR SHALL REMOVE AND REINSTALL CORRECTLY AT HIS OWN
EXPENSE ANY EQUIPMENT NOT IN COMPLIANCE.
D - THE CONTRACTOR SHALL CONSULT MANUFACTURERS INSTALLATION
INSTRUCTIONS FOR SIZES, METHODS, ACCESSORIES, AND CLEARANCES IN
SPACE AVAILABLE PRIOR TO BIDDING PROJECT.
E - ANYTHING NOT CLEAR OR IN CONFLICT WILL BE EXPLAINED BY MAKING
APPLICATION TO THE ENGINEER IN WRITING.
G-2 - ANY AND ALL ALTERATIONS TO THE SYSTEM SHOWN SHALL BE SUBMITTED
TO THE ENGINEER PRIOR TO CHANGES FOR APPROVAL. CONTRACTOR SHALL
NOT START ANY CHANGES UNTIL NOTIFIED IN WRITING. IF CHANGES ARE MADE
PRIOR TO APPROVAL CONTRACTOR SHALL TAKE ALL RESPONSIBILITY FOR THE
CHANGES MADE AND ALL COSTS RELATING TO FAILURE OR REPLACEMENT OF
ALTERATIONS.
G-3 - CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LOCATIONS.
G-4 - THE WORKING DRAWINGS ARE DIAGRAMMATIC. THEY DO NOT SHOW EVERY
OFFSET, BEND, OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION IN
THE SPACE PROVIDED. ALL LOCATIONS FOR MECHANICAL EQUIPMENT SHALL BE
FIELD VERIFIED AND COORDINATED WITH ALL DRAWINGS. THE CONTRACTOR
SHALL PROVIDE OR COORDINATE WITH THE GENERAL CONTRACTOR PROVISIONS
FOR BLOCKOUTS OR CORE DRILLS THROUGH STRUCTURE.
G-5 - THE INSTRUCTION TO "PROVIDE" ALSO INCLUDES INSTALLATION.
G-6 - MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL SMOKE AND FIRE
DAMPERS AS REQUIRED BY LOCAL CODES AND AUTHORITIES.
G-7 - SHEET METAL DUCT SIZES SHOWN ON DRAWINGS ARE FREE AREA
DIMENSIONS.
G-8 - PROVIDE AND INSTALL BALANCING DAMPERS IN ALL SUPPLY AND EXHAUST
AIR BRANCH DUCTS. BALANCE TO CFM SHOWN ON PLAN.
G-9 - SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF
DIFFUSERS AND GRILLES.
G-10 - PROVIDE TURNING VANES IN ALL ELBOWS OF RECTANGULAR DUCT.
G-11 - THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY IN HANDLING AND
DISPOSING OF REFRIGERANTS, OILS, ETC. ALL SUCH MATERIALS SHALL BE
HANDLED, DISPOSED, AND USED IN ACCORDANCE WITH ALL LOCAL, STATE, AND
FEDERAL LAWS.
G-12 - THE MECHANICAL CONTRACTOR SHALL VERIFY MOTOR VOLTAGES WITH
THE ELECTRICAL DRAWING BEFORE ORDERING MOTORIZED EQUIPMENT AND
CONTROLS.
G-13 - C.F.M. LISTED IS ACTUAL AIR.
G-14 - SUPPLIERS SHALL REVIEW ALL DRAWINGS AND THE SPECIFICATIONS
PRIOR TO SUBMITTING PRICES TO THE CONTRACTOR. ALL QUESTIONS AND
DISCREPANCIES SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO
BIDDING.
G-15 - CONTRACTOR SHALL THOROUGHLY REVIEW AND SIGN SUBMITTALS FOR
COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS PRIOR TO
ENGINEERS REVIEW. SUPPLIERS SHALL HIGHLIGHT OR MARK ALL INFORMATION
REQUIRED TO SHOW COMPLIANCE TO THE SPECIFICATIONS. ALL REQUESTED
EXCEPTIONS TO THE SPECIFICATIONS, OR SCHEDULES SHALL BE CLEARLY
NOTED AND EXPLAINED. SUBMITTAL REVIEW AND ACCEPTANCE IS FOR DESIGN
CONCEPT ONLY, AND DOES NOT AT ANY TIME RELIEVE THE CONTRACTOR OF
RESPONSIBILITY TO MEET SPECIFICATIONS, CAPACITIES, OR DESIGN INTENT.
