This is a Stage II Invitation to Bid solicitation issued by the State of Utah Division of Facilities Construction and Management (DFCM) for construction services at the Matheson Courthouse in Salt Lake City. The project involves removing existing landscape areas and constructing an asphalt-paved ADA handicap parking facility on 500 South near the courthouse. Work scope includes sawcutting and removing concrete slabs and sidewalks, excavating and disposing of existing materials, relocating a street light pole with electrical connections, installing new aggregate base courses, pouring new concrete sidewalks and curbs, laying bituminous concrete pavement, installing traffic control signage and striping, and reinstalling irrigation systems. A mandatory meeting is scheduled for July 15, 2026 at 2:30 PM at the Matheson Courthouse, with attendance required for all prime contractors wishing to bid. The questions deadline is July 20, 2026, the addendum deadline is July 27, 2026, and bids are due by July 30, 2026 at 3:00 PM via the U3P website. Subcontractor lists must be submitted by July 31, 2026. The project has a substantial completion date of August 31, 2026, with liquidated damages assessed at $300 per day for delays.
The construction budget for this project is $297,000. Bids are restricted to contractors who have been prequalified through DFCM's Stage I prequalification process for Paving & Site Civil work. A bid bond of 5% of the bid amount on the AIA Document A310-2010 form must accompany all bids. The contract will be awarded to the lowest responsive and responsible bidder and requires performance and payment bonds equal to 100% of the contract sum. The contractor must obtain required permits from the Utah Division of Air Quality and Utah Department of Environmental Quality, with all associated fees and compliance responsibility falling to the contractor. No health insurance statement of compliance is required as the contract amount is below the $2,000,000 threshold. Contractor performance on this project will be evaluated and may affect prequalified status and eligibility for future DFCM contracts, with contractors required to maintain an overall performance rating of 4.0 or greater.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Facilities Construction and Management Taylorsville State Office Building 4315 South 2700 West, 3rd Floor
Taylorsville, Utah 84129 dfcm.utah.gov | 801.957.7270
Stage II Invitation to Bid for Stage I Prequalified Paving & Site Civil Contractors
Low Bid Procurement for Construction Services Project budgets up to $3.5M
July 8, 2026
Matheson Courthouse 500 South ADA Parking
Administrative Office of the Courts Salt Lake City, Utah
DFCM Project #27009150 U3P Reference # CS27001
Project design provided by Hansen & Associates
DFCM Stage II Prequalified Invitation to Bid with BONDS, 5.15.2026 2
Solicitation Summary The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Stage II Prequalified Paving & Site Civil Contractors for Construction services for the following project. Contractors not prequalified through the Stage I Request for Statement of Qualifications process are not eligible to bid on this project.
Matheson Courthouse 500 South ADA Parking Administrative Office of the Courts 450 South State Street, Salt lake City, Utah DFCM Project #27009150 | U3P Reference # CS27001
Communication during the selection process shall be directed to the DFCM Representatives below only.
DFCM Project Manager: Tim Christensen timchristensen@utah.gov 435-225-2081 Brief Project Description: Removing of existing landscape area between the curb and gutter and sidewalk on 500 South and constructing an asphalt paved ADA handicap parking area.
Substantial Completion Date: August 31, 2026 Liquidated Damages: $300.00 per day Construction Budget: $297,000.00 Tax Exempt: Yes ☐ No ☒ Energy Incentives: Yes ☐ No ☒
Solicitation Schedule Event Date Time Location
Solicitation Posting Wednesday, July 8, 2026 3:00 PM U3P
Mandatory Meeting Wednesday, July 15, 2026 2:30 PM
☒In person: Matheson Courthouse, 450 S. State St., SLC, UT – Meet outside near the front entrance.
☐Virtual:
Questions Deadline Monday, July 20, 2026 3:00 PM U3P
Addendum Deadline Monday, July 27, 2026 3:00 PM U3P
Bid and Bid Bond Deadline Thursday, July 30, 2026 3:00 PM U3P
Subcontractor Lists Deadline Friday, July 31, 2026 3:00 PM Email to:
dfcmcontracts@utah.gov https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:dfcmcontracts@utah.gov
DFCM Stage II Prequalified Invitation to Bid with BONDS, 5.15.2026 3
Project Details Detailed Project Description/Base Bid:
Sawcut Concrete Slabs and Sidewalk.
Sawcut and Remove Upper 5-inches of 500 South Curb & Gutter, Including Grinding of Sawcut Marks and Concrete Sealing Per Plan.
Excavate and Remove Existing Concrete Slabs and Waterway.
Remove Existing 6-foot Wide Sidewalk.
Remove Existing Small Sections of Existing Curb and Gutter On North Side of 500 South.
Excavate and Dispose Of Existing Sod Per Plan.
Excavate And Remove Base and Subbase Under New 6-foot Wide Sidewalk Area to 8” Below Finish Grade – (Finish grade approximately 4” below existing grade: 1,537 S.F. x 8” = 38 cu.yds.
Excavate And Dispose Base and Subbase Under New Asphalt Pavement Area To 16” Below Finish Grade (2,611 Sq.ft. x 17” avg depth = 137 cu.yds.).
Remove Existing Electrical Pull Box.
Remove Existing Abandoned Metal Electrical Cabinet and Concrete Base.
Remove Existing Sign and Post With Concrete Base (Sign to be salvaged and reused on new post).
Remove and Discard Existing Sign and Post.
Remove and Discard Existing Signs From A Post Or Street Light Pole.
Locate And Disconnect Connection Of Existing Sprinkling System In Sod Park Strip and Remove and Dispose Of Existing Small Diameter Irrigation Pipe And Sprinkler Heads.
Remove and Dispose Existing 6-feet Deep x 2-foot Diameter Street Light Pole Concrete Footing And Backfill Hole With A1a Granular Borrow.
Remove Existing Street Light Underground Electrical Wires (3 Each) In Existing 2” PVC Conduit From Existing West Pole Location To New Pull/Splice Box Adjacent At New Street Light Pole Location; Provide Pull Cord In Conduit When Wires Are Removed.
Install New 2” Sched. 40 PVC Conduit Pieces To Existing Conduit And Connect With 2” Solvent-Weld PVC Couplers (at new pull box location).
Install 3 Each RHW #6 Copper Wires, one green @ 32 l.f., one white @ 32 l.f., one black @ 32 l.f. for a total of 96 l.f., From Existing Pull Box Through An Existing Pull Box To A New Pull Box At New Pole Location, Using Pull Cord Provided In Item 16 Above.
Install New Electrical Pull Box With Fuses At Relocation of Street Light Pole.
Pour New 6-foot Deep X 24” Dia. Concrete Pole Footing With Conduit Per Plans.
Unbolt, Remove, and Re-install Existing Street Light and Pole From Existing Pole Footing To New Pole Footing At New Location.
Imported Aggregate Base Course For New Sidewalk – Grade 1; (1,423 Sq. ft. X 6.5’ wide X 4” thick) X (144 lbs/cu.ft.).
Imported Aggregate Base Course Under New Bituminous Pavement – Grade 1.5; (2,749 Sq.ft. X 12”Thick) X (144 lbs/cu.ft.).
New 6’ Wide Concrete Sidewalk (w/o Retainage Curb) Per Plans.
New 6’ Wide Concrete Sidewalk With 6” Wide Retainage Curb Per Plans (total 6.5’ outside width).
New 30” Type A Concrete Curb and Gutter Along Edge of Pavement on 500 South.
New 24” Type C Concrete Catch Curb and Gutter.
New 24” Type D Concrete Spill Curb and Gutter.
4” Thick Bituminous Concrete SP 1/2, DM75, PG64-34.
Reinstall Sign No. 3 On New Post and Concrete Footing To Match Height and Style of Previous Installation.
Install New Pedestrian Warning Sign Per Key Note No. 4 on Sheet C-106 With Pole and Concrete Footing.
4” Wide Yellow Traffic Paint Striping 4” Wide White Dashed Traffic Striping of 500 South Lane Reconstruct Manhole To Finish Grade with Concrete Collar Per Plans.
Furnish and Install 1” Landscape Rock in Xeriscape Areas Over Geotechnical Weed Barrier Per Plan; Color of Rock Per Owner.
Re-sod Landscape Areas Per Plan.