G-16 - ALL MECHANICAL SHALL BE INSTALLED AND CONFORM TO THE 2021
EDITION OF THE IMC AND IPC WITH UTAH ANNOTATIONS AND LOCAL AUTHORITY
REQUIREMENTS.
G-17 - THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE DRAINING DOWN AND
RE-FILLING OF ALL SYSTEMS NECESSARY TO COMPLETE THE WORK OUTLINED BY
THIS PROJECT. THIS INCLUDES PROVIDING THE REQUIRED CHEMICAL
TREATMENT WHEN RE-FILLING THE SYSTEM.
G-18 - ALL PIPING, MATERIALS, ETC. SHALL BE NEW AND DOMESTIC MADE UNLESS
SPECIFICALLY AUTHORIZED IN WRITING PRIOR TO BID.
G-19 - THIS CONTRACTOR SHALL CONTRACT WITH A DESIGN BUILD ELECTRICAL
CONTRACTOR FOR THE DESIGN AND CONSTRUCTION OF THE ELECTRICAL
PORTION OF THIS PROJECT. ELECTRICAL INSTALLATION AND DESIGN SHALL BE
PER 2023 NEC.
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
06/24/2026DD
CL
06/24/2026
26060
CL
MECHANICAL
LEGEND AND
GENERAL NOTES
MG001
OGDEN REGIONAL
CENTER SEWER
EJECTION PUMP
REPLACEMENT
DFCM#27079310
2532 Washington Blvd, Ogden, UT 84401
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
BASEMENT
86' -
6"BASEMENT
86' - 6"
1 1
4"ø (E) 4"ø (E)
4 4
6 6
7 7
SP
SP
SP
SP
3"ø (E)
4"ø (E)
3"ø (E) 3"ø (E)
4"ø (E)
3"ø (E)
4"ø (E)
5 TYP.
SP
SP
SP
SP
6TYP. 4
3"ø (E)
3"ø
3"ø
3"ø
3"ø (E)
3"ø (E)
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
06/24/2026DD
CL
06/24/2026
26060
CL
BASEMENT LEVEL -
MECHANICAL FLOOR
PLANS
ME101
OGDEN REGIONAL
CENTER SEWER
EJECTION PUMP
REPLACEMENT
DFCM#27079310
2532 Washington Blvd, Ogden, UT 84401
1/2" = 1'-0"
BASEMENT LEVEL - MECHANICAL
DEMOLITION PLAN
1/2" = 1'-0"
BASEMENT LEVEL - MECHANICAL
FLOORPLAN
KEY PLAN - BASEMENT
BASEMENT LEVEL ISOMETRIC VIEW -
DEMOLITION
BASEMENT LEVEL ISOMETRIC VIEW -
FLOORPLAN
0'
SCALE : 1/2" = 1'-0"
2'1' 6'4' 0'
SCALE : 1/2" = 1'-0"
2'1' 6'4'
GENERAL NOTES:
1. CONTRACTOR SHALL CONFIRM EXISTING MECHANICAL, STRUCTURAL,
ELECTRICAL AND ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT
LIMITED TO: EXISTING ROUTING AND LOCATION OF DUCTWORK, PIPING,
ELECTRICAL, AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL FIELD
VERIFY ANY POTENTIAL CONFLICTS BETWEEN NEW MECHANICAL
ELEMENTS AND EXISTING CONDITIONS PRIOR TO BEGINNING
FABRICATION OR ORDERING NEW EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION BETWEEN
SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE COORDINATION
BETWEEN SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS AND
FACILITIES, SUB-TIER CONTRACTORS AND ARCHITECT/ENGINEER, ETC.
3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE
BROKEN DOWN TO FIT THROUGH EXISTING DOOR, OPENINGS, AND
HATCHES. CONFIRM EXACT SCOPE OF DEMOLITION AND REMOVAL
PATH. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE
TO BUILDING DURING REMOVAL OF EQUIPMENT AND MATERIAL.
4. CONTRACTOR SHALL COORDINATE WITH DFCM PROVIDED HAZMAT
REPORT PRIOR TO THE DEMOLITION OF ANY EQUIPMENT, DUCTWORK,
DUCT INSULATION, PIPING, PIPE INSULATION, ETC.