DFCM Stage II Prequalified Invitation to Bid with BONDS, 5.15.2026 4
Reinstall Sprinkling System On North Side of New Sidewalk and Reconnect To Existing Sprinkler System.
Traffic Control Plan and UDOT Permitting.
Traffic Control Signage and Barricades Per Traffic Control Plan.
Construction Survey Staking.
Additive Alternates:
N/A
Mandatory Bidder Qualification Requirements (if applicable):
N/A
Project Requirements:
- DFCM Approved Fabricator List
- DFCM Design Management Documents
- DFCM Roofing Design Requirements
- State of Utah High Performance Building Standard and all appendixes https://dfcm.utah.gov/construction-management/building-official/inspections-and-testing/ https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/roofing-program/ https://dfcm.utah.gov/construction-management/high-performance-building-program/
DFCM Stage II Prequalified Invitation to Bid with BONDS, 5.15.2026 5
Solicitation Documents The solicitation documents consist of all documents listed below and referenced within this solicitation.
Solicitation Documents and Forms The following project specific documents and forms can be accessed in the U3P project for this solicitation.
Project specific documents:
- Invitation to Bid Solicitation
- Approved Plans
- Approved Specifications
- Bid Schedule
Standard documents and forms:
- DFCM General Conditions
- DFCM Subcontractor List Form & Instructions
- Health Insurance Statement of Compliance
DFCM Construction Management Standard Reference Documents All DFCM standard documents referenced in this solicitation can be accessed by visiting the DFCM Construction Management – Standard Documents page of the DFCM website.
DFCM General Conditions The DFCM General Conditions (“General Conditions”) and all Supplemental General Conditions (“also referred to as General Conditions”) are available on the DFCM Construction Management – Standard Documents page of the DFCM website and made part of this solicitation by reference.
https://dfcm.utah.gov/construction-management/standard-documents/ http://www.dfcm.utah.gov/ https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/standard-documents/ http://www.dfcm.utah.gov/ http://www.dfcm.utah.gov/
DFCM Stage II Prequalified Invitation to Bid with BONDS, 5.15.2026 6
Procurement Process
• ONLY Contractors prequalified through the Stage I Request for Statement of Qualifications are allowed to bid on this Stage II Invitation to Bid.
• Prequalified Contractors are ONLY authorized to bid on Stage II Prequalified projects within the discipline that they are prequalified under.
The current lists of Stage I Prequalified Contractors can be found on the DFCM website.
For questions regarding prequalification or eligibility, please email dfcm_vbs@utah.gov.
1. Mandatory Meeting A mandatory meeting will be held on the date and time and at the location specified on the Solicitation Schedule. All prime Contractors wishing to bid on this project must attend and sign in. Contractors not in attendance at this meeting are ineligible to bid on this project. Subcontractors and suppliers are invited to attend this meeting, but it is not mandatory.
During the mandatory meeting, a presentation will be made describing the overall scope of work and intended project schedule. Interested Contractors may ask questions and request clarification about the project and the procurement process.
2. Requests for Information, Questions and Addendum All project related requests for information, clarifications, and questions must be submitted to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule. An addendum in response will be posted on the U3P website no later than the time and date specified on the Solicitation Schedule. All addenda issued shall become part of the solicitation, and any changes or additional requirements shall be incorporated into the Contractor’s proposal and/or bid.
a) Interpretation of Drawings and Specifications If any person or entity contemplating submitting a proposal or bid is in doubt as to the meaning of any part of the drawings, specifications or other contract documents, such person shall submit a request for an interpretation to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule. Any interpretation of the proposed documents will be made only by addenda posted on the U3P website. Neither DFCM nor A/E will be responsible for any other explanations or interpretations of the proposed documents. The A/E is deemed to be the architect or engineer hired by DFCM as the A/E or Consultant for the project.
b) Product Approvals Where reference is made to one or more proprietary products in the contract documents, but restrictive descriptive materials of one or more manufacturer(s) is referred to in the contract documents, the products of other manufacturers will be accepted, provided they equal or exceed the standards set forth in the drawings and specifications and are compatible with the intent and purpose of the design, subject to the written approval of the A/E. Such written approval must occur prior to the time and date specified on the Solicitation Schedule for the final addendum. The A/E’s written approval will be issued in an addendum. If the descriptive material is not restrictive, the products of other manufacturers specified will be accepted without prior approval provided they are compatible with the intent and purpose of the design as determined by the A/E.