5. PROVIDE NEW COLOR COORDINATED PIPING LABELS WITH FLOW
DIRECTION ON ALL NEW PIPING. COORDINATE WITH OWNER FOR
PREFERRED COLOR FOR EACH PIPING TYPE PRIOR TO ORDERING.
6. PROVIDE A FULL TEST AND BALANCE REPORT OF ALL
IMPACTED SYSTEMS BY A LICENSED AND APPROVED TEST
AND BALANCE CONTRACTOR.
7. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN BUILD
ELECTRICIAN TO CONFIRM ELECTRICAL CONDITIONS. DESIGN BUILD
CONTRACTOR SHALL PROVIDE ANY NEW WIRING, CIRCUIT BREAKERS,
PANELS, SWITCH GEAR, AND ALL NECESSARY ELECTRICAL
ACCOMMODATIONS FOR ANY NEW OR RE-LOCATED MECHANICAL
EQUIPMENT. CONTRACTOR SHALL COORDINATE THE DEMOLITION AND
REMOVAL OF ANY ELECTRICAL ELEMENTS ASSOCIATED WITH EXISTING
MECHANICAL EQUIPMENT BEING REMOVED. ALL ABANDONED PIPING
AND WIRING SHALL BE REMOVED BACK TO PANEL UNLESS OTHERWISE
APPROVED. ELECTRICIAN SHALL FIELD VERIFY AND CONFIRM
ELECTRICAL SCOPE AND EXISTING CONDITIONS PRIOR TO ANY
DEMOLITION WORK AND ORDERING ANY NEW MECHANICAL
EQUIPMENT.
SHEET NOTES
1 REMOVE EXISTING EJECTION SEWER PUMP IN THIS APPROXIMATE
LOCATION. REMOVE EXISTING METAL PLATE SUMP COVER.
REMOVE ALL CONTROLS AND ELECTRICAL RELATED ITEMS.
2 REMOVE EXISTING SANITARY SEWER PIPE BACK TO THIS
APPROXIMATE LOCATION. FIELD VERIFY EXACT ROUTING AND
POINTS OF REMOVAL. SEE ISOMETRIC VIEW FOR DETAIL.
3 DOMESTIC WATER, HEATING WATER, FIRE SYSTEM, AND VENT PIPE
ARE NOT IN SCOPE. CONTRACTOR SHALL CONFIRM ALL EXISTING
CONDITIONS PRIOR TO PERFORMING ANY WORK.
4 PROVIDE NEW EJECTION SEWER PUMP IN THIS APPROXIMATE
LOCATION. PROVIDE NEW METAL PLATE SUMP COVER. PROVIDE
ALL NEW CONTROLS AND TIE INTO EXISTING BMS FOR STATUS AND
MONITORING. PROVIDE ALL NEW ELECTRICAL ACCOMODATIONS
FOR A FULLY FUNCTIONING SYSTEM. COORDINATE WITH DESIGN
BUILD ELECTRICIAN. CONTRACTOR SHALL CONFIRM ALL EXISTING
CONDITIONS PRIOR TO PERFORMING ANY WORK. INSTALL PER
MANUFACTURER'S RECOMMENDATIONS. SEE DETAILS.
5 REMOVE AND REPLACE EXISTING STARTER AND DISCONNECT IN
THIS APPROXIMATE LOCATION.
6 PROVIDE NEW COMBINATION PUMP STARTER/FUSED-DISCONNECT
IN THIS APPROXIMATE LOCATION. PROVIDE WITH HAND/OFF/AUTO
AND RUN-INDICATOR LIGHT. COORDINATE WITH DESIGN BUILD
ELECTRICIAN TO PROVIDE ALL ELECTRICAL ACCOMODATIONS
NEEDED.
7 TIE INTO EXISTING SANITARY SEWER PIPE IN THIS APPROXIMATE
LOCATION. FIELD VERIFY EXACT ROUTING AND POINTS OF
CONNECTION. SEE ISOMETRIC VIEW FOR DETAIL.
8 REMOVE EXISTING VENT PIPE BACK TO THIS APPROXIMATE
LOCATION. FIELD VERIFY EXACT ROUTING AND POINTS OF
REMOVAL. SEE ISOMETRIC VIEW FOR DETAIL.