3. Bidding, Bid Deadline, and Bid Bonds Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule.
Contractors attempting to submit a bid through U3P website after the bid deadline has passed will not be successful and therefore disqualified from consideration of award of this project. It is the sole responsibility of the Contractor to confirm their bid is successfully submitted into U3P prior to the bid deadline. Technical questions related to bidding in U3P should be directed to u3padmin@utah.gov.
After the bid deadline listed on the Solicitation Schedule has passed, the bid tabulation will be available in U3P and the Contract award will go to the Contractor submitting the lowest responsive and responsible bid.
http://www.dfcm.utah.gov/ mailto:dfcm_vbs@utah.gov https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:u3padmin@utah.gov
DFCM Stage II Prequalified Invitation to Bid with BONDS, 5.15.2026 7
Before submitting a bid, the Contractor shall carefully examine the solicitation; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in their bid the cost of all items required by the solicitation. If the Contractor observes that portions of the Contract Documents are at variance with applicable laws, building codes, rules, regulations or contain obvious erroneous or uncoordinated information, the Contractor shall promptly notify the DFCM Project Manager, and the necessary changes shall be accomplished by addendum.
By submitting a bid, in any format, the Bidder / Offeror / Vendor certifies that: (1) no product to be supplied by the Bidder / Offeror / Vendor in connection with this Solicitation is a “forced labor product” as that term is defined in Utah Code 63G-6a-121; and (2) to the extent, if any, that this Solicitation involves technology, or technology services, networks or systems, the Bidder / Offeror / Vendor is not a “restricted foreign entity” as that term is defined in Utah Code 63G-6a-121.
a) Bid Bonds A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form in the amount of 5% of the bid, or equivalent, must accompany the bid submitted within U3P. If the bid bond is not provided with the bid, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.
The bid bond must be submitted on the AIA document A310 – 2010 Bid Bond Form, or equivalent, to be accepted unless only one bid is received by DFCM, or the failure to comply with the bid bond requirements is determined by the Director of DFCM to be immaterial based on the following:
1. the bid bond is submitted on a form other than the AIA Document A310 – 2010 Bid Bond form, or equivalent, and the bid bond meets all other requirements including being issued by a surety firm authorized to do business in the State of Utah and be listed in the U.S. Department of the Treasury Circular 570, Companies Holding Certificates of Authority as Acceptable Securities on Federal Bonds and as Acceptable Reinsuring Companies for an amount not less than the amount of the bond to be issued. A co-surety may be utilized to satisfy this requirement; and
2. the Contractor provides a bid bond properly signed by a qualified surety and on the AIA Document A310 – 2010 Bid Bond form, or equivalent, by the close of business of the next business day after DFCM notifies the Contractor of the defective bid bond.
4. Termination and Debarment By submitting a bid, the Contractor certifies that neither it nor its principals, including project nor site managers, have been, or are under consideration for, debarment or suspension, or any action that would exclude such from participation in a construction Contract by any governmental department or agency. If the Contractor cannot certify this statement, provide a detailed written explanation to dfcmcontracts@utah.gov by the time and date specified as the bid deadline on the Solicitation Schedule. DFCM reserves the right to reject the Contractor’s explanation and disqualify them from the selection process.
5. Listing of Subcontractors All Contractors are required to submit their DFCM Subcontractors List Form to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule. The DFCM Subcontractors List Form & Instructions can be found on the DFCM website – Construction Management - Standard Documents page and is also posted in U3P.
If the DFCM Subcontractors List Form is not provided by the time and date specified on the Solicitation Schedule, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.
DFCM retains the right to audit or take other steps necessary to confirm compliance with requirements for the listing and changing of subcontractors. Any Contractor who is found incompliant with these requirements is subject to a debarment hearing and may be debarred from consideration for award of DFCM contracts for a period not to exceed three years.
6. Withdrawal of Bids Bids may be withdrawn on written request received from bidder prior to the time fixed for opening. Negligence on the part of the bidder in preparing the bid confers no right for the withdrawal of the bid after it has been opened.
https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:dfcmcontracts@utah.gov mailto:dfcmcontracts@utah.gov
DFCM Stage II Prequalified Invitation to Bid with BONDS, 5.15.2026 8
7. DFCM Reservation of Rights The Division of Facilities Construction and Management reserves the right to reject any or all proposals or bids or to waive any formality or technicality in any proposal or bid in the best interest of the State.
8. Contract and Bonding Requirements DFCM intends to enter into a Construction Contract with the Contractor submitting the lowest responsive and responsible bid. A copy of the Construction Contract can be found on the DFCM website – Construction Management - Standard Documents page.
The Contractor is required to provide performance and payment bonds on the AIA Document A312 - 2010 Performance and Payment Bond forms in the amount of 100% of the Contract Sum and secured from a company that meets the requirements specified in UAR 23-1-1102. The bonds are to be emailed to dfcmcontracts@utah.gov within ten (10) business days of receipt of the Contract for signature. The Contract Notice to Proceed will not be issued until the bonds have been received by DFCM.
9. Health Insurance Statement of Compliance Form The Health Insurance Statement of Compliance Form applies to: (i) a prime Contractor (and design professional) if the prime contract (or design professional contract) is in the aggregate amount of $2,000,000 or greater; and (ii) applies to a subcontractor (and subconsultant of design professional) if the subcontract is in the aggregate amount of $1,000,000 or greater. For benchmark information, please visit Health Insurance Statement of Compliance Benchmark Information.
If applicable to this project, the awarded Contractor must submit the Health Insurance Statement of Compliance Form to DFCM via email at dfcmcontracts@utah.gov before the Construction Contract Notice to Proceed will be issued. The form can be found on the DFCM website – Construction Management - Standard Documents page and is also posted in U3P.
10. Licensure The Contractor shall comply with and require all subcontractors to comply with the license laws as required by the State of Utah.
11. Permits In concurrence with the requirements for permitting in the General Conditions, it is the responsibility of the Contractor to obtain the fugitive dust plan requirements from the Utah Division of Air Quality and the SWPPP requirements from the Utah Department of Environmental Quality, submit the completed forms, and pay any permit fee that may be required for this specific project. Failure to obtain the required permit may result in Work stoppage and fines from the regulating authority that will be the sole responsibility of the Contractor. Any delay to the project because of failure to obtain the permit, or noncompliance with the permit, shall not be eligible for extension in the Contract Time.
12. Financial Responsibility of Contractors, Subcontractors and Sub-subcontractors Contractors shall respond promptly to any inquiry in writing by DFCM to any concern of financial responsibility of the Contractor, Subcontractor or Sub-subcontractor.
13. DFCM Contractor Performance Rating and Retaining Prequalified Status At the completion of each project, DFCM will evaluate Contractor’s performance on the project. The performance rating the Contractor receives on this project may affect their prequalified status and their ability to obtain future Contracts with DFCM. Contractors retain their prequalified status provided the following:
(a) They receive an overall performance rating of 4.0 or greater on each DFCM project. Contractors that receive an overall rating of less than 4.0 on any single project may be removed from the Prequalified Contractors list for a period of at least one year before they are eligible to reapply. Contractors receiving a performance rating of less than 4.0 may be given the opportunity to meet with DFCM to develop a performance improvement plan for requalification that would require successful completion before the Contractor is placed back on to the prequalified list;
(b) They are not suspended for failure to comply with requirements of their contract;
(c) The Contractor has not undergone a significant reorganization involving the loss of key personnel (site superintendents, project managers, owners, etc.) to a degree such that the Contractor no longer meets the prequalification requirements outlined in Stage I;
https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/standard-documents/ mailto:dfcmcontracts@utah.gov http://www.health.utah.gov/chip/PDF/2016Benchmark.pdf mailto:dfcmcontracts@utah.gov https://dfcm.utah.gov/construction-management/standard-documents/
DFCM Stage II Prequalified Invitation to Bid with BONDS, 5.15.2026 9
(d) The financial viability of the Contractor has not significantly changed, and
(e) The Contractor is not otherwise disqualified by DFCM.
File details come from the government source that posted it. Updated .