9 TIE INTO EXISTING VENT PIPE IN THIS APPROXIMATE LOCATION.
FIELD VERIFY EXACT ROUTING AND POINTS OF CONNECTION. SEE
ISOMETRIC VIEW FOR DETAIL.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
PIPE HANGER DETAIL
2SEWAGE PUMP DETAIL
CLEVIS HANGER
SINGLE HORIZONTAL RUN
WITHOUT INSULATION
CLEVIS HANGER
NOTE:
PROVIDE WITH VAPOR BARRIER
ON CHILLED WATER AND
DOMESTIC COLD WATER PIPING
HANGER
BOLT UNISTRUT TO EXISTING
WALL AND CONCRETE USING
EXPANSION ANCHOR BOLTS
MOUNT PIPING TO UNISTRUT
CALCIUM SILICATE
BLOCK
PROVIDE PIPE CLAMPS
WITH BOLTS AND NUTS
16 GA. ZINC COATED SHEET STEEL
SHIELD AT LEAST 12" LONG (TYP)
CALCIUM SILICATE
BLOCK
INSULATION WITH OR WITHOUT
VAPOR BARRIER
ATTACH TO ROOM
OVERHEAD STRUCTURE
SPRING TYPE ISOLATOR
FOR INSTALLATION NEAR
HOT WATER PUMPS
ATTACH TO EXISTING
CEILING
HANGER ROD
HEAVY DUTY
CLEVIS HANGER
PIPE
HANGER ROD
HEAVY DUTY
CLEVIS HANGER
SUPPORT NUT
LOCKING NUT
INSULATION
LOCKING NUT
SUPPORT NUT
PIPE
16 GAGE ZINC COATED
SHEET STEEL SHIELD
AT LEAST 12" LONG.
CALCIUM SILICATE BLOCK
SCALE: NONE
SCALE: NONE
SEE PUMP SCHEDULE
FOR CAPACITIES
VENT PIPE
ISOLATION VALVE
FLANGE
CHECK VALVE
FLOOR
NEW METAL PLATE
SUMP COVER
EXISTING CAST
IRON RECEIVING
PIT
EXISTING CONCRETE
PIT FOR PUMP
FLOAT
EXISTING
SEWER
INLET
1. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.
2. ALL PUMPS SHALL BE SIZED IN THE MOST EFFICIENT PART OF THE CURVE.
3. PROVIDE NEW COMBINATION STARTER DISCONNECT WITH RUN INDICATOR LIGHTS AND HAND/OFF/AUTO FUNCTION.
4. TIE INTO EXISTING BUILDING AUTOMATION SYSTEM.
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
06/24/2026DD
CL
06/24/2026
26060
CL
MECHANICAL
DETAILS AND
SCHEDULES
ME501
OGDEN REGIONAL
CENTER SEWER
EJECTION PUMP
REPLACEMENT
DFCM#27079310
2532 Washington Blvd, Ogden, UT 84401
SEWAGE PUMP SCHEDULE
TAG
PUMP TYPE MIN GPM HEAD
MAX SOLID
SIZE
DISCHARGE
SIZE
ELECTRICAL MANUF &
MODEL
SCHEDULE
NOTESTYPE # VOLTAGE PHASE FREQUENCY HP SPEED
SP 1 VERTICAL
WASTEWATER
90 GPM 25 ftH2O 2.5" 4" 460 V 3 60 Hz 1.5 hp 1,150 WEIL 2224 1,2,3,4
SP 2 VERTICAL
WASTEWATER
90 GPM 25 ftH2O 2.5" 4" 460 V 3 60 Hz 1.5 hp 1,150 WEIL 2224 1,2,3,4
SP 3 VERTICAL
WASTEWATER
90 GPM 25 ftH2O 2.5" 4" 460 V 3 60 Hz 1.5 hp 1,150 WEIL 2224 1,2,3,4
SP 4 VERTICAL
WASTEWATER
90 GPM 25 ftH2O 2.5" 4" 460 V 3 60 Hz 1.5 hp 1,150 WEIL 2224 1,2,3,4
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
| Sheets |
| G001 - COVER SHEET |
| G002 - SPECIAL INSPECTIONS AND TESTING FORM |
| ME101 - BASEMENT LEVEL - MECHANICAL FLOOR PLANS |
| ME501 - MECHANICAL DETAILS AND SCHEDULES |
| MG001 - MECHANICAL LEGEND AND GENERAL NOTES |
File details come from the government source that posted it. Updated